CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies

Similar documents
REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

CRENSHAW/LAX PILOT BUSINESS SOLUTION CENTER (BSC} and METRO'S PILOT BUSINESS INTERRUPTION FUND (BIF} MONTHLY REPORT

Local Taxes and Highway Tolls: The New Normal

REQUEST FOR PROPOSALS

Public-Private Partnership Program May 2015 Transit Coalition Update

Eagle Project Update

REQUEST FOR PROPOSAL (RFP) SOAP MINE ROAD GROUNDWATER CLEAN-UP DESIGN BUILD PROJECT. RFP RELEASE DATE January 17, 2014

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

APP NVITAT ON LETTERS COOPERATING AGENCY - Agency Categories:

Financing Transit Projects with Traditional and Innovative Sources And Mechanisms

Metro. Board Report. File #: , File Type:Informational Report

Design-Build Procurement Overview Manual. Alternative Project Delivery

Long Range Transportation Plan

Unsolicited Proposal Policy FAQs

3. Award and execute contract modifications for up to $1,200,000.

State Project No. XXXXXX City Project No. c401807

Met r 0 Met"'fKK'ibn Transportation Authority

~BEVE~Y AGENDA REPORT

ATTACHMENT G-1 LOS ANGELES COUNTY REGIONAL ITS ARCHITECTURE CONSISTENCY SELF-CERTIFICATION FORM

CITY OF MONTEBELLO AND MONTEBELLO SUCCESSOR AGENCY REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

LANDSCAPE AND IRRIGATION MAINTENANCE SERVICES SYSTEMWIDE (EXCLUDING METRO ORANGE LINE)

TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

Downtown Santa Monica, Inc. Request For Proposals Media Relations Program

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

CITY OF HAWAIIAN GARDENS COMMUNITY DEVELOPMENT DEPARTMENT

SUBJECT: REGIONAL RAlL PLANNING AND ENGINEERING BENCH AND REGIONAL RAlL UPDATE. INITIATE PROCESS TO ESTABLISH A REGIONAL RAlL BENCH

REQUEST FOR QUALIFICATIONS

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC

CALIFORNIA HIGH-SPEED RAIL DIANA GOMEZ

City of Culver City. Staff Report

Appendix H Invitation Letters

In developing the program, as directed by the Board (Attachment A), staff used the following framework:

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

REQUEST FOR PROPOSALS

PRE-PROPOSAL CONFERENCE Tuesday, October 19, 2010 SOUTH CENTRAL CORRIDOR HIGH CAPACITY TRANSIT FEASIBILITY STUDY

CITY OF LOMPOC REQUEST FOR PROPOSALS DEVELOPMENT IMPACT FEE UPDATE STUDY

REQUEST FOR INFORMATION

Chabot-Las Positas Community College District

Authorize the Chief Executive Officer to award and execute the following contracts for the Eastside Phase I1 Transit Corridor Project:

Request for Qualifications/Proposals Alameda County Redevelopment Agency Economic Development Strategic Plan

Policies and Procedures. Unsolicited Proposals. Western Lands

Fixing America s Surface Transportation Act: FAST Act Implications for the Region

Subject: Request for Proposal Route 99 Interchanges at Hammett Road and Kiernan Avenue

CITY OF MADISON, ALABAMA

Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

Request for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan

TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

Eastside Transit Corridor Phase 2 Draft EIS/EIR Public Hearings

Metro. Board Report. File #: PLANNING AND PROGRAMMING COMMITTEE MAY 20, 2015

MISSISSIPPI STATE UNIVERSITY. Request for Proposals (RFP) Curriculum Management Software for Mississippi State University

A. Amend the FY LACMTA Budget to add $3,000,000 from Measure R 3% Commuter Rail funds for the Rancho Vista Grade Separation Project

Request for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

Request for Proposals

VALUE ENGINEERING PROGRAM

Project Budget and Schedule Status

UNSOLICITED PROPOSALS

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

Water Filtration Plant Motor Control Center Upgrade Engineering and Design Services City of Bristol Tennessee RFP 16009

