UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Industrial Base Analysis and Sustainment Support. Prior Years FY 2013 FY 2014 FY 2015

Similar documents
UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 20 R-1 Line #37

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Prior Years FY 2013 FY Total Cost FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. R-1 Program Element (Number/Name) PE SE / Homeland Security Presidential Directive (HSPD-12) Initiative

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Defense-Wide Electronic Procurement Capabilities. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 5 R-1 Line #138

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #169

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

UNCLASSIFIED FY This program develops and demonstrates advanced technologies, including Electromagnetic (EM) Rail Gun for naval weapon systems.

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #142

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #199

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : Hard Target Void Sensing Fuze.

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #198

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #118

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: Project MDAP/MAIS Code(s): N42

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Service Systems Engineering FY 2012 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123

Department of Defense INSTRUCTION

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #152

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Department of Defense Corrosion Policy and Oversight FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE T: Overseas Humanitarian Assistance Shared Information System (OHASIS)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Nuclear Arms Control Monitoring Sensor Network. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE T / Overseas Humanitarian Assistance Shared Information System (OHASIS)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Transcription:

Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base and Support FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Office of Secretary Of Defense Page 1 of 5 R-1 Line #181 Cost To Complete Total Program Element 0.000-9.993 14.778-14.778 17.896 15.536 10.341 5.719 Continuing Continuing 819: Industrial Base Analysis and # The FY 2015 OCO Request will be submitted at a later date. 0.000-9.993 14.778-14.778 17.896 15.536 10.341 5.719 Continuing Continuing Note This was a new start program in FY 2014 with a strategic goal of strengthening the industrial base in support of DoD supply chain and defense manufacturing requirements. A. Mission Description and Budget Item Justification The Defense-wide Industrial Base Analysis and (IBAS) program element provides the Department with a comprehensive ability to achieve the strategic goal of strengthening the industrial base in support of DoD supply chain and defense manufacturing requirements. This program maintains or improves the health of essential parts of the defense industry to avoid reconstitution costs for capability after a Defense procurement hiatus on major investment programs or critical supply chain products where affordable and innovative mechanisms are available to work with the producers in the interim. A stated purpose of the program is to provide for sustainment of the industrial base through a break in production. Criteria for project selection will include factors such as 1) identifiable path of preservation, transformation or innovation between an existing capability and a capability with a very high probability of being needed in the short to medium term (< 5 years); 2) loss of the capability is likely in the absence of the proposed project; 3) analysis showing that the project results in a lower overall cost to the department than if capability is developed from scratch when needed; and 4) preference is given to projects supporting multiple programs or services with no clearly identifiable principle beneficiary. B. Program Change Summary ($ in Millions) FY 2013 FY 2014 FY 2015 Base FY 2015 OCO FY 2015 Total Previous President's Budget - 14.000 12.000-12.000 Current President's Budget - 9.993 14.778-14.778 Total Adjustments - -4.007 2.778-2.778 Congressional General Reductions - - Congressional Directed Reductions - -4.000 Congressional Rescissions - -0.007 Congressional Adds - - Congressional Directed Transfers - - Reprogrammings - - SBIR/STTR Transfer - - Reduction - - -1.718 - -1.718 Total Cost

Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development and Support Travel efficiencies savings - - -0.004 - -0.004 Missile Sector - - 4.500-4.500 Change Summary Explanation FY 2014 Industrial Base : Funds realigned to this DoD high priority issue to achieve the strategic goal of strengthening the industrial base in support of DoD supply chain and defense manufacturing requirements. FY2015 increase for Missile Sector is targeted to improvements in the existing production process efficiencies, exploration of advanced materials for higher performance, and upgrading of outdated technology for missile components. Office of Secretary Of Defense Page 2 of 5 R-1 Line #181

