DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

Similar documents
DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2012 President's Budget February 2011

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

FY 2016 President's Budget February Electronics (NOTIONAL): N/A. RCS (Radio Communication System) Turnkey 216 M CANES 32 M

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

CRS Report for Congress

FY 2014 President's Budget April 2013

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

DATE: FY 2013 President's Budget February 2012

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

N/SHIP SELF DEFENSE - DEM/VAL

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED R-1 ITEM NOMENCLATURE

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

UNCLASSIFIED UNCLASSIFIED

Trusted Partner in guided weapons

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Future of MIW from the LCS Platform

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED UNCLASSIFIED

CLASSIFICATION: UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2010 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES MAY 2009 OTHER PROCUREMENT, NAVY BUDGET ACTIVITY 4

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Challenges and opportunities Trends to address New concepts for: Capability and program implications Text

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support

UNCLASSIFIED R-1 ITEM NOMENCLATURE

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

Status of Unmanned Systems: EXECUTING!

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

9 th Annual Disruptive Technologies Conference

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

Assessing Technologies using Campaign Analysis and War Gaming: The Warfare Innovation Continuum at NPS

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/LITTORAL COMBAT SHIP (LCS)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. FY 2017 Base FY 2017 OCO

R-1 ITEM NOMENCLATURE / PROJECT NO. PE BB SOF PSYOP/D476. COST (Dollars in Millions) FY07 FY08 FY09 FY10 FY11 FY12 FY12

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07

AEGIS Ballistic Missile Defense

COST (Dollars in Millions) FY07 FY08 FY09 FY10 FY11 FY12 FY12

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2008/2009 BIENNIAL BUDGET JUSTIFICATION OF ESTIMATES FEBRUARY 2007 SHIPBUILDING AND CONVERSION, NAVY

Navy Aegis Cruiser and Destroyer Modernization: Background and Issues for Congress

Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

REQUIREMENTS TO CAPABILITIES

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED UNCLASSIFIED

PRIOR YR FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 TO COMP TOTAL PROG QUANTITY End Cost

UNCLASSIFIED UNCLASSIFIED

Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 P-1 Line #1

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/LITTORAL COMBAT SHIP (LCS)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

PRIOR YR FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 TO COMP TOTAL PROG QUANTITY End Cost

N/JT CNTR RADIO CONTROLLED IED ELEC WAR (JCREW)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 12 P-1 Line #51

Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

DDG 1000 Class Destroyer

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

C4I System Solutions.

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Region/Sector Operation Control Center Modernization Program

Fiscal Year (FY) 2011 Budget Estimates

4 Aug 92. Encl: From: Commanding Officer, USS MICHIGAN (SSBN 727) To: Director of Naval History (0-09BH), Washington Navy Yard, Washington, DC 20374

FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

Employing Merchant Vessels for Offshore Presence and Launch of US Military Operations

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

Transcription:

BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY 4 2 4 4 4 4 2 2 27 53 End Cost 2,434.3 1,162.6 1,834.0 1,785.0 1,819.6 1,881.5 1,013.0 896.0 17,562.4 30,388.4 Less Advance Procurement 0.0 0.0 78.9 0.0 0.0 0.0 0.0 0.0 0.0 78.9 Full Funding TOA 2,434.3 1,162.6 1,755.1 1,785.0 1,819.6 1,881.5 1,013.0 896.0 17,562.4 30,309.5 Plus Advance Procurement 0.0 78.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 78.9 Total Obligational Authority 2,434.3 1,241.5 1,755.1 1,785.0 1,819.6 1,881.5 1,013.0 896.0 17,562.4 30,388.4 Plus Outfitting / Plus Post Delivery 2.8 4.7 49.0 60.1 76.4 132.7 133.8 210.0 663.6 1,333.1 Total 2,437.1 1,246.2 1,804.1 1,845.1 1,896.0 2,014.2 1,146.8 1,106.0 18,226.0 31,721.5 Unit Cost ( Ave. End Cost) 608.6 581.3 458.5 446.3 454.9 470.4 506.5 448.0 650.5 573.4 MISSION: Provides for the design, construction, integration and testing of the Littoral Combat Ship (), including Ordnance, Government Furnished Equipment (GFE), and includes Program Office and change order costs. is a fast, agile, and networked surface combatant with capabilities optimized to defeat asymmetric threats, and assure naval and joint force access into contested littoral regions. It uses open-systems-architecture design, modular weapons, and sensor systems, and a variety of manned and unmanned vehicles to expand the battle space and project offensive power into the littoral. operates with focused-mission packages that deploy manned and unmanned vehicles to execute a variety of missions, including littoral anti-submarine warfare (ASW), surface warfare (SUW), and mine countermeasures (MCM). also possesses inherent capabilities, regardless of mission package installed, including Intelligence Surveillance Reconnaissance (ISR), homeland defense, Maritime Interdiction/Interception Operations (MIO), anti-terrorism/force protection (AT/FP), air self-defense, joint littoral mobility, and Special Operating Forces (SOF) and logistic support for movement of personnel and supplies. This relatively small, high-speed surface combatant will complement the U.S. Navy's AEGIS fleet, by operating in environments where it is less desirable to employ larger, multi-mission ships. It can deploy independently to overseas littoral regions, remain on station for extended periods of time either with a battle group or through a forward-basing arrangement and is capable of underway replenishment. It will operate with Carrier Strike Groups, Surface Action Groups, in groups of other similar ships, or independently for diplomatic and presence missions. Additionally, it can operate cooperatively with the U.S. Coast Guard and Allies. Characteristics Overall Length: Max Beam: Displacement LM GD/AUSTAL 115.3m 127.6m 17.5m 31.6m 3089 mt 2842 mt FY11 FY11 FY12 FY12 FY12 FY12 FY13 FY13 FY13 FY13 Production Status: 7 8 9 10 11 12 13 14 15 16 Contract Award Date 3/11 3/11 3/12 3/12 3/12 3/12 3/13 3/13 3/13 3/13 Months to Completion a) Contract Award to Delivery 49 months 43 months 47 months 41 months 53 months 48 months 47 months 41 months 53 months 46 months b) Construction Start to Delivery 35 months 36 months 35 months 36 months 37 months 35 months 35 months 35 months 36 months 35 months Delivery Date 4/15 10/14 2/16 8/15 8/16 3/16 2/17 8/16 8/17 1/17 Completion of Fitting Out 8/15 2/15 6/16 12/15 12/16 7/16 6/17 12/16 12/17 5/17 Obligation Work Limiting Date 7/16 1/16 5/17 11/16 11/17 6/17 5/18 11/17 11/18 4/18 11-1

APPROPRIATION: WEAPON SYSTEM COST ANALYSIS (EXHIBIT P-5) (Dollars in Thousands) P-5 EXHIBIT BUDGET ACTIVITY: 2 Other Warships P-1 LINE ITEM NOMENCLATURE SUBHEAD NO. BLI: 2127 LITTORAL COMBAT SHIP () FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 ELEMENT OF COST QTY COST QTY COST PLAN COSTS 2 36,603 2 24,438 2 91,386 4 83,459 4 83,989 BASIC CONST/CONVERSION 1,138,316 955,325 809,749 1,485,671 1,453,694 CHANGE ORDERS 38,610 45,950 43,100 82,100 72,684 ELECTRONICS 21,677 26,992 27,245 55,417 56,350 HM&E 4,595 5,908 6,806 13,843 14,078 OTHER COST 106,761 1,000 166,942 76,927 67,038 ORDNANCE 11,090 17,056 17,300 36,625 37,126 TOTAL SHIP ESTIMATE 1,357,652 1,076,669 1,162,528 1,834,042 1,784,959 LESS ADVANCE PROCUREMENT FY12 78,949 LESS SCN AND MATERIALS TRANSFER FY06 340,700 NET P-1 LINE ITEM: 1,016,952 1,076,669 1,162,528 1,755,093 1,784,959 11-2

