Proceedings of the 112 nd SEIAA meeting held on 28 th January 2016 at Room No. 709, M.S Building, Bangalore.

Similar documents
Proceedings of the 126 th SEIAA Meeting held on 5 th December 2016 at Room No. 709, M.S Building, Bangalore.

, 89, SAS

STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY PUNJAB Ministry of Environment and Forests, Government of India. Registered

14. Corporate Tower at Plot No-A-143, Sector-136, Noida- Sri Rakesh Gupta, Director, A-68, New Friends Colony, New Delhi. File No.

EIA process in India. Sujit Kumar Singh Programme Manager Centre for Science and Environment New Delhi, India

FKCCI EXPORT EXCELLENCE AWARD 2016

MUSSOORIE DEHRADUN DEVELOPMENT AUTHORITY, TRANSPORT NAGAR, DEHRADUN

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

OPERATING PERMITS FAQs

No. SEAC/CEE(HQ)/ Dated Registered POST

GUIDELINES OF THE MEGA LEATHER CLUSTER SUB-SCHEME OF INDIAN LEATHER DEVELOPMENT PROGRAMME

Environmental Impact Assessment

An Bord Pleanála STRATEGIC INFRASTRUCTURE DEVELOPMENT PLANNING AND DEVELOPMENT ACTS 2000 TO An Bord Pleanála Reference Number: 29S.

PRE BID CLARIFICATION/CORRIGENDUM NO. 1

MATCHING SCHEME OF ASSISTANCE TO PUBLIC LIBRARIES TOWARDS INCREASING ACCOMMODATION

1136 Dupont Street - Zoning Amendment Application - Preliminary Report

Planning: a Short Guide

IN THE HIGH COURT OF KARNATAKA AT BENGALURU BEFORE THE HON BLE MR. JUSTICE H.G.RAMESH MISCELLANEOUS FIRST APPEAL NO.

APPLICATION FORM FOR PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (Seven Copies to be submitted)

Contractors who are desirous of tendering for above work and fulfills the Following requirements shall be eligible to apply:

CITY OF TYLER PLANNING AND ZONING COMMISSION STAFF COMMENTS

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Corporate Social Responsibility Policy *********

Standard Operating Procedures for Registration of Environmental Consultancy Offices in Abu Dhabi

1. Sh. Kuldip Singh, IFS (Retd) Chairman 2. Er. Malvinder Singh, FIE Member 3. Sh. Harbax Singh Member 4. Dr. A.S.Reddy Member

Point Wise Compliance Report (EDS Dtd. 24 September 2017)

Rural Innovation Fund FAQS

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE

EIA/VER-2/2008 EIA Consultant Registration Scheme Guidance Document

Ease Of Doing Business

Unregulated Heating Oil Tank Program Guidance

(Under Construction)

Downtown Shoulder Area Community Improvement Plan. Investing in our Community

NCC Infrastructure Holdings Limited

GOVERNMENT OF INDIA MINISTRY OF RAILWAYS (RAILWAY BOARD)

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

555 Dupont Street - Rezoning - Preliminary Report

Application Form A BACKGROUND

Petition 487, Quintain City Park Gate Birmingham Limited

SPECIFIC AND MASTER PLANS

PLAN (SIMP) AND REHABILATION AND RESETTLEMENT STUDIES. Date of Submission:- 5/11/2016 up to 17:00Hrs

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

York Mills Road Rezoning Application Refusal Report

The Karnataka Sakala Services Act 2011

PLANNING DEPARTMENT ADMINISTRATION

42695 C/o Shree Hospital, Behind Akkamahadevi College, BIDAR DISTRICT, BIDAR.

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

Integrated Low Cost Sanitation Scheme Revised Guidelines, 2008

Fill in this form to apply for a Building and Land use Permit for the following activities: (Please tick whichever applies)

This report will be open to the public on 11 July 2017.

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE

Karnataka Health Geographical Information System

NOW THEREFORE, the parties enter into the following Agreement:

THE CORPORATION OF THE CITY OF ST. CATHARINES

Master Development Plan Written Report

Regulation for the Environmental Clearance of Projects

Page 1 of 12. Sl. No. Enquiry No. Reg. No. Doctor s Name. Address Action Taken Order date

APPLICATION FORM FOR ENLISTMENT OF VENDORS

SHARED SPACE and SERVICES

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

KARNATAKA INDUSTRIAL AREAS DEVELOPMENT BOARD

REQEUEST FOR EXPRESSION OF INTEREST (REOI) FOR OIL, CENTRE OF EXCELLENCE FOR ENERGY STUDIES (COEES) BUILDING AT GUWAHATI IN ASSAM

LICENSINGAPPLICATION GUIDELINES, 2016

Northern Ireland Social Care Council. NISCC (Registration) Rules 2017

Application for POOLING OF CONTRACTORS FOR VARIOUS CATEGORIES OF WORKS IN IIMK

CONNECTED CITY FREQUENTLY ASKED QUESTIONS

COCHIN SHIPYARD LIMITED KOCHI (P&A Department) No.P&A/2(239)/14 25 Sep 2017 SELECTION OF CSR PROJECTS MANAGER ON CONTRACT BASIS

A. SUPPORT FOR CONDUCTING SEMINAR / WORKSHOP /CONFERENCE

POLICIES & PROCEDURES

COCHIN SHIPYARD LIMITED KOCHI-15 (P&A DEPARTMENT) No.P&A/6(90)/02-VI 07 March 2018

APPLICATION FOR PARCEL MAP

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

Government of India Planning Commission (LEM Division)

Child Care Program (Licensed Daycare)

INVITING EXPRESSION OF INTERESTS (EOIs)

City of Signal Hill Wireless Communications Facility Application

Government of Haryana Industries and Commerce Department

Pradhan Mantri Awas Yojana Housing for All (Urban) State Urban Development Agency (SUDA)

Expansion of the Wanchai Campus of the Hong Kong Academy for Performing Arts

MMRCL Recruitment Advertisement

Request for Empanelment (RFE) of. Facilitators

POLICY NUMBER: C553B AUTHORITY: City Manager EFFECTIVE DATE: October 31, Development Incentive Program Procedures

