DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)

Similar documents
A DEFINITIONS AND ACRONYMS

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

CHESAPEAKE BAY BRIDGE AND TUNNEL DISTRICT PARALLEL THIMBLE SHOAL TUNNEL REQUEST FOR QUALIFICATIONS #PTST-15-1

REQUEST FOR QUALIFICATIONS. Design Professional Services

Exhibit A DEFINITIONS AND ACRONYMS

REQUEST FOR PROPOSALS For Design Services for New Fire Station

A DEFINITIONS AND ACRONYMS

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, :00 P.M.

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Small Business Enterprise Program Participation Plan

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

REQUEST FOR QUALIFICATIONS CAMP HALL RAILROAD BUILD-IN DESIGN-BUILD PROJECT. Camp Hall Commerce Park (Camp Hall) Ridgeville, South Carolina

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR INFORMATION

FORM A-2 FINANCIAL PROPOSAL SUBMITTAL LETTER

LOCKHART INDEPENDENT SCHOOL DISTRICT

Request for Qualifications for Selected San Francisco Public Utilities Commission Construction Projects

TRANSPORTATION 2050 PROGRAM MANAGEMENT SUPPORT SERVICES

REQUEST FOR QUALIFICATIONS TO PROVIDE ON-CALL ENGINEERING SERVICES FOR CONSTRUCTION MANAGEMENT AND INSPECTION

Design-Build Procurement Overview Manual. Alternative Project Delivery

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

REQUEST FOR QUALIFICATIONS CONSULTING ENGINEERING SERVICES LLANO COUNTY

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

BISHOP CONSOLIDATED INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT

ARKANSAS STATE HIGHWAY AND TRANSPORTATION DEPARTMENT. Request for Proposals (RFP) INNOVATIVE FINANCING STUDY FOR THE INTERSTATE 69 CORRIDOR

REQUEST FOR QUALIFICATIONS

Date: April 6, 2018 SUBJECT: REQUEST FOR QUALIFICATIONS. RFQ # Business Analyst Services

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

TEXAS DEPARTMENT OF TRANSPORTATION INSPECT, SAMPLE, AND TEST FOR ASBESTOS CONTAINING MATERIAL AND MONITOR ABATEMENT PROJECTS PUBLICATION

VDOT. Virginia Department of Transportation REQUEST FOR QUALIFICATIONS A DESIGN-BUILD PROJECT

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR RAISED MEDIAN AT EL DORADO STREET. Issued by:

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama REQUEST FOR PROPOSALS RFP WEBSITE DEVELOPMENT AND REDESIGN

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018

Request for Qualifications. Architectural Firms

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

SELECTION PROCESS & QUESTION DEVELOPMENT

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

October 6, The proposal due date and time scheduled for Friday, November 3, at 04:30 P.M. remains unchanged.

Request for Qualifications Wayfinding, Signage and Streetscape Design Initiative City of Mobile, AL

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

Request for Qualifications/Proposals LAND ACQUISITION DUE DILIGENCE & PROFESSIONAL TECHNICAL SERVICES ADDENDUM #1: FEBRUARY 1, 2018

Page 1 of 10 Chicago Infrastructure Trust Joint Public Safety Training Academy - RFQ Clarifications - November 9, 2017

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

UNION COUNTY MINORITY AND SMALL BUSINESS GUIDELINES AND OUTREACH PLAN

FARMERSVILLE INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT SERVICES

PIEDMONT TRIAD AIRPORT AUTHORITY

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR PROPOSALS

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

Attention Design Firms

Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Request for Statements of Qualifications Architectural Services. University of California, Merced Classroom and Academic Office Building

REQUEST FOR QUALIFICATIONS RFQ NO Orange Coast College Classroom Modernization Project

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS FACILITIES DEVELOPMENT & OPERATIONS DEPARTMENT CAPITAL IMPROVEMENTS DIVISION

San Mateo County Project Development Unit. Issued: August 4, 2017 Responses due: September 1, 2017 at 2:30 pm. Sam Lin, Manager

Request for Proposals (RFP) Consulting and Design Services for Solar Photovoltaic Systems for Iowa City Facilities September 22, 2017

Would like the list of RFQ respondents in order to contact for teaming.

