RETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194)

Similar documents
RETF: P (TF097410), P132585, and P (TF014769) BETF: P (TF092194)

Minutes of Meeting Subject

Wildlife Conservation Society 12/24/08 to 12/31/13 (72 months)

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

PNPM SUPPORT FACILITY (PSF) PORTFOLIO

Implementation Status & Results Indonesia Support for Poor and Disadvantaged Areas Project (P078070)

Implementation Status & Results Indonesia ID SPADA in Aceh and Nias (P097605)

BETF: P (TF and TF013728)

P (TF and TF ) Rekompak. George Soraya

Community CCT in Indonesia The Generasi Project

Millennium Challenge Account Indonesia. Monitoring and Evaluation Plan. July 2017 Version 4 1

INDONESIA: IMPROVING TEACHER PERFORMANCE AND ACCOUNTABILITY (KIAT GURU)

PNPM Support Facility

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Interim Impact Evaluation Report

PROJECT PROPOSAL PAPER FOR GPSA GRANT US$ 500,000 PUBLISH WHAT YOU PAY INDONESIA - (PWYP) INDONESIA FOR A

NATIONAL SLUM UPGRADING PROGRAM (NSUP) LOAN No. IBRD Ln.8636; AIIB LN 004-IDN. Procurement Plan Version No.: 3 Date: March 15, 2018

Indonesia - FCPF Readiness Preparation Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

AVAILABILITY AND QUALITY OF PUBLIC HEALTH FACILITIES IN EASTERN INDONESIA: RESULTS FROM THE INDONESIA FAMILY LIFE SURVEY EAST 2012

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

Public Disclosure Copy. Implementation Status & Results Report Global Partnership for Education Grant for Basic Education Project (P117662)

Loan No INO: POOR FARMERS INCOME IMPROVEMENT THROUGH INNOVATION PROJECT. INCEPTION MISSION May 21 June 5, 2003 MEMORANDUM OF UNDERSTANDING

INDONESIA S COUNTRY REPORT

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE URBAN SECTOR DEVELOPMENT REFORM PROJECT (USDRP) LOAN 7760-IND

Financing Agreement. (National Program for Community Empowerment in Rural Areas Project) between REPUBLIC OF INDONESIA. and

The World Bank Social Accountability Knowledge, Skills, Action and Networking (P147835)

Public Disclosure Copy

Implementation Status & Results Guinea Development of Inclusive Education in Guinea (P129210)

Anti Poverty Interventions through Community-based Programs (PNPM) and Direct Cash Support (PKH)

Indonesia - FCPF Readiness Preparation Grant FCPFR - Forest Carbon Partnership Facility

Re: Indonesia: JSDF Grant for Sustaining Women s Leadership Project Grant No.TF095058

Institutional Capacity Assessment on Nutrition in Indonesia

The World Bank Kenya GPE Primary Education Development Project (P146797)

INNOVATIONS IN FINANCE INDONESIA

HEALTH FACILITIES SAFE FROM DISASTERS

Desa Siaga Model Supported by SISKES in NTB. DESA SIAGA Dana Sosial Kesehatan. Pendonor Darah. Rahmi Sofiarini, PhD Advisor.

Priority programmes and rural retention the example of TB. Karin Bergstrom Stop TB Department WHO, Geneva

Implementation Status & Results Sri Lanka Sri Lanka - Second Health Sector Development Project (P118806)

WASH Field Report No. 284

NATIONAL COMMUNITY EMPOWERMENT PROGRAM IN URBAN AREAS FOR APPROVED ON NOVEMBER 20, 2012 REPUBLIC OF INDONESIA

Members of the PNPM Mandiri Daerah Tertinggal World Bank team recently visited Aceh, and so this newsletter largely focuses on work in the province.

