Corrigendum No. V: Part-B Date: Addendum

Similar documents
Baan Warehousing Inventory Planning

The Children s Hospital Aurora, Colorado. Total Program Management for Healthcare

NPDES ANNUAL REPORT Phase II MS4 Permit ID # FLR05G857

The Accreditation Process (ACC)

Mastering the Standards for Survey Success: The 2018 HFAP Quality Review

Centre for Intellectual Property Rights (CIPR), Anna University Chennai

Tour Operator Partnership Program. Guidelines, Applications, and Forms

Complaint form. Helpline:

Planning for Your Spine Surgery

HCR MANORCARE NOTICE OF INFORMATION PRACTICES

HFAP QUALITY REPORT 2017

Policy with guidance notes church health and safety policy

Data-Driven Healthcare

UNDERGRADUATE NON-DEGREE ENROLLMENT FORM

PUBLICATIONS SYSTEM CHANGE TRANSMITTAL FOR TRICARE SYSTEMS MANUAL (TSM), FEBRUARY 2008

Managed Care Pharmacy Best practices that offer quality care and cost-effective coverage to patients, payers, employers, and government

CMA Physician Workforce Survey, National Results for Anesthesiologists.

NETCENTS CONTRACTS CAGE CODES

** FINAL ** NIGP PAPPA CHAPTER PENNSYLVANIA PUBLIC PURCHASING ASSOCIATION. GENERAL MEETING May 18, 2015

The MISP is not just kits of equipment and supplies; it is a set of activities that must be implemented

COMBINED FEDERATED BATTLE LABORATORIES NETWORK (CFBLNet)

ICM Internationales Congress Center München Details Room 11 including technical specifications and seating variants

A Systematic Review of Public Health Emergency Operations Centres (EOC) December 2013

CLINICAL GUIDELINE FOR RESTARTING OF ANTIPLATELET / ANTICOAGULATION MEDICATIONS Aim/Purpose of this Guideline

AETNA BETTER HEALTH SM PREMIER PLAN

Using CareAnalyzer Reports to Manage HUSKY Health Members

FLSA Classification: Non Exempt

HL7 FHIR Connectathon Care Plan Track Outcome Summary

Reproductive Health. in refugee situations. an Inter-agency Field Manual

AETNA BETTER HEALTH SM PREMIER PLAN

The Six-Step Parity Compliance Guide for Non-Quantitative Treatment Limitation (NQTL) Requirements

2016 APDIM SPRING CONFERENCE VEGAS THE MIRAGE HOTEL AND CASINO APRIL 17 21, 2016

Marshall Aid Commemoration Commission Account

new york state department of health the hiv quality of care program new york state department of health aids institute

Authorization for Verification of Academic Records/Transcripts

JOIN AMCP. The First Step to Your Career in Managed Care Pharmacy. Student Pharmacist Membership

Ministry of Defence. Reserve Forces. Ordered by the House of Commons to be printed on 28 March LONDON: The Stationery Office 12.

The Provision of Out-of-Hours Care in England

Instructions for administering GMC colleague and patient questionnaires

group structure. It also might need to be recorded as a relevant legal entity on a PSC register. How to identify persons with significant control

The South Eastern Passenger Rail Franchise

Imaging Services Accreditation Scheme (ISAS) Delivering quality imaging services

Joint External Evaluation. of THE REPUBLIC OF LIBERIA. Mission report: September 2016


Financial Management in the NHS

The attached brochures explain a number of benefits for logging on and creating your account with Medical Mutual.

Developing teachers and trainers in undergraduate medical education

Your 2013 Aetna Enrollment Guide

General Information Dates and Fees 2015/16 Terms and Conditions Enrolment Form

Glasgow Dental Hospital and School/ Royal Hospital for Children. Job Profile. StR in Paediatric Dentistry

Successful health and safety management

Provider Reference Guide CARE

GRADUATE DIVERSITY ENRICHMENT PROGRAM (GDEP) Proposal deadline: May 30, 2017 (4:00 pm ET)

guidance notes CHURCH FUNCTIONS Version 5

EagleCrest. The Hearth Enhanced Assisted Living

Summary: The state of medical education and practice in the UK: 2012

STUDENT STEM ENRICHMENT PROGRAM (SSEP) Proposal deadline: April 18, 2018 (4:00 pm EDT)

PAPER PLANT SAFETY. wrong. You re doing it. if you don t do these. things.

