PPT Presentation delivered on Pre-bid Conference II on RESCO tender for Rooftop Solar PV Projects in the State of Madhya Pradesh

Similar documents
New and Renewable Energy Department Government of Madhya Pradesh

Open Category Applicants

POLICY FOR DEVELOPMENT OF SOLAR PARKS IN THE STATE OF MADHYA PRADESH

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet

2016 Call. Operational Programme I European Structural and Investment Funds

Solar Energy Corporation of India Limited New Delhi

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Request for Proposals and Specifications for a Community Solar Project

Tender 1/2018 Request for Existing Plant Pre-Qualification for the Power 2022 Procurement Process

CENTRAL MUNICIPAL POWER AGENCY/SERVICES

WIND AND SOLAR SPP SOLICITATION 2015 REQUEST FOR QUALIFICATION (RFQ) COMMERCIAL OPERATION OF WIND AND SOLAR SMALL POWER PROJECTS OCTOBER 2015 FOR

No.NRED/BM.GEN-01/consultant NRE/ /1225 Issue date:

Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project

DRAFT PROPOSAL REQUIREMENTS

National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga Rejuvenation

MADHYA PRADESH GAZETTE (Extraordinary) Notification

May 25, Request for Proposals No Offsite Virtual Net Metering

M P STATE ELECTRONICS DEVELOPMENT CORPORATION LTD (A Govt. of M.P Undertaking) Tender No: MPSEDC/TRIBAL/VC/DCGM/2018/374 Dated

Commercial Scale. Direct Ownership-Application. Renewable Energy Projects over 10kW. Commercial Block program details can be found at:

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

REQUEST FOR PROPOSAL For East Bay Community Energy Technical Energy Evaluation Services

microfit FAQ Version 4.1

Carbon Neutral Adelaide

REQUEST FOR PROPOSALS (RFP) AND GENERAL INSTRUCTION TO SERVICE PROVIDERS BID DATA SHEET (BDS)

DRAFT PROPOSAL REQUIREMENTS

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

Bhopal, Dated January 22, ADDENDUM No. 1

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

Indian Institute of Information Technology, Design and Manufacturing, Kurnool (IIITDM Kancheepuram Campus) Chennai Tender Document.

Reply of Prebid queries (RFP for selection of integrated marketing communication agency for promotion branding of Assam Tourism in India Overseas)

State of Qatar. Kahramaa Solar PV. Independent Power Project. Pre-Qualification Questionnaire ( PQQ ) for Applicant

Request for Proposal. For. Selection of Architectural Consultants. For IT CAPACITY BUILDING & TRAINING CENTRES. Madhya Pradesh

NCC Infrastructure Holdings Limited

Professional Development and Training Services

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

All proposals must be received by August 30, 2016 at 2:00 PM EST

Telecommunications Consultants India Ltd. (A Government of India Enterprise)

SEALED PROPOSAL REQUEST FOR PROPOSAL. Professional Archaelogical Services

Solar Electricity For Community Buildings Pilot Program. Workbook

Selection of Private Player for Refurbishment, Operation & Maintenance of Fruit and Vegetable Market at Mohali, Punjab

Ease Of Doing Business

Ref: AIDC/CC/KP/1/2506 Date: 18/07/2017. CORIGENDUM No. II

The Narragansett Electric Company d/b/a National Grid

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

For Information, Issuance and Submission of EOI, please contact as follows:

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011.

North Pinellas County Solar Co-op RFP

Faculty of Engineering and Technology Jadavpur University NATIONAL COMPETITIVE BIDDING FOR PROCUREMENT OF EQUIPMENT

Tamil Virtual Academy Anna University Campus, Gandhi Mandapam Road, Near Govt. Data Centre, Guindy, Chennai

Establishment of Computer Labs in Government Girl s Institutions of Islamabad Capital Territory Phase 2

49469-IND: Mumbai Metro Rail Investment Project. 12 June 2018, 15:00 hours Indian Standard Time (IST)

I 2 Program Frequently Asked Questions

j. Billing procedure k. Periodical Inspections Page 1

Aboriginal Community Capital Grants Program Guide

Refer to section 2.C. for more information on the evaluation criteria.

FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES

MCE Feed-In Tariff for Distributed Renewable Generation

PREQUALIFICATION DOCUMENT

Request for Empanelment (RFE) of. Facilitators

Request for Proposals

Energy. Request For Proposals for Renewable Power Supply Resources

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

INVITING EXPRESSION OF INTEREST (EOI) FOR DEVELOPMENT OF INDUSTRIAL PARK / PROJECT AT Kiratpur (Jilwani), Dist.

Tender Notice No: 4/2018 dated: 17/07/2018

201 North Forest Avenue Independence, Missouri (816) [September 25, 2017] REQUEST FOR PROPOSAL GRADUATION CAPS AND GOWNS

RESPONSE TO QUERIES Request for Proposal for Empanelment of Consultants for Appraisal of Detailed Project Reports (DPRs) for Industrial Projects

Request for Proposal PROFESSIONAL AUDIT SERVICES

Advertisement Vacancy "Energy Expert"

SOUTH CAROLINA ELECTRIC & GAS COMPANY REQUEST FOR PROPOSALS FOR SOLAR PHOTOVOLTAIC DISTRIBUTED ENERGY RESOURCES AT TWO DESIGNATED SITES

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT

Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA. Water Supply

Attention: Suncorp Solar Potential Investors and Shareholders SMALL IPP PROGRAM SOUTH AFRICA RENEWABLE ENERGY MARKET

Lyndon Township Broadband Implementation Committee Lyndon Township, Michigan

MARKET OPPORTUNITY ANALYSIS FOR THE OCEAN TECHNOLOGY SECTOR IN NEWFOUNDLAND AND LABRADOR

Rhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules

Gujarat Energy Transmission Corporation Limited (GETCO)

Request for Qualifications DRPA Solar Photovoltaic Systems

REQUEST FOR PROPOSAL

ADVERTISEMENT OF PUBLIC NOTICE

The Narragansett Electric Company d/b/a National Grid

County of Alpena Website Design and Development RFP

Consumer User Manual for Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh

Promotion of Renewable Energy Sources in the Domestic Sector PV Grant Scheme

Request for Proposals. ORION Impact Study: An RFP to Determine ORION's Social and Economic Impact in Ontario

Council of Independent Colleges in Virginia Solar Group Purchasing: Results and Lessons Learned

Expression of Interest (EoI) Notice

FORTUNE SACCO REQUEST FOR PROPOSAL FOR PROVISION OF AUDIT SERVICES FOR THE FINANCIAL YEAR CLOSING DATE: MONDAY 20 th, MARCH 2017, TIME: 11:30AM

Automated License Plate Reader (ALPR) System. City of Coquitlam. Request for Proposals RFP No Issue Date: January 25, 2017

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.

Roadmap for Implementation of Renewable Energy Certificate Mechanism for India. Guidelines and Operating Rules for Monitoring Institution(s)

Trade Ally WPS Bonus Bid Program

Environmental Management Chapter

New Jersey Energy Resilience Bank

The Request for Proposal consists of the following documents, and should be read in conjunction with any Addenda issued:

REQUEST FOR PROPOSALS Thomas MacLaren State Charter School Classroom Furniture for K-5 School March 2, 2018

REQUEST FOR PROPOSAL FOR AUDIT SERVICES RFP W.E. Upjohn Institute for Employment Research 300 S. Westnedge Ave. Kalamazoo, MI 49007

ENGIE FEED IN TARIFF APPLICATION FORM. Version ENGIE FIT Application P a g e 0

Illinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next?

