boston college i n s t i t u t i o n a l submitted to Boston Redevelopment Authority Boston, Massachusetts submitted by

Similar documents
Allston Brighton Boston College Community Task Force. Brighton Marine Health Center October 16, :30PM to 8:30PM

Buildings Related to Boston College Operations Location and Primary Use, Spring 2002

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / NOTICE OF PROJECT CHANGE

COMMUNITY MEETING NOTES UCSF Mission Bay Phase 2 Study. Meeting Date: June 17, 2010 Genentech Hall Mission Bay campus Subject: Community Meeting 1

University of San Francisco 2012 Institutional Master Plan. SUPPLEMENT A Proposed Student Residence Hall December 2013

COMMUNITY MEETING 3 February 15, Mission Bay Phase Two

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE

Past and Present Campus Recreation Facilities

Off-Campus Recreation, Intercollegiate Athletics, College of Education and Human Performance, and Facilities and Open Spaces.

NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO STATE UNIVERSITY CREATIVE ARTS & HOLLOWAY MIXED-USE PROJECT

STAFF REPORT. Meeting Date: May 16, 2017

MassDOT Air Rights Parcels Citizens Advisory Committee Questions for Proponents

Community Integrated Master Plan Workshop 4: CIMP Consensus Elements

AMERICAN UNIVERSITY Agenda October 20, 2009

SOUTHWEST LRT (METRO GREEN LINE EXTENSION)

EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS ACTION ITEM

Table 6.1.a Inventory of Existing Support Building Space-Main Campus BUILDING NUMBER

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

SAN FRANCISCO PLANNING DEPARTMENT

Request for Proposals

BAY MEADOWS PHASE II Development Agreement (Effective 12/21/05) Annual Review Matrix

FY 2016 Capital Development Plan. Northern Arizona University. Revised April 2016

REQUEST FOR PROPOSALS

TOWN OF GREENWICH Annual Department Operational Plan (FY )

BCDC EXECUTIVE SUMMARY AUGUST 27, Emerson College Boston, MA august 27,

Nassau County 2030 Comprehensive Plan. Public School Facilities Element (PSF) Goals, Objectives and Policies. Goal

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM

FLORIDA STATE UNIVERSITY MASTER PLAN 6 Support Facilities

Strategic Plan Objectives July 1, 2018 June 30, 2019

Boston College Visiting Team Guide

Request for Redevelopment Proposal 102 N. Broadway, City of De Pere

Committee on Budget and Finance January 21, 2016

APPLICATION FOR PARCEL MAP

Mission Bay Master Plan File No M September 27, 1990

Request for Proposals 2018 Hennepin Youth Sports Program Facility Grants

M E M O R A N D U M. The Project and the items that the Commission will be considering at the June 15 th, 2010 meeting are summarized below.

TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM 1

TABLE OF CONTENTS. Boston College Swimming& Diving 1

North Miami Beach Community Redevelopment Agency

REQUEST FOR CITY COUNCIL ACTION

California Pacific Medical Center Hospital Rebuild

4. IMPLEMENTATION. 4.1 Implementation Matrix

IMPLEMENTATION CENTRAL STATE UNIVERSITY CAMPUS WIDE MASTER PLAN

City of Coquitlam. Request for Information and Qualifications RFIQ No Design Services for Maillardville Community Centre

VARIOUS CITY OF BUFFALO PARKS AND BUFFALO PUBLIC SCHOOLS FACILITIES SURVEY AND DESIGN DEVELOPMENT

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

Sunday, May 20, 2018

Milton Academy Town-Academy Report

PSA/Visit Pensacola/Escambia County DMO Thoughts on Community Recreation and Sports Tourism Needs and Facility Feasibility Study

BAKERSFIELD COLLEGE 2016 BOND PRESENTATION SESSION #1

Department of Code Compliance

Multipurpose facility: Why it will benefit Temple and Philadelphia

Memorial Student Union

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

ANCHORAGE, ALASKA AO No

Memo to the Planning Commission INFORMATIONAL ONLY

Request for Proposals # P12-044A. Pre-Qualification - Purchase and. Development of Bloomfield Property

PLANNING AND PROGRAMMING COMMITTEE NOVEMBER 5, 2014 CHAVEZ AND SOTO JOINT DEVELOPMENT

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT

Cal Poly EXECUTIVE SUMMARY. Cal Poly Master Plan. In Fall 1999, the average GPA and SAT scores for incoming freshmen were 3.64 and 1162.

