THE PROCUREMENT HOLIDAY

Similar documents
1THE ARMY DANGEROUSLY UNDERRESOURCED' AUSA Torchbearer Campaign Issue

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

BALANCING RISK RESOURCING ARMY

Legacy Force Recapitalization: An Urgently Needed Program for Today s Army

RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY AND GENERAL MARK A. MILLEY CHIEF OF STAFF UNITED STATES ARMY BEFORE THE

Army Experimentation

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT

RECORD VERSION STATEMENT BY LIEUTENANT GENERAL JAMES O. BARCLAY III DEPUTY CHIEF OF STAFF OF THE ARMY, G-8 BEFORE THE

GAO DEFENSE ACQUISITION. Army Transformation Faces Weapon Systems Challenges. Report to Congressional Committees

MG Joe M. Ernst Assistant Deputy Commanding General USAR U.S. Army Materiel Command

Strategic Responsiveness: New Paradigm for a Transformed Army

WikiLeaks Document Release

We acquire the means to move forward...from the sea. The Naval Research, Development & Acquisition Team Strategic Plan

Steven Costa Program Manager, Ammunition Marine Corps Systems Command

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

The Future of US Ground Forces: Some Thoughts to Consider

A'rrl' Torchbearer National Security Report. Army Recapitalizati""'... A Focused Investment in Today's Army

Headquarters, Department of the Army Distribution Restriction: Approved for public release; distribution is unlimited.

ASSOCIATION OF THE UNITED STATES ARMY

CRS Report for Congress

Proposed U.S. Arms Export Agreements From January 1, 2008 to December 31, 2008 Published on Arms Control Association (

As we close the book on one of America s longest military

U.S. Army The U.S. Army is America s primary land

STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001

Equipping the Army National Guard for the 21st Century

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150%

GAO. OVERSEAS PRESENCE More Data and Analysis Needed to Determine Whether Cost-Effective Alternatives Exist. Report to Congressional Committees

The Necessity of Human Intelligence in Modern Warfare Bruce Scott Bollinger United States Army Sergeants Major Academy Class # 35 SGM Foreman 31 July

For over 224 years, The Army active component (AC), Army

The U.S. military, especially the Army, was in poor shape after Vietnam:

RECORD VERSION STATEMENT BY THE HONORABLE MARK T. ESPER SECRETARY OF THE ARMY BEFORE THE COMMITTEE ON ARMED SERVICES UNITED STATES SENATE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

STATEMENT OF ADMIRAL WILLIAM F. MORAN U.S. NAVY VICE CHIEF OF NAVAL OPERATIONS BEFORE THE HOUSE ARMED SERVICES COMMITTEE STATE OF THE MILITARY

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

NDIA Ground Robotics Symposium

Issue Briefs. Nuclear Weapons: Less Is More. Nuclear Weapons: Less Is More Published on Arms Control Association (

June 25, Honorable Kent Conrad Ranking Member Committee on the Budget United States Senate Washington, DC

U.S. Army representatives used the venue of the 2012

For the US Army to expand rapidly, its leaders will have to make

The current Army operating concept is to Win in a complex

Project Manager Munitions Executive Summit

GAO FUTURE YEARS DEFENSE PROGRAM. Funding Increase and Planned Savings in Fiscal Year 2000 Program Are at Risk

2014 Army Posture Statement Concept Briefing. This presentation is UNCLASSIFIED

RECORD VERSION STATEMENT BY THE HONORABLE KATHERINE G. HAMMACK ASSISTANT SECRETARY OF THE ARMY (INSTALLATIONS, ENERGY & ENVIRONMENT) BEFORE THE

Equipping an Operational Army Reserve

CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE. 9t ATEMENT K Dublic releoml Unib&itad S TUD Y. DTIC QUALITY INSFi Cxi L'ÄijU

STATEMENT BY GENERAL RICHARD A. CODY VICE CHIEF OF STAFF UNITED STATES ARMY BEFORE THE

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

COL Michael Milner Project Manager Armored Multi-Purpose Vehicle

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

INTRODUCTION BACKGROUND

GAO. FORCE STRUCTURE Capabilities and Cost of Army Modular Force Remain Uncertain

Department of Defense INSTRUCTION

Italy s Nuclear Anniversary: Fake Reassurance For a King s Ransom

The Rebalance of the Army National Guard

C4I System Solutions.

