BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 493

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

UNCLASSIFIED UNCLASSIFIED

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. May RDT&E, DW/04 Advanced Component Development and Prototypes (ACD&P) Date

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

THEATER HIGH ALTITUDE AREA DEFENSE (THAAD)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Spacelift Range System

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Control and Reporting Center (CRC) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Control and Reporting Center (CRC) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Transcription:

COST (In Thousands) FY2000 Actual FY 2004 FY2005 FY2006 FY2007 to Theater High Altitude Area Defense (THAAD) 81614 540998 A. Mission Description and Budget Item Justification The Theater High Altitude Area Defense (THAAD) program has been transferred to PE 0603881C Terminal Defense. The THAADSystem Engineering and Manufacturing Development (EMD) phase will refine and mature the Program Definition and Risk Reduction (PDRR) system design to ensure component and system performance, producibility, and supportability. The mission of the THAAD System is to defend against short and medium range Theater Ballistic Missiles (TBMs) at long ranges and high altitudes. THAAD s long range capability will protect U. S. and allied Armed Forces, broadly dispersed assets and population centers against TBM attacks. THAAD s capability to intercept at high altitudes allows multiple intercept opportunities and will significantly mitigate the effects of weapons of mass destruction. The THAAD System consists of missiles, launchers, and radar(s), Battle Management/Command, Control, Communications, and Intelligence (BM/C 3 I) units, and support equipment. The acquisition philosophy for Engineering and Manufacturing Development (EMD) results in a First Unit Equipped (FUE) for an initial configuration (C1) in FY 2007. C1 will include the capability to defeat all expected upper tier threats in that timeframe, and will meet the key performance parameters outlined in the Operational Requirements Document. Enhanced survivability and battalion operational software are deferred to the next configuration (C2). FY 2000 Accomplishments: 81614 ed EMD prime contract, (Aug 2000), and brought on major subcontracts and suppliers. 81614 Planned Program: 459763 Continue hardware and software development for the missile, radar, BM/C 3 I, and launcher. Conduct radar hardware Critical Design Review (CDR); conduct breadboard testing, conduct Preliminary Design Reviews (PDRs) for launcher and BMC 3 I. 18100 In-house support: Fund government salaries and benefits, travel, training, etc. 1307 Establish operational test & evaluation (OT&E) support. 3700 Test Planning 33971 Support contracts: Continue software independent verification and validation. Continue hardware in the loop (HWIL), general engineering analysis and independent assessment, simulation over live driver (SOLD). Continue nuclear environment survivability analysis. Continue discrimination, navigation and control algorithm development. 24157 Other Government Agencies (OGAs), Government Furnished Equipment (GFE)/other: Continue integration and testing of Joint Tactical Information Distribution System (JTIDS) radios. Continue BM/C 3 I, and simulation efforts. Continue system threat vulnerability assessment. Maintain integrated logistics and product assurance efforts. Continue support for development of adaptive algorithms with BMDO. 540998 Project Page 1 of 5 Pages Exhibit R-2 (PE 0604861C)

B. Program Change Summary FY2000 FY2001 Previous President s Budget ( PB) 79462 549945 Congressional Adjustments Appropriated Value 549945 BMDO Adjustments Adjustments to Appropriated Value a. Congressional Reductions -208-8947 b. OSD Reductions -1750 c. Gov t wide Realignment (OSD) 4110 Adjustments to Budget Years Since PB Current Budget Submit ( PB) 81614 540998 Change Summary Explanation: FY2001 (-7447): Congressional general reductions. (-1500): SIAP Reprogramming. C. Other Program Funding Summary FY 2000 FY 2004 FY 2005 FY 2006 FY 2007 To Compl THAAD Dem/Val 0603861C 506221 THAAD SYS PROCUREMENT 0208861C D. Acquisition Strategy: The EMD contract was a sole source award to the Dem/Val contractor team (as approved September 15, 1995 by Under Secretary of Defense for Acquisition, Technology, and Logistics utilizing the DoD Acquisition Streamlining approach) with Lockheed Martin Space Systems Company being the prime and Raytheon Company being the major subcontractor. The EMD contractor team will become the contractor team for the Low Rate Initial Production (LRIP) and Full Rate Production (FRP) phases. This single prime contractor will have total system performance responsibility for the EMD, LRIP, and FRP phases. E. Schedule Profile FY 2004 FY 2005 FY 2006 FY 2007 Radar CDR (HW/SW) 4Q Project Page 2 of 5 Pages Exhibit R-2 (PE 0604861C)

Launcher PDR BM/C 3 I PDR (HW) Launcher CDR BM/C 3 I CDR (SW/HW) System PDR Missile CDR System CDR Configuration 2 PDR EMD Radar 1 Integration &Test Component Test Flights Begin C2 Authority to Proceed (ATP) Developmental Tests Begin 14 Missile Option Production Qualification Test Ready Production Readiness Review Assessment Long Lead EMD Radar 2 Integration & Test LRIP-1 FUE 3Q 3Q Page 3 of 5 Pages Exhibit R-2 (PE 0604861C)

BMDO RDT&E COST ANALYSIS (R-3) I. Product Development PYs To a. THAAD System EMD CPAF/FF LMSSC 81614 427431 Aug 00 509045 Subtotal Product Development: 81614 427431 509045 II. Support s PYs To a. SETA Various 0 33971 33971 b. OGAs MIPR 0 20945 20945 c. Program Mgmt Various 0 18100 18100 Subtotal Support s: 73016 73016 III. Test and Evaluation PYs To a. Test Planning MIPR 0 3700 3700 b. OT&E 0 1307 1307 c. Lethality 0 0 Subtotal Test and Evaluation: 5007 5007 TBD Project Page 4 of 5 Pages Exhibit R-3 (PE 0604861C)

BMDO RDT&E COST ANALYSIS (R-3) IV. Management Services PYs To a. MIT/LL MIPR/FFRDC LEXINGTON,MA 0 1300 1300 b. MITRE MIPR/FFRDC FT.MONMOUTH, NJ 0 1912 1912 c. d. e. f. Subtotal Management Services: 3212 3212 V. Other Categories PYs b. SBIR 11316 c. OSD/Undistributed cuts 21016 Subtotal Other Categories 32332 To Project : 540998 81235 Project Page 5 of 5 Pages Exhibit R-3 (PE 0604861C)