Future Land Use Supporting Data

VIRGINIA STATE UNIVERSITY 2016 Higher Education Procurement Forecast

Approved: April 5, 2017 CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, MARCH 8, :30 P.M. - ARDEN HILLS CITY HALL

CITY OF SHASTA LAKE GOALS AND OBJECTIVES WORKSHOP FEBRUARY 9, Economic Development and Downtown Revitalization

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

Request to Develop Land (RDL) on USF Campus Property Revised 3/6/09

5.1 EXISTING REVENUE/FUNDING SOURCES

2014 Comprehensive Master Plan

407 East Environmental Assessment (EA) Development/Land-use Application Guidelines

City of Saint Paul Request for Proposals for a Downtown Parking Management Strategy Event 91

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C.

Activity Recreation Cultural Center

E-J Industrial Spine BOA Nomination Study

Florida International University

VISION AND RECOMMENDATIONS

Newton County. Impact Fee Annual Update FY2011

TABLE OF CONTENTS. Boston College Men s Ice Hockey 2

OFFICE OF THE CITY CLERK

coordination and collaboration between St. Mary s College and the Town of Moraga

REQUEST FOR PROPOSALS. Former Fire Station 47 Site - 24,400 square feet

REQUEST FOR QUALIFICATIONS CAMPUS MASTER PLAN UPDATE MOBILITY AND WAYFINDING

DPR Sport User Group, Field Allocation, Fall Pilot Sports Commission

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

CITY GATE COMMERCE PARK DRI NOTICE OF PROPOSED CHANGE IN COLLIER COUNTY

RiNo Park Buildings Business Case Analysis. July 10, 2017

PUBLIC SCHOOL FACILITIES ELEMENT

Fairfax County FY 2019 Advertised Budget The 2018 Economic Outlook Summit April 12, 2018 w w w. f a i r f a x c o u n t y. g o v / b u d g e t

BLUE HILLS MASTER PLAN RFP OUTLINE

Call to Artists/Request for Qualifications Engine 37

19 December 2016 Reference: Public Involvement Plan Group c/o Ms. Linda L. Segal 9 Aqueduct Road Wayland, Massachusetts 01778

FINANCE COMMITTEE Arkansas Higher Education Coordinating Board Conference Call Friday, June 29, :00 a.m.

Department of Residence Life Annual Assessment Plan

Neighborhood Revitalization. Fiscal Year 2017 State Revitalization Programs Application. DEADLINE FOR SUBMISSION: Friday, July 15, 2016 at 3:00 p.m.

UCSF Long Range Development Plan (LRDP)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.2 STAFF REPORT May 17, Staff Contact: Ward Stewart (707)

City of Albany Industrial Development Agency (CAIDA)

OBJECTIVE 1.1: To seek a reasonable share of state capital construction funds to construct teaching, research, and support facilities.

CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico

Transcription:

boston college i n s t i t u t i o n a l master plan supplement submitted to Boston Redevelopment Authority Boston, Massachusetts submitted by Boston College 140 Commonwealth Avenue Chestnut Hill, Massachusetts january 29, 2009

Table of Contents Introduction... 1 Summary of Proposed Institutional Projects... 2 Housing... 2 Program Goal... 2 Analysis of Alternative Sites for 350 Beds... 5 Housing Restriction... 6 Jesuit Faculty and Graduate Student Housing... 6 Occupancy of 2000 Commonwealth Avenue... 7 Mortgage Assistance Program... 7 Brighton Athletics Center... 7 Project Modifications... 7 Athletics Advisory Committee... 7 Schedule of Use... 7 Transportation... 9 Brighton Campus Access... 9 Transportation Demand Management Measures... 9 Parking... 9 No-Build Zone... 10 Property Acquisitions... 10 Table of Contents i

List of Tables Table No. Title Page 1 Proposed Institutional Projects... 3 2 Phasing of Undergraduate Housing... 5 3 Schedule of Use for Brighton Athletics Center... 8 4 Parking Plan Changes... 10 ii Table of Contents

Institutional Master Plan Supplement List of Figures Figure No. Title at End of Document 1 Proposed Institutional Projects 2 Proposed Brighton Campus Access 3 Proposed No-Build Zone Table of Contents iii