PROPINSIGHT A Detailed Property Analysis Report

Public Scoping Meeting for the Environmental Impact Report

Local Area Key Issues Paper No.12: Cane lands

GOVERNMENT OF INDIA MINISTRY OF LABOUR AND EMPLOYMENT

2011 SURVEY OF MUNICIPAL REGULATIONS AND FIRE CODE REGULATIONS AFFECTING CHILD CARE FACILITIES DEVELOPMENT IN SANTA CLARA COUNTY

DEPARTMENT OF TOURISM

Request for Proposal Tree Trimming Services June 4, 2018 Procurement Contact Linda Lapeyrouse

Planning Board Submission Process and Instructions

Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY

Technology Business Incubator (TBI)

ToR FOR DEVELOPING AQUACULTURE PRODUCTION STRATEGY & THEIR IMPLEMENTATION UNDER OTELP

PROCEDURE AND CHECKLIST FOR APPROVAL OF BUILDING PLANS AND REGISTRATION/RENEWAL OF LICENCE OF FACTORY UNDER FACTORIES ACT, 1948

Request for Qualifications Professional Engineering Services

APPLICATION FORM FOR GRANT OF PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (FM) (To be submitted in Quadruplicate)

EXISTING CONDITIONS

RFP for Empanelment of Interior Furnishing Contractors

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program

Rs with GP Rs.2800/-

Transcription:

Proceedings of the 112 nd SEIAA meeting held on 28 th January 2016 at Room No. 709, M.S Building, Bangalore. 112.1 Confirmation of the proceedings of 111 th SEIAA Meeting held on 11 th January 2016. Proceedings of 111 th SEIAA Meeting held on 11 th January 2016 was read and as there were no comments the same was accepted. 112.2 Action Taken reports on the proceedings of 111 th SEIAA meeting held on 11 th January 2016. The Authority noted that the action is being taken on the proceedings of 111 th SEIAA meeting held on 11 th January 2016. 112.3 Deferred Project: For Invite: Construction Projects: 112.3.1 Residential Apartment at Survey No. 21/1 and 12, Chikkanagamangala Village, Sarjapura Hobli, Anekal Taluk, Bangalore Urban District of M/s. M.J.Infrastructure, (SEIAA 37 CON 2015) It is a proposal seeking Environmental Clearance for construction of Residential Apartment of 225 Units with BF + GF + 4 UF on a plot area of 14,012.24 Sq.mts and with total built up area of 34,346.67 Sqm. Total water requirement of project is 151.85 KLD. The subject was discussed in the SEAC meeting held on 5 th & 6 th June 2015 and 17 th & 18 th August 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, with a condition that the proponent shall maintain more greenery on the mother earth and with the following observations: 1. The proposal is a low rise building having B+G+4UF only and the conceptual plan have been approved by the competent authority.

2. The proponent clarified that sufficient ventilation and lighting has already been provided by providing open to sky spaces wherever required in order to maintain the good ventilation and light. 3. NOC dated 17.03.2014 from the Village Panchayat for water supply has been submitted by the proponent and the water balance also calculated fresh water demand at the rate of 55 LPCD as per the norms prescribed for rural water supply and the scheme for meeting the additional requirement has been given. 4. Since the ground coverage is only 50%, there is a scope for providing more than 30% of the greenery on the mother earth. The Authority during the meeting held on 29 th August 2015 had perused the proposal and took note of the recommendation of The Authority noted that the following observations were raised during the 99 th SEIAA meeting held on 29 th June 2015: The Authority observed that the residential units are compactly arranged without adequate space for ventilation. The project does not have required recreational area and the greenbelt. The internal circulation roads are narrow and having varying width. The proposal do not have any proof assured source of water supply. The picturesque view of the drawing gives an indication of possible high level of indoor pollution in the proposed residential units. The Authority after discussion decided to get the following information for further considerations: 1. Modification in the conceptual plan keeping the observations of the Authority made on 29 th June 2015. 2. Details of Recreation Ground Area. 3. Details of greenbelt with provision for at least 33% of the plot area. 4. Details of the internal circulation roads of at least 6m width and drive way of 8 m width. 5. Possibility of high level indoor pollution and the proposed modified plan for preventing indoor pollution. The Authority also decided to invite the proponent. The Authority during the meeting held on 26.09.2015 had perused the reply submitted by the proponent on 21.09.2015. The proponent appeared before the Authority and explained the proposal in brief. The Authority opined that the reply submitted vide letter dated 21.09.2015 is incomplete and do not address the issues raised by SEIAA completely. The proponent 2

sought for some time for submission of revised reply as directed by the Authority. The Authority after discussion decided to consider after the receipt of revised reply. The Authority also decided to invite the proponent. The Authority perused the reply submitted by the proponent on 25.01.2016. The proponent appeared before the Authority and explained the proposal in brief. The Authority after discussion decided to clear the proposal for issue of Environmental Clearance subject to submission of the following information: 1. Revised scaled layout plan clearly indicating entry/exit, STP/MSW treatment facility location and all other infrastructural facility including RG area. 2. Enhance RG Area to the required 15% and converting one flat area for recreational purpose, as committed. 3. Relocate STP. 4. Increase in the green belt area to at least 33% and if there is a space constraint, alternate provision for compensating the greenery. 5. Specific social commitment plan with budget, activity and timeframe 112.3.2 Modification of High Rise commercial Building (Multiplex and Shopping Mall), Residential Apartments Project at Sy.No.2699/1, (old no.42 to 47, 10, 11, 12, 32), PID No.31-42-111 of Hosakere Road, Binnypet, Ward No.121, Bangalore Urban District of M/s. Relationship Properties Pvt. Ltd., (SEIAA 134 CON 2015) This is a proposal seeking Environmental clearance for proposed modification for High-rise commercial building (Mall & Amenities) and residential Apartment on a total plot area of 213808.52 Sq.mts and with total Built up area of 7,56,250.00 Sq.mts. The proposed building under expansion and modification consists of residential apartment of 3484 units consisting 11 blocks, Mall with 2 Basement+ Ground Floor+ 5 Upper Floor + Terrace Floor and Amenity Centre with Basement+ Ground Floor+ 1 Upper Floor + Terrace Floor. Total water requirement is 3316 KLD. It is noted that the proposal had earlier obtained Environmental Clearance vide Environmental Clearance letter No. SEIAA 201 CON 2012 dated 19 th July 2013 for the expansion and modification of Mixed Use Development consisting residential apartments with 5 Towers & a premium tower having 2B + G + 19 UF + Terrace. Commercial building consists of club house, hotel in 2B + G + 8 UF + Terrace and mall in 2B + G + 5 UF + Terrace. The subject was discussed in the SEAC meeting held on 30 th September 2015 and 2 nd November 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. 3

