Application Form For JAPAN s Grant Assistance for Grassroots Projects (GGP)

Similar documents
Scheme of Merit cum means based scholarship to students belonging to minority communities.

ELECTION COMMISSION OF INDIA

To evaluate the impact of NRHM interventions, by Agencies outside the Government, and make recommendations on:

Welcome to this meeting on July 21, 2017

Environmental Impact Assessment

THE ORIENTAL INSURANCE COMPANY LIMITED A-25/27, ASAF ALI ROAD HEAD OFFICE, NEW DELHI

FREQUENTLY ASKED QUESTIONS. < About GGP Scheme > 2. < About Grant Assistance > 3. < About Process of Sanction of Grant > 4. < How to apply for GGP > 4

Let s play on the Spectrogram

CHECK-LIST AND GUIDELINES FOR SUBMISSION OF PROPOSALS UNDER THE CENTRALLY SPONSORED SCHEME- POULTRY DEVELOPMENT

Sample INDEX. 1. List and Information about Nursing Colleges from India. 2. States

STATE NURSING COUNCIL CONTACT ADDRESS (O) (O) (F) (O) (F)

Invitation for Expression of Interest (EOI) for Hiring of an agency for Capacity Building Scheme through an ECBC Cell in Karnataka State PWD

DBT in Fertilizers. PoS Procurement Status 16 th March Department of Fertilizers

Surakshit Khadya Abhiyan TM

Department of Economic Analysis & Research, NABARD

Invitation for Expression of Interest (EOI) for Hiring of an agency for Capacity Building Scheme through an ECBC Cell in Uttar Pradesh SDA

Rural Health Care System in India

Aegis Skills Edge Pvt. Ltd.

GoI-UNDP Disaster Risk Management Programme. Project Management Board (PMB) GoI-UNDP Disaster Risk Management Programme [ ] Agenda Notes

Brief about ITIs and process of opening and grant of affiliation of ITIs Role of Industrial Training Institutes (ITIs)

The PMAY (Urban) Mission was launched by the Hon ble Prime Minister on 25th June, The Mission envisages facilitating the

Guidelines for Conduct of Declamation Contests ( ) On Patriotism and Nation Building (Ek Bharat Shreshtha Bharat)

Rural Health Care System in India. Rural Health Care System the structure and current scenario

TRANSFER/ PLACEMENT POLICY FOR GROUP A OFFICRS OF THE INDIAN REVENUE SERVICE (C & CE)

CHALLENGES FACED BY CARE GIVERS OF ELDERS IN INDIA. Prof Jacinta lobo MSc nursing (OBG)

'START-UP INDIA' SCHEME 1

General Education (Schooling Education) Aligarh Muslim University UNIVERSITY MERIT SCHOLARSHIP UNIVERSITY GENERAL MERIT SCHOLARSHIP

GUIDELINES OF RASHTRIYA AROGYA NIDHI (RAN

Rural Health Care System in India. Rural Health Care System the structure and current scenario

No financial proposal is required to be submitted as the selection is based only on technical proposal. 2 TERMS OF REFERENCE

CHAPTER-7 ICT DIFFUSION AND DIGITAL DIVIDE IN INDIA

Subject: Monitoring of the ICDS Training Programme: Minutes of the first quarterly review meeting during Regarding

ANNUAL REPORT

Concept Note on Transformation of Employment Exchanges to Career Centres And Model Career Centres

Speed Post. New Delhi dated the 8 th September, The Chief Secretaries of All the State Govts. (As per list attached)

REFERENCE NOTE. No. 23 /RN/Ref./August/2013. National Highways Development Project: An Overview

CONCEPT NOTE on NATIONAL TELEMEDICINE NETWORK (NTN)

An analysis of CSR fund flow in India from FY to FY 18-19

Estimation of Mercury Usage and Release from Healthcare Instruments in India

ON THE PATH TO SUSTAINABILITY AND SCALE

(GafPrC.~ Director(MbJ) Tel Fax:

Disaster Risk Reduction Programme

THE INDIAN NURSING COUNCIL ACT, 1947* ACT NO. 48 OF

Rojgar Samachar, Government Jobs, Employment News Weekly: February 1 to February 7, 2016

CHAPTER 30 HEALTH AND FAMILY WELFARE

The maximum age limit for General candidates is 25 years of age as on for all posts.