WHO/CCU/15.02 /Graphics O WH Cover by

The GMC s role in continuing professional development: Annexes

GUIDELINES FOR ENVIRONMENTAL EMERGENCIES

TAE Course. Information. The Certificate IV in Training and Assessment

Integrating Physical & Behavioral Health: Planning & Implementation

Ethical & Professional Obligations for RDs When Completing SDA Forms

Guide to Your Benefits and Enrollment

AETNA BETTER HEALTH OF OHIO a MyCare Ohio plan (Medicare Medicaid Plan)

invest in your futuretoday. Certified Public Finance Officer (CPFO) Program.

The Medical Assessment of Incapacity and Disability Benefits. REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 280 Session : 9 March 2001

AETNA BETTER HEALTH SM PREMIER PLAN

An event is also considered sentinel if it is one of the following:

General Information Dates and Fees 2014/15 Terms and Conditions Enrolment Form

Person-Centered Care Coordination. December 8, 2016

Achieving good medical practice:

Innovations in Rural Health System Development

The Skye Foundation Scholarships

Guide to Your Benefits and Enrollment

The medication use process is one of the

The checklist on law and disaster risk reduction

2018 SQFI Quality Achievement Awards proudly endorsed and sponsored by Exemplar - Global

Inniswood Village. The Blendon Assisted Living Apartments

Clinical Research Training Specialists

Skills and Training for a. Green New Deal. Conclusions and Recommendations

Healthcare Learning Consortium. Recognizing and Rewarding the Role of Entry-level Healthcare Workers

National training survey 2013: summary report for Wales

Visionary Solutions for Global Communities. Opportunities. Register Today at mhli.org!

Call for Presentations

. There are no partnering anangements.. Approximate number of completions in past year for CPC10108 = 418

Standards of Excellence for Family-Run Organizations

Professional behaviour and fitness to practise:

Sharing Health Records Electronically: The Views of Nebraskans

entrepreneurship & innovation THE INNOVATION MATCHMAKER Venture Forum The Collaborative Innovation Service Benefit from start-up innovations

Development and Utility of the Front Line Manager s Quick Reference Guide

Aboriginal and Torres Strait Islander Pilot Survey Report

National trainer survey Key findings

The relationship between primary medical qualification region and nationality at the time of registration

Innovations in Rural Health System Development

Compliance and Federally Qualified Health Centers. Jacqueline C. Leifer, Esq. Senior Partner AGENDA. PIN : Sliding Fee Discount Program

S trive for L. I. F. E News

Applications to the GP and Specialist Registers

A Safer Place for Patients: Learning to improve patient safety

Transcription:

Corrigedum V: -B Date:- 21.07.16 Addedum Teder Notice N1C-05/2016. (NCB), Dt.14.05.2016Date of Pre-Bid Meetig: - 10 th Jue 2016 Teder No (As uploaded i the e-teder portal) 46 Name of work: Costructio of METRO Trai Depot at MIHAN (North-South Corridor) & HINGNA (East-West Corridor) icludig Civil & E&M Works for Nagpur Metro Rail Project SN Sectio Clause ref. Existig descriptio Replaced with 1. -4 Fiacial Bid & Bill Of Quatities (BOQ) 2. -1: Sectio-II: Aexure-II- I this teder Bid Security is to be paid i Two Biddi A s, - Rs. 4500000/ by g NEFT/RTGS Paymet via et bakig facility Proce provided by bidder's bak & -B dure Rs. 17500000/I the form of Bak Guaratee. Sca Tool copy BG is to be attached. Kit for- E- Tede r Portal All Clauses. -4 Fiacial Bid & Bill Of Quatities (BOQ) Please Refer Revised BOQ (Corrigedum V: -E) 3. -1 NIT Teder Security The total security amout shall be a total of INR 16 millio submitted I this teder Bid Security is to be paid i Two s, - Rs. 2850000/ by NEFT/RTGS Paymet via et bakig facility provided by bidder's bak & -BRs. 11400000/I the form of Bak Guaratee. Sca copy BG is to be attached. Teder Security The total security amout shall be a total of INR 14.25 millio submitted