The Authority during the meeting held on 30.11.2015 had perused the proposal and took note of the recommendation of The Authority noted that construction of block number 1, 2 and 3 have been undertaken and the rest are proposed to be modified. Even though there is a reduction in built up area from the earlier E.C., there is an increase in the height of the buildings in the proposed plan upto 41 m. Justification in this regard is required. The Authority after discussion decided to get the following information for further consideration: (1) Layout plan of the proposed project super imposed on the project already issued with Environmental Clearance. (2) Revised calculation for the water requirement and corresponding water balance chart along with design of the STP and equalization tank taking the peak flow into consideration. (3) Explore the possibility of providing block-wise STP for decentralized sewage treatment and utilization of the treated water. (4) Revised layout plan to the scale clearly indicating all the infrastructure facilities and the proposed construction activity. (5) Real time traffic study report. (6) Details of the developments in the neighbourhood such as other developmental projects, infrastructural facilities, commercial establishments, road, railway line, etc in a radius of 3 Kms along with the sloping pattern. (7) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements and parking plan for corresponding number of vehicles. (8) Proposal to enhance energy savings to at least 25%. (9) Details of Recreational Ground Area with total percentage to the plot area. (10) Compliance on the earlier E.C. The Authority also decided to invite the proponent. The Authority during the meeting held on 17 th December 2015 had perused the reply submitted by the proponent. The proponent appeared before the Authority and explained the proposal in brief. The Authority noted that the proponent have already undertaken construction activity in violation of the provisions of EIA Notification, 2006. The construction activity that have been undertaken is not in accordance with the proposal approved vide the Environmental Clearance letter No. SEIAA 201 CON 2012 dated 19 th July 2013. The Authority therefore directed the proponent to stop the construction activity with immediate effect. 4

The Authority after discussion took the following decisions: (1) Issue the following directions under section 5 of the Environment (Protection) Act, 1986 to the proponent: (a) To suspend the construction activity of the above said project with immediate effect at the existing level till the Environmental Clearance is obtained. (b) To submit details regarding present level of construction along with latest dated photographs. (c) To show cause why action should not be initiated against you for the violation (2) Get the mahazar of the project site done to establish the violation. (3) Filing a complaint before the jurisdictional court for the violation under section 19 of the Environment (Protection) Act, 1986. The Scientific Officer, SEIAA is authorized for filing complaint on behalf of the Authority. (4) To consider the proposal after filing of the complaint and receipt of the information sought. Accordingly, the direction has been issued on 05.01.2016. The Authority perused the reply dated 20.01.2016 and the report of the mahazar conducted on 25.01.2016. The proponent was invited as per the request made in their letter dated 25.01.2016. The proponent appeared before the Authority and explained the proposal in brief. The proponent informed the Authority that out of 11 towers proposed as per the modified plan, construction of only three floors have been undertaken as per the approved plan. The Authority further noted that total plinth area of Tower 1, Tower 2 and Tower 3 as per the plan produced for Environmental Clearance issued on 19 th July 2013, whereas the plinth area of the said Towers as per the modified plan submitted for the Environmental Clearance is 6131.98 Sqm only which is less than the approved area. The proponent further informed that in Tower 1, out of 2 Basement, Ground and 18 Upper Floors approved, presently 2 Basement, Ground and 5 Upper Floors are completed and the 6 th Floor is in progress. In Tower 2, out of 2 Basement, Ground and 18 Upper Floors approved, presently 2 Basement, Ground and 5 Upper Floors are completed and the 6 th Floor is in progress and in Tower 3, 2 Basement, Ground and 18 Upper Floors approved, presently 2 Basement, Ground and 3 Upper Floors are completed and the 4 th Floor is in progress. The proponent therefore asserted that they have not exceeded the construction approved in the Environmental Clearance letter dated 19 th July 2013 and therefore it should not be treated as a case of violation. The 5

proponent while responding to a query with regard to change in the location of the said towers informed the Authority that two Towers (Tower1 and Tower 3) are started in the same location as approved and only location of Tower-2 is slightly shifted towards eastern side to accommodate parks and open spaces as per BDA norms at the western end of the project site. The Authority after discussion opined that the construction undertaken is not in violation of the provisions of EIA Notification, 2006 as the proponent hold a valid Environmental Clearance. The Authority therefore decided not to treat this as a case of violation and to drop the proposed action under E (P) Act. The Authority further decided to issue Environmental Clearance as per the recommendation made by the SEAC, subject to submission of the following information: 1) Ways and means of utilization of excess treated water proposed to be let into the sewer line including exploring the possibility of providing a detention pond. 2) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements. 3) Neighbourhood details of the proposed project site. 4) Details of Recreational Ground area with at least 15% of the plot area. 5) Specific social commitment plan with budget, activity and timeframe For further consideration: 112.3.3 Residential Development, Sy. Nos. 80, 2/1, 2/2, 2/3, 54/1B, 54/1A, 79/4, Rachenahalli Village, K.R.Puram Hobli, Bangalore East Taluk, Bangalore Urban District of M/s. Mantri Technology Constellations Pvt. Ltd (SEIAA 50 CON 2013) It is a proposal seeking Environmental Clearance for proposed residential development Mantri Sun3 project of 1273 flats on a Plot Area of 47,006.35 Sqm and with the total Built Up Area of 1,96,748.43 Sqm. The Authority noted that the SEAC during the 102 nd SEAC meeting held on 26 th & 27 th April 2013 have decided to issue model ToRs along with the additional TORs for the preparation of EIA by the project proponent. Accordingly the ToR was issued on 22.05.2013. The proponents have submitted the EIA report on 20.03.2015. The subject was discussed in the SEAC meeting held on 11 th & 12 th August 2014, 30 th & 31 st March 2015, 13 th July 2015, 23 rd September 2015 and 7 th October 2015. The Committee has recommended for issue of environmental clearance, after appraising the proposal along with the EIA report. 6