JAPAN SOCIAL DEVELOPMENT FUND (JSDF) Grant Funding Proposal (FY11 Round 33)

PNPM Support Facility (PSF) Technical Committee - January 7, 2013 Meeting Meeting Minutes

Letter No. CD-399/PAMSIMAS/X/2013 October 30, 2013

Public Disclosure Copy

OBA Urban Sanitation Facility for the Greater Accra Metropolitan Area (GAMA) (P145139)

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Implementation Status & Results Swaziland Swaziland Health, HIV/AIDS and TB Project (P110156)

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

Development of New INA-CBG Reclassification

HEALTH INSURANCE FOR THE INDIGENT PEOPLE IN INDONESIA

Implementation Status & Results Congo, Democratic Republic of Emergency Demobilization and Reintegration Project (P078658)

Completion Report. Project Number: Loan Number: 2449-INO(SF) October Indonesia: Rural Infrastructure Support to the PNPM Mandiri Project

CONCEPT NOTE Community Maternal and Child Health Project Relevance of the Action Final direct beneficiaries

TERMS OF REFERENCE: PRIMARY HEALTH CARE

Country Coordinating Mechanism The Global Fund to Fight AIDS, Tuberculosis, and Malaria Indonesia (CCM Indonesia)

Implementation Status & Results Central African Republic Multisectoral HIV/AIDS Project (P073525)

HEALTH AND EDUCATION SERVICES SURVEY BOOK 4 MIDWIVES. ENUMERATOR, EDITOR AND SUPERVISOR Enumerator Editor Supervisor Name and Code of Officer

EMPOWERMENT IN URBAN AREAS

EVALUATION NURTURING THE MOTHER-CHILD DYAD IN AN URBAN SETTING: FINAL EVALUATION OF THE HATI KAMI PROJECT IN JAKARTA, INDONESIA

Contracting Out Health Service Delivery in Afghanistan

JAYAWIJAYA WATCH PROJECT

Report: Expansion and Replication of EMAS Program Approaches

Entrepreneurial Interests of Posyandu Cadres in Karang Berombak Village West Medan Sub-District Medan City

Actual Project Name : Community Recovery In Earthquake Affected Areas Through Urban Poverty Project Country: Indonesia

The World Bank Vietnam Climate Innovation Center (VCIC) RETF (P155260)

Implementation Status & Results Guatemala GUATEMALA Maternal and Infant Health and Nutrition (P077756)

The World Bank Research and Innovation in Science and Technology Project (P121842)

Uzbekistan: Woman and Child Health Development Project

Comprehensive Evaluation of the Community Health Program in Rwanda. Concern Worldwide. Theory of Change

The World Bank Swaziland Health, HIV/AIDS and TB Project (P110156)

Health and Nutrition Public Investment Programme

RWANDA S COMMUNITY HEALTH WORKER PROGRAM r

Public Disclosure Copy

COMMUNITY-BASED HEALTH AND NUTRITION TO REDUCE STUNTING PROJECT (CHNP) PRIVATE SECTOR RESPONSE SUB-ACTIVITY (PSRA) CfP Ref: CfP/PSRA/002/2016 FOR

Resettlement Planning Document

FANTA III. Improving Pre-Service Nutrition Education and Training of Frontline Health Care Providers TECHNICAL BRIEF

Implementation Status & Results Indonesia Health Professional Education Quality Project (P113341)

Treatment and Prevention of Acute Malnutrition in Jonglei & Greater Pibor Administrative Area, Republic of South Sudan

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF RURAL HEALTH PROJECT LOAN 7551-CN. June 24, 2008 TO THE PEOPLE S REPUBLIC OF CHINA

The World Bank Skills Strengthening for Industrial Value Enhancement Operation (P156867)

Table of Contents I. PROGRAM OVERVIEW

Saving Every Woman, Every Newborn and Every Child

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF THE HEALTH SECTOR REFORM PROJECT - PHASE II (APL2) LOAN NO RO January 28, 2005

MINISTRY OF EDUCATION AND HUMAN RESOURCES DEVELOPMENT DRAFT POLICY STATEMENT AND GUIDELINES FOR GRANTS TO EDUCATION AUTHORITIES IN SOLOMON ISLANDS

FOR OFFICIAL USE ONLY RESTRUCTURING PAPER ON A

THE FUNCTIONING OF COMMUNE COMITTEE FOR WOMEN AND CHILDREN

Impact Evaluation Concept Note HEALTH MILLENNIUM DEVELOPMENT GOALS PROGRAM-FOR-RESULTS (P4 R) ETHIOPIA

of Health Services in Indonesia:

Confidential REPUBLIC OF INDONESIA JPS-PSK CENTRAL INSTITUTION OF STATISTICS 1999 SOCIAL SAFETY NET SURVEY (JPS)