Indira Gandhi Conservation Monitoring Centre World Wide Fund for Nature-India New Delhi. ENVIS Centre-07 NGOs, Parliament & Media

ADMISSION NOTIFICATION 2018 EXECUTIVE POST GRADUATE CERTIFICATE PROGRAMMES

Integrated Child Development Services Scheme. Monitoring Visits. (Four Year s Time Interval Revisiting Exercise) 2008/ /12.

LIST OF FORMS DISABILITY CERTIFICATE (IN CASES OF AMPUTATION OR COMPLETE PERMANENT PARALYSIS OF LIMBS AND IN CASES OF BLINDNESS)

FOUNDATION FOR EXCELLENCE INDIA TRUST

Impact of Schemes/ Programmes of. Maulana Azad Education Foundation

Medicine and surgery date back to the beginning of civilization. because diseases preceded humans on earth. Early medical treatment was

Guidelines for preparation of AWP&B for the year

SURANA & SURANA NATIONAL TRIAL ADVOCACY MOOT COURT COMPETITION & JUDGMENT WRITING COMPETITION ON CRIMINAL LAW 2017 RULES AND REGULATIONS

CHAPTER DISASTER MANAGEMENT. Change of approach. Disaster Management Act (DMA) Role of Central and State Governments. Ministry of Home Affairs

48 th ANNUAL REPORT

A journey towards a sustainable future

U.S. MISSION INDIA PUBLIC DIPLOMACY GRANTS PROGRAM


Information Communication and Technology (ICT) in simple term means, any. product or system that communicates, stores and or processes information.

RECRUITMENT AGAINST EX-SERVICEMEN QUOTA IN ERSTWHILE GROUP D

Corporate Social Responsibility Annual Report of Apple India Private Limited (the Company ) FY

ROLE OF TELEMEDICINE IN INDIAN HEALTHCARE SYSTEM

Revised National Tuberculosis Control Programme TRIBAL ACTION PLAN

CHAPTER V RAJA RAM MOHAN ROY LIBRARY FOUNDATION (RRLF)

Chapter II. Health Care System in India

र ष ट र य क व और ग र म ण ववक स ब क National Bank for Agriculture and Rural Development

GOOD INCUBATION IN INDIA

(TO BE PUBLISHED IN THE GAZETTE OF INDIA, PART II, SECTION 3, SUB-SECTION (i) )

Verifying open defecation free status: experiences and insights going to scale in India

Thursday, September 7, 2017

National Rural Health Mission (NRHM) State Institute of Health & Family Welfare, Jaipur

Experience Two year experience in the field of Networking/Programming/ Software Development etc.

CIRCULAR. Subject: - Draft Recruitment Rules for various Group 'C' posts in National Zoological Park.

Dr. Ajay Khera Deputy Commissioner Ministry of Health and Family Welfare, Government of India February 17 th, 2012

Dr. Ambedkar Medical Aid Scheme (Revised 2016)

GRANT ASSISTANCE FOR GRASSROOTS HUMAN SECURITY PROJECTS (GGP) GUIDELINES

Recruitment Rules for the post of Staff Car Driver (Special Grade)

For Private Circulation only National Skill Development Corporation November 2010

Vendor Enlistment/ Rate Contract for Pre Bid tie ups.- Stage-I CSG-03-Testing of cooling towers- Induced Draft / Natural Draft

INSPIRE Awards-MANAK

P.O. BOX: 5925, JEDDAH-21432, KINGDOM OF SAUDI ARABIA TEL: (009662) , FAX: CABLE: BANKISLAMI

GRANT ASSISTANCE FOR GRASS-ROOTS HUMAN SECURITY PROJECTS (GGP) GUIDELINES for 2018

t-~ It ""0 MINISTRY OF DEFENCE New Delhi, the?1 f.?lj, 2002

Grant Assistance for Grassroots Human Security Projects. Embassy of Japan to the Independent State of Samoa

International Journal of Health Sciences and Research ISSN:


INFORMATION SHEET (Guideline) CRITERIA FOR 2018

Ref : ACASH/Exhb/ / Date :

[CURRENT AFFAIRS 4-Aug -2018]