RE: Request for Proposal Number GCHP081517

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

Request for Proposals for Economic Development Consultant. Downtown Revitalization Initiative Durkee Street City of Plattsburgh, NY

Request for Proposals. Housing Study Consulting Services. Proposals DUE: January 6, City of Grandview. Economic Development Department

REQUEST FOR PROPOSALS

November 4, 2013 Office of Transportation Public Private Partnerships

Economic Development Services Join Us On the Road to Success

Corridor Management Committee. March 28, 2018

CSU Dominguez Hills & DH Foundation University Village-Mixed-Use Development/Market Rate Housing LETTER OF INVITATION REQUEST FOR QUALIFICATIONS

OVERVIEW OF UNSOLICITED PROPOSALS

Will County 911 System Office. Request for Qualifications 911 Operational Audit

Crenshaw/LAX Transit Corridor Community Leadership Council (CLC) Business Sustainability (During Construction) POD Meeting

SOLICITATION FOR PARTICIPATION IN A REQUEST FOR PROPOSALS FOR CHIEF EXECUTIVE OFFICER (CEO) SEARCH SERVICES JACKSONVILLE, FL SOLICITATION NUMBER 94414

NC General Statutes - Chapter 136 Article 19 1

REQUEST FOR PROPOSALS FOR TOWING SERVICES

Request for Proposal. Housing Opportunity Program Development Services

Santa Ana Arts and Culture Master Plan

APPENDIX A. I. Background & General Guidance. A. Public-private partnerships create opportunities for both the public and private sectors

CITY OF LA CENTER PUBLIC WORKS

REQUEST FOR PROPOSALS

San Mateo County Workforce Investment Board Summer Youth Employment Programs Request for Concept Papers. Overview and Submission Guidelines

CITY OF RANCHO SANTA MARGARITA CITY COUNCIL STAFF REPORT

REQUEST FOR PROPOSALS

LEXINGTON-FAYETTE URBAN COUNTY AIRPORT BOARD REQUEST FOR PROPOSALS. to provide INVESTMENT MANAGEMENT SERVICES. for BLUE GRASS AIRPORT

CITY OF LOMITA REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO PROVIDE BID PROPOSAL FOR

Cone Mill Master Development

ADDENDUM #2 FOR CONSTRUCTION MANAGEMENT CONSULTANT (CMC) THIS ADDENDUM #2 IS ISSUED: AUGUST 15, 2017

APPENDIX D CHECKLIST FOR PROPOSALS

Lessons Learned for a Transit Public-Private Partnership. Phillip A. Washington, General Manager Regional Transportation District

Request for Qualifications (RFQ) RFQ202: Code Consultant Services

Mid-Coast Corridor Transit Project Construction Bench Open House November 9, 2016

Request for Proposals (RFP) City of Indianapolis/Marion County Pedestrian Plan

MEMORANDUM. July 7, 2016

Automated Airport Parking Project

CRAWFORD MEMORIAL PARK

SACRAMENTO REGIONAL SOLID WASTE AUTHORITY REQUEST FOR PROPOSALS FOR CONSULTING SERVICES FOR A REGIONAL GREEN WASTE PROCESSING FACILITY

Transcription:

CRENSHAW/LAX TRANSIT CORRIDOR PROJECT: A New Beginning for the Crenshaw Corridor Through Use of Innovative Procurement Strategies Robert Ball, PE Kimberly Ong, PE Los Angeles Metropolitan Transportation Authority Los Angeles, CA INTRODUCTION Background The Los Angeles County Metropolitan Transportation Authority (LACMTA) has embarked upon a major capital expansion program to improve public transit service and mobility in Los Angeles County. As part of this program, the $1.763-billion Crenshaw/LAX Light Rail Project will interline with the Metro Green Line, and provide connections to the Exposition Line and Los Angeles International Airport (LAX) along an 8.35- mile alignment. The guideway includes approximately 3.15 miles of underground construction both cut-andcover and mined methods, 3.6 miles of at-grade and 1.6 miles of aerial construction segments. Six light rail stations are included in the baseline project with two optional stations carried as bid options; one located in the historic Leimert Park area where significant controversy exists with the community s strong desire for an additional underground station. This paper describes the innovative design-build procurement approach, the funding and political challenges that have defined the project configuration, and outlines the strategy for a significant investment in predominantly African American and Hispanic communities. The Crenshaw Transit Corridor is generally a northsouth corridor that extends approximately 10 miles in length throughout much of the South LA community, a large area comprising approximately 45 square miles. The South Los Angeles area has a population of approximately 850,000 comparable in size to the City of San Francisco. For two decades, the region has faced challenges in attracting capital investments. It remains the most affluent African American population west of the Mississippi though many of the area residents still suffer from lack of good paying jobs. Refer to the South LA Community profile in Figure 1. South Los Angeles Community Profile Figure 1 South Los Angeles Community Profile The Crenshaw corridor includes portions of five jurisdictions: Cities of Los Angeles, Inglewood, Hawthorne and El Segundo as well as portions of unincorporated Los Angeles County. Three major interstate highways traverse the corridor: the Santa Monica Freeway (I-10), Glen Anderson Freeway (I-105) 1

and San Diego Freeway (I-405). The Harbor Freeway (I- 110) parallels the corridor to the east. In 1967, the Crenshaw Transit Corridor was included in the region s first rail system plan and over the last 40 years have been the focus of numerous plans and studies by LACMTA and its predecessor agencies, the Southern California Rapid Transit District (SCRTD) and Los Angeles County Transportation Commission (LACTC). LACMTA has completed three transportation studies of the corridor over the last 13 years alone. In 1994, the Crenshaw-Prairie Corridor Preliminary Planning Study clearly identified the need for high capacity transit improvements. These options were further developed in December 2000 with the Crenshaw-Prairie Route Refinement Study, which identified the need for viable transportation alternatives. In 2003, the Crenshaw-Prairie Corridor Major Investment Study (MIS) was competed to assist decision makers in evaluating the most effective solution or phasing of solutions to the transportation challenges identified in the corridor while achieving local goals and objectives. The MIS provided the foundation for the inclusion of the Crenshaw Transit Corridor into the LACMTA Long Range Transportation Plan (LRTP), which led to the preparation of a Draft Environmental Impact Statement/Draft Environmental Impact Report (DEIS/DEIR) completed in 2009. Certification of a final project definition was made by the LACMTA Board of Directors in September 2011 and a Record of Decision (ROD) was received from the Federal Transit Administration (FTA) in December 2011. This recommended action, consistent with the adopted 2009 LRTP will pave the way to restore high capacity transit not seen along the Crenshaw Transit Corridor since the Yellow Car operations were terminated in the 1950s. Refer to Figure 2 for a picture of the original Yellow Car running on the corridor. This paper discusses in detail a two step, best value procurement method that was initiated with the release of a Request for Qualifications in December 2011 where interested firms were required to submit detailed Statement of Qualifications. Five proposers submitted qualifications and four proposers were invited to the second step to receive a Request for Proposals (RFP) in June 2012. The RFP included a design innovation approach referred to as Alternative Technical Concepts (ATCs) to encourage pre-qualified proposers to apply their creativity to achieve a competitive edge on cost and schedule in addition to providing an underserved community the best possible project including consideration for an optional station in historic Leimert Park if supported within a fixed life of project budget. Proposers were allowed to present ATCs for agency review and signoff as a step in the procurement process where confidentiality was maintained between the Agency and Proposer. The Crenshaw/LAX line was an excellent candidate for Design-Build as was best value to provide maximum flexibility to proposers without violating basic technical and contractual requirements. Upon contract award and payment of stipends to unsuccessful proposers, all Alternative Technical Concepts become the intellectual property of LACMTA with freedom to direct implementation to the successful proposer. LACMTA is applying a similar procurement template for project delivery as established for the Crenshaw/LAX project to its other major rail projects. View of the Yellow Car Line 5 operating in the medians on Crenshaw Boulevard and Leimert Avenue in the 1950 s, heading south on Leimert Avenue towards Crenshaw Boulevard. Funding and Political Challenges Finding the right solution for the Crenshaw corridor has been a challenge since the initiation of these early studies and continued through the draft environmental phase. Initial reviews did not look towards a rail solution. Bus Rapid Transit was a serious consideration although it was not favored by the neighborhoods along the corridor that were looking for equality with other neighborhoods which either had an existing rail solution or were planning one. With Light Rail selected as a locally preferred alternative in December 2009, the community had raised their voices and a rail project started to become a reality although numerous challenges remain to be overcome. Refer to project map in Figure 3. Figure 2 2