This Page Intentionally Left Blank iv Table of Contents

Institutional Master Plan Supplement Introduction Boston College (the University ) filed its proposed Institutional Master Plan ( IMP ) with the Boston Redevelopment Authority in June 2008 in response to a Scoping Determination issued by the Authority in February 2008. In the past six months, the IMP has been under the public review contemplated by Article 80 of the Boston Zoning Code. During this time, the Allston Brighton Boston College Community Task Force (the Task Force ), the staff of the Authority, other public agencies, and individual neighbors have carefully reviewed the IMP and have made numerous comments concerning the University s plan, including suggestions to modify the IMP to reduce and mitigate anticipated impacts. This Supplement identifies modifications to the IMP proposed by the University in response to public comment. This Supplement contemplates no new Proposed Institutional Projects. Instead, this Supplement withdraws two projects, reduces the scope of certain proposals, and describes additional mitigation measures. Institutional Master Plan Supplement 1

Summary of Proposed Institutional Projects Figure 1 in this Supplement replaces Figure 5-1 in the IMP and Table 1 in this Supplement replaces Table 5-2 in the IMP. The two major revisions to Figure 1 and Table 1 are the elimination of the Jesuit Faculty and Graduate Housing project on Foster Street (No. 1 on Figure 5-1 of the IMP) and undergraduate housing with 350 beds near the School of Theology and Ministry library on the Brighton Campus (No. 8 on Figure 5-1 of the IMP). Both of these changes are discussed in the Housing section below. The remaining projects have been renumbered on Figure 1 and in Table 1. In addition, Table 1 has been revised to show a reduced number of seats in the baseball and softball facilities on the Brighton Campus, a change described in the Brighton Athletics Center section below. Except for these changes, all other Proposed Institutional Projects shown on Figure 1 and listed in Table 1 in this Supplement remain as they were presented in Figure 5-1 and Table 5-2 in the IMP filed in June 2008. Housing Program Goal Boston College reaffirms it intention, announced in the IMP, to pursue the goal of meeting 100 percent of its undergraduate housing demand (as analyzed in the IMP) in the context of the University Strategic Plan and the design principles outlined in the IMP. Boston College proposes to advance to the first phase of construction the following Proposed Institutional Projects, in order that they be completed and fully occupied prior to the demolition of Edmonds Hall: 470-bed residence hall on the More Hall site (No. 12 on Figure 1); 150-bed residence hall at the north side of Commonwealth Avenue near the proposed spine road (No. 7 on Figure 1); 560 beds at 2000 Commonwealth Avenue to be occupied by 2012(No. 11 on Figure 1); 170-bed residence hall on Shea Field at (the most easterly of three proposed residence halls shown as No. 14 on Figure 1). Following demolition of Edmonds Hall, the University proposes two additional phases of residence hall construction: Two buildings on Shea Field housing 380 students (the balance of the project shown as No. 14 on Figure 1); and The 185-bed replacement housing at the modular housing site (No. 16 on Figure 1). 2 Institutional Master Plan Supplement