National Guard and Reserve Equipment Appropriation (NGREA)

Norwegian upgrade program for Leopard 2, MBT, CV90 and M-113

Statement of Rudolph G. Penner Director Congressional Budget Office

RECORD VERSION STATEMENT BY LIEUTENANT GENERAL JOHN M. MURRAY DEPUTY CHIEF OF STAFF OF THE ARMY, G-8 AND

How Can the Army Improve Rapid-Reaction Capability?

By Lieutenant Colonel Scott Jones and Major Detrick L. Briscoe

The Bear Marches West Alternate Tables of Organization & Equipment for Optional Wargame Scenarios. Glenn Dean

38 th Chief of Staff, U.S. Army

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

"~'CRS ReDort for Congress

U.S. AIR STRIKE MISSIONS IN THE MIDDLE EAST

FY18 SAC-D Defense Appropriations Act

Army Vision - Force 2025 White Paper. 23 January DISTRIBUTION RESTRICTION: Approved for public release.

The U.S. Marine Corps (USMC) is the nation s

Form Approved OMB No Report Documentation Page Public reporting burden for the collection of information is estimated to average 1 hour per re

Standards in Weapons Training

FAS Military Analysis GAO Index Search Join FAS

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence

Methodology The assessment portion of the Index of U.S.

GAO. QUADRENNIAL DEFENSE REVIEW Opportunities to Improve the Next Review. Report to Congressional Requesters. United States General Accounting Office

The Ability of the U.S. Military to Sustain an Occupation in Iraq

DEPARTMENT OF DEFENSE OPERATION AND MAINTENANCE. Operation and Maintenance, Defense-Wide

UNITED STATES SENATE COMMITTEE ON ARMED SERVICES

Winning in Close Combat Ground Forces in Multi-Domain Battle

U.S. Army s Modular Redesign: Issues for Congress

ADDENDUM. Data required by the National Defense Authorization Act of 1994

Chapter 1. Introduction

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association (

Issue Briefs. NNSA's '3+2' Nuclear Warhead Plan Does Not Add Up

UNCLASSIFIED. Close Combat Weapon Systems JAVELIN. Systems in Combat TOW ITAS LOSAT

OFFICE OF ASSISTANT SECRETARY OF DEFENS E (PUBLIC AFFAIRS )

Setting Priorities for Nuclear Modernization. By Lawrence J. Korb and Adam Mount February

September 30, Honorable Kent Conrad Chairman Committee on the Budget United States Senate Washington, DC 20510

STATEMENT OF ERIC P. EBELING ON BEHALF OF USA MARITIME U.S. HOUSE OF REPRESENTATIVES

Lessons of the Past Must Guide the Army s Future

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC

Department of the Army Historical Summary

SUBJECT: Army Directive (Expanding Positions and Changing the Army Policy for the Assignment of Female Soldiers)

The Air Force Aviation Investment Challenge

REQUIREMENTS TO CAPABILITIES

GAO. BOTTOM-UP REVIEW Analysis of DOD War Game to Test Key Assumptions

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

Chapter 13 Air and Missile Defense THE AIR THREAT AND JOINT SYNERGY

(203) VerDate Mar :59 Jun 07, 2011 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A365.XXX A365

Transcription:

THE PROCUREMENT HOLIDAY THE A RMY DANGEROUSLY UNDERRE SOURCED Fifty years ago, Task Force Smith of the 24th Infantry Division-the first American ground forces deployed to defend South Koreaengaged the advancing North Korean Army. The result was a disaster as the North Korean forces cut through the small US force and its South Korean allies, who were still equipped with weapons from World War II. The American anti-tank rocket, bounced right off the armor of the modernized North Korean T-34 tanks. The more potent 3.5-inch bazooka had not yet been deployed to the Army forces in the Far East, nor had sufficient quantities of armor piercing munitions been supplied to the supporting artillery. Today, The Army-active Army, Army National Guard (ARNG) and Army Reserve (USAR)-is underresourced, underpaid and overcommitted. It has too many missions and not enough soldiers. As the Army has been responding across the globe, moving from one contingency to another while maintaining forward-based forces in potential hot spots such as the Korean Peninsula, the Army has had to rob the procurement accounts to pay for current operations and to sustain shortterm readiness. Future readiness has been mortgaged to the hilt. At present rates of procurement and modernization, the Army in the foreseeable future may face another Task Force Smith. The Army's inventory will have aged to the point of obsolescence, and not enough modernized equipment will be in the force to meet the potential challenges of a prepared and thinking foe. We must guard against a repeat of Task Force Smith. Today, when the Army is committed, it expresses the will of the American government and the American people. Soldiers on the ground present a clear signal to friend and foe alike. The National Strategy of Engagement means, however, that Army forces are deployed all over the globe doing the nation's bidding-and it is manpower intensive. That commitment has not come without a price. While defense resources have been dramatically slashed since the end of the Cold War, Army deployments across the globe have been up 300 percent. And we have had to mortgage our future readiness to pay for current requirements by tapping the procurement and modernization accounts. We now must warn the American people that we are on the path to future unpreparedness. 1