P-5B Exhibit Analysis of Ship Cost Estimate - Basic/Escalation DATE: Ship Type: LITTORAL COMBAT SHIP Complete I. Design/Schedule Start/Issue Reissue /Response Complete /Response Issue date for TLR N/A N/A N/A N/A Issue date for TLS N/A N/A N/A N/A Preliminary Design 07/03 12/03 N/A N/A Contract Design 05/04 12/04 N/A N/A Detail Design DEC 04/OCT 05 JUN 07/OCT 07 N/A N/A II. Request for Proposals N/A 01/10 N/A N/A Design Agent Classification of Cost Estimate LOCKHEED MARTIN - AUSTAL CLASS C LOCKHEED MARTIN - AUSTAL N/A N/A III. Basic Construction/Conversion 2009 2010 2011 2012 2013 A. Actual Award Date 03/09, 05/09 12/10 3/11 TBD TBD B. Contract Type ( and Share Line if applicable ) FPI FPI FPI FPI FPI C. SHARELINE VARIES 50/50 50/50 50/50 50/50 IV. Escalation Escalation Termination Date Escalation Requirement Labor/Material Split Allowable Overhead Rate V. Other Basic(Reserves/Miscellaneous) Amount 11-3

EXHIBIT P-27 SHIP PRODUCTION SCHEDULE DATE: SHIP TYPE HULL NUMBER SHIPBUILDER FISCAL YEAR AUTHORIZED CONTRACT AWARD START OF CONSTRUCTION DELIVERY DATE 3 LOCKHEED MARTIN 09 MAR-09 APR-09 JUN-12 4 GD/AUSTAL 09 MAY-09 OCT-09 MAR-13 5 LOCKHEED MARTIN 10 DEC-10 JUL-11 AUG-14 6 AUSTAL 10 DEC-10 JUN-11 JUN-14 7 LOCKHEED MARTIN 11 MAR-11 MAY-12 APR-15 8 AUSTAL 11 MAR-11 OCT-11 OCT-14 9 LOCKHEED MARTIN 12 MAR-12 MAR-13 FEB-16 10 AUSTAL 12 MAR-12 SEP-12 AUG-15 11 LOCKHEED MARTIN 12 MAR-12 AUG-13 AUG-16 12 AUSTAL 12 MAR-12 APR-13 MAR-16 13 LOCKHEED MARTIN 13 MAR-13 MAR-14 FEB-17 14 AUSTAL 13 MAR-13 SEP-13 AUG-16 15 LOCKHEED MARTIN 13 MAR-13 AUG-14 AUG-17 16 AUSTAL 13 MAR-13 FEB-14 JAN-17 17 LOCKHEED MARTIN 14 MAR-14 MAR-15 FEB-18 18 AUSTAL 14 MAR-14 OCT-14 JUL-17 19 LOCKHEED MARTIN 14 MAR-14 AUG-15 AUG-18 20 AUSTAL 14 MAR-14 FEB-15 DEC-17 21 LOCKHEED MARTIN 15 MAR-15 MAR-16 FEB-19 22 AUSTAL 15 MAR-15 SEP-15 JUL-18 23 LOCKHEED MARTIN 15 MAR-15 AUG-16 AUG-19 24 AUSTAL 15 MAR-15 FEB-16 NOV-18 25 TBD 16 MAR-16 MAR-17 FEB-20 26 TBD 16 MAR-16 SEP-16 JUL-19 27 TBD 17 MAR-17 SEP-17 JUL-20 28 TBD 17 MAR-17 MAR-18 FEB-21 11-4