Institutional Master Plan Supplement Table 1 Proposed Institutional Projects Proposed Institutional Project Location Map No. on Figure 1 Current Uses RESIDENTIAL LIFE Undergraduate Housing Current More Hall Site 12 Administrative Offices Undergraduate Housing 470 beds; Parking 0-100 Spaces Undergraduate Housing Commonwealth Avenue on Brighton Campus 7 Undeveloped Undergraduate Housing 150 beds Undergraduate Housing Commander Shea Field 14 Baseball Field Undergraduate Housing 550 beds (170 beds in Phase 1) Undergraduate Housing Existing Modular Housing Site on 16 Modular Housing Undergraduate Housing Lower Campus 185 beds Undergraduate Housing 2000 Commonwealth Avenue 11 Residential Undergraduate Housing 560 beds Parking 200 Spaces ACADEMIC Fine Arts District Library Storage STUDENT LIFE Brighton Athletics Center Commonwealth Avenue between the former Cardinal s Residence and the former Creagh Library on the Brighton Campus Next to existing School of Theology and Ministry Library Building on Brighton Campus North End of the Brighton Campus 1 Recreation Fields and Maintenance Garage 9 Undeveloped Museum/Fine Arts building; Auditorium Proposed Future Uses Proposed Building Gross Floor Area 1 Building Height Primary Uses Principal Sub Uses (Area to be Demolished) Stories Feet Student Lounges Housing 235,000 Retail 12,000 Parking up to 35,000 (64,584) Current Zoning of Site 4-6 60 Boston College Institutional Student Lounges Housing 50,000-75,000 4-5 60 Conservation Protection Student Lounges Housing 275,000 5-6 60 Boston College Institutional Student Lounges Housing 87,500-92,500 4-5 60 Boston College (47,136) Institutional Student Lounges Housing 214,750 17 ~167 Multifamily Residential Garage 72,400 MFR-2 Museum/Fine Arts 55,000 Auditorium 30,000 5 Undeveloped Library Storage Library Office Library Storage 14,000 N/A Up to 40 1,000-seat Baseball Facility, 300-seat Softball Facility, 1 Intramural Field, and Support Facility Batting Cages, Locker Rooms, Rest Rooms, Offices, Conference Rooms; Concession Area, Support Facility 60,000 (15,408) 4-5 60-70 Conservation Protection 2-3 Up to 50 Conservation Protection Conservation Protection Tennis Courts South of the proposed garage on the Brighton Campus 6 Undeveloped Tennis Courts N/A N/A N/A Conservation Protection Recreation Center Edmonds Hall Site 13 Undergraduate Housing 790 Beds Recreation Center Pool, Multipurpose Courts, Jogging Track, Locker Rooms, Recreation Center 200,000 (245,078) Up to 3 Up to 70 Boston College Institutional subdistrict Offices, Fitness Center, Multipurpose Rooms University Center Lower Campus 17 Parking, Flynn Recreation Complex (part) Dining, Student Organizations, Offices, Conference Center, Theatre University Center 285,000 (118,267) Up to 4 Up to 60 Boston College Institutional SUPPORT Parking Garage Interior of Brighton Campus near Athletics Fields 4 Undeveloped Parking 500 Spaces Garage 175,000 5 (one below grade) Up to 40 Conservation Protection Beacon Street Garage Addition Beacon Street Garage 15 Playing Fields (portion) Additional Parking Bay 350 spaces Garage 122,500 4 40 Boston College Institutional Academic and Administrative Building (Bishop Peterson Hall) Administrative Buildings (Chancery and Creagh Library) Administrative Space (St. John s Hall (part)) Conference and Meeting Facility (Cardinal s Residence) 1. In square feet (sf) 129 Lake Street 2 Academic and Administrative Academic and Administrative Academic and Administrative 69,880 2121 Commonwealth Avenue 2123 Commonwealth Avenue 5 Conservation Protection 8 Chancery Offices and Library Administrative Administrative 66,100 2-3 Conservation Protection 127 Lake Street 3 Administrative Administrative Administrative 12,000 N/A N/A Conservation Protection 2101 Commonwealth Avenue 10 Conference and Meeting Facility Conference and Meeting Facility Conference and Meeting Facility 23,000 2 Conservation Protection Institutional Master Plan supplement 3

This page intentionally left blank 4 Institutional Master Plan Supplement

Institutional Master Plan Supplement Table 2 in this Supplement replaces Table 6-2 in the IMP. As shown in Table 2, the revised IMP includes the development of an additional 940 beds, bringing the University s total number of undergraduate beds to 8,270. This represents 96 percent of total undergraduate demand for housing, as analyzed in detail in the IMP. As described below, Boston College will also study locations for an additional 350 beds, which would bring the total supply of beds to 8,620 or 100 percent of student demand. Table 2 Phasing of Undergraduate Housing Projects Phase Location Change in Number of Beds Phase 1 More Hall Site +470 Commonwealth Avenue on Brighton Campus +150 Shea Field (one building) +170 2000 Commonwealth Avenue +560 Raze Edmonds Hall -790 Subtotal Phase 1 +560 Phase 2 Shea Field (remaining two buildings) +380 Subtotal Phases 1 & 2 +940 Phase 3 Mods Replacement -- Remove 11 Mods -185 Replacement Housing +185 Subtotal Phases 1, 2 & 3 +940 Phases 1-3 Total Housing 8,270 Total Beds as Percent of Undergraduate Demand 96% Analysis of Alternative Sites for 350 Beds In response to calls for further study of the University s proposal for a 350-bed residence hall on the Brighton Campus Library Parking Lot Site, the University agrees to seek approval for the additional 350 beds at a later date. Figure 5-1 and Table 5-2 of the IMP have been revised to indicate that this residence hall is not one of the Proposed Institutional Projects to be approved in the current IMP submission. Figure 1 and Table 1 in this Supplement replace Figure 5-1 and Table 5-2, respectively, in the IMP. Although the location for this project proposed in the IMP is still the University s preferred option, the University acknowledges that any future approval of this specific project will require an amendment of the IMP. Furthermore, the University agrees that before filing any such amendment it will enter into a study process to be conducted jointly with the Authority (and with opportunity for public input) to identify and evaluate alternative locations to Institutional Master Plan Supplement 5