HISTORY OF THE PROCUREMENT HOLIDAY: How WE GoT WHERE W E A RE The magnificent Army that we have today was technologically conceived in the 1970s, built in the 1980s, and fought in the 1990s. The Reagan defense build-up meant the Army was infused with new, high-technology equipment such as the M1 Abrams tank, the Bradley fighting vehicle, and the AH-64 Apache attack helicopter. These weapons were designed to defeat the massed Soviet formations and the foes that threatened South Korea and the Persian Gulf. The first major test of these weapons came in 1990-91, when the Persian Gulf War demonstrated to the American people the superiority of the U.S. Army. Besides being the best trained and best led force in the world, it was the best equipped. 2 With the end of the Cold War, the dissolution of the Soviet Union and the absence of a superpower threat, our leaders anticipated that a strategic pause had arrived. It meant that the United States could afford to reduce national security spending. Force levels were cut, as was spending on new weapons. While procurement was to be temporarily reduced-to take a "holiday" -during the strategic pause, force cuts were to be more permanent. For the Army that meant a reduction in combat divisions from 28 to 18. It also included substantial cuts in Army National Guard and Army Reserve combat support (CS) and combat service support (CSS) formations. This drawdown allowed older pieces of equipment to be discarded and newer pieces massively cascaded to active and reserve units. Unfortunately, the assumptions that drove the procurement holiday and the force drawdown proved to be too optimistic. The National Strategy of Engagement and Enlargement meant that the Army had a 300 percent increase in operational deployments while undergoing a 33 percent reduction in force. With a declining budget topline, more and more money from the Army budget had to be diverted to operations and maintenance accounts to fund contingency operations in such places as Iraq, Kuwait, Haiti, Bosnia, Somalia, Rwanda and now Kosovo. The bottom line is that since 1989 the Army has provided over 60 percent of the forces for 32 of 36 major deployments. At the same time its force structure was reduced by 33 percent, its infrastructure by 21 percent, and its obligating budget authority by 37 percent.1 The combination of a shrinking Army budget and funds required for current operations and shortterm readiness meant that the "temporary" procurement holiday became a permanent feature of the 1990s Army budgets. Worse, the Army's procurement accounts not only sank precipitously from a high of $16.4 billion in 1990 to a low of $7.6 billion in 1998, but also became the checkbook balance of first resort for "pop-up" contingencies. Since the end of the Cold War, the Army has had to terminate or restructure over 100 programs because of fiscal constraints. These programs have included such key systems as the M8 Armored Gun System and the Follow-On To TOW missile. More recently, the current Program Objective Memorandum CPOM) showed that another round of major modernization program restructuring forced nine programs to be restructured, delayed 12 and reduced the buy in 13.2

