552nd ACW (Air Control Wing), 2000, informal paper defining C2ISR package commander, 552 ACW/552 OSS, Tinker AFB, Okla.

Similar documents
Ramstein AB, Germany. Major Units 9/4/18. Page 1 of 5. HQ USAFE Civil Engineers Contact Information: DSN: FAX:

Airspace Control in the Combat Zone

Exhibit R-2, RDT&E Budget Item Justification

Time Critical Targeting

Major Commands and Reserve Components. Air Combat Command. JB Langley-Eustis, Va. Air Combat Command, JB Langley-Eustis, Va.

U.S. Air Force Electronic Systems Center

Air Force Cyber Operations Command

Headquarters U.S. Air Force

Annual Automated ISR and Battle Management Symposium

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

1. Headquarters 497th Intelligence Group (HQ 497 IG). Provides intelligence support to HQ USAF.

Air Force WALEX Applications

Innovation Across Industry Panel

Air Force Cyberspace Command NDIA 2007 DIB Infrastructure Protection Symposium

Research Proposal Major William Torn Tompkins ISR RTF Vigilant Horizons. Working Title

UNCLASSIFIED FY Quantity of RDT&E Articles

Decision Support System Engineering for Time Critical Targeting

PROVIDING THE WARFIGHTER S EDGE

INTRODUCTION. Chapter One

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO

Impact of the War on Terrorism on the USAF

Joint Test and Evaluation Programs

UNCLASSIFIED. FY 2011 Total Estimate

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Information Operations

Naval Unmanned Combat Air Vehicle

This block in the Interactive DA Framework is all about joint concepts. The primary reference document for joint operations concepts (or JOpsC) in

ACTD Transition Guidelines: Executive Summary, available at

A Concept for Standing Joint Force Headquarters (SJFHQ)

GLOBAL INFORMATION GRID NETOPS TASKING ORDERS (GNTO) WHITE PAPER.

FORWARD, READY, NOW!

Network Centric Warfare

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

Exhibit R-2, RDT&E Budget Item Justification

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Headquarters U. S. Air Force

GAO. QUADRENNIAL DEFENSE REVIEW Opportunities to Improve the Next Review. Report to Congressional Requesters. United States General Accounting Office

PROVIDING THE WARFIGHTER S

ACC/C2ISR Delivering Desired Effects on the Battlefield

AF Technical Program 2018 Dixie Crow Symposium 43 Call for Papers

UNCLASSIFIED. Unclassified

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Joint Fires Integration & Interoperability FY 2012 OCO

EMPLOYING INTELLIGENCE, SURVEILLANCE, AND RECON- NAISSANCE: ORGANIZING, TRAINING, AND EQUIPPING TO GET IT RIGHT

Air-Sea Battle: Concept and Implementation

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

Department of Defense DIRECTIVE

MANAGING LARGE DISTRIBUTED DATA SETS FOR TESTING IN A JOINT ENVIRONMENT

Department of Defense DIRECTIVE

THE AIR FORCE DEVELOPMENT TEAM

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Spectrum of Testing. OPERATIONAL testing for the warfighter in the representative BATTLESPACE ENVIRONMENT

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

STATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE

Fighter/ Attack Inventory

US Joint Forces Command Approach to Interoperability and Integration

The Joint Force Air Component Commander and the Integration of Offensive Cyberspace Effects

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

Advanced Technology Overview for the Huntsville Aerospace Marketing Association

US Military Space Organizations

HEADQUARTERS DEPARTMENT OF THE ARMY FM US ARMY AIR AND MISSILE DEFENSE OPERATIONS

Global Vigilance, Global Reach, Global Power for America

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification

Command and Control of Space Forces

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE FEBRUARY Operations

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. COST (in millions) FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09

COMMON AVIATION COMMAND AND CONTROL SYSTEM

Precision Strike Winter Roundtable

Exhibit R-2, RDT&E Budget Item Justification

3 rd Annual Electromagnetic Spectrum Operations Summit

New Global Missions for Strategic Command

Space as a War-fighting Domain

CRS Report for Congress

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Fundamentals of Electro-Optics and Infrared Sensors

AAC Welcome & Perspective

REPORT DOCUMENTATION PAGE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

AIR COMMAND AND STAFF COLLEGE AIR UNIVERSITY DISTINCTIVE FUNCTIONS OF THE UNITED STATES AIR FORCE IN THE CYBERSPACE DOMAIN

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Capability Integration

ANNEX 3-52 AIRSPACE CONTROL. COMMAND AND ORGANIZATION CONSIDERATIONS ACROSS THE RANGE OF MILITARY OPERATIONS Last Updated: 23 August 2017

To be prepared for war is one of the most effectual means of preserving peace.