accommodate these 350 beds. Locations to be studied shall include, but not be limited to, sites on the Chestnut Hill Lower Campus, including land currently occupied by modular housing, and various alternative Brighton Campus sites, including sites east of the proposed "Spine Road." The study shall define criteria to be used to evaluate the identified sites, including the campus planning goals enumerated in the IMP, as well as a comparison of potential impacts of student behavior on adjacent neighborhoods. Moreover, the study shall consider the effects of alternative design and occupancy strategies, including but not limited to an evaluation of the feasibility of limiting occupancy to students who meet certain criteria, such as class year, academic honors, specific curricular or co-curricular interests, or substance-free living, or some combination thereof. The analysis will be informed by the results of an assessment of the actual neighborhood impact of student occupancy of 2000 Commonwealth Avenue, the 150-bed Brighton Campus residence, and a similar assessment of the impacts of the University's upper campus and Centre Street residences on adjoining Newton neighborhoods. In anticipation of such assessment, and to better assure the success of programs designed to promote neighborly behavior among students, Boston College shall work with the Campus Community Partnership Initiative (the CCPI ) through its regularly scheduled meetings to provide periodic reviews of student behavior in 2000 Commonwealth Avenue as well as the proposed 150-bed residence hall, and to seek advice concerning any needed solutions to problems that may arise. More information on the composition and purpose of the CPPI is set out in Chapter 6 of the IMP. Housing Restriction Boston College reaffirms its intention, announced in the IMP, to meet 100 percent of its undergraduate housing demand (as analyzed in the IMP) in the context of a campus plan reflecting the design principles outlined in the IMP. Boston College acknowledges that reducing the number of Boston College undergraduates living in one- and two-family houses in the surrounding neighborhood is a goal of its housing plan. Accordingly, the University will propose, as part of its Institutional Master Plan Amendment for the 350-bed student residence, University efforts designed to eliminate occupancy by its students of one- and twofamily houses in the 02135 zip code area (including the residential neighborhoods of Radnor Road, Kirkwood Road, Foster Street, Gerald Road, Lake Street, Undine Road, Kenrick Street and Greycliff Road), to become effective upon completion of the 350-bed residence hall. Jesuit Faculty and Graduate Student Housing The Jesuit Faculty and Graduate Student Housing project has been removed by Boston College from the list of the University s Proposed Institutional Projects, but will proceed as a project to be developed by the Weston Jesuit Community, Inc. ( WJC ), a Massachusetts nonprofit corporation supervised and controlled by the U.S Jesuit Conference. Extensive information on this project has been filed by WJC and reviewed by the Authority under the Small Project Review provisions of Article 80 of the Boston Zoning Code. The project was approved by the Authority on November 13, 2008. 6 Institutional Master Plan Supplement

Institutional Master Plan Supplement Occupancy of 2000 Commonwealth Avenue In order to plan for an orderly transition of the apartments at 2000 Commonwealth Avenue to student use, the University now proposes to phase the occupancy of this building as a residence to provide for full occupancy by 2012. Mortgage Assistance Program The University agrees to establish a mortgage program to assist full time University faculty and staff to purchase homes in the Allston-Brighton neighborhood, thereby helping to reduce absentee ownership and promote neighborhood stability. This program will be established upon approval of the IMP. Brighton Athletics Center Project Modifications The modifications to the Brighton Athletics Center include the following: Baseball Facility -- 1000-seat, lighted facility with synthetic surface. Seating reduced from 1,500 seats. Softball Facility -- 300-seat, lighted facility with synthetic surface. Seating reduced from 500 seats. Advisory Committee Boston College will form an Athletics Advisory Committee to provide advice and comment on operational and management issues related to the Brighton Athletics Center including staffing, parking, pedestrian and vehicular access routes, sound, lighting and signage. The size and composition of the committee will be mutually agreed upon by the City of Boston, Boston College and the Allston-Brighton Boston College Community Task Force, and such details shall be addressed in the cooperation agreement entered into by the University and the BRA. Schedule of Use Table 3 in this Supplement replaces Table 7-2 in the IMP. The University proposes a reduced schedule of use for the Brighton Athletics Center as detailed in Table 3. The fields will be used for varsity and intramural/club sports activities starting at 3 p.m., and informal use by BC individuals or groups when the fields are not reserved for organized activities. Institutional Master Plan Supplement 7