FIGHTING TOMORROW'S WARS WITH YESTERDAY'S WEA PONS: WHY WE C AN ' T GET THERE FROM HERE ARMY- PURCHASES OF SELECTED WEAPON SYSTEMS (Yearly Averages for Various Periods) Tanks, Artillery and Other Armored Vehicles Number of Systems Scout and Attack Helicopters Number of Systems 1,600 200 1,400 180 1,200 160 140 1,000 120 800 100 600 80 400 60 40 200 20 0 0 1974-1993 1994-1999 2000-2005 1974-1993 - - - - Annual Steady-State Purchases (less optimistic service lives) - - - - Annual Steady-State Purchases (more optimistic service lives) Source: Congressional Budget Office based on Data from the Department of Defense 1994-1999 2000-2005 By 2010, our stocks of weapons and equipment will have aged beyond their projected lifespans and, because of the miniscule procurement and recapitalization funds available, few or no replacements will be available. The soldier of 2010 will go to war with largely the same weapons as the soldier of 1990, and the soldier of 2020 will do the same according to current plans. Today 70 percent of the equipment for the Army of 2025 is sitting in active Army, Army Reserve and Army National Guard motor pools. This will have a serious impact on the Army's ability to accomplish its mission in the future and as was stated in a recent congressional testimony, "If parents are uncomfortable sending their sons and daughters to college in 25-year-old cars, what will they think about sending them into war in 25-year-old helicopters?"3 The Army's procurement underfunding is so massive that if it is not corrected between Fiscal Year 2000 and FY 2010, the national leadership will face some very hard choices by 2010. The Congressional Budget Office chart above highlights the annual buys needed to sustain the Army's equipment in just two categories that are crucial to execute the National Military Strategy. The Army's current modernization priorities of digitizing the force, retaining combat overmatch, developing science and technology, recapitalizing the legacy systems, and testing and evaluating new systems are underfunded by a combined total of $5 billion per year. That is an enormous sum! The most recent POM shows that digitization is short 18 percent of its required funding. Procurement of new systems to retain combat overmatch and recapitalization of the older systems are short 32 percent and 38 percent respectively. Funds for science and technology and testing and 3

. evaluation are short 23 percent combined. 4 Virtually every major acquisition program has suffered delays, rescheduling and reductions in buys. Key follow-on programs have had to be cancelled. Unfunded requirements have been deferred in the POM to FY 2006 and beyond. That will increase costs and probably result in further cancellation of programs in that bow-wave. "The Army is living off of its old technology and falling behind on modernization," said Bernard Rostker, Under Secretary of the Army. "The problem clearly is resources-we have the programs, but we don't have the resources to procure new systems."5 Congress has noted the pervasiveness of the Army's modernization underfunding and has declared a number of the components of the modernization plan "incomplete."6 The stark truth is that the current FY 2001-2005 POM will not enable the Army to maintain modernization programs at levels that will ensure mid-term and long-term readiness and combat overmatch. The Army is facing a death spiral. More and more dollars have to go into equipment maintenance to sustain current readiness, thus decreasing the amount of dollars available for future procurement. It is a vicious cycle that both Under Secretary of Defense Jacques Gansler and the former Deputy Chief of Staff for Logistics, General John C. Coburn, have detailed publicly, and it impacts on the entire Army.7 4 PERCENTAGE OF ARMY REQUIREMENTS FUNDED OVER THE FY 2001-2005 PROGRAM OBJECTIVE MEMORANDUM 100% 90 80 70 60 50 40 30 20 10 0 POM Digitization Combat Science & Recapitalization Test & Funding Categories Overmatch Technology Evaluation Source: U.S. Army POM Fiscal Years 01-05 Executive Summary, 17 May 1999 The reserve components-the Army National Guard and the Army Reserve-have seen little new modernized equipment since the massive cascading of 1992 and 1993. Moreover, combat support and combat service support equipment has been updated and replaced more slowly than combat systems, and the reserve components have the majority of CS and CSS units. According to the National Guard and Reserve Equipment Readiness Report, the reserve components are simply not equipped to meet the full requirements of the National Military Strategy. Major General Thomas J. Plewes, the Chief of the Army Reserve, states that shortages of new and modern equipment prevent units from being able to train with and integrate with the units they need to support. Also, "the inability to strengthen... CSS... through new procurement or by initiating modernization... severely affects the capability of the USAR to fulfill its wartime mission."8 Major General Roger C. Schultz, the Director of the Army National Guard, echoes these sentiments: '11Unfortunately, we have a long road to travel before we can achieve the degree of parity in combat, combat support and combat service support systems required to fully support the Army modernization plan, and, by extension, the National Military Strategy.119 In both the ARNG and USAR, priority funding has been given to