Figure 3 Crenshaw/LAX Transit Corridor Project Alignment Map 3

PROCUREMENT PROCESS As a public agency, LACMTA adheres to statutory requirements defined under Public Contract Code (PCC), Sections 20209.5 20209.14 where either a Sealed Bid or a Negotiated full trade off best value procurement process is determined to provide the best benefit for a project. Although LACMTA has traditionally used a Sealed Bid process, the latter method was selected for the Crenshaw/LAX project due to the complexity of the project and the need to hire the best contractor team to work with a diverse and active community. This method involves a two step process: Step One: Request for Qualifications (RFQ) that required a Statement of Qualifications to be submitted by interested proposers and which was evaluated on Pass/Fail criteria. Step Two: Request for Proposal (RFP) that was issued to pre-qualified proposers who were requested to submit separate Technical and Price Proposals which were then evaluated by a Proposal Evaluation Team (PET) to make a Best Value Determination. Major Activities in Order to Make a Best Value Determination The major activities included two distinct phases, a pre-submittal of proposals and a second phase with four steps after receipt of submittal of proposals. Pre-submittal of Proposals Initial Alternative Technical Concepts were developed by the Proposers and issued to LACMTA for review. Extensive engineering and cost information was not required for the initial ATCs. There was no discussion with proposers at this initial stage and this is considered a lessons learned where early confidential one-on-one meetings would have benefited the initial ATC process by providing clarification to the proposers and guidance for the submittal of detailed ATCs for final acceptance by the agency. Without the potential added benefit of this dialogue, LACMTA evaluated the ATCs and identified which ATCs were deemed to have sufficient merit to be included as a detailed ATC. Detailed ATCs were then developed by the Proposers and issued to LACMTA for review. Confidential one-on-one meetings were held between LACMTA and each of the Proposers to clarify the detailed ATCs. The detailed ATCs that were accepted by LACMTA could then be incorporated into both technical and price proposals. After Receipt of Proposals Phase 1 Evaluation of technical proposals by the Proposal Evaluation Team with support by subject matter experts. The PET provided initial scoring and ranking of proposers. Price proposals were evaluated by a separate cost team and scores were combined after initial technical scores were determined. Phase 2 Oral presentations were requested by LACMTA with each of the Proposers. The PET evaluated if a contract award could be made or if the BAFO should be exercised. Phase 3 Since an award decision was not made in Phase 2, a Competitive Range was established and discussions were held with proposers in preparation for release of a BAFO. Phase 4 Received BAFO from interested proposers, and the PET re-evaluated to determine final scores and determine contract award. ALTERNATIVE TECHNICAL CONCEPTS Summary of ATCs The ATCs were required to be equal or better than the original requirements of the contract. The required elements for the ATCs included the following: Description A full description of the proposed ATC, including drawings, product data, and other technical information, and a discussion of how the ATC will be used on the Project. Justification - A justification for the use of the ATC, including a description of the objectives of the proposed ATC and a discussion of the reasons why the acceptance of the ATC would be advantageous to LACMTA (i.e., the specific quality improvement or cost or schedule savings that will result). Relation to Technical Requirements Identification of any technical requirements or other Contractual Documents (including the RFP) that is inconsistent with the proposed ATC, and a description of the specific deviations or 4