REQUEST FOR PROPOSALS. Uptown Main Street/US 25 Traffic Calming Analysis. Date Issued: June 5, 2018

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

Request for Qualifications for Assistive Technology Consultant Services

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

JERSEY COLLEGE RECOGNITION OF 5000 TH GRADUATE SCHOLARSHIP PROGRAM RULES FOR PARTICIPATION AND AWARDING

2016 Park Assessment

Request for Proposal (RFP)

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

TEXAS DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING AND SUPPORTIVE SERVICES (OJT/SS) PROGRAM

MISSOURI. Downloaded January 2011

REQUEST FOR QUALIFICATIONS

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

Denver International Airport Request for Qualifications (RFQ) Gate Holdroom Concession Services Concourse C West Expansion

Construction Management (CM) Procedures

ADDENDUM NO. 2. Date Of Addendum: April 21, 2014

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT CONSULTANT SERVICES

Northeast UAS Airspace Integration Research Alliance, Inc. (NUAIR)

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA

MINNESOTA DEPARTMENT OF TRANSPORTATION STATEWIDE

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT MARKETING AND BRANDING PLAN

Request for Qualifications Construction Manager

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9

Request for Proposals No Project-Management Services. for. Wahluke School District No East Saddle Mountain Drive Mattawa, WA 99349

REQUEST FOR QUALIFICATIONS FOR OWNER REPRESENTATIVE PROFESSIONAL SERVICES DURING PROCUREMENT AND CONSTRUCTION FOR

Attention Design Firms

A. PROJECT INFORMATION

REQUEST FOR PROPOSAL FOR: Grant Writing & Post-Award/Project Implementation Technical Assistance River Valley Community College BID #RVC15-09

REQUEST FOR PROPOSAL NEW MARKET TAX CREDIT CONSULTANT SERVICES

REQUEST FOR BIDS PUBLIC ACCESS TELEVISION MANAGEMENT SERVICES THE CITY OF YORK. November 17, 2014

REQUEST FOR QUALIFICATIONS for ENGINEERING SERVICES

Transcription:

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6 (February 14, 2012) RFQ 1. Part A, Section 4.2(a), Page 6 2. Part A, Sections 4.2(b) & 4.2(c) Please confirm that financial requirements are to be provided as hardcopies only, with no electronic version. b) General format requirements: Submittals must be prepared on 8-1/2" x 11" sized, white paper and bound. Double-sided printing is encouraged. 11" x 17" pages are allowed (each 11" x 17" page will be counted as a single page and will be included in the page count contained in Volume 1) for schematics, organizational charts, other drawings or schedules, but not for narrative text. Printed lines may be single-spaced. Insofar as is practical or economical, all paper stock used shall be composed of recycled materials. (c) Volume 1 requirements: Volume 1 (as described in Part B) shall have all pages sequentially numbered and not exceed 40 pages, including any 11" x 17" pages (insofar as they are allowed as stated in Part A, Section 4.2(b)). Each printed side shall be considered one page. The font size in Volume 1 shall be no smaller than twelve-point, other than in tables, diagrams, organization charts and other such graphics, which may be in ten-point. As set forth in Part A, Section 4.2, each responding Proposer shall include one digital copy of its QS in a readonly format on a CD. The read-only CD must include the entire QS, including Volume 2. The page count applies to all components of Volume 1. Further, as set forth in Part A, Section 4.3 of the RFQ, [i]f a Proposer is compelled to include material in addition to the information specifically requested, the Proposer shall append that material to the end of the most appropriate defined section of the outline. Additional material is subject to the page limitation. A table of contents, title page and cover letter are not specifically requested in the RFQ and will count toward the 40 page limit. Texas Department of Transportation 1

Please clarify if items contained in Volume 1 such as a Table of Contents, Title Page, Cover Letter, etc. will count towards the 40 page limit. 3. Part A, Section 4.2(c), Page 6 Volume 1 (as described in Part B) shall have all pages sequentially numbered and shall not exceed 40 pages... Please see response to Q. 2. Does the 40 page limit for Volume 1 include a Table of Contents? 4. Part A, Section 5.2(d), Page 8 and Part B, Vol. 2, Section A(f), Page 8 5. Part B, Volume 1, Section B(d) Form D, Reference Summary, Page 5 Part B, Volume A Table of Contents may be included and will not count against the 40 page limit. The financials provided by the proposer are graded as a pass/fail per part A page 8. Part B page 8 states, "...TxDOT may, in its discretion based upon the review of the information provided, specify that an acceptable Guarantor is required as a condition of shortlisting." Is there a minimum dollar amount or other grading criteria to determine if the financials provided by a proposer will meet the pass/fail requirements? On Form D Reference Summary is it permissible to place the reference information for experience and qualifications for projects that have not been provided pursuant to Part B, Volume 1, Section (c)? Included in Part B, Volume 3 Section E There is no minimum dollar amount or other specific grading criteria for this determination. TxDOT will make the determination, in its sole discretion, based on its review of the information provided in the QS. Proposers may include additional project references on Form D. The instructions will be clarified as set forth below: Volume 1, Section B, Subsection (d) Reference Summary on page B-5 will be revised in Addendum #3 to the RFQ to read: Texas Department of Transportation 2