4. -1 Sectio III- Evaluatio & Qualificatio Criteria Sectio Clause ref. Existig descriptio Replaced with 5. -2. Aexure VII B Teder drawigs icludig GADs. 6. -2 Sectio VIIB 7. -2 Sectio VII A, Geeral s as below: (a) INR 3.5 Millio by RTGS/NEFT/Credit Card Olie as per Procedure i E-teder Portal. (b) INR 12.50 millio i form of Bak Guaratee, as per procedure give i bid documets. as below: (a) INR 2.85 Millio by RTGS/NEFT/Credit Card Olie as per Procedure i E-teder Portal. (b) INR 11.40 millio i form of Bak Guaratee, as per procedure give i bid documets. 4.2 (a) Evaluatio & Qualificatio Criteria Please refer Revised Evaluatio & Qualificatio Criteria (Corrigedum V: -C) Prelimiary drawigs. Prelimiary drawigs attached as Corrigedum V: -D. 7.1.6.1 Type of Coduit All coduits for wirig system irrespective of surface or cocealed shall be of G.I. Geerally cocealed electrical wirig istallatio shall be i GI coduits ad surface wirig also i G.I. coduits. 2.1.6 Though Aligmet plas (both vertical ad horizotal) ad obligatory pier locatios are provided by the Employer to the Cotractor. Utility idetificatio at all the foudatio locatios will be doe by the Cotractor before startig Type of Coduit All coduits for wirig system irrespective of surface or cocealed shall be of G.I. except where specifically described i a particular item. Geerally cocealed electrical wirig istallatio shall be i GI coduits ad surface wirig also i G.I. coduits. Utility idetificatio at all the foudatio locatios will be doe by the Cotractor before startig pilig/excavatio ad i case utility(s) is ecoutered or obligatory requiremets of Local Authorities are to be met out, the Cotractor

Sectio Clause ref. Existig descriptio Replaced with pilig/excavatio ad i case utility(s) is ecoutered or obligatory requiremets of Local Authorities are to be met out, the Cotractor would modify the spa cofiguratio at such locatios to save the utility(s) or to meet out the obligatory requiremets withi the accepted price 8. -2 Sectio VII 2.18 Cotractor will maitai all the systems i a comprehesive maer icludig all kids of spares ad cosumables without ay extra cost durig Defect Liability period of 2 years from the date of takig over". would modify the cofiguratio at such locatios to save the utility(s) or to meet out the obligatory requiremets withi the accepted price. Cotractor will maitai all the systems i a comprehesive maer icludig all kids of spares ad cosumables without ay extra cost durig Defect Liability period of 2 years from the date of takig over". -3 Sectio IX 6 "12 moths from the date of Commercial "24 moths from the date of Commercial Operatios Date (COD) of Depot. Durig the Defects Liability Period the Cotractor shall rectify/ replace the defective works without claimig ay cost for the defective works fulfill his obligatios durig the Defects Liability Period as laid dow i GC ad Works Requiremets" Operatios Date (COD) of Depot. Durig the Defects Liability Period the Cotractor shall rectify/ replace the defective works without claimig ay cost for the defective works fulfill his obligatios durig the Defects Liability Period as laid dow i GC ad Works Requiremets" 9. -1 Sectio-IV: B.4, Form 4.4 A geeral descriptio of the complete costructio, A geeral descriptio of the complete Biddig Bidder s istallatio, testig ad commissioig of works for costructio, istallatio, testig ad Form Techical statios ad viaduct portios for this Cotract with Commissioig of works for Depots for this Submissios brief techical descriptio of each system as Cotract with brief techical descriptio of each idicated i the followig sectios. system as idicated i the followig sectios. 10. -2 Sectio VII 2.1 Schedule Schedule A Geeral A, B, C, D, E, F ad G (Schedules of BOQ) A, B, C, D, E, F,G & H (Schedules of BOQ) described i clause 2.9 of Employer s described i clause 2.9 of Employer s s Requiremets- Fuctioal Requiremets- Fuctioal 11. -2 Sectio VII 2.1.3, SN (iv) Lift shafts ad escalators pits ad other fixtures i Lift shafts ad escalators pits ad other fixtures i

