ETCS Baselines, status, roadmap

Similar documents
Technical specifications for Interoperability (TSIs)

Technical Position Paper

Processes and Responsibilities. ERA ETCS Conference on Testing and Certification Lille March 29 th 2011

for European Commission regarding OPINION OF THE EUROPEAN UNION AGENCY FOR RAILWAYS ERA/OPI/ specifications test

INTEROPERABILITY UNIT

Position Paper. ETCS On-board Subsystem Reliability Requirement for Operational Safety

Guidance on the Application of the Control Command and Signalling TSI

COMMISSION DIRECTIVE 2011/18/EU

Delivery time frame for the EU portal and EU database

Return of Experience on the approval processes for projects of retro-fit and upgrade vehicles with an ETCS On Board subsystem

SHIFT2RAIL JU COMMUNICATION STRATEGY Promoting Shift2Rail Joint Undertaking Activities and Objectives

DRAFT. Transition guide from former RIV/UIC regime to new TSI/GCU regime

High Level Pharmaceutical Forum

Railway Interoperability and Safety Committee. Working document

3. OBJECTIVES AND PRIORITIES:

Annex. Provisions on auditing notified conformity assessment bodies in the framework of Article 34 3 of the Agency Regulation 1

New European Union Clinical Trial Regulations

Report on Developed Tools for Joint Activities

Contents A. INTRODUCTION... 2 A1. Purpose, scope and other addressees of the report... 2 A2. Significant organisational changes affecting the NSA...

New financial schemes for European transport infrastructure projects. State of Play for CEF and Juncker Plan

NOTICE OF CALL FOR PROPOSALS. with a view to obtaining grants in the field of rail transport, in particular

Responsibility of NoBo & DeBo in the authorization process

Connecting Europe Facility (CEF) Financing Opportunities

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan

Commission Guidelines for the implementation of the Clinical Trials Regulation NTA Ethics Oslo

Galileo : EGNSS Awareness raising and capacity building

Annex 2 to the HMA esubmission Roadmap: Implementation of mandatory use of ectd format for regulatory submissions

Atlantic Area Programme Draft Transnational Partnership Agreement For the implementation of the project

SocialChallenges.eu Call for grants 2 nd Cut-off date

CREATIVE EUROPE ( ) Culture Sub-programme. Call for proposals : EACEA 32/2014 : European cooperation projects

Joint Operational Programme Romania Republic of Moldova

STUDY TO EXAMINE JOB PROFILE AND TASKS OF TRAIN CREW MEMBERS NOT DRIVING TRAINS BUT PERFORMING OTHER SAFETY CRITICAL TASKS ON BOARD OF TRAINS

Linking research and standardization. Integrating standards in your research project: a pocket guide for project proposers

Zurich s Research Intensive Universities and FP9. Position of ETH Zurich and the University of Zurich (UZH) Date 6 June 2017.

EGNOS Grant Plan 2018

Frequently Asked Questions EU Aid Volunteers Initiative

EGNOS Exploitation Grant Plan 2017

General FAQ relating to e-submission for Veterinary Applications

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

EGNOS Africa Joint Programme Office (JPO) TOWARDS EGNOS IN AFRICA SAFIR/JPO

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

Context paper CWE Intraday

Aim Higher EUROSTARS. Funding excellence in innovation. Guidelines for >Commitment and signature form >SME declaration. August 2016 Version 2.

Summary of LINKING SPACE TO USER NEEDS. GSA Achievements in 2016

(Non-legislative acts) REGULATIONS

APRE Agency for the promotion of European Research. Introduction to FP7 & Rules for participation in the Seventh Framework Programme ( )

Deutsche Forschungsgemeinschaft

Headline Goal approved by General Affairs and External Relations Council on 17 May 2004 endorsed by the European Council of 17 and 18 June 2004

WORKSHOP ON CLUSTERING POLICY DISCUSSION NOTE

Brussels, 10 November 2003 COUNCIL THE EUROPEAN UNION 14487/03 TELECOM 144. REPORT from : COREPER date : 7 November 2003

CAPACITIES WORK PROGRAMME (European Commission C(2009)5905 of 29 July 2009)

1 The EU Harmonised technical ectd guidance version 4.0

ERA SAFETY UNIT SAFETY REPORTING SECTOR GUIDANCE ON SAFETY RECOMMENDATIONS IN TERMS OF ARTICLE 25 DIRECTIVE 2004/49/EC

Negotiation Guidance Notes

2015 CEF Transport Call

Horizon 2020 Legal Documents

2017 CEF Transport Blending Call. FREQUENTLY ASKED QUESTIONS Blending features Last update 12 July 2017 (new questions in blue)

Electronic submission of information on medicinal products in accordance to Article 57(2) requirements: Maintenance submission

Horizon Support to Public-Public Partnershiups

Questions and answers on the procedure of PIP compliance verification at EMA, and on paediatric rewards

Therefore the provision of medicines is an area for which a Community regulatory framework should be properly supervised to ensure full and

The implementation of the Clinical Trial Regulation (CTR, n 536/2014) in Belgium. and impact on the ethical review process

COMMISSION OF THE EUROPEAN COMMUNITIES. Proposal for a DECISION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

EUROPEAN FEDERATION OF NURSES ASSOCIATIONS (EFN) CONSTITUTION

NOTE BY THE TECHNICAL SECRETARIAT

Terms of reference 6 th call for proposals

Guidelines.