The Authority during the meeting held on 29.10.2015 had perused the proposal and took note of the recommendation of The Authority after discussion decided to get the following information for further consideration: (1) Clarification as to why action should not be taken for the discrepancies in the EIA report as observed by (2) Revised scaled layout plan duly indicating entry, exit, STP/MSW treatment facility location and all other infrastructural facility. (3) Project configuration with drawing. (4) Water audit for the project along with water balance chart for the monsoon and non-monsoon season. (5) Details of excavated Earth and plan for safe disposal of excess excavated earth with details of site proposed for disposal. (6) Justification for utilization of entire organic waste generated in the project with due calculations. (7) Details of green belt development with at least 33% of the plot area. The Authority also decided to invite the proponent. The Authority during the meeting held on 11 th January 2016 had perused the reply submitted by the proponent vide letter dated 21.12.2015. The proponent appeared before the Authority and explained the proposal in brief. The Authority opined that the clarification furnished by the proponent with regard to discrepancies in the EIA report is not convincing. The Authority therefore decided to reconsider the proposal during the next meeting with a detailed scrutiny of EIA report submitted by the proponent earlier and the present EIA report in the office. The proponent was advised by the Authority to submit the lab reports pertaining to the baseline data collection undertaken for preparation of the latest EIA report. The Authority perused the reply submitted by the proponent vide letter dated 13.01.2016. The Authority after discussion decided to get explanation for the discrepancies such as building configuration, baseline data, projected impact on the environmental parameters, etc in the EIA report submitted. The Authority also decided to invite the proponent for furnishing clarification. 7

112.3.4 Proposed Residential Project Sumadhura Soham at Khata No. 1791, Sy. No. 147/2, 148/1, Pattandur Agrahara Village, Bangalore East Taluk, Bangalore of Sri. Milind S. Thakker, No. 43, CKB Plaza, 2nd Floor, Varthur Main Road, Marathahalli, Bangalore. (SEIAA 169 CON 2015) This is a proposal seeking Environmental clearance for Development of Residential apartment of 299 units with B + GF +4UF+Terrace, on a total Plot area of 16,097.68 Sq.mts and with total Built up area of 49,660.03 Sq.mts. Total water requirement is 174 KLD. The subject was discussed in the SEAC meeting held on 17 th November 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of the following information: 1. Requisition letter given to BWSSB 2. Corrected FAR after considering TDR. The Authority during the meeting held on 17.12.2015 had perused the proposal and took note of the recommendation of SEAC along with the reply submitted by the proponent vide letter dated 08.12.2015. The Authority after discussion decided to get the following information for further consideration: 1) Revised scaled layout plan in metric units clearly indicating entry, exit, location of municipal solid waste management facility, STP, internal circulation, etc. 2) Details of Recreational Ground area. 3) Details of green belt with at least 33% of the plot area. 4) Revised water calculation and corresponding water balance chart. 5) Revised quantification of MSW as per standards and the corresponding management plan. 6) Rain water harvesting as per CGWA norms. The Authority perused the reply submitted by the proponent vide letter dated 17.01.2016. The Authority opined that the point-wise information furnished are incorrect and not satisfactory. The Authority therefore decided to direct the proponent to submit the following information for further consideration: 1) Layout plan on the scaled drawing with all the details such as entry/exit, internal road and other infrastructural facilities. 2) Width of the internal circulation road. 8

3) Details of Recreational Ground area with at least 15% of the plot area. 112.3.5 "Bren Edge Water", Residential apartments at Sy. No.33/1 and 33/2, Haralur Village and Sy.No.30/8B, Kasavanahalli village, Varthur Hobli, Bangalore East, Bangalore of M/s. Bren Corporation, (SEIAA 11 CON 2015) It is a proposal seeking Environmental Clearance for Construction of "Bren Edge Water", Residential Apartments of 308 Flats with Basement + GF + 13 UF + TF on a plot area of 15944.92 Sq.mts and with total built up area of 48150.39 Sq.mts. Total water requirement of project is 208 KLD. The subject was discussed in the SEAC meeting held on 19 th and 20 th March 2015. The Committee has recommended for issue of environmental clearance, subject to submission of the following information. 1. Revised hydrological study of the area influencing the surface water flow duly marking the ridges. 2. Lake water quality analysis report. The Authority during the meeting held on 20.04.2015 had perused the proposal and took note of the recommendation of The Authority further noted that the project authorities are alleged to have undertaken earth work and have caused inconvenience to the local people due to unscientific way of handling the excavated earth. The Authority therefore decided to consider the proposal after getting details on the said allegation. The Authority perused the reply submitted by the proponent vide letter dated 21.01.2016. The Authority noted that the proponent have informed that the earthwork referred to above is because of the works undertaken for construction of compound wall and site leveling/soil testing. The proponent have submitted an undertaking that the earthwork will be done in scientific way and ensure that it will not cause any inconvenience to the surrounding people. The Authority after discussion decided to clear the proposal for issue of Environmental Clearance subject to submission of the following information: 1) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements. 2) Specific social commitment plan with budget, activity and timeframe. 9