COST ($ in Millions) 819: Industrial Base Analysis and Prior Years FY 2013 FY 2014 FY 2015 Base and Support Office of Secretary Of Defense Page 3 of 5 R-1 Line #181 FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete - - 9.993 14.778-14.778 17.896 15.536 10.341 5.719 Continuing Continuing Quantity of RDT&E Articles - - - - - - - - - - # The FY 2015 OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification OSD Acquisition, Technology and Logistics (AT&L) investments under this program are informed by the Department's industrial assessment tools to include the Sector by Sector, Tier by Tier (S2T2) repository of defense industrial base information maintained by Deputy Assistant Secretary of Defense (Manufacturing and Industrial Base Policy) (DASD(MIBP)). These tools collaboratively identify elements of the industrial base where current acquisition programs will not invest enough in production and/or research to support the minimum sustaining rate that would keep critical suppliers viable. While industrial base risks identified through these assessment tools are to be mitigated primarily through direct engagement with military departments, agencies, and industry, exceptional cases will require defense-wide intervention via investment accounts, often in collaboration with multiple Services and agencies, to ensure adequate industrial capability to support future defense needs. This funding is a key tool for addressing supply chain risks and diminishing manufacturing sources. Investments are prioritized though a careful analysis at every tier of the supply chain according to a numerical scale of risk-area's fragility and criticality. Criticality examines characteristics that make a specific product or service difficult to replace if disrupted; fragility examines characteristics that make small deviations in the status quo likely to have substantial effects on an industry / supplier. These concepts underpin AT&L s core mission and inform critical investment, budgetary, and programmatic decision-making. Title: Industrial Base Description: Sector by Sector, Tier by Tier (S2T2) fragility and criticality assessments are applied across the DoD enterprise to identify and prioritize industrial base niches requiring additional investment by DoD. The purpose of investment is to sustain essential industrial production and design team capabilities. Projects will have impact across all industrial base sectors: aircraft; Command, Control, Communications and Computers (C4); missiles; ground vehicles; radar & Electronic Warfare (EW) and others. Projects will be improvements of existing capabilities with a very high probability of success. IBS will include focused projects in the following critical areas in FY 2014: Butanetriol, a solid rocket fuel precursor chemical; Infrared Focal Plane Array; Advanced Solid Rocket Propulsion; Test Facilities for Radiation Hardened Electronics. With a decline in the procurement of missile programs, design and production skills for critical components within the missile sector industrial base are at risk which could result in costly delays and unanticipated expense. The loss of this design and production capability could have a significant impact on many current and future missile programs damaging the readiness of the Total Cost - 9.993 14.778

and Support Office of Secretary Of Defense Page 4 of 5 R-1 Line #181 Department. The missile sector sustainment effort will improve the existing production process efficiencies, explore advanced materials for higher performance, and upgrade outdated technology for missile components. FY 2014 and FY 2015 efforts will include the following important capabilities: high precision attitude control, thermal batteries; and fuzes. FY 2014 Plans: Address supply chain vulnerabilities and early indicators of program risk and make corrective and innovative investments in essential defense supply chains. Butanetriol: This project develops a qualified domestic source for Butanetriol (BT), a solid rocket fuel precursor chemical,that will preclude the necessity of procurement from a prohibited foreign source. Since 2008, DoD s projected requirements have shrunk to levels that substantially change the business case for development of new domestic source. To re-enable the business case and develop a permanent domestic industrial base, DoD plans to fund a project to close the gap between the new and old business cases. Infrared Focal Plane Array (IRFPA): This project focuses on sustaining a continuous production capability for the impending modernization program of Improved Forward Looking Infrared (I-FLIR). There is a gap between the end of horizontal integration of FLIR and the slated start of I-FLIR modernization. In order to bridge the gap, the Department plans to maintain the foundry capability and intellectual base of critical suppliers through time-phased lots of IRFPAs. Advanced Solid Rocket Propulsion: To support future missile interceptor missions, advanced kill vehicle thrusters for high precision and long duration missions are required. This is a defense-unique industrial base niche. In order to maintain this capability and avoid the loss of skills and intellectual capital, the Department is executing a project to develop high precision attitude control. Test Facilities for Radiation Hardened Electronics: joint efforts with other DoD, Department of Energy, and the National Reconnaissance Office to maintain industrial base facilities that are capable of testing radiation hardened electronics. Provides resources to cover a one-time FY 2014 funding gap. FY 2015 Plans: Address supply chain vulnerabilities and early indicators of program risk and make corrective and innovative investments in essential defense supply chains. Missile Sector : Fragility and Criticality Assessments have assessed the impacts to the missile industrial base caused by declining procurements. Specific action is necessary preserve industrial base capabilities for fuzes and thermal batteries.

and Support Projects will be executed to improve the efficiency of existing production processes, explore advanced materials for higher performance and upgrade outdated technology. Industrial Base Other: DoD will conduct additional industrial base assessments in FY 2014 to identify weaknesses and fragile and critical capabilities for FY 2015 project development. A call for FY 2015 projects has also been sent to the Service s Acquisition Executives requesting that proposals rate the fragility and criticality of subject capabilities. A Joint Industrial Base Working Group Panel will rank the proposals, and the Deputy Assistant Secretary for Manufacturing and Industrial Base Policy will make the final selection. C. Other Program Funding Summary ($ in Millions) N/A Remarks D. Acquisition Strategy N/A E. Performance Metrics Goal is to insert industrial base considerations consistently in program review To make informed investment and production decisions To avoid reconstitution costs for capability that we will need again soon Accomplishments/Planned Programs Subtotals - 9.993 14.778 Office of Secretary Of Defense Page 5 of 5 R-1 Line #181