Discussion Paper on Health Statistics

EXPRESSION OF INTEREST FOR FNGO PROCUREMENT OF OPELIP

B.8c Nursing with two years experience as Staff Not exceeding 35 Nurse in a Hospital. OR

RANK State/UT City 1 Odisha Bhubaneswar 2 Maharashtra Pune 3 Rajasthan Jaipur 4 Gujarat Surat 5 Kerala Kochi 6 Gujarat Ahmedabad 7 Madhya Pradesh

associate Reach greater heights with us

Corporate Social Responsibility. (CSR) Policy Document

ICDS in India: Policy, Design and Delivery Issues

Request for Proposal. Selection of Data Collection Agency for Field Work for Impact Evaluation of Evaluation Study

MINISTRY OF COMMERCE AND INDUSTRY DEMAND NO. 12 Department of Industrial Policy and Promotion

Transcription:

Application Form For JAPAN s Grant Assistance for Grassroots Projects (GGP) Attachment: Check List for Documents to be attached Embassy of Japan in India, The Consulate-General of Japan, Kolkata The Consulate-General of Japan, Chennai The Consulate-General of Japan, Mumbai The Consulate of Japan, Bangalore This document was updated on Nov. 2011

Notification I. Kindly provide all the information as per following GGP Application Form. *Please read carefully Guidelines for GGP Application and Instructions for Filling up GGP Application Form. *While filling up the form, please provide the information in detail (answer box can be expanded). However, the applicant should not change the application format II. Incomplete application form is not acceptable. *Please check thoroughly the application form and required documents (See Check List for Documents to be attached ) before submission. III. Kindly submit the application by registered post / courier to the corresponding GGP office, or by hand with prior appointment with the office. *The corresponding GGP office is decided based on the location of the project site. The corresponding GGP offices are as follows. For any enquiries or clarifications, please contact the corresponding GGP office, and make prior appointment for a meeting with the office. 1

The Corresponding Office GGP Unit, Economic Section, The Embassy of Japan in India 50-G, Chanakyapuri, New Delhi, 110021 Tel: 011-2687-6564 Fax:011-2611-0752 States/ UTs of the Project Area Andaman & Nicobar Islands (UT), Arunachal Pradesh, Assam, Chandigarh, Delhi, Haryana, Himachal Pradesh, Lakshadweep (UT), Manipur, Meghalaya, Mizoram, Nagaland, Punjab, Rajasthan, Sikkim, Tripura, Uttarakhand, Uttar Pradesh, GGP Unit, The Consulate-General of Japan, Kolkata 55, M.N. Sen Lane, Tollygunge, Kolkata, 700040 Tel: 033-2421-1970 Fax: 033-2421-1971 Bihar, Jharkhand, Odisha, West Bengal, GGP Unit, The Consulate-General of Japan, Chennai No.12/ 1, Cenetoph Road, 1 st Street, Teynampet Chennai, 600018 Tel: 044-2432-3860/ 3 Fax: 044-2463-3859 Andhra Pradesh, Kerala, Puducherry (UT), Tamil Nadu GGP Unit, The Consulate-General of Japan, Mumbai 1.M.L.Dahanukar Marg, Cumballa Hill, Mumbai, 400026 Tel: 022-2351-7101 Fax: 022-2351-7121 Chhattisgarh, Dadra & Nagar Haveli (UT), Daman & Diu (UT), Goa, Gujarat, Madha Pradesh, Maharashtra, GGP Unit, The Consulate of Japan, Bangalore 1st Floor, Prestige Nebula, No, 8-14, Cubbon Road, Bangalore 560001 Tel: 080-4064-9999 080-4166-0111~3 Fax: 080-4166-0114 Karnataka, 2

APPLICATION FORM FOR JAPAN S GRANT ASSISTANCE FOR GRASSROOTS PROJECTS (GGP) Part I. APPLICANT 1. Name of the Applicant 1 2. FCRA No./ Date of Issue 2 3. Registration No./ Date/ Place of Registration 3 / / 4. Address 5. Phone Number/ Fax Number/ E-mail/ Web page Address (If any) 6. Responsible Individual (Name/ Designation/ Phone Number/ E-mail) / / / 7. Organizational Structure 7-1. Year of Establishment 7-2. Nature of the Organization 4 7-3. Number of Branches, Field Offices and their Locations 7-4.Number of Staff members incl. Volunteers (Permanent & Temporary, Administrative & Technical) and their Responsibilities 5 8. Purpose of Establishment, Vision and/ or Mission Statement 3