early-deploying units. Laterdeploying units retain older equipment or rely on substitute or cross-leveled equipment. This results in shortfalls in active component/ reserve component (AC/RC) equipment compatibility and sustainment. This is more serious because units considered later-deploying for wartime scenarios are many times the first-deploying for peacetime engagement operations common in today's contingency environment. The Army Reserve has identified $2.2 billion in procurement shortfalls alone in the current POM. Half of that sum is needed to purchase 5,894 medium and 3,698 light variants of the new Family of Medium Tactical Vehicles (FMTV) truck and 5,222 High Mobility Multipurpose Wheeled Vehicles (HMMWVs). The Army National Guard has existing equipment shortfalls that have not been emphasized in the Program Objective Memorandum process and remain unfunded. Wheeled vehicles, test equipment, engineer equipment and communications equipment lead the list. In addition, massive Army National Guard force structure adjustments resulting from the ARNG Division Redesign Study (ADRS) program alone will cost the Army $2.3 billion in new procurement during FY 2001-2005. Additional modernization dollars will be needed to complete the ADRS program by the FY 2009 target. MEETING THE REQUIREMENTS OF Joint Vision 2010 The Army's modernization strategy is designed to meet the operational capabilities required in Joint Vision 2010 to execute the National Military Strategy. The cornerstone is leveraging new technology that will allow us to fight and win the wars of the 21 st century. According to the Senate Armed Services Committee, "Joint Vision 2010, the Pentagon's vision for the future in force dominance, depends on swift, decisive victory with minimal casualties by a smaller force. This will require more technological advantage, not less."10 Without the money to buy the new technology to recapitalize and upgrade selected fighting platforms and to replace worn-out equipment, the fate of the Army of 2010 is sealed, and the future Army in 2025-the Army After Next (AAN)-may well be stillborn. The Army cannot become lighter, more mobile, more lethal and smaller without an appropriate level of investment. First, much research and development (R&D) is necessary for new technologies-such as electric power drives, active armor and directed-energy weapons-to be perfected, but R&D funding for the Army has been reduced 22 percent from its 1990 levels. Second, once the new technologies are proven, we need to procure equipment in sufficient quantities for a large percentage of the force, rather than be restricted to a few "silver-bullet " items. The need to keep our military capabilities linked with the evolving strategy was articulated by then Army Chief of Staff, General Dennis J. Reimer: '11When the link between strategy and our rationale for retaining and modernizing forces remained clear and compelling, the military proved an effective instrument of national policy. When strategy and military capability drifted apart, we put both our national interests and the men and women of the armed forces at risk.11 5

Modernization and recapitalization frmds are needed today to keep today' s systems soldiering on until 2010. The Army of 2010, even if AAN progresses, will still be 70 percent legacy systems (e.g., M1, Bradley and Paladin). Only 30 percent, at best, will be based on the new systems that will be the hallmark of the AAN (e.g., Comanche and Crusader). Furthermore, only a portion of that 70 percent will have been refurbished to extend their useful life. That means a three-tiered Army with some "silver bullets," some recapitalized systems and mostly legacy systems still in the inventory-aged past their intended lifespan. By 2025, the M1 tank will be more than 45 years old-20 years past its projected lifespan. The soldiers who will operate that tank in 2025-the driver, gunner, loader and tank commander-have yet to be born, and will not be born for some time. WHAT IT ALL MEANS As the Army's equipment and weapons age over the coming years, it will result in a number of important consequences in meeting national security challenges and their impact on the Army budget. First, aging equipment demands more money for operation and maintenance. Spares cost more, and more time is needed in both preventive maintenance and repair work. These rising costs will further squeeze the procurement budget, exacerbating, in turn, the aging problem. As General Coburn summarized, "Because of funding challenges, we are forced to either reduce the quantities of systems or stretch our programs or both. These actions raise unit costs and further delay modernization."12 Second, as the aggregate number of weapons and equipment age, the risks associated with the conduct of military operations will increase in terms of both potential lives lost and time for mission accomplishment. Finally, we will risk losing our overmatch capability as astute and prepared potential foes modernize their forces by exploiting asymmetric weapons and technologies. Future-Years Defense Plan (FYDP) to plow back into modernization.13 It has accepted manpower cuts. Recently, the heavy division redesign cut the equivalent of 3.5 combat divisions' worth of combat systems. Unfortunately, that still is not enough. The Army frmdamentally is overcommitted, underpaid and underresourced. Future readiness is at stake, and the lack of money is such that another Task Force Smith is looming. The Army's procurement accounts are underfunded by at least $5 billion per year. The procurement holiday must end and so must the leveraging of the procurement accounts to pay for current readiness and "pop-up" contingencies. 6 The Army has done its best to fund modernization and current readiness in today's constrained fiscal environment. It has taken advantage of reforms and efficiencies in the way it does business to gain $10 billion in savings over the current