RFQ 1, Section B (c) Forms E-1, E-2 and E-3, Relevant Experience, Page 4 Part B, Volume 3, Section E, Project Descriptions, Page 13 6. Part B, Volume 1, Section B(e)(2) Project Descriptions to describe their qualifications and experience in performing the role that the Proposer proposes to allocate to them? That are not included as project experience listed on Forms E-1, E-2 and E-3. Please change the language in the RFQ to reflect the following: Provide a list and a brief description of all instances during the last five years involving transportation projects in which the Proposer (or any other organization that is under common ownership with the Proposer), any equity member or any Major Non-Equity Member was (i) determined, pursuant to a final determination in a court of law, arbitration proceeding or other dispute resolution proceeding between the public owner and such entity, to be liable for a material breach of contract, or (ii) terminated for cause. For each instance, identify an owner s representative with a current phone and e-mail address. For any entity identified in the QS for which experience and qualifications have not been provided pursuant to Part B, Volume 1, Section B(c), the Proposer may, but is not required to, include relevant project references on Form D briefly describe their qualifications and experience in performing the role that Proposer proposes to allocate to them. The description need not be lengthy or go into the level of detail sought in Part B, Volume 1, Section B(c). No change will be made. Reasoning: Proposer s team includes large multinational companies with vast numbers of international affiliates in a number of industries Texas Department of Transportation 3

and jurisdictions, and the efforts necessary to diligence such activities would be difficult given the time frame for the prequalification submission. As such, these proposed revisions are intended to provide information to TxDOT that will be necessary for it to perform a fully informed evaluation, while also making it feasible for us to provide the requested information. The requested changes are consistent with changes made by TxDOT in a prior RFQ. 7. Part B, Volume 1, Section B(e), Page 5 and Q&A Matrix #4, Answer #4 The following information regarding legal issues affecting the Proposer and its team members shall be submitted: Please clarify that Legal Qualifications are only required for Equity Members and Major Non- Equity Members. The legal qualifications are required for the specific team members identified in clauses (1),(2) and (3) of Part B, Volume 1, Section B(e) of the RFQ. The reference to team members in the first sentence of Part B, Volume 1, Section B(e) does not expand on the requirements set forth in those clauses. 8. Part B, Volume 1, Section B(e)(3), Page The following information regarding legal issues affecting the Proposer and its team members Equity Members and Major Non- Equity Members shall be submitted: Please change the language in the RFQ to reflect the following: Provide a list and a brief description (including the resolution) of each arbitration, litigation, dispute review board and other formal dispute resolution proceeding occurring during the last five years between the public owner and Proposer (or any other Please see Dallas Horseshoe RFQ Addendum #2 and response to Q. 5 in Q & A Matrix #5. No additional changes will be made. Texas Department of Transportation 4

organization that is under common ownership with the Proposer), any Equity Member or any Major Non-Equity Member and involving an amount in excess of $500,000 related to performance in transportation with a contract value in excess of $25 million. Include a similar list and description for all projects included in the response to Part B, Volume 1, Section B(c) regardless of whether the dispute occurred during the past five years or involved the same organization that is on the Proposer s team. For each instance, identify an owner s representative with a current phone and e-mail address. 9. Part B, Section C(a), Page 11 The RFQ requires references on personnel resumes. Specifically, it states, "Resume shall include...the public owner's contact information (project manager name, phone number, e-mail address). If the owner's project manager is no longer employed by the owner, provide an alternative contact at the owner/agency who played a leadership role for the owner during and is familiar with the project" No change will be made. Reasoning: Not every individual on large projects reports directly to the owner, especially in the case of a PPP or Owner's Representative. Texas Department of Transportation 5