112.3.6 Residential Apartment at Sy. No. 103/1, Khatha No.216, Doddatogur Village, Begur Hobli, Bengaluru South Taluk, Bengaluru Urban District of M/s Sree & Sree Builders & Promoters (SEIAA 94 CON 2015) It is a proposal seeking Environmental Clearance for construction of Residential Apartment of 351 units with Basement+Ground Floor+11 Upper Floor on a plot area of 17,502.50 Sq.mts (karab area = 607.02 Sq.m) and with total built up area of 54,578.58 Sqm. Total water requirement of project is 237 KLD. The subject was discussed in the SEAC meeting held on 4 th September 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of the following information. 1. Scientific assessment of the availability of the water from the bore well in the project site 2. Revised water balance calculating fresh water demand at the rate of 55 LPCD as per the norms prescribed for rural water supply and the scheme for meeting the additional requirement 3. Revised rain water harvesting calculations 4. Proposal to provide an underpass to connect the other side of the project site. The Authority during the meeting held on 26 th September 2015 had perused the proposal and took note of the recommendation of The Authority observed that the parcel of land in Part-2 is not of any practical use or beneficial to the project activities, as it is bifurcated by a public road and the entire activity is concentrated on the land in Part-1 The Authority after discussion decided to get the following information, in addition to information sought by SEAC for further consideration: 1. Revised layout plan exclusively for the land in Part-1 without considering the land in Part-2. 2. Details of Kharab land duly marking it on layout plan. 3. Revised land-use plan such as ground coverage, park & open spaces, greenbelt, parking area, etc. with respect to Part-1 only. 4. Source of water and NOC from the competent authority. 5. Enhance energy savings to at least 25%. 6. Revised quantification of MSW as per the standards. 7. Revised water balance with due emphasis for utilization of the treated water. 8. Design of rainwater harvesting pit as per CGWA norms. The Authority also decided to invite the proponent. 10

[ 112 th SEIAA Meeting Proceedings Dated 28 th January 2016 The Authority during the meeting held on 30.11.2015 had perused the reply submitted by the proponent vide letter dated 18.11.2015. The proponent appeared before the Authority and explained the proposal in brief. The Authority observed that the drawing submitted is not to the scale, the land in the Part -2 of the project site is deducted, but the activities in the land in Part-1 remains unchanged. In view of this, the activities proposed are disproportionate to the available area and therefore required lung space and other amenities cannot be accommodated as per norms. The Authority therefore advised the proponent to submit revised plan designed as per norms. The proponent requested for an opportunity to submit the revised plan and other required information. The Authority therefore decided to reconsider the proposal after the receipt of revised drawing and other relevant information from the proponent. The Authority perused the reply submitted by the proponent vide letter dated 25.01.2016. The Authority after discussion decided to clear the proposal for issue of Environmental Clearance subject to submission of the following information: 1) Justification for the higher density of occupancy in the proposed built up area. 2) Specific social commitment plan with budget, activity and timeframe 112.3.7 Expansion of Residential building Project at Survey Nos.22, 23 & 24 of Chandrashekarpura Village & Sy. No. 50/2(P) of Yellenahalli Village, Begur Hobli, Bangalore South Taluk, Bangalore Urban District of M/s. Nandi Housing Pvt. Ltd., # 48, 36 th Main Road, BTM Dollars Scheme, Bangalore 560 068 (SEIAA 147 CON 2015) It is a proposal seeking Environmental clearance for expansion of Residential Building Project from 672 units with BF+GF+4UF to 851 units with BF+GF+4 UF on a plot area of 51217.59 Sq.mtr and with the total Built up area of 1,19,338.10 Sq.mtr (additional 48176.1 Sq.mtr). Total water requirement is 574 KLD. The proponent obtained EC from MoEF vide No: 21-390/2006-IA.III dated 21.02.2007. The subject was discussed in the SEAC meeting held on 20 th October 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, after the submission of the following information. 1. Detailed Hydrological study of the influencing the area 2. Details of the adjoining lake. The Authority during the meeting held on 11.11.2015 had perused the proposal and took note of the recommendation of 11

The Authority noted that Environmental Clearance for the ongoing project has been issued on 21.02.2007 by the Ministry of Environment and Forests, Government of India. Validity of the Environmental Clearance as specified by the MoEF is only 7 years. The proponent have submitted the application for the modification of the Environmental Clearance on 15.09.2015 i.e., after the expiry of validity period of the Environmental Clearance. The Authority after discussion decided to get the following information in addition to the information sought by SEAC for further consideration: (1) Present level of construction undertaken as per the earlier Environmental Clearance issued by the Ministry of Environment and Forests, Government of India. (2) Details of constructions that has already been completed and the proposed with a comparative statement. (3) Justification with regard to addition of 179 units with 48,176.1 Sqm built up area, when the plot area and the configuration of the building remains the same. (4) Details of Recreational Ground Area with total percentage to the plot area. (5) Revised parking calculations based on the requirement as per MoEF, BHK norms and BBMP norms providing for the maximum of the above requirements. (6) Revised greenbelt development plan with at least 33% of the plot area. (7) Rain water harvesting plan as per the CGWA norms. (8) Location of STP, solid waste management facility and other infrastructure facilities duly indicating on layout plan. (9) Revised scaled layout plan super imposing the proposed activity on the earlier plan. (10) Revised design of the equalization tank taking peak hour flow into consideration. The Authority also decided to invite the proponent. The Authority during the meeting held on 11 th January 2016 had perused the reply submitted by the proponent vide letter dated 12.12.2015. The proponent appeared before the Authority and explained the proposal in brief. The Authority noted that Environmental Clearance has been issued for this project by the Ministry of Environment and Forests, Government of India on 21 st February 2007. Therefore the validity of the E.C. which is now revised to seven years is lapsed and the proponent have not got it extended following the due procedure of law. The proponent informed that the said Environmental Clearance has been issued in accordance with the provisions of EIA Notification, 1994 and no validity period is mentioned in the E.C. letter. Therefore, seeking extension of validity was not felt 12