IMPLEMENTATION OF SANITATION CLINIC PROGRAM IN EAST LOMBOK REGENCY, PROVINCE OF WEST NUSA TENGGARA, INDONESIA

THe liga InAn PRoJeCT TIMOR-LESTE

Public Disclosure Copy

Summary of the Evaluation Study

Public Disclosure Copy. Implementation Status & Results Report Second Private Sector Competitiveness and Economic Diversification Prj (P144933)

Executive Summary. Rouselle Flores Lavado (ID03P001)

Financing Agreement. (National Program for Community Empowerment in Urban Areas Project) between REPUBLIC OF INDONESIA. and

Indonesia Country Report FY16

Engagement of medical professional associations in the distribution of specialist doctors to support universal health coverage in Indonesia, 2014

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-77370) ON A LOAN IN THE AMOUNT OF US$77.82 MILLION TO THE REPUBLIC OF INDONESIA FOR A

Transcription:

PNPM GENERASI Quarterly Progress Report: July to September 214 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Start date to Closing Date Geographic Coverage Approved Budget US$ 193,124,5 Disbursements during the Quarter US$ 1,723,1 Disbursements US$ 118,468,162 Progress Project Overview Active RETF: P12232 (TF9741), P132585, and P147658 (TF14769) BETF: P111966 (TF92194) Robert Wrobel (rwrobel@worldbank.org) Directorate for the Empowerment of Community Social and Cultural Institutions, Directorate General of Community and Village Empowerment (PMD), Ministry of Home Affairs, and PSF BETF: 26 May 28 to 31 December 217 (115 months) RETF: TF9741: 1 August 21 to 31 December 214 (53 months); TF14769: 24 June 213 to 31 December 217 (54 months) 5,4 villages in 499 poor sub-districts in eleven provinces (East Nusa Tenggara [NTT], West Nusa Tenggara [NTB], West Java, East Java, North Sulawesi, Gorontalo, West Sulawesi, Maluku, West Kalimantan, Central Kalimantan, and South Sumatra) The development objective of PNPM Generasi is to empower local communities in poor, rural subdistricts in project provinces to increase the utilization of health and education services. The program aims to facilitate the achievement of three Millennium Development Goals in which Indonesia s performance is lagging: (i) the achievement of universal basic education; (ii) a reduction in child mortality; and (iii) improvements in maternal health. Through the existing PNPM Rural platform and utilizing the community-driven development (CDD) approach, PNPM Generasi uses community planning and incentivized sub-district grants to improve outcomes in terms of 12 priority health and education indicators. Communities, with assistance from PNPM facilitators, work with health and education service providers to identify locally appropriate ways to improve access to, and increase the use of, health and education services. Sub-district grants are used to address either small-scale supply or demand constraints, depending on where the need is the greatest. Overall progress towards development objective Progress toward the project s development objective continues to be satisfactory. In addition to using data from the project Management Information System (MIS) as a source of data for tracking the key performance indicators (KPIs), since 213 onwards, the Directorate General of Community and Village Empowerment (PMD) has been using data from its Performance Monitoring Survey (PMS). PMS uses a small-cluster sampling methodology to report on progress towards achieving KPIs. Data collection for the second round PMS will commence in November 214. The first round of survey from October 213 revealed that in 213, PNPM Generasi met or exceeded targets for several KPIs. For example, 89 percent of deliveries were assisted by trained professionals (against a target of %). 85.4 percent of children of the age were enrolled in junior secondary school