Sectio Clause ref. Existig descriptio Replaced with A Geeral s 12. -2 Sectio VII A Geeral s 13. -2 Sectio VII A Geeral s 14. -2 Sectio VII- 15. -2 Sectio VII- 2.1.3, SN (viii) statios subject to coordiatio with respective system cotractors icludig water proofig of lift pit/escalator pits. Udergroud water tak ad pump house, D.G. room, bore wells 2 os at each statio ad coectio from bore wells to the udergroud water taks, water proofig i the udergroud structure, terrace ad Overhead Taks. 2.1.6, SN (v) The platform legth of 77.5m ad statio legth of 140m show i teder drawig. No claim o accout of chage i legth of platform & statio limit will be etertaied. 2.1.3 The Statio Load shall be classified ito three categories: 2.2.16 A itegrated, comprehesive Data logger System with microprocessor/pc based cofiguratio shall be provided i the Statio Cotrol Room to eable moitorig of all parameters like Voltage, Frequecy, Power Factor, KVARh, KW, KWh, Power Outages etc. depots subject to coordiatio with respective system cotractors icludig water proofig of lift pit/escalator pits. Udergroud water tak ad pump house, D.G. room, bore wells 2 os at each depots ad coectio from bore wells to the udergroud water taks, water proofig i the udergroud structure, terrace ad Overhead Taks. Deleted. The Statio/Depot Load shall be classified ito three categories: A itegrated, comprehesive Data logger System with microprocessor/pc based cofiguratio shall be provided i the Depot Cotrol Room to eable moitorig of all parameters like Voltage, Frequecy, Power Factor, KVARh, KW, KWh, Power Outages etc. 16. -2 Sectio VII- 8.3.8 The auciatio alarm shall be repeated to the statio cotrol room through Buildig Maagemet System (BMS). The auciatio alarm shall be repeated to the Depot cotrol room through Buildig Maagemet System (BMS).

17. -2 Sectio VII- 18. -2 Sectio VII- 19. -2 Sectio VII- 20. -2 Sectio VII- 21. -2 Sectio VII- Sectio Clause ref. Existig descriptio Replaced with 9.4.2 UPS shall be provided with RS 485 compatibility for remote moitorig ad to exted alarm & status idicatios & auciatio ad meterig to remote paels, statio cotrol ceter ad Operatio cotrol ceter. Parameters Tube well pumps at statio. for cotrol ad Raw water pumps at statio. moitorig for the various Domestic water pumps at statio equipmet 10.1 This describes the miimum stadards of the Buildig Maagemet System (BMS) for elevated statios of NMRCL etwork. 10.6.5 The Cotractor shall establish the I/O requiremets ad provide the most ecoomic cofiguratio of PLCs based upo cost balaces betwee uit modularity ad cablig costs for idividual statios. 10.8.1 The output iformatio should be grouped i accordace with the make-up of the services systems i the statio buildig rather UPS shall be provided with RS 485 compatibility for remote moitorig ad to exted alarm & status idicatios & auciatio ad meterig to remote paels, Depot cotrol ceter ad Operatio cotrol ceter. Tube well pumps at statio/depots Raw water pumps at statio/depots Domestic water pumps at statio/depots This describes the miimum stadards of the Buildig Maagemet System (BMS) for Depots of NMRCL etwork. The Cotractor shall establish the I/O requiremets ad provide the most ecoomic cofiguratio of PLCs based upo cost balaces betwee uit modularity ad cablig costs for idividual statios/depots The output iformatio should be grouped i accordace with the make-up of the services systems i the statio/depot buildig

Sectio Clause ref. Existig descriptio Replaced with 22. -2 Sectio VII- 23. -2 Sectio VII- 24. -2 Sectio VII- 25. -2 Sectio VII- 26. -2 Sectio VII- tha the locatio of the field hardware. 10.6.1 The workstatio pc shall be istalled i the statio cotrol room of each statio. this shall be a separate pc. the OCC work statio shall be provided with similar pc or higher pc/server, as per the requiremet. 10.9.1 The cotractor shall prepare i clear ad logical form documets describig the fuctios trasmitted ad the operatios carried out at the statios cotrol room workstatio ad that at OCC. 10.9.6 Alarms will flash o the preset scree ad be audible to the statio cotroller, it will be messaged to the mobile phoe of the statio cotroller ad other cocered NMRC authorities, as decided by the Employer. 10.10.1 This test shall be arraged to test the itegratio of the BMS server at OCC ad all workstatios of differet statios. 10.10.5 Egieer/ Maager traiig should cocetrate o makig them familiar with the capabilities of the system so they he ca take full rather tha the locatio of the field hardware. The workstatio pc shall be istalled i the Depot cotrol room of each Depot. This shall be a separate pc. The OCC work statio shall be provided with similar pc or higher pc/server, as per the requiremet. The cotractor shall prepare i clear ad logical form documets describig the fuctios trasmitted ad the operatios carried out at the statios/depot cotrol room workstatio ad that at OCC. Alarms will flash o the preset scree ad be audible to the statio /Depot cotroller, it will be messaged to the mobile phoe of the statio/depot cotroller ad other cocered NMRC authorities, as decided by the Employer. This test shall be arraged to test the itegratio of the BMS server at OCC ad all workstatios of differet Depots. Egieer/ Maager traiig should cocetrate o makig them familiar with the capabilities of the system so they he ca take full