GENERAL TENDER CONDITIONS

The IDEAS Work Programme

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY

CALL FOR PROPOSALS MARE/2014/46. Terms of Reference for an EU grant under the European Maritime and Fisheries Fund

Post- Fukushima accident. Action plan. Follow-up of the peer review of the stress tests performed on European nuclear power plants

Towards faster implementation and uptake of open government

ERN board of Member States

Guidance for the conduct of good clinical practice inspections

The Commission s future spending plans in accordance with climate targets

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Eloy Rodrigues. University of Minho, Portuga

LET S DELIVER TOGETHER 2016 CEF TRANSPORT CALLS FOR PROPOSALS SNEAK PREVIEW

Education and Training Committee, 5 June 2014

CONSULTATION PAPER BY DG INTERNAL MARKET AND SERVICES ON THE PROFESSIONAL QUALIFICATIONS DIRECTIVE 15 March 2011

Developing an Incremental Proposal for EU gas transmission. Draft Project Plan

Official Journal of the European Union. (Non-legislative acts) REGULATIONS

Safety Occurrence Reporting and Analysis

Draft Roadmap on Enhanced Civil-Military CNS Interoperability and Technology Convergence

esubmission roadmap v2.0: Industry viewpoint

Current and future standardization issues in the e Health domain: Achieving interoperability. Executive Summary

Digital Entrepreneurship Monitor EASME/COSME/2014/004

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE COUNCIL AND THE EUROPEAN PARLIAMENT

Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT

Review of Knowledge Transfer Grant

Erasmus+ Application Form. Call: 2014 KA2 Cooperation and Innovation for Good Practices. A. General Information. B. Context

CEF-SESAR U-SPACE Single stage

ERASMUS MUNDUS Frequently-asked questions ACTION 2: Questions from higher education institutions Latest update: January 2011

GUIDANCE NOTES ON PROJECT REPORTING

Patient Registry Initiative- Strategy and Mandate of the Cross-Committee Task Force

TORNO SUBITO What is Torno Subito?

IENE - MoU (Memorandum of Understanding)

THE ACQUIS COMMUNAUTAIRE & DIRECTIVE 2005/36/EC, amended by 2013/55/EU

Transcription:

ETCS Baselines, status, roadmap ERTMS Conference CCRCC 2013 Lille, 12-13/11/2013 Hans Bierlein, ERA ERTMS Unit

ERTMS - European determination ERTMS is a major European industrial project, started and supported by the European Commission EU Political support: European Coordinator for ERTMS EU Financial support: hundred M for initial development; 500 M reserved in the TEN2007-13; support also for Rolling Stock equipment EU Legal Framework: HS railway system: mandatory when new/renew/upgrade CR system: obligations in the European Deployment Plan 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 2

MoU 2008 The MoU 2008 (Memorandum of Understanding) between the European Commission and the European Railway Associations (CER, EIM, ERFA, GSM-R Industry Group, UIC, UNIFE) recognised the ETCS specifications 2.3.0d as the stable and interoperable basis for the deployment in Europe, but also asked the Agency to develop the specifications for ETCS Baseline 3 by 2012, which closes previous open points, includes new functionality and allows trains equipped with it to operate both on Baseline 3 and on 230d lines (backward compatibility). 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 3

ETCS Baselines, status 2012 Commission Decision 2012/696/EU on the 6 th November 2012, which has been published in the Official Journal of the European Union on the 10 th November 2012. Annex A contains 2 sets of specifications: ETCS baseline 2 and GSM-R baseline 0 ETCS baseline 3 and GSM-R baseline 0 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 4

ETCS Baselines, 2012 modifications The introduction, by keeping the ETCS stable specifications since year 2008 (the so-called 2.3.0d ), of the ETCS Baseline 3 specifications, The amended on-board test specifications for ETCS Baseline 2, The introduction of the GSM-R specifications EIRENE FRS 7.3.0 and EIRENE SRS 15.3.0. In regard to Baseline 3, for the first time since the development of the system, the operational principles and rules have been elaborated in parallel with the technical requirements. In addition and also for first time, the specification of the ETCS-Driver Machine Interface (DMI) is part of the mandatory requirements. 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 5

MoU 2012 To accompany the introduction of Baseline 3, ensuring that the development of products and the early deployment will provide return of experience to help consolidate the specifications and manage the experience allowing the maintenance of a common standard, a new MoU, complementing the 2008 MoU, was signed by the EC, the Sector Associations and the Agency in April 2012. 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 6

MoU 2012 tasks A double check of the backward compatibility of Baseline 3. Complementing of Baseline 3 with additional documents to facilitate the process of certification and authorisation and make the system more cost effective, in particular: Test specifications for ETCS Baseline 3 Interface specifications between RBC and RBC Train Interface specifications (interface between the ETCS on board and the vehicle) Planning of maintenance releases Additional functionalities/interfaces (ATO, Satellite positioning, bearer independency) 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 7

ETCS release planning 2 releases, initial planned together with the sector organisations and agreed in the Steering committee, are foreseen. Release 1 Recommendation to EC end of 2013 Voting in RISC mid of 2014 Content: Baseline 3 backward compatibility Error corrections Findings from early implementers (e.g. DMI indications in Limited Supervision mode) Baseline 3 test specifications Interface specifications 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 8

Second maintenance release ERTMS is the system of today but also of the future. We must therefore, beside taking into account the return of experience, prepare on time and plan evolution. For the second release it is planned (detailed planning is on-going) : Return of experience from the implementations Making ETCS independent of the communication system Interfacing to additional functions (ATO, satellite navigation) 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 9

We make the railway system work better for society. Thanks for your attention! Yes we have done and Yes we can do era.europa.eu 12-13/11/2013 ERTMS Conference CCRCC 2013, Lille 10