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

EFFECTS BASED OPERATIONS WARGAMING SIMULATION (EBOWS)

A Paradigm for Integrated Warfighting: Kinetic and Non-kinetic Solutions

SPAWAR Systems Center Atlantic Cooper River Landing Conference Center (Bldg. 3112) DRAFT AGENDA (Subject to Change - as of May 29, 2018)

Exhibit R-2, RDT&E Budget Item Justification

Unmanned Systems. Northrop Grumman Today Annual Conference

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

Transcription:

REFERENCES 552nd ACW (Air Control Wing), 2000, informal paper defining C2ISR package commander, 552 ACW/552 OSS, Tinker AFB, Okla. 93rd ACW, 1998, Draft Tactics Techniques and Procedures (TTP) for 93rd Air Control Wing Joint STARS Attack Support, Warner- Robins AFB, Ga., 15 February., 2000a, Airborne Time Critical Targeting Cell TTP, Annex to AC2ISRC/AFC2TIG, 2000b, Warner-Robins AFB, Ga., July., 2000b, Airborne TCT Working Group meeting held at the 93rd ACW (JSTARS wing), Warner-Robins AFB, Ga., November. AC2ISRC (Aerospace C2 & ISR Center), 1999, Defeating Theater Time Critical Targets, Capstone Requirements Document (CRD), AC2ISRC (USAF) 401-98, draft, Langley AFB, Va., August. This document was superseded by the Family of Systems Requirements Document, AC2ISRC, 2000a., 2000a, Defeating Theater Time Critical Targets, Family of Systems Requirements Document (FSRD), AC2ISRC (USAF) 401-98, Langley AFB, Va., 11 January., 2000b, Strategy and Modernization Plan for Time Critical Targeting and Real Time Information to the Cockpit, Langley AFB, Va., 7 February., 2000c, Draft Concept of Operations for Expeditionary Operations Center, Langley AFB, Va., 21 March. 47

48 Enhancing Dynamic Command and Control Against Time Critical Targets, 2000d, Multi-Mission Command and Control, Intelligence, Surveillance, and Reconnaissance (C2&ISR) Aircraft Operational Concept, draft, Langley AFB, Va., 30 October., 2001, Concept of Operations for the Multi-Sensor Command and Control Aircraft, draft, Langley AFB, Va., 25 April. AC2ISRC/AFC2TIG (Air Force Command and Control Training and Innovation Group), 2000a, Baseline Concept of Operations for Time Critical Targeting (TCT) in JEFX 2000, Version 6.0, Hurlburt Field, Fla., 2 September., 2000b, Tactics, Techniques, and Procedures (TTP), Manpower and System Requirements for Time Critical Targeting (TCT) in JEFX 2000, Version 6.2, Hurlburt Field, Fla., 2 September. AC2ISRC/AFEO (Air Force Experimentation Office), 2000a, JEFX 2000 Detailed Experiment Plan (DEP), Langley AFB, Va., 2000b, JEFX 2000 Final Report, draft, Langley AFB, Va., December. Government publication; not releasable to the general public. AC2ISRC/C2B (Command and Control Battlelab), 2000a, CONOPS for Intelligence, Surveillance, Reconnaissance Battle Management (ISR BM) in JEFX 2000, Version 2.0, Hurlburt Field, Fla., July., 2000b, ISR BM Initiative White Paper: Abstract for JEFX 2000, Hurlburt Field, Fla. AC2ISRC/C2N (Strategic Forces Directorate), 2000a, Time Critical Targeting Automated TCT Tools, briefing charts, Langley AFB, Va., 2000b, Joint Integrated TCT cell, briefing charts, Langley AFB, Va., July. AC2ISRC/CC (Aerospace C2 & ISR Center Commander), 2000, CAF AOC Weapon System, briefing charts, Langley AFB, Va., April. AC2ISRC/JWID JPO (JWID Joint Project Office), 2000a, Joint Warrior Interoperability Demonstration (JWID) 2000 2001 Update, briefing charts, Langley AFB, Va., November.