necessary. Now the proponent is before the Authority for expansion of the project by undertaking additional construction in the vacant land reserved for future expansion. The Authority after discussion decided to take up the proposal for further consideration after ascertaining the statutory position with regard to validity of E.C. issued under EIA Notification, 1994. It is ascertained from the available records that the Environmental Clearance letter No. 21-390/2006-IA.III dated 21.02.2007 issued by the erstwhile Ministry of Environment and Forests in favour of M/s Nandi Housing Pvt. Ltd. has been issued under EIA Notification, 1994. As per Notification No. S.O. 356 dated 4/5/1994 read with Notification No. S.O.2555(E) dated 21 st August 2013, validity of the Environmental Clearance is for a period of five years for commencement of the construction or operation. The Authority while examining the proposal sought to know whether the construction activity has been started well within the validity period or not. The Authority therefore decided to get authentic documents if any to convince the Authority that the construction activity has been started as per the provisions of the EIA Notification, 1994 and the amendments made thereon. The Authority therefore decided to consider the proposal after the receipt of the aforesaid document. Mining Projects: 112.3.8 Building Stone Quarry Project, Sy.No.179/1A of Pajeer Village, Bantwal Taluk, Dakshina Kannada Dist. (1-0 Acre) (QL No.63) of Sri Dinakar Ullal (SEIAA 1108 MIN 2015) This is a Renewal proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Land. The subject was discussed in the SEAC meeting held on 19 th October 2015. The committee observed that based on the elevation of the quarry site above ground level (Difference in level. 10.00 m), depth proposed is 9 m, area of quarrying (as per land use plan), and with the available area, it is not possible to go that depth, because lifting of quarrying material from that depth & movement of vehicles will be very difficult. Also the committee observed that already mining has been done in the proposed quarry area. Though it is a patta land, without obtaining EC, doing mining is violation of EIA Notification 2006. The Committee after discussion decided to limit the production to 70%(Restricting the depth of mining to 10m) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind and decided to recommend the proposal to SEIAA for issue of Environmental Clearance. 13

The Authority during the meeting held on 11.11.2015 had perused the proposal and took note of the recommendation of The Authority after discussion decided to get a clarification from the proponent with regard to the violation noted for further consideration. The Authority perused the reply submitted by the proponent vide letter dated 28.12.2015. The Authority noted that it is a renewal quarry with a validity of 5 years as per the Notification dated 29.04.2015. extraction of building stone limiting the production to 70%(Restricting the depth of mining to 10m) of the proposed production, as recommended by 112.4 Fresh Projects: Mining Projects: 112.4.1 Building Stone Quarry Project of Sy.No.122/3K/2 of Ainapur Village, Bijapur Taluk & Dist. (2-0 Acres) of Sri Vivekananda Virappa Gunari, Neelaganagai, Plot No.77, Aishwarya Nagar, Bijapur District. (SEIAA 385 MIN 2015) This is a renewal proposal seeking Environmental clearance for quarrying of Building stone in 2-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 24 th to 29 th July 2015, 17 th November 2015 and 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance with a condition that, before execution, the proponent must obtain land conversion from the competent authority. extraction of building stone as per approved quarry plan, with a condition that, before execution, the proponent must obtain land conversion from the competent authority. 112.4.2 Building Stone Quarry Project, Sy.No.123 (P) of Bilakundi Village, Gokak Taluk & Belagavi Dist. (16-0 Acres) of Sri Gopal Durgappa Harijan, #180, Kalliguddi Village, Gokak Taluk, Belagavi Dist. (SEIAA 738 MIN 2015) [ This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 16-00 Acres, Govt. Gyrana Land. 14

The subject was discussed in the SEAC meeting held on 21 st October 2015 and 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan. 112.4.3 Building Stone Quarry Project, Sy.No.123 (P) of Bilakundi Village, Gokak Taluk, Belagavi Dist. (23 Acres) of Sri Shivappa Venkappa Kuddemmi S/o Sri. Venkappa Kuddemmi # 170/D, Badigswad Village, Gokak Taluk, Belagavi District (SEIAA 741 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 23-00 Acres, Govt. Gyrana Land. The subject was discussed in the SEAC meeting held on 5 th September 2015, 21 st October 2015 and 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan. 112.4.4 Ornamental Stone Quarry Project, Sy.No.145/2 of Maniyambal Village, Kanakapura Taluk, Ramanagara Dist. (13-23 Acres) of H.A.Iqbal Hussain (SEIAA 1204 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Ornamental Stone in 13-23 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 21 st October 2015, 25.11.2015 and 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of ornamental stone as per approved quarry plan. 15

112.4.5 Pink Granite Quarry Project, Sy.No.32/2/1 of Bandargal Village, Kustagi Taluk & Koppala District (2-0 Acres) (QL No.774) of Sri Rekhappa L Rathod (SEIAA 1445 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Pink Granite in 2-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of pink granite as per approved quarry plan. 112.4.6 Building Stone Quarry Project at Sy.No.75 of Varavukaval Village, Challakere Taluk, Chitradurga District (1-0 Acre) (QL No.503) of Sri R. Tipperudraiah, Chitrayyanahatti Village, Challakere Taluk, Chitradurga District - 577522. (SEIAA 1482 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Revenue Land. The subject was discussed in the SEAC meeting held on 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan. 112.4.7 Building Stone Quarry Project at Sy.No.263 of Nannivala Village, Challakere Taluk, Chitradurga District (1-03 Acre) (QL No.509) of Sri R. Tipperudraiah, Chitrayyanahatti Village, Challakere Taluk, Chitradurga District - 577522. (SEIAA 1483 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 1-03 Acres, Government Revenue Land. The subject was discussed in the SEAC meeting held on 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. 16