modifications to those requirements that would be necessary. Example Cases A description of other projects or cases in which the proposed ATC has been used, and the results of such usage in achieving stated ATC objectives. Cost and Schedule Impacts - Identification of any anticipated impacts on cost (including construction cost, project management cost, operations and maintenance cost, etc.) or anticipated impacts on schedule resulting from the implementation of the proposed ATC. Operations or Maintenance Impacts - Identification of any operational or maintenance impacts (including any life cycle impacts), or any change in operation or maintenance requirements, anticipated to result from the use of the proposed ATC. Construction, Environmental, and Safety Impacts - Identification of any construction, environmental, or safety impacts (improvements or detriments) that could be anticipated from the use of the proposed ATC, including any inconsistencies with or impacts on the Final EIS/EIR or the Record of Decision or any mitigation measure required by or adopted in those documents. Rights of Way - Identification of any additional right of way or other property interests that would need to be acquired in connection with the implementation of the proposed ATC. Risks - Identification of any risks to LACMTA, third parties, or the Project resulting from the implementation of the ATC. Of the 119 initial ATCs received, 37 ATCs were subsequently approved by LACMTA. The range of cost savings was $50 to $90 million. Summary of dispositions for the ATCs are identified in Table 1 and Table 2 below. Table 1 - Initial Alternative Technical Concepts Disposition Total Pass 88 Reject 27 Not an ATC 4 Total 119 Table 2 - Detailed Alternative Technical Concepts Disposition Total Accept 37 Reject 8 Not an ATC 2 Examples of ATCs Total 47 The ATCs received covered many aspects of the project. Below are examples of ATCs that were presented. Ventilation Ventilation was included in the base design for a medium fire growth rate with supplemental fire protection measures for the underground stations. A higher arson fire growth rate was mandated as a bid option with proposers having the flexibility to propose innovative concepts for competitive pricing to be included in evaluation of total contract price. Several proposers identified alternatives to the alignment, station design and operational scenarios that allowed for compliance with the more restrictive mechanical design criteria and reduced the construction cost. Station Kit of Parts The base design in the procurement documents established a modular approach for station design and construction. Several months before the RFP was released, the agency completed a report that established a systemwide concept for station design at both ground and above ground level, the station Kit of Parts. The Station Kit of Parts was included in the RFP, and application of the Kit of Parts would be determined by the Proposers. The Proposers identified alternative concepts incorporating the Kit of Parts that reduced the construction cost. Grade Separation and Station at La Brea The base design at the La Brea intersection grade separated the LRT below a major roadway, La Brea Avenue, and located the La Brea station at-grade, but 5

below the adjacent major street, Florence Avenue. ATCswere proposed for the LRT to bridge over La Brea Avenue and raise the station to be level with the adjacent street. This alternative concept was initially evaluated in an earlier phase of the project as part of the Locally Preferred Alternative, although it was a considerably longer and higher structure but was not incorporated into the final environmental approval due to factors including the uncertainty of abandonment of an adjacent BNSF freight track. Allowing this alternative concept in the RFP process after a formal abandonment order was issued for BNSF did not require a supplemental environmental assessment or opening of the Record of Decision, which was not allowed according to the procurement instructions. By implementing this alternative concept, the construction cost was reduced, the construction impact to the community was greatly lessened, and the operations and visibility of the station was significantly improved. Bridge Over I-405 Freeway The LRT crosses over a state highway, and the base design placed the new LRT Bridge within the footprint of an existing freight bridge. During preliminary engineering, it was determined that a multi-span bridge over the highway would be more cost effective than a clear span bridge. An alternative concept proposed the LRT Bridge to clear span over the freeway, which would appear to be more expensive; however, the existing freight bridge would be left in place for alternative uses and is beneficial in eliminating impacts on freeway traffic, which would reduce costs. Optimizing Horizontal and Vertical Alignment Profiles Proposers were encouraged to optimize the alignment particularly underground segments where raising a station box by several feet could generate significant cost savings. One ATC went as far to completely shift one of the underground stations allowing the elevation of the station to be raised by over ten feet. This design innovation required discussion with a third party who was brought in under a confidentiality agreement to solicit their comments and support before signing off on the ATC. In the majority of ATCs that took advantage to optimize the alignment, the only restrictions placed on proposers were compliance with LACMTA s design criteria and no additional property acquisition. Benefits of ATCs Including the ATCs as part of the procurement process was determined to be beneficial for both the proposers and for the agency. Benefits included improved contract documents and better understanding of the contract documents by the proposers, improved design solutions, and competitive pricing. Improved Contract Documents In Design-Build procurement, an ATC process clarifies the type of design innovation that is permissible and clarifies contractual technical requirements. Improved Design Solutions This encourages both a designer and contractor to work collaboratively in developing solutions that can enhance or streamline project features while providing a team a competitive edge and lower costs to the agency. The ATCs resulted in out of the box solutions that were incorporated into the bid price and allowed execution upon contract award. Alternatively, if the ATC process had not been used, the alternative concepts may not have been identified to the agency until after NTP as Value Engineering, which would reduce potential schedule benefit and only allowed the agency savings of 50% that are likely understated without competition. Competitive Pricing Confidential ATCs and clarification one-on-one meetings, within the extent allowed, enabled LACMTA to have competitive proposals (technical and price). BEST AND FINAL OFFER PROCESS Discussions LACMTA advised proposers that a recommendation for award was not made after initial evaluations and scoring. Questions were developed and discussions were coordinated over a one month period with proposers on both technical and price proposals. Discussions included additional ATCs and cost saving measures. 6