RFQ 10. Part C, Exhibit A, Section 1, Page 2 Request: Please amend the "Owner" reference requirements to allow inclusion of a reference who can verify the experience claimed from an individual. Addendum #2 added work along IH 30 from Hotel Street to west of IH-45. Please provide a drawing outlining the limits of this additional scope for the westbound Collector-Distributor widening, existing ramp and new ramp modifications and any associated bridge modifications. Please see the updated Preliminary Horseshoe Schematic available in the Reference Information Documents section of the project website. 11. Part C, Form C, Page 12 & Q # 19 in Q & A Matrix # 4 Q&A #4, Q #19 asked: Question 4 is not bound to a specific time frame like question #1 is. Will TxDOT please confine this question to a relevant period of time as it was on the Grand Parkway RFQ? (i.e. the last 10 years) Existing text: Has the firm or any affiliate* ever been found liable in a civil suit or found guilty in a criminal action for making any false claim or other material misrepresentation to a public entity? Suggested text: Has the firm or any affiliate* ever been found liable in a civil suit or found guilty in a criminal action for making any false claim or other material misrepresentation to a public entity within the past ten years? TxDOT : The requested change will be made in Addendum #2. The requested change will be made in Addendum #3. Texas Department of Transportation 6

New Question: No changes to were made in Addendum #2 in Part C, Form C, Page 12. Please confirm that Form C, Question #4 will be updated in a future addendum. 12. Part C, Form C, Page 14 Please change the language in the RFQ to reflect the following: The term Affiliates, as amended by Q&Q Matrix # 4 issued January 13, 2012 includes parent companies, subsidiary companies, joint venture members and partners in which the entity has more than 15% financial interest. No change will be made. As set forth in Part B, Volume 3, Section A of the RFQ, a Form C is required to be completed by the Proposer, each Equity Member of Proposer, each Guarantor and each Major Non-Equity Member. There is no requirement that each affiliate of each such entity complete the form. Reasoning: Definition of Affiliates: It is common practice for proposers to team up with other parties and form project specific joint ventures. In such cases, a joint venture party has no control over the other joint venture members, particularly after the project for which the joint venture was created is completed. The definition of Affiliates, as drafted, requires proposers to request joint venture members of all joint ventures to which the proposer is a party, to complete Form C, on order to allow proposer to respond to Form C accurately. This requirement is not realistic as most joint venture partners will not comply with the request for information. Therefore, we request that the words joint venture members be deleted from the definition. Texas Department of Transportation 7

13. Part C, Form E- 2, Note (3), Page 17, In regards to Q & A Matrix #4, Question 23, the response states, No changes will be made. Proposers are to include only the projects in which the Joint Venture Member held at least 30% of the joint venture that had ultimate responsibility for construction of the project and only if such Joint Venture Member is the entity that will perform at least 30% of the Lead Contractor s construction work for the Project. (Emphasis added). No change will be made. Does this mean that a 20% Joint Venture Member who is ultimately responsible for at least 30% of the Lead Contractor s construction work for the Project is eligible to list projects on Form E2? We request that all Joint Venture Members who are ultimately responsible for at least 30% of the Lead Contractor s construction work be eligible to list projects on Form E2. By not allowing all Joint Venture Members as noted to be included, the relevant experience of our dedicated resources cannot be fully demonstrated in the SOQ phase. If required, please revise the RFQ language and Note 3 on Form E2 to allow for projects performed by all Joint Venture Members to be included on Texas Department of Transportation 8

RFQ 14. Part B, Volume 3, Section C, Page 11 Forms E-2. In the Description of Position column located in the table on Page 11, the Design Quality Assurance Manager is required to work "for an independent quality assurance firm hired by the Design-Build Contractor." No change will be made. Can the "Design Quality Assurance Manager" work for the Lead Engineering Firm, provided that it is not an Equity Member? In the Description of Position column located in the table on Page 11, the Design Quality Assurance Manager: "Works for an independent quality assurance firm hired by the Design-Build Contractor. The firm may be the Lead Engineering Firm if the Lead Engineering Firm is not an Equity Member." 15. General Q&A #4 issued 1/13/12 refers to Addendum #2. What is the anticipated release date for Addendum #2, as it is critical for our SOQ development. 16. General Will TxDOT be providing forms in native format? If not, does TxDOT grant permission to the Proposers to alter forms? 17. General I would like to know if there is a Buy American Steel clause on this project. Dallas Horseshoe RFQ Addendum #2 was posted on the Project Website on February 3, 2012. Please see response to Q. 7 in Q & A Matrix #5. As set forth in Part A, Section 3.7 of the RFQ, as amended, and in response to Q. 30 in Q & A Matrix #4 and Q. 1 in Q & A Matrix #5, due to anticipated federal funding, Buy America requirements will apply. This means that the Design-Build Contractor will be required to comply with the Federal Texas Department of Transportation 9

Highway Administration (FHWA) Buy America Requirement in 23 CFR 635.410, which permits FHWA participation in the contract only if domestic steel and iron will be used on the Project, unless such compliance is waived by the Secretary of Transportation after publication and a public comment period on the waiver request. Texas Department of Transportation 10