(JSS) (against a target of 65%). percent of children under three years old were weighed monthly, meeting the target. However, the project fell short in 214 in terms of involving 51 percent of community members identified to be the poorest in project-planning and decision-making meetings (against a target of 6%). The involvement of women was also underachieved, being rated at 68 percent (against a target of 7%). A detailed description of the current KPI achievements is at the end of the report. Key developments during the quarter As of September 22, 214, PMD has disbursed community block grants amounting to US$13,89,588, which accounts for 34.6 percent of total block grants; Restructuring of TF9741 has been approved by the World Bank in August 214. The restructuring is intended to optimize the use of the fund by reallocating some fund categories such as consultant service, training, and workshop to the block grant category. PMD is in the process of submitting a DIPA revision to Ministry of Home Affairs (MOHA) for further process in Ministry of Finance (MOF); Training on Infant and Young Child Feeding (IYCF) by the Millennium Challenge Account Indonesia (MCA-I) has been delivered in three districts of West Java (West Bandung, Sukabumi and Garut). Training in Bandung Barat and Sukabumi were given to kader posyandu (village health post cadre), while in Garut both bidan (midwife) and kader posyandu attended the training. In South Sumatra, similar training was given to puskesmas (sub-district community health center) staff. In September, training of trainers was delivered to provincial health staff of South Sumatra. Socialization of MCA-I program on community-based health and nutrition program was also held in West and Central Kalimantan for District Health Officers and heads of puskesmas; Progress on impact evaluation (IE) study: Generasi and MCA-I Generasi: Feasibility study for the final round of Generasi IE is completed. Preliminary results suggest that PNPM Generasi is potentially well positioned to address key constraints to impact on final outcomes given a sufficient implementation period reamining. Conducting a long term evaluation of Generasi has relevant policy implications for the emerging service delivery agenda as it could establish the extent to which community based approaches can address shortcomings in service delivery outcomes, independent of investments in service delivery systems. The IE team is developing a concept note for the study and the preparation for the impact evaluation study will be commenced later this year, once the concept note approved by the Joint Management Committee. MCA-I: The procurement of a consulting firm for the MCA-I impact evaluation study was just completed and the selected firm (Survey Meter) is preparing data collection for the baseline study. Data collection will be conducted from November 214 up to February 215, with the cleaned data set to be submitted to MCA-I in May 215. The collaborative activity between PNPM Generasi and Creative Communities teams (PSF) has begun in in West Kalimantan, West Java, and NTB. This joint activity is intended to improve the ability of villagers, especially poor and marginalized people, to participate actively in PNPM Generasi processes using cultural expressions in project locations; Development of Phase-2 communication strategy has been initiated with field assessment carried out in September (West Kalimantan, South East Maluku, and West Sulawesi). This is intended to produce a comprehensive communication strategy that can be used as a PNPM Generasi approach to change community s behavior and improve the capacity of program actors; Preparation of Monitoring & Evaluation (M&E) /MIS review has commenced. Initial review of the functioning of the project MIS has been carried out in several districts in NTB. This will be followed up with the drafting of a concept note for the M&E/MIS review;

The PSF has provided technical assistance to facilitate discussions between PMD and the Ministry of Education and Culture (MOEC) and Bappenas to analyze the results of the three-district pilot utilizing PNPM Generasi s incentivized approach to increase participation of the poor in early childhood education and development (ECED) services. PMD is interested in mainstreaming the community-level ECED indicator in PNPM Generasi, but for this approach to be effective, efforts to improve community ECED teacher training and ECED quality control are required. The PSF will continue to facilitate cross-agency dialogue with the aim of linking efforts to improve the quality of ECED services with PNPM Generasi s demand-side support. Critical challenges While the restructuring of TF9741 was approved by the World Bank, the DIPA revision should be completed soon in order for Generasi activities that are funded by this TF to be completely disbursed this year; Follow-up actions on the latest Aide Memoire, especially regarding the issuance of letter (SK) related to the inclusion of Ministry of Health (MOH) and MOEC in the Pokja Pengendali structure and the SK for the establishment of technical team (sub-pokja) under Pokja Pengendali has not been completed. This issue will be discussed during the PNPM Generasi multi-stakeholder meeting to be held in October; Refresher training for all Generasi facilitators is supposed to be delivered next quarter. However, this may be delayed due to the changes of procurement policy at the national level (at MOHA). Activities planned during the next quarter A multi-stakeholder workshop on strengthening the collaboration amongst Generasi stakeholders will be held in October 214. This workshop is intended to establish an effective mechanism of collaboration between PNPM Generasi and line ministries, such as MOH, MOEC, and Ministry of Social Welfare (MSW). Preparation for the workshop, which is financed by the PSF and guided by Bappenas, has been completed; Support is being provided to PMD to conduct refresher trainings for district facilitators (Faskab and Faskeu) and district computing operator (Opkom) in October 214. This is intended to refresh the facilitators knowledge and skills related to their jobs, and to introduce new policies; Starting from October, MCA-I will provide IYCF training for frontline health workers in all of the three new provinces (South Sumatra, Southeast Kalimantan and West Kalimantan). This training provides health workers with skills related to the planning and preparation of infant and young feeding, including procurement of the materials; Report of the Generasi ECED piloting has been completed and submitted to Bappenas and PMD for their review during the next quarter; The concept note for the second round of Performance Monitoring Survey (PMS) is currently revised by the team and will be utilized as a basis for contracting a consulting firm that will manage data collection and processing. The concept note is to be finalized at the end of October.