9. Main Activities of the Organization 6 10. Details of Donations/ Grants 7 Year & Duration Name of the Donor Nature of Donor (Choose from Foreign/ Indian Gov t, Intern l/ Foreign/ Indian Funding Agencies, NGOs, Other Category) Amount Received / or to be received Purpose of Fund 11. If you had applied for the GGP grant in the past, please give the details as mentioned below. Year & Month of submission Project Title Approval/ or Rejection Part II. Proposed Project 1. Project Title The Project for ~ 2. Category of the proposed project (Please tick one in the following bracket.) ( ) a. Basic Health Care ( ) b. Primary Education and Adult Literacy ( ) c. Poverty Alleviation ( ) d. Safe Drinking Water and Sanitation ( ) e. Women s Empowerment ( ) f. Child Welfare incl. Support for Street Children/ Elimination of Child Labour ( ) g. Support for Persons with Disabilities ( ) h. Preservation of Environment ( ) i. Others ( ) 4

3. Project Site 8 3-1. Address (Village/ Gram Panchayat/ Block/ District/ State) / / / / 3-2. Distance from the nearest major city to the project site (Nearest major city/ Distance) / 3-3. Distance from the corresponding GGP office to the project site *GGP Office is Delhi, Kolkata, Chennai, Mumbai or Bangalore 3-4. Transportation from the corresponding GGP office to the project site and time required for each mode of transport GGP Office to Major City Distance/ Travel time GGP Office to Project Site Distance/ Travel time By Air From Airport By Train From Railway Station By Bus / Car From Bus Station *Distance/ Travel time should be as accurate as possible 3-5. Geographical Conditions of the Project site (e.g. hilly, mountainous, prone to drought/ floods, if any.) 3-6. Address of the monitoring office (The office which is responsible for monitoring the proposed project) 9 4. Background of the Project Situation Analysis/ Needs Assessment 4-1. Describe the issue(s) targeted to work on under the proposed project at the national and state level providing qualitative as well as quantitative data that are updated and having valid source. 4-2. Describe the issues and the needs identified in the project site in particular, to bring 5

out the situation and needs of the target group providing qualitative as well as quantitative data. (Please emphasise on the problems faced by the target group.) 4-3. Describe the organization s past/ current activities especially RELATED TO THE ISSUE(S) dealt with in the PROPOSED PROJECT and the outcomes/ achievements. 10 4-4. Based on the issue and needs identified, describe in specific, what kinds of assistance the organization is requesting from the GGP to add value to the past/ current activities. (Please describe in details about the change in the nature and number of beneficiaries, if any, and how the requested assistance would address their needs) *In case of building construction, please mention ownership of the land. 5. Outline of the Project 5-1. Overall Goal and Objective(s) of the project 11 (a) Overall Goal There should be one overall goal of the project. The goal should be based on the issues identified in order to address the needs of the target group. The goal should help in bringing about the positive/ qualitative change in the long run. (b) Objective(s) Objectives are a set of projections which would ensure achievement of the Goal by 6

ensuring benefits which are verifiable. The objectives should indicate what you aspire to achieve through the project as well as the steps that you would have to take to achieve your overall goal. 5-2. Methodology: Describe the strategies and implementation process to achieve the objective(s) of the proposed project 12 Objective(s) Strategies Implementation process 5-3. Expected Beneficiaries and Impacts/ Effects Kindly give details of expected beneficiaries including its estimated number and expected impacts on them. Direct Beneficiaries Indirect Beneficiaries (target group) Details including the number Expected Impacts/ Effects 5-4. Stakeholder: Responsibilities and specific roles of the staff in the organization, the target group, local community, government, etc, under the proposed project. Describe how they would contribute to the project. 6. Utilization/ Justification of the Proposed Items 6-1. List of proposed Items 13 *In case of building construction, please describe the units and its size on each floor. Sl. No. Units Quantity (Nos.) Purpose/ Utility User Owner Applicant Operating Life Applicant Applicant Applicant Applicant 7