extraction of building stone as per approved quarry plan. 112.4.8 Building Stone Quarry Project at Sy.No.372/c of Dashamapura Village, Hagaribommanahalli Taluk, Bellary District (12-0 Acres) of M/s. Travancore Minerals & Transport Co., #610, Sree Vilasa, 15 th Ward, Bharathi Nagar, Amravathi, Hospet - 583201. (SEIAA 1490 MIN 2015) This is a New proposal seeking Environmental clearance for quarrying of Building Stone in 12-00 Acres, Government Revenue Land. The subject was discussed in the SEAC meeting held on 28 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of an undertaking that the approach road to be made pucca. extraction of building stone as per approved quarry plan, subject to submission of information sought by 112.4.9 Pink Porphery Granite Quarry Project at Sy.No.44, Kengal Village, Nelamangala Taluk, Bangalore Rural District 4-0 Acres (Q.L.No.464) of M/s. Vijay Enterprises (SEIAA 1213 MIN 2015) This is a renewal proposal seeking Environmental clearance for quarrying of Pink Porphery Granite in 4-00 Acres, Govt. Revenue Land. The subject was discussed in the SEAC meeting held on 21 st October 2015, 25 th November 2015 and 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, with a condition that, the proponent should strictly follow the conditions stipulated in the earlier issued EC and also further EC conditions also and after submission of revised land use plan duly signed by DMG. extraction of Pink Porphery Granite as per approved quarry plan, with a condition that, the proponent should strictly follow the conditions stipulated in the earlier issued EC and subject to submission of information sought by 17

112.4.10 Black Rock (Dolorite) Quarry Project, Sy.No.81/4, Andagove Village, Somwarpet Taluk, Kodagu Dist. (2-0 Acres) (QL No.845) of Sri S K Raj Kumar, Reliance Stationary Mart, #55, Commercial Street, Bengaluru, Karnataka (SEIAA 770 MIN 2015) This is a renewal proposal seeking Environmental clearance for quarrying of Black Rock (Dolorite) Quarry in 2-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 22 nd September 2015 and 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, after submission of the following information. 1. Scheme of disposal of quarry waste 2. Provision of garland drain all along the periphery of the quarry boundary with gully plugs and series of check dams in the lowest level of the quarry area. extraction of Black Rock (Dolorite) as per approved quarry plan, subject to submission of information sought by 112.4.11 Building Stone Quarry Project, Sy.No.1118/4 of Bangaramakki Bengre II Village, Bhatkal Taluk & Uttara Kannada Dist. (0-20 Acre) of Sri Sunil B Naik (SEIAA 1370 MIN 2015) This is a new proposal seeking Envionmental clearance for quarrying of Building Stone in 0-20 Acre, Patta Land The subject was discussed in the SEAC meeting held on 25 th November 2015 and 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan. 112.4.12 Building Stone Quarry Project at Sy.No.66 of Gabbadi Village, Kanakapura Taluk, Ramanagara District (QL No.1178) of M/s. Sri Venkateshwara Stone Crushing Company, Yelethotadapalya Village, Anjapura Post, Bangalore South Taluk, Bangalore Urban District. (SEIAA 1492 MIN 2015) This is a working Quarry proposal seeking Environmental clearance for quarrying of Building Stone in 2-00 Acres, Government Land. 18

The subject was discussed in the SEAC meeting held on 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of complete audit report. extraction of building stone as per approved quarry plan, subject to submission of complete audit report. 112.4.13 Building Stone Quarry Project at Sy.No.66 of Gabbadi Village, Kanakapura Taluk, Ramanagara District (1-0 Acre) (QL No.1222) of M/s. Sri Venkateshwara Stone Crushing Company, Yelethotadapalya Village, Anjapura Post, Bangalore South Taluk, Bangalore Urban District-560062. (SEIAA 1493 MIN 2015) This is a working Quarry proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Land. The subject was discussed in the SEAC meeting held on 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind, subject to submission of audit report, modified quarry plan for the above quantity approved by DMG and an undertaking to make approach road pucca. extraction of building stone limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the proposed production, as recommended by SEAC, subject to submission of information sought by 112.4.14 Building Stone Quarry Project at Sy.No.28/A of Bingapur Village, Hangal Taluk, Haveri District (1-0 Acre) of Sri Shivappa Puttappa Basapur, Bingapur Village, Hangal Taluk, Haveri District. (SEIAA 1498 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acres, Government Land. 19

The subject was discussed in the SEAC meeting held on 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, extraction of building stone as per approved quarry plan. 112.4.15 Building Stone Quarry Project at Sy.No.28/A of Bingapur Village, Hangal Taluk, Haveri District (1-0 Acre) of Sri Basavaraj Kuravatti, Bingapura Village, Hangal Taluk, Haveri District. (SEIAA 1499 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acre, Government Land. The subject was discussed in the SEAC meeting held on 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of complete audit report. extraction of building stone as per approved quarry plan, subject to submission of complete audit report. 112.4.16 Shahabad Stone Quarry Project at Sy.No.100/7 of Miriyan Village, Chincholi Taluk, Kalaburgi District (1-0 Acre) of Sri Sudhakar, H.No.36, R/o Miriyan, Chincholi Taluk, Kalaburagi District. (SEIAA 1502 MIN 2015) This is a new proposal submitted by Sri Sudhakar, seeking Environmental clearance for quarrying of Shahabad Stone in 1-00 Acre, Patta Land. The subject was discussed in the SEAC meeting held on 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind, after the submission of the modified quarry plan for the above quantity approved by DMG. 20

extraction of Shahabad stone limiting the production to 80%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the proposed production, as recommended by SEAC, subject to submission of information sought by 112.4.17 Grey Granite Quarry Project, Sy.Nos.70/3 & 70/4 of Chendur Village, Yelburga Taluk, Koppala Taluk (5-0 Acres) (2.023 Ha) of Sri Suresh Yankanagouda Patil, No.4610/A/72, Joshigalli, Ilkal, Hunagunda Taluk, Bagalkot District - 567125. (SEIAA 1505 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Grey Granite in 5-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 29 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, after the submission of an undertaking to utilize the quarry waste as building material with the permission of DMG. extraction of grey granite as per approved quarry plan, subject to submission of information sought by 112.4.18 Shahabad Stone Quarry Project at Sy.No.80/1 of Miryan Village, Chincholi Taluk, Gulbarga District (1-0 Acre) (QL No.409) of Sri. Venkatram Reddy S/o N. Shivareddy, Plot No.30, C/o Somashekhara Rao, Shanthappa Conlony, Tandur (AP) (SEIAA 1476 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Shahabad Stone in 1-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 11 th December 2015 and 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 50%(Restricting the depth of mining to 5m considering the depth of reserves submitted in the quarry plan as 5 m only) of the total estimated production, after the submission modified quarry plan for the above quantity approved by DMG. 21