REQUEST FOR PROPOSALS SERVICES FOR. [Federal Media Network Training] Prepared by. IOM Somalia. [Somalia Stabilization Initiative - SSI]

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs

Transcription:

PPT Presentation delivered on Pre-bid Conference II on RESCO tender for Rooftop Solar PV Projects in the State of Madhya Pradesh 22 June 2018 Madhya Pradesh Urja Vikas Nigam Limited

Introduction 1. RESCO tender for Roof Top Solar PV Projects at Various Locations in the State of Madhya Pradesh; 2. Total capacity of projects under different Project Group is estimated of 28 MWp; 3. The projects are categorized in different Project Groups as mentioned here; 4. Each group might have different size of projects within but enjoy uniform tariff. 5. The contract would be awarded to one bidder for a group at the uniform tariff 6. Bid shall be valid for 180 Days from the Bid Deadline Date; Project Group A B C Type of Institution Colleges under Dept. of Higher Educations. Govt. Medical Colleges under Dept. of Medical Education Institutions of Central Govt./ National Importance Count of projects Est. Capacity (kwp) 311 5,754 3 3,800 16 4,760 D Institutions of State Govt. 3 210 E Govt. Universities 11 2,850 F MP Police Establishments 59 1,640 G H Govt. Engineering/ Poly- Technic/ ITI Colleges Municipal Corporations/ Nagar Palika Parisad 130 2,232 6 3,800 I U Private Institutions 14 3080 Total 28,126 2

One tender for each project group 1. Tenders are available for purchase from www.mperproc.gov.in. 2. Each Project Group is a separate tender - Total 22 tenders are hosted 3. RfP and draft PPA are hosted under Tender Notification which can be accessed without fees. 4. Details of project sites and access to the Data Room is provided through a document hosted in a paid section named as Tender Document 5. Bidder can view the master table and Link for the data room only after paying the bid processing fee. 6. Bid processing fee for each tender is Rs. 50,000. However, if it is paid once, the bidder can claim exemption from subsequent fees by uploading the payment slip. 7. There is a nominal registration fees charges by the portal for each tender. 8. Two envelope bid, Financial bid online submission; 3

Eligibility Criteria 1. The Bidder should be a Company or a Partnership Firm or a Limited Liability Partnership Firm (LLP) or registered Sole Proprietor; 2. No Technical Eligibility Criteria; 3. Financial Eligibility Criteria: I. Bidder should have minimum net worth of INR one crore MWp; Net worth requirement for each project group is provided in the tender (Min. 5 Lakhs for project group T, Max 5.75 Cr for project group A ) I. In case of Consortium, Net Worth should be fulfilled by Lead Member; II. If Bidder bids for multiple Project Group, Net worth requirement will be assessed individually for each project group, however, it will not be additive. 4

Project groups and important parameters Proj. Group Type of Institution No. of Sites Est. capacity (kwp) NW required (Rs. Lac) Bid Security req. (Rs. 000) A Colleges under Dept. of Higher Education 311 5,754 575 6,905 B Govt. Medical Colleges under Dept. of Medical Education 3 3,800 380 4,560 C Institutions of Central Govt./ National Importance 16 4,760 476 5,712 D Institutions of State Govt. 3 210 21 252 E Govt. Universities 11 2,850 285 3,420 F MP Police Establishments 59 1,640 164 1,968 G Govt. Engineering coll./poly-technic/iti 130 2,232 223 2,678 H Municipal Corp. / Nagar Palika Parisad 6 3,800 380 4,560 I Private Institution 1 100 10 120 J Private Institution 1 500 50 600 K Private Institution 1 500 50 600 L Private Institution 1 150 15 180 M Private Institution 1 200 20 240 N Private Institution 1 100 10 120 O Private Institution 1 200 20 240 P Private Institution 1 200 20 240 Q Private Institution 1 200 20 240 R Private Institution 1 200 20 240 S Private Institution 1 100 10 120 T Private Institution 1 50 5 60 U Private Institution 1 80 8 96 V Private Institution 1 500 50 600 Total 553 28,126 5

General Features of RFP 1. Pre-identified Procurers including Govt./ Pvt. Institutions; 2. More than 28 MW capacity already identified under RESCO Mode; 3. No need to go for Procurer search in Market; 4. Revision in project capacity allowed before signing PPA if agreed by procurer; 5. Neither prior experience of solar required nor technical partner in the consortium; 6. Net worth required is only 1 Cr./MW; 6