6-2. If the proposed item is to replace an existing item or to expand an existing facility, please give reasons for the same. 6-3. Management and Maintenance plan Describe how you would manage and maintain the proposed item(s) particularly in terms of operational aspects after the sanction. 7. Monitoring and Evaluation of the Project 14 Please describe how the organization will monitor and evaluate impacts/ effects of the project providing their indicators as well as means of verifications. Impacts/ Effects Indicators Means of Verification* * Should be readily available/can be produced immediately 8. Project Budget: Estimated Cost of the Project 8-1. Entire Cost (Non-recurring and Recurring Cost) Rs. 8-2. Please give breakdown of non-recurring cost of the project, for both requested items and non-requested items as below. 15 All the expenses should be included in order to give us the whole cost of implementation. S. No Items Quan - tity Unit price excl. tax Total Unit Amount Total tax * GGP To be supported by Applicant Others 1 2 3 4 5 Total Amount *Please indicate the tax amount for each item only in the given column. Do not include the tax amount in unit price or total amount. 8

8-3. Requested Amount from GGP (Non-recurring Cost excluding Tax) Rs. 8-4. Give summary of quotations on both requested items and non-requested items from 3 builders/ suppliers in the format as given below and attach the quotations. 16 Items Quotations (excl. Tax)* Company A Company B Company C Selected Quotation Reason for selecting the said Quotation *Please indicate the amount excluding tax. 8-5. Breakdown of recurring cost of the project 17 Indicate the recurring cost after the sanction of the project on one year basis. S.No Items Cost Total Amount To be Supported by Applicant Others 8-6. Management of Recurring Cost and Other Expenses 18 Give a projection of management of recurring cost, taxes and other required expenses, which GGP does not support, for 5 years after sanction of the project in the format as given below. Total Amount Sources/ Fund Raising Activities Amount Recurring Cost (Per Year) Tax Others 9. Action plan or Work Schedule of the project for 3 years after sanction of the project. 9

Schedule after Sanction Activities 1 st year 1 st month (Brief 2 nd month description 3 rd month about the 4 th month progress 5 th month of the GGP 6 th month funded 7 th month project 8 th month work) 9 th month 10 th month 11 th month 12 th month (Note: The construction of buildings or installation of equipments must 2 nd year 3 rd year 1 st quarter 2 nd quarter 3 rd quarter 4 th quarter 1 st quarter 2 nd quarter 3 rd quarter 4 th quarter be completed.) 10. Expected risk factors which may discourage the process in implementing the project and planned strategy to overcome the same. (e.g. cost escalation, weather conditions, etc) 11. Sustainability of the Project Explain how the impacts of the project will be operationally and financially sustained after the completion of the project. (e.g. setting up a committee, etc.) Date of Submission: Name of the Applicant Organization: Name of the Responsible Individual: Title/ Designation: Signature: 10

Attachment Check List for Documents to be attached Please confirm that all the required documents are attached before submission!! A) For all projects [ ] Copy of the FCRA certificate [ ] Copies of FORM FC-3 submitted to the Ministry of Home Affairs of India for the last 3 years [ ] Copies of the registration certificate under the relevant registration Act [ ] Brochures and pamphlets [ ] Annual reports for the last 3 years [ ] Audited financial statements for the last 3 years [ ] Organizational chart with a list of staff and executive members [ ] Maps and photographs indicating the location of the project site in the concerned state, as well as a route map from the nearest major city to the site [ ] Quotations of 3 different suppliers of proposed products and/or services duly signed by the suppliers. (Each quotation must separately show the tax component.) [ ] Sanction letters from the donors, if any, promise to support the specific expenses in the proposed project B) For building construction [ ] The documents which ensure that the land for the project is owned by the applicant organization [ ] The documents which ensure the permission for construction from concerned local authority [ ] Blue Print of the building plan/ design prepared and attested by registered architect (The Blue Print should show the exact total area of the building.) C) For formal schools [ ] The documents which ensure the permission to run schools from concerned local authority D) For hand pumps or water harvesting structure [ ] The documents which ensure the ownership of the land for the project [ ] The documents which ensure the permission for the installation [ ] Blue Print of the construction and/or installation plan/design E) For Medical Equipment [ ] The documents and/or catalogue which show the feature, details and specification of equipment 11