Examples of BAFO Changes The benefits of BAFO discussions prompted a number of cost savings. Several are indicated below: Allowing the ATC process without any initial commitment to a BAFO process allowed discussion of alternative concepts early in the procurement process that could have been held until the BAFO phase, thus allowing a shortened duration for the BAFO phase. Changes in requirements for deflection criteria on support of excavation walls for station boxes and cut and cover segments that allowed proposers more flexibility in means and methods. Allowing increased flexibility in hardscape and landscape treatments in station and plaza areas. Staging land at a new planned 18 acre maintenance facility adjacent to the Crenshaw /LAX corridor to provide additional laydown areas and an existing office facility on LACMTA-owned property for use as a colocated project office. Reductions in the number of key personnel that proposers had to commit to the project allowing proposers more flexibility in staffing the job. Owner-furnished trackwork materials to be furnished by the agency instead of the contractor with options for another major Measure R project to increase cost savings. Reduction in daily liquidated damages and cap on maximum exposure on liquidated damages. Reduction of cap on limit of liability on Builder s Risk insurance and limit on damages to correct non performing work. Current Procurement Status At the writing of this paper, LACMTA has completed the evaluation of BAFOs and is moving forward with award strategies to be presented at a May board meeting. The recommended contractor cannot be named until after mail-out of board reports the first week of May. A Notice to Proceed to the successful proposer is anticipated in Summer 2013. As a footnote, the South Los Angeles (LA) Community has a rich cultural history as do many areas that make up the South LA Community Profile. An example of this diverse history is the old adobe buildings of Rancho La Cienega and Baldwin Hills which is a major community and neighborhood in South LA. These communities are expected to benefit from the significant investment that LACMTA is making in the corridor. Refer to figures 3, 4 and 5 to see the early pioneers. Old adobe buildings of Rancho La Cienega or Paso de la Tijera. Circa 1930 LESSONS LEARNED Summary of lessons learned are below: Allow confidential one-on-one discussions with Proposers from initiation of RFP instead of after submittal of detailed ATCs. A number of proposers commented that the ATC process was the only means to have dialogue with the agency and encouraged the agency to have dialogue with proposers regardless if there is a formal ATC process or not. Two-step ATC provided a valuable screening process to eliminate concepts that were not deemed feasible for incorporation during the procurement process. This allowed the Proposers and the agency to concentrate resources on only those potentially viable concepts. Figure 3 7

Baldwin Hills and other surrounding geography are named for the famous 19 th century horse racing and land development pioneer, Elias J. Lucky Baldwin, who is pictured below. John Fisher and son Julian, Lucky Baldwin s ranch foreman and race horse trainer are pictured below. Figure 4 Figure 5 8