Key Performance Indicators 1 Indicator Baseline Achievements for 214 Achieved in 214 Remarks Project Development Objective: To empower local communities in poor, rural sub-districts in the project provinces to increase utilization of health and education services. PDO#1: Improved access to and utilization of health services in the targeted areas % of pregnant women receiving four prenatal care visits % of deliveries assisted by trained professionals % of children under three weighed monthly % of pregnant women participating in pregnancy and nutrition class monthly 2 % of male caregivers participating in pregnancy and nutrition class monthly % of parents -2 year olds participating in children parenting an nutrition class monthly PDO#2: Improved access to and utilization of education services in the targeted areas Junior secondary enrollment rate PDO#3: % community members involved in planning and decision-making meetings - Women - Poorest community members PDO#4: Total number of beneficiaries: - 499 kecamatan (old and new locations) - 13 kecamatan (new location) 7 65 65 6 5.4 mil mil >8 >6 4 >6 > >6 6.7 million 1.3 million 7-1 > 89 From 214 onwards, PMD is using data collected through its Performance Monitoring Survey (PMS), which was delivered by University of Gadjah Mada (UGM) in October 213. Data for 214 will be collected in November 214. +4 8 PMS data. Data for 214 will be collected in November 214. -1 8 See above. 5 214 data will be extracted from the planned PMS to be conducted in November 214. 1 See above. 5 See above. 85.4 71 57 3,77,979 * ** +.4 7 Based on the 213 PMS data, the 214 target for JSS enrolment rate has already been achieved and this exceeded the expected cumulative target value. -4-3 3.7 mil 1.3 >7 6 6.7 million 1.3 68 51-2 -9 MIS data from 477 out of 499 sub-districts. From MIS *213 data that covers old kecamatan only (369 kecamatan), extracted from 74% completed MIS data. **Data for new locations will be available starting from 1 Starting from the second quarter of 214, the Generasi results framework and monitoring follows the one agreed in the additional financing (TF14763) that was cosigned by the Ministry of Finance on July 7, 214. In summary, main changes pertain to the number of PDO level indicators from five to four and the number of intermediate results reduced from four to three components. 2 This and the remaining two indicators under PDO#1 are new indicators introduced through the additional financing.

Key Performance Indicators 1 Indicator - % of which female Baseline 5 Component 1: Generasi kecamatan grants IOI (intermediate outcome indicator)#1: % of sub-districts with 1% disbursement rate at the end of program cycle IOI#2: % of previous non-users as beneficiaries of sub-projects IOI#3: % of sub-districts in which service providers attended MAD 55 85 >9 25 >5 6 Component 2: Facilitation Support IOI#4: % of district government which conducted supervision to communities as planned IOI#5: % sub-districts conducted planning and coordination workshop with district-level health and education office to discuss Generasi activities IOI#6: % of district-level MIS data completed (verified, entered and submitted) IOI#7: % of sub-districts in which 5% of villages conducted crossvillage audits as planned 8 45 5 4 8 8 85 6 >7 Achievements 57% *** 99 46 mil +7 for 214 Achieved in 214 million 55 Remarks October this year. ***Both numerator and denominator refer to old locations only +9 34.6-81 This is the disbursement rate for the total program consisting of four components. -4 4 MIS data for 213. For 214, this will be measured at the end of the project cycle (May 215). 99 +19 6 79 +19 MIS data. 5 Supervision by district governments planned for later in 214. 99 +19 7 79 +9 MIS data. 77 29 Component 3: Implementation Support and Technical Assistance IOI#8: % of planned facilitators at all levels were recruited and trained according to the agreed training plan IOI#9: % of sub-districts audited each year and for which the results are published 8 9 2 2 95.4 (214) -8 8 1.3* MIS data. *In 214, only 3 out of 64 districts have started entering the data into MIS application. -41 65 Cross-village audit for 214 commenced in June 214 (for old locations), while it will start for the new locations in early 215. +5.4 9 96 +6 PMD data. 96.7 percent of the quota for facilitators has been recruited and trained. The remaining Generasi consultants and facilitators to be recruited include 1one national consultant and 24 facilitators (Faskeu=2, FK=6, asisten FK=16) 28 2 Project report. Based on BPKP audit for FY 213 (reported to PMD in July 214), 13 out of 369 subdistricts (28%) have been audited.