Sectio Clause ref. Existig descriptio Replaced with 27. -2 Sectio VII- 28. Aexure IX A 29. -3 Sectio IX icular Coditios of Cotract advatage of the BMS i ruig statio buildig. 11.7.1.2 The motor shall be Flameproof / No Flameproof type & totally eclosed type, with capacitor start ad ru type motor, rated for cotiuous duty ad rugged i costructio. Vedor List For MEP Works: 1.5 The documets formig the Cotract are to be take as mutually explaatory of oe aother. For the purposes of iterpretatio, the advatage of the BMS i ruig statio/depot buildig. The motor shall be Flameproof (Fire rated fa for 250 ºC, 120 miute)type & totally eclosed type, with capacitor start ad ru type motor, rated for cotiuous duty ad rugged i costructio. Vedor List For MEP Works: All materials ad products shall coform to the relevat stadards/specificatios of IS code, BS Code etc. ad shall be of approved make ad desig. A list of maufacturers / vedors is give herei below for guidace. The approval of a maufacturer/vedor shall be give oly after review of the sample /specime by the Egieer. The complete system ad istallatio shall also be i coformity with the Applicable Codes, Stadards ad Publicatios. List of approved makes for products ad materials is give below. Other equivalet maufacturers may be cosidered with prior approval. The documets formig the Cotract are to be take as mutually explaatory of oe aother. For the purposes of iterpretatio, the priority of the documets shall be i accordace with the

30. NIT Date & Time of submissio of Teder 31. NIT Date & Time of Opeig of Teder Sectio Clause ref. Existig descriptio Replaced with priority of the documets shall be i accordace with the followig sequece: (a) the Cotract Agreemet (if ay), (b) the Letter of Acceptace, (c) the icular Coditios A, (d) the icular Coditios B (e) the Geeral Coditios; ad (f) the, (g) the Drawigs, (h) the Schedules ad ay other referece documets formig part of the Cotract. If a ambiguity or discrepacy is foud i the documets, the Egieer shall issue ay ecessary clarificatio or istructio. Olie submissio up till 16.00 Hrs. o 01.07.2016 i NMRCL s e-teder portal. O 04.07.2016 at 16.00 Hours or as decided by the authority at Metro House, 28/2, Aad Nagar, Civil lies, Nagpur 440001 followig sequece: (a) the Cotract Agreemet (if ay), (b) the Letter of Acceptace (c) Letter of Bid (d) the icular Coditios A, (e) the icular Coditios B (f) the Geeral Coditios; ad (g) Bill of Quatities, (h) the, (i) the Drawigs, (j) the Schedules ad ay other referece documets formig part of the Cotract." Olie submissio up till 16.00 Hrs. o 13.08.2016 i NMRCL s e-teder portal. O 16.08.2016 at 16.00 Hours or as decided by the authority at Metro House, 28/2, Aad Nagar, Civil lies, Nagpur 440001 32. BID Sectio 2 ITB 4.1 Maximum umber of members i the JV shall be: 3 Please refer Revised Evaluatio of qualificatio

data sheet 33. BID data sheet 34-2 Sectio VII- A: - Geeral s Sectio Clause ref. Existig descriptio Replaced with (Three) Lead member should ot have less tha 40% participatio ad other members shall have miimum 20% participatio i the proposed JV / Cosortium for this work. Sectio 2 ITB 19.1 A Bid Security is required i two parts (I Idia Rupees or equivalet USD): (a) INR 3.50 Millio (Three Poit Five Millio Oly) as cash by RTGS/ NEFT/ Credit Card as per procedure give e-teder portal. (b) INR 12.50 Millio (Twelve Poit Five Millio Oly) Criteria corrigedum V: -C A Bid Security is required i two parts (I Idia Rupees or equivalet USD): (a) INR 2.85 Millio (Two Poit Sixty Five Millio Oly) as cash by RTGS/ NEFT/ Credit Card as per procedure give e-teder portal. (b) INR 11.40 Millio (Te Poit Sixty Millio Oly) 2.1.9.6 Iterface Works Iterface work betwee with Machiery ad Plat Cotractor corrigedum-v: -F Geeral Maager/Procuremet, Nagpur Metro Rail Corporatio Limited.