Enhancing Features of RFP 1. Data room containing site wise survey report along with past electricity bills. 2. Operational Life is for 25 Years from Scheduled COD (SCOD); 3. No operational performance bank guarantee; 4. Liquidated damages (LD) on delay in commissioning of project from SCOD; 5. LD also on not fulfilment of defined milestone during construction period; 6. Advance payment of subsidy, on Procurer s demand, up to 50% of subsidy for Procurer is permissible; 7. Remaining payment of subsidy within 45 days from COD; 8. Bidder with Lowest first year quoted tariff would be a winner; 9. Annual tariff escalation of 3% up to 25 years; 10. Concessional World Bank loan for Commercial and Industrial Group; 11. Concessional IDBI bank loan for all project group; 7

General Features of PPA 1. Term of PPA is 25 years from SCOD; 2. Commissioning within 9 Months from PPA signing; Part Commissioning allowed; 3. Extension in SCOD on Procurer s delay in fulfilment of CS or on account of receipt of Commissioning certificate from concerned DISCOM; 4. Payment security mechanism need to be established by Procurer and Net Metering application need to be submitted in concerned DISCOM by Power Producer within 2 months from the Signing of PPA; 5. 5% of C-PBG value as LD per week of delay in commencement of power supply; 6. Monthly Bill Payment within 15 days from receipt of invoice; 8

Enhancing features of PPA 1. Payment security from Procurer or Agency under which Procurer falls; 2. No termination (pre-mature) allowed before 5 Operational Years; 3. Termination payment provision in case of Procurer default as well as Power Producers default; Higher termination payment on procurer s default; 4. Procurer agreement to procure 100% of the energy generated; In case of lower demand, loss in revenue is made good by Procurer based on Deemed Generation; 5. Payment on Deemed Generation during Project disruption period; 6. In case of under generation, the penalty of 20% of tariff is imposed on shortfall; If CUF falls below 10% on a monthly basis for continuous 6 months, it will termed as power producer event of default and Procurer can trigger PPA termination. 7. Late payment surcharge (1.5% pm) and early payment rebate (1% pm); 8. No delay in payment of disputed bill, adjustment are allowed in later bills; 90% disputed amount should be paid within 15 days of invoice; 9. Substitution right of Lender; 10. Timelines for O &M defined to reduce the interference during working hours; 9

Process Flow from Bid Submission to COD Bid Security shall be paid as per slide No 5 Bid Submission Bid Evaluation LICA to lowest Bidder of each Project Group Completion of Conditions Precedent Signing of PPA with Procurer COD of Project within 9 months from signing of PPA Power Producer and Procurer need to fulfil CPs within Given time Before signing, C-PBG submission of 25 lakh/mwp or part thereof; BG against Advance Subsidy payment, if Bidder wants advance;

Key Milestone from issuance of LICA to CoD Selected Bidder to be awarded LICA 15 days LICA Signing 15 days Space to be provided by Procurer 15 days Site survey to be completed by Bidder 15 days PPA Signing 10 days C-PBG submission by Producer 15 days SNA to confirm capacity in 10 days 10 days Inform SNA on final capacity 30 days Submit design drawings 30 days Net metering app, project layout, BoM by Producer Payment Sec. by Procurer 7 months COD

Payment Terms for release of Subsidy and Liquidated Damages Payment Terms Subsidy for each Projects shall be released in two parts: 1. Advance subsidy payment of 50% of the subsidy value for PPA Capacity of each Project. Bank Guarantee shall be submitted against the advance subsidy requirement by Power Producer; 2. Remaining subsidy payment shall be released within 45 days from the COD; Liquidated Damages (LD) 1. LD on delay in Commissioning: 5% of C- PBG value per week of delay from the SCOD subject to maximum of 20 Weeks; 2. LD on non-compliance during Construction Period: 2% of C-PBG per week of delay or part thereof, in case of failure in adhering in submission of details as mentioned in CS of the Project. 3. LD on delay in achieving any milestone mentioned in COD schedule by Power Producer: 0.5% of C-PBG per week of delay or part thereof except for final milestone; 4. If CoD is achieved in time, accrued penalty during Construction Period would not be levied 12