P-8A EXHIBIT Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) Ship Type: LITTORAL COMBAT SHIP FY 2011 FY 2012 FY 2013 ELECTRONICS a. P-35 Items AN/WSC-6E(V)9 SUPER HIGH FREQUENCY (SHF) DUAL TERMINAL 2 6,007 4 12,217 4 12,425 6,007 12,217 12,425 b. Major Items ELECTRONIC KEY MANAGEMENT SYSTEM (EKMS)/CRYPTO SYSTEM COMMON DATA LINK MANAGEMENT SYSTEM (CDLMS) AN/URC-141 (C) MIDS ON SHIP (MOS) AN/USQ-172(V)5 GLOBAL COMMAND AND CONTROL SYSTEM - MARITIME (GCCS-M) DS- LOGISTICS MAINTENANCE AUTOMATED INFO SYSTEM - BAR CODE SUPPLY (BCS) NAVY TACTICAL COMMAN MULTI-VEHICLE COMMUNICATION SYSTEM (MVCS) AN/USQ-144J(V)2 AUTOMATED DIGITAL NETWORK SYSTEM (ADNS) HIGH FREQUENCY DIGITAL MODULAR RADIO 2 931 4 1,894 4 1,926 2 1,545 4 3,143 4 3,197 2 4,001 4 8,138 4 8,276 2 1,189 4 2,418 4 2,459 2 437 4 889 4 904 2 2,860 4 5,817 4 5,916 2 2,729 4 5,550 4 5,645 2 2,245 4 4,567 4 4,645 15,937 32,416 32,968 c. Other ELECTRONICS OTHER ELECTRONICS Total ELECTRONICS 2 5,301 4 10,784 4 10,957 5,301 10,784 10,957 27,245 55,417 56,350 11-5

P-8A EXHIBIT Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) Ship Type: LITTORAL COMBAT SHIP FY 2011 FY 2012 FY 2013 ORDNANCE a. P-35 Items SEARAM/RAM 2 16,520 4 35,045 4 35,519 16,520 35,045 35,519 b. Major Items ORDNANCE HANDLING EQPT 2 780 4 1,580 4 1,607 780 1,580 1,607 c. Other ORDNANCE Total ORDNANCE 17,300 36,625 37,126 11-6

P-8A EXHIBIT Analysis of Ship Cost Estimates - Major Equipment (Dollars in Thousands) Ship Type: LITTORAL COMBAT SHIP FY 2011 FY 2012 FY 2013 HM&E a. P-35 Items b. Major Items JOINT BIOLOGICAL POINT DETECTION SYSTEM (JBPDS) AN/SRC-59 SHIPWIDE INTERIOR WIRELESS COMMUNICATION SYSTEM (SIWCS) TRASH DISPOSAL - SMALL PULPER VISUAL LANDING AIDS (VLA) 2 279 4 568 4 578 2 774 4 1,575 4 1,601 2 274 4 558 4 567 2 3,877 4 10,330 4 10,507 5,204 13,031 13,253 c. Other HM&E MEDICAL EQPT AND ENGINEERING SUPPORT INTEGRATION Total HM&E 2 1,602 4 812 4 825 1,602 812 825 6,806 13,843 14,078 11-7

P-35 EXHIBIT MAJOR SHIP COMPONENT FACT SHEET (Dollars in Thousands) Ship Type: LITTORAL COMBAT SHIP Equipment Item: AN/WSC-6E(V)9 SUPER HIGH FREQUENCY (SHF) DUAL TERMINAL PARM Code: 3Z I. DESCRIPTION/CHARACTERISTICS/PURPOSE: The AN/WSC-6E(V)9 Super High Frequency (SHF) radio provides joint interoperable high capability voice, data, and video communications for combatants and Flag-capable ships. It provides the required global connectivity among Fleet units, joint forces, allied and NATO forces, and Naval C4I commands. II. CURRENT FUNDING: P-35 Category FY 2011 FY 2012 FY 2013 Major Hardware Systems Engineering Engr/ILS/Mgmt Spt Tech Data Technical Support Services Spares Program Management Schedule B Services Total 2 5,541 4 11