extraction of shahabad stone limiting the production to 50%(Restricting the depth of mining to 5m considering the depth of reserves submitted in the quarry plan as 5 m only) of the proposed production, as recommended by. 112.4.19 Building Stone Quarry Project, Sy.No. 61 of Ajjagowdana Valse Village, Kanakapura Taluk, Ramanagara District (8-20 Acres) (QL No.1261) of Sri Mohan Kumar S N (SEIAA 1287 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 8-20 Acres, Government Gomala Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance. extraction of building stone as per approved quarry plan. 112.4.20 Limestone & Dolomite Mining Project, Sy.Nos.45/1A & 47/1 of Kamkeri Village, Ramadurga Taluk, Belgaum Dist. (4.12 Ha) of Sri R S Pujari Jadar Aralikatti Village, Lokapur Post, Mudhol Taluk,Bagalkot District -587122 (SEIAA 519 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Limestone & Dolomite Mine Quarry in 4.12 Acres at Sy.Nos.45/1A & 47/1 of Kamkeri Village, Ramadurga Taluk, Belgaum District. The subject was discussed in the SEAC meeting held on 29 th July 2015, 2 nd November 2015 and 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to condition that the cross sections & drawings should be got signed by IBM. extraction of Limestone & Dolomite as per approved quarry plan. 112.4.21 Grey Granite Quarry Project at Sy.No.101/2 Killarhatti Village, Lingasugur Taluk, Raichur District (11-10 Acres) of Sri Govindappa T. Pulpatli, #4265/J, Ilkal, Hunagunda Taluk, Bagalkot District - 587125. (SEIAA 1506 MIN 2015) 22

This is a new proposal seeking Environmental clearance for quarrying of Grey Granite in 11-10 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, after the following. 1. An agreement with surrounding patta land owners for utilizing their land for transportation of quarry material. 2. Mitigation measures to protect the adjoining agricultural fields. 3. Copy of RTC 4. An under taking to make approach road pucca. extraction of grey granite as per approved quarry plan, subject to submission of information sought by 112.4.22 Building Stone Quarry Project at Sy.No.17 of Udarahalli Village, Kanakapura Taluk, Ramanagara District (5-0 Acres) of M/s. Aprameya Granites Pvt. Ltd., No.981, 18th Main Road, 66th Cross, 5th Block, Rajajinagara, Bangalore - 560010.(SEIAA 1507 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 5-00 Acres, Government Gomala Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, with a condition to make approach road pucca. SEAC along with the reply submitted by the proponent vide letter dated 23.01.2016. extraction of building stone as per approved quarry plan, with a condition to make approach road pucca. 112.4.23 Black Granite Quarry Project at Sy.Nos.148/2 & 148/3 of Nanjadevanapura Village, Chamarajanagara Taluk & District (1-28 Acres) of Sri R M Rajappa, M/s. Nanjadevanapura Cluster Association, #713, Ramasamudra, Chamarajanagara Taluk & District -571313. (SEIAA 1510 MIN 2015) 23

This is a new proposal seeking Environmental clearance for quarrying of Black Granite in 1-28 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, extraction of black granite as per approved quarry plan.[ 112.4.24 Building Stone Quarry Project at Sy.No.203/4 (P) of Theerthkunde Village, Khanapur Taluk, Belgaum District (5-0 Acres) of Sri A K Savanth, PL No.678, Subhas Chandra Nagar, Tilakwadi, Belgaum District. (SEIAA 1511 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 5-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, limiting the production to 70%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the total estimated production keeping the minable area quantity and the sustainability of the mine in the mind, subject to submission of audit report, modified quarry plan for the above quantity approved by DMG, Mitigation measures taken to protect adjoining agricultural fields and an undertaking to make approach road pucca. extraction of building stone limiting the production to 70%(Restricting the depth of mining to 10m below lowest level in the quarry area) of the proposed production, as recommended by SEAC, subject to submission of information sought by 112.4.25 Building Stone Quarry Project at Sy.No.545/2 of Tabakada Honalli Village, Khalghatgi Taluk, Dharwad District of Smt. Mangala M Challamarad, Plot No.34, 8th Cross, Vishweshwara Nagar, Hubli & Sri Bheemanna H Ghanti, Masalagara Oone, Sarswathapura, Dharwad. (SEIAA 1512 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 6-00 Acres, Patta Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of measures taken to preserve top soil and with a condition that, 24

mining should be started only after taking written consent from the adjoining patta land owners for using their land as approach road for transportation of quarry material. extraction of building stone as per approved quarry plan, subject to submission of information sought by 112.4.26 Building Stone Quarry Project at Sy.No.2 (P) of Bilkundi Village, Gokak Taluk, Belgaum District (2-0 Acres) (QL No.1566) of Sri Ramesh Karepa Utagi, Avaradi Village & Post, Gokak Taluk, Belagavi District. (SEIAA 1513 MIN 2015) This is an existing proposal seeking Environmental clearance for quarrying of Building Stone in 2-00 Acres, Government Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of an undertaking to make approach road pucca. SEAC, along with the reply submitted by the proponent vide letter dated 25.01.2015. extraction of building stone as per approved quarry plan. 112.4.27 Building Stone Quarry Project at Sy.No.1/D1 of Ucchangidurga Village, Harapanahalli Taluk, Davanagere District (1-0 Acre) of Sri Manjunatha R Patil (SEIAA 1514 MIN 2015) This is a new proposal seeking Environmental clearance for quarrying of Building Stone in 1-00 Acre, Government Land. The subject was discussed in the SEAC meeting held on 30 th December 2015. The Committee has recommended to SEIAA for issue of Environmental Clearance, subject to submission of an undertaking to make approach road pucca. SEAC along with the reply submitted by the proponent vide letter dated 25.01.2016. extraction of building stone as per approved quarry plan, subject to submission of information sought by 25