Payment Security Mechanism Procurer or Procurer s Administrative Department can provide payment security in any one of the below form: 1. Letter of Credit; 2. Unconditional and irrevocable bank guarantee; 3. Fixed Deposit Receipt with Nodal Agency; 4. Cash Receipt with Nodal Agency; 5. Guarantee of the concerned Department; For Government entities: ~ 120% of the estimated average monthly billing/ previous Operational Year. For Private entities ~ 400% of the estimated average monthly billing/ previous Operational Year. 13

Compensation on Termination Power Producer s event of default: 1. Procurer have a right to terminate the PPA and Project ownership shall be transferred to procurer after paying termination payment to Power Producer which is equivalent to 50% of Net Asset Value; Net Asset Value = Benchmark Capex X (1 (4% x No of operational years)) Procurer s event of default: 1. Power Producer have a right to terminate the PPA and ownership of asset will be transferred to Procurer. Procurer has to pay termination payment which is equivalent to Net Asset Value; 2. In case, Power Producer s removes the asset from the Premises, termination payment received by Power Producer would be only 10% of Net Asset Value; Net Asset Value = Benchmark Capex X (1 (4% x No of operational years)) Termination on request of Procurer: 1. Procurer can request for termination of PPA after completion of 5 years. In such case, Procurer shall termination payment which is equivalent to Net Asset Value; Nodal Agency shall keep the share of termination payment in the ratio of subsidy paid to total Benchmark Cost.

World Bank Loan for Projects under Commercial and Industrial Project Group 1. Only Commercial and Industrial Project Group is eligible for World Bank Loan; 2. Sole proprietorship Firm, Partnership Firm including LLP and Company/SPV/NBFC; 3. Bidder should have at least one year experience in power sector; 4. Door to door term loan for 15 years tenor is available up to 75% of project cost. Need based NFB facility is available; 5. Interest rate would range from one year SBI MCLR plus 20 basis point to 90 basis point, depending on risk rating of Successful Bidder; 6. Bidder should comply with EHSS guideline and must have secured all required clearances/approvals; 7. Borrower s Guarantee would be required; 8. DSRA equivalent to 3 months principal and interest should be maintained; 9. Developer should maintain average DSCR of 1.25 at P75 and minimum interest coverage ratio of 1.75; 15

Project Group wise Master Table A Master table has been prepared for each project group which contains the following fields: Name of the Institution District Lat (N) Long (E) Est. capacity (kwp) Est. energy generation from solar (MWh/yr) Present Contract Demand Present Supply Voltage (V, kv) DT capacity GOI + GoMP Subsidy (net of 2% as UVNL s admin charges) Rs. Maulana Azad National Institute of Technology Bhopal 23.213880 77.407808 1000 (2 X 500) 1,609.0 2 X 1000 33 kv 2 X 1000 KVA 2,27,90,000 Motilal Vigyan Adarsh Mahavidyalya Bhopal 23.244151 77.407629 80 125.5 <10kW 400V 2 X 200 KVA 18,92,000 16

Explaining Subsidy Computation Project Capacity (kwp) Benchmark (Rs/Wp) Net Subsidy (Govt. Buildings) 1 10 60 43% x 60 x Capacity in Wp 10 100 55 43% x 55 x Capacity in Wp 100 500 53 43% x 53 x Capacity in Wp Project Capacity (kwp) Benchmark (Rs/Wp) Net Subsidy (Private Institutions) 1 5 60 28% x 60 x Capacity in Wp 5 10 60 (28%+20%)*60*Capacity in Wp 10 100 55 (28%+20%)*55*Capacity in Wp (20% subsidy is available for up to 25 kw) 100-500 53 (28%+20%)*53*Capacity (20% subsidy is available for up to 25 kw) 17

A Data Room is created for bidders facilitation 1. A data room have been prepared to facilitate bidders in decision making. 2. The data room will contain the following documents for each project site: i. Document explaining the Approach and Methodology followed during site survey and creation of Annual Production Report. ii. iii. Annual Production Report with details such as Irradiance, Module DC Capacity, Inverter AC Capacity, Month wise expected generation, Sources of system losses, photograph of rooftop with panel placement for each site. Electricity Bills for project site. The data room can be accessed after paying the bid processing fee. 18

Contents in Annual Production Report

Timelines 20

Towards cleaner and greener future. Thank you