Table 3 Schedule of Use for Brighton Athletics Center Time of Year/User Group Days of Week Time of Day September to November February to May Varsity Team Practice Mon - Fri 3:00 p.m. to 7:00 p.m. Varsity Night Games To Be Determined To Be Determined Intramural and Club Sports Mon Fri Sat Sun 3:00 p.m. to 9:30 p.m. 3:00 p.m. to 7:00 p.m. 3:00 p.m. to 9:30 p.m. June to August Youth Camps/Clinics Mon Sat Sun 8:00 a.m. to 9:30 p.m. 3:00 p.m. to 7:00 p.m. Informal Use: Fields will be available for informal use by BC individuals and groups when not reserved for organized activities. The University anticipates approximately 10-15 evening varsity games each for baseball and softball annually, with actual schedules determined by ACC requirements, weather conditions and scheduling limitations of non-conference schools. The Athletics Advisory Committee will be informed of varsity schedules on a timely basis. When fields are in use, lights will be dimmed at 9:30 p.m. and turned off at 10:00 p.m., except when a varsity game continues beyond those times. Intramural play on the Brighton fields will conclude by no later than 9:30 pm regardless of the status of play (i.e. mid-period or inning, if necessary). The University shall work closely with the Athletics Advisory Committee to monitor compliance with conditions applicable to such night play. To this end, the University shall produce periodic reports summarizing actual intramural lighting use and meet regularly with the Athletics Advisory Committee during the academic year to review such reports. If in any academic year, the reports evidence material, persistent violations by the University (defined as 10 percent or more of intramural games ending after 9:45 pm), Boston College shall be required to submit a remedial plan to the Athletics Advisory Committee, outlining additional conditions on lighting use designed to insure stricter compliance in the following academic year. Failure to submit such remedial plan may subject the University to further action by the City of Boston to enforce compliance with the light restrictions. 8 Institutional Master Plan Supplement

Institutional Master Plan Supplement Transportation Brighton Campus Access Five alternatives for access to the Brighton Campus were analyzed in the IMP. Boston College agrees to implement access Alternative 3 as shown in Figure 2. As part of this alternative, St. Thomas More Road access to Lake Street will remain open and a new access road to the Brighton Campus will be provided along the rear of the More Hall site. Transportation Demand Management Measures Boston College will expand its TDM program with the following measures: Provide pre-tax MBTA pass sales for full time employees Provide 25 percent MBTA pass subsidy for full-time employees who forgo a campus parking permit Parking The University agrees that the construction of its proposed 500-space parking garage on the Brighton Campus will commence after the completion of the first phase of University housing. Table 4 summarizes the net change in the parking inventory as shown in Table 9-18 in the IMP. There will be a net increase of just over 50 spaces on the Brighton and Chestnut Hill campuses, assuming eventual elimination of the 184 spaces in the lot located adjacent to the School of Theology and Ministry Library. Boston College believes, and current Master Plan transportation analyses demonstrate, that a 500-space parking facility on the Brighton Campus will be needed to meet the projected parking demand. There will be an incremental loss of existing surface parking on the Brighton Campus due to building projects, and it is anticipated that no fewer than 750-800 people will work on this campus as existing facilities are converted to academic and administrative office use. Boston College therefore seeks approval of this Proposed Project for up to 500 spaces, as described in the Institutional Master Plan, with the understanding that the Article 80 Large Project Review of this project will include a comprehensive review of the University s overall transportation demand management programs and a detailed study of alternative parking strategies for the Brighton Campus. The scope of this study will include, at the minimum, updating the parking demand analysis, programs to improve alternate modes of transportation to reduce parking demand, additional site analyses which may result in distributing the parking spaces in multiple sites or an adjustment of the size and location of the garage. Institutional Master Plan Supplement 9