References 49, 2000b, Joint Warrior Interoperability Demonstration (JWID) 2000-2001 Campaign Plan (JWID 00 01 CPLAN), Langley AFB, Va., March. ACC (Air Combat Command), 1996, Airborne Warning and Control System (AWACS) Requirements Roadmap, HQ ACC/DRC, Langley AFB, Va., May 16., 1997, Combat Air Forces Concept of Operations for Command and Control Against Time Critical Targets, Langley AFB, Va., 8 July., 1999, Draft Combat Air Forces Concept of Operations for Command and Control of Intelligence, Surveillance and Reconnaissance Operations, Langley AFB, Va., 28 October., 2000a, Draft Combat Air Forces Control and Reporting Center Concept of Operations for Expeditionary Air Operations, Langley AFB, Va., 14 June., 2000b, Draft Air Force Concept of Operations for Aerospace Operations Center, Langley AFB, Va., 2000c, Strategic Vision for Command & Control, briefing charts, Langley AFB, Va. AFDC/DR (Air Force Doctrine Center/Requirements Directorate), 2000, Draft Aerospace Commander s Handbook: The JFACC, 3 October 2000 prototype, Maxwell AFB, Ala., October. ASD(C3I) (Assistant Secretary of Defense [Command, Control, Communications, and Intelligence]), 2000a, Intelligence, Surveillance, and Reconnaissance Integrated Capstone Strategic Plan (ISR-ICSP), Version 1.0, Washington, D.C., 3 November. Government, 2000b, Annex E, ISR Integration and Challenges Ahead (Draft), Supplement to Chapter 7 of the ISR-ICSP, Version 1.0, Washington, D.C., 31 May. Boyle, Col Edward J., 1999, Operation Allied Force: Rapid Targeting, Collection, and Execution, briefing charts, USAFE/IN, Ramstein AB, Germany, 4 August. Government publication; not releasable to the general public.

50 Enhancing Dynamic Command and Control Against Time Critical Targets COMUSAFE (Commander, U.S. Air Forces in Europe), 2000, Limitations of Doctrine, briefing charts, USAFE, Ramstein AB, Germany. DoD (Department of Defense), 2001, Space-Based Radar Roadmap, report to Congress, Washington, D.C., 1 May. Government Dupont, Daniel G., 2000, OSD Mulling Funding for Single Integrated Air Picture Development, Inside the Air Force, Vol. 11, No. 48, 1 December, pp. 3 4. Hamilton, Thomas, and Richard Mesic, 2001, A Simple Game- Theoretic Approach to SEAD and Other Time Critical Target Analyses, internal document, RAND. Not releasable to the general public. Hura, Myron, Gary McLeod, et al., 2000, Interoperability: A Continuing Challenge in Coalition Air Operations, MR-1235-AF, RAND. Hura, Myron, Gary McLeod, et al., 2002, Dynamic Command and Control: Focus on Time Critical Targets, RAND. Government JC2ISR JT&E, 2000, JC2ISR JT&E Joint Working Group meeting, Joint Warfighter Facility, Suffolk, Va., 28-30 November. Joint Staff/J6I, 2000, Global Information Grid: Supporting the 21st Century Warrior, briefing charts, Washington, D.C., 1 December. JTAMDO and BMDO, 1998, 1998-B Theater Air and Missile Defense (TAMD) Master Plan, Washington, D.C., December. Government Jumper, Gen John P., 2001, Global Strike Task Force Way Ahead, briefing, Air Combat Command, Langley AFB, Va., February. Mayer, MSgt Daryl, 2001, Upgraded AWACS Declared Ready for Duty, news release, Electronic Systems Center Public Affairs, Hanscom AFB, Mass., 25 June. OASD(C3I)/DASD(C3ISR&S), Joint Staff/J2, and Joint Staff/J6, 2000, Information Superiority Investment Strategy (ISIS) Options

References 51 Description Document, Washington, D.C., 31 October. Government Ochmanek, David A., Edward Harshberger, David A. Thaler, and Glenn A. Kent, 1998, To Find and Not to Yield: How Advances in Information and Firepower Can Transform Theater Warfare, MR- 958-AF, RAND. Sauer, Philip S., William A. Williams, et al., 2000, Joint Capability Assessment of Joint Expeditionary Force Experiment 2000, internal document, RAND, November. Not releasable to the general public. USAF (U.S. Air Force), 1999a, Operational Procedures: Aerospace Operations Center, Air Force Instruction 13-1AOC, Volume 3, Washington, D.C., 1 June. Currently under revision., 1999b, Draft Expeditionary Air Force C2 Process Manual, Washington, D.C., December., 2000, Draft Aerospace Operations Center Process Manual: Air Force Tactics, Techniques, and Procedures, Washington, D.C., 1 August. USAF/XOI (U.S. Air Force/ISR Directorate), 2000, USAF C2ISR Battle Management Initiatives, briefing charts, Washington, D.C. USJFCOM/J9 (U.S. Joint Forces Command/Joint Experimentation Directorate), 1999, A White Paper for Attack Operations Against Critical Mobile Targets Concept, Suffolk, Va., 9 November., 2000a, Attack Operations 2000, briefing charts and experiment demonstration documents, Suffolk, Va., 2000b, Final Report Intelligence, Surveillance & Reconnaissance Workshop November 30 December 2, 1999, Attack Operations Against Critical Mobile Targets (AOACMT) Concept, Suffolk, Va. Wolfe, Frank, 2001, Mushala: Revised F-22 Buy Plan to Allow Institution of Cost Reduction Initiatives, Defense Daily, 24 September, p. 4.