,.. WHAT MUST BE DONE The Army needs a minimum infusion of $5 billion per year for its modernization and recapitalization programs to ensure our soldiers have the right equipment to dominate the battlefields of tomorrow. That is the right thing to do. The Army must halt the aging process of its equipment. That requires an increase in the topline-and not from further manpower reductions. In an era where too many missions and too few soldiers have made the Army fragile, the Army cannot further reduce force structure and still successfully execute the National Military Strategy. The increase in the Army's procurement topline needs to go to investing smartly in the right things to accomplish Chief of Staff General Eric K. Shinseki's intent. He wants to make the heavy forces lighter and the light forces more lethal, to create the medium-weight Strike Force, and to make the Army strategically responsive in terms of joint operational capabilities.14 The key will be to match the investment strategy with the critical desired JV 2010 capabilities. Not every piece of equipment requires one-for-one replacement, but many do. And the available procurement and modernization funds need to be targeted. For example: Some of the stock is in excellent shape and faces no aging or recapitalization problems out to 2010 or 2025. The 120mm mortars and Javelin antitank missiles now being procured are good examples. Some equipment needs to be modernized through product improvement programs or technologtj insertion to ensure continued operation with new equipment in a joint environment. This type of equipment ranges from radios to helicopters and the M1 battle tank. Some equipment simply needs to be replaced with newer versions because of aging. Examples are the 36,000 Commercial Utility Cargo Vehicles (CUCVs) and much of the 2.5-ton and 5-ton truck fleet. New, modernized equipment must be procured to allow the Army to operate effectively within the JV 2010 framework. Examples would be the RAH-66 Comanche in the short term, the Future Scout/Cavaln; Vehicle in the mid-term, and the Future CombizfVehicle in the long term. Selected stocks of war reserve materials, spares and ammunition must be procured and brought up to minimum prudent levels. In sum, the decade-long procurement holiday must end now. Mortgaging future readiness must be stopped. The Army needs $5 billion per year for procurement alone to avoid another Task Force Smith. If we act now to adjust the peace dividend and properly fund procurement and modernization, we can ensure that the Army of 2010 is still the best equipped. If we wait until it is too late, the price will be higher in money, in time and in the lives of the men and women who are charged to fight and win the nation's battles. The Army is the heart and soul of America. American soldiers-the infantryman walking point, the National Guardsman supervising a homeland defense facility and the Army Reservist handling the logistical support of a strategic maneuver force-personify boots on the ground. As they defend America's interests, it is in America's interest to provide them the best and most effective equipment. That is truly providing for the "common defense."

ENDNOTES 1. U.S. Army Posture Statement for Fiscal Year 2000, presented to the U.S. Senate and House of Representatives, February 1999. 2. U.S. Army Program Objective Memorandum 00-05 Executive Summary, 22 May 1998. 3. Robert Zoellick, President, Center for Strategic and International Studies, statement before the Committee on the Budget, U.S. Senate, 24 February 1999. 4. U.S. Army POM 01-05 Executive Swnmary (draft), 17 May 1999. 5. Bernard Rostker, Under Secretary of the Army, as quoted by Henry Cunningham, in "Falling Behind," Fayetteville Observer-Times, 19 May 1999. 6. U.S. Senate Armed Services Committee, National Defense Authorization Act for Fiscal Year 2000, 17 May 1999. 7. The Honorable Jacques Cansler, Under Secretary of Defense (Acquisition and Technology ), speech in Washington, DC, 13 August 1998; General Jolm C. Coburn, testimony before the House Armed Services Committee's Subconm1ittee on Military Procurement, 24 February 1999. 8. Major General Thomas J. Plewes, Chief, Army Reserve, testimony before the Senate Armed Services Conmlittee's Subcommittee on AirLand Forces, 24 March 1999. 9. Major General Roger C. Schultz, Director, Army National Guard, testimony before the SASC Subconm1ittee on Air Land Forces, 24 March 1999. 10. Senate Armed Services Committee, National Defense Authorization Act for Fiscal Year 2000, 17 May 1999. 11. General Detmis J. Reimer, Army Chief of Staff, testimony before the SASC Subconmuttee on AirLand Forces, 24 March 1999. 12. Coburn, Ibid. 13. U.S. Army Posture Statement for Fiscal Year 2000, p. 63. 14. General EricK. Shinseki, Army Chief of Staff, Statement of Intent, 23 June 1999. 8