Table 4 Parking Plan Changes Chestnut Hill Campus Brighton Campus Newton Campus Total Existing Parking Spaces 3,011 819 675 4,505 Displaced Spaces -713-507 0-1,220 New Parking Spaces +740 +534 +150 +1,424 Total Future Parking 3,038 846 825 4,709 Net Change in Parking +27 +27 +150 204 No-Build Zone The University agrees to maintain a buffer zone of 50 feet in depth along Lake Street from Commonwealth Avenue to the St. John s Hall driveway for a period of 25 years from the date of approval of the IMP. The boundaries of the buffer area are shown on Figure 3. Property Acquisitions Boston College will notify appropriate individuals in the Mayor s Office and the Boston Redevelopment Authority prior to a property purchase of $5 million or more in the City of Boston. 10 Institutional Master Plan Supplement

Institutional Master Plan Supplement Kenrick Street Glenmont R oad Proposed Institutional Projects Boston Properties Colby 23 24 Chandler Pond Gallagher Memorial Park Street Newton Campus 2 es tr ee t 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 Ave Hill stn Che Ce n sto Bo ton w Ne nt re 26 ut ter St F os 6 re et 25 Str 4 nue eet Lak 5 Brighton Campus Mill Street Proposed Projects Newton Properties 8 10 9 7 nu Ave 11 Dr Lower Campus St T 16 15 19 t t Proposed Institutional Project et Proposed Renovation Stre eg e 22 ll 21 on 20 Beacon Str eet Aven Source: Building Footprints - Boston Redevelopment Authority (BRA), Parcels - FY 2002 Parcels from the City of Boston Assessor s maps Vanasse Hangen Brustlin, Inc. Figure 1 ir n sto n Bo wto e N Proposed Institutional Projects Ten-Year Plan Sto ne Ave et nu e re St rvo d on d Rese mm Roa Acac ia Ha Lee ue Aven ue Co et Stre Existing Boston College Building 14 Beac ad Ro Road on Legend 18 Upper Campus r Chestnu ad Ro y on Col Old p.1 ue en Av Ro ad Tudo Hill Beac Chestnut Hill Reservoir ee \\ mawald \ ld \ 10039.00 \ Graphics \ Figures \ IMP \ PR-SITE-IMPS-Final.indd ut tn Road Chesnut Hill Campus Middle Campus Str Hammond es e Mayflower Road Quincy Mor 13 8 17 Ch as hom Hill vew ay Ca C om Way Integrated Science Center Stokes Commons Academic Building Academic Building Carney Hall Renovation Surface Parking Recreation/Athletics Building Smith Wing Replacement Stuart Hall Renovation Dri a mon wea lth ihy erl Fr H Evergreen Cemetary 12 18 19 20 21 22 23 24 25 26 e Commonwealth Avenue ll ane mp Brighton Athletics Center Bishop Peterson Hall St. John's Hall Parking Garage Library Storage Tennis Courts Undergraduate Housing Chancery/Creagh Library Renovation Fine Arts District Cardinal's Residence Renovation Undergraduate Housing Undergraduate Housing Recreation Center Undergraduate Housing Beacon Street Garage Addition Undergraduate Housing University Center 0 300 600 Feet Boston College Institutional Master Plan Supplement

Institutional Master Plan Supplement Lake St Brighton Campus Commonwealth Ave Fr. Herlihy Dr mawald \ ld \ 10039.00 \ Graphics \ Figures \ IMP \ Prop-Access.indd p.1 Campanella Way St. Thomas More Rd Legend Existing Roadway Proposed Roadway Closure New Roadway Restricted Use Vanasse Hangen Brustlin, Inc. Proposed Brighton Campus Access Figure 2 Boston College Institutional Master Plan Supplement

Institutional Master Plan Supplement kenrick Street GLenmont r oad Chandler Pond Gallagher Memorial Park 2 1 es tr ee t 3 eet L ak 5 ter Str 4 n sto Bo ton w Ne BrightoN Campus 8 9 erl Evergreen Cemetary 12 ihy 11 dr way Legend Existing Boston College Building Lower CampuS t as mor 13 8 25-Year No-Build Zone e 17 vew ay hill dri 400 Feet Source: Building Footprints - Boston Redevelopment Authority (BRA), Parcels - FY 2002 Parcels from the City of Boston Assessor s maps hom 200 Proposed Renovation St t 16 0 Proposed Institutional Project road CheStnu pa Cam 10 CommonweaLth avenue Fr h mawald \ ld \ 10039.00 \ Graphics \ Figures \ IMP \ Prop-Access.indd p.1 7 La nel FoS 6 No-Build Zone Vanasse Hangen Brustlin, Inc. Figure 3 Boston College Institutional Master Plan Supplement ChesNut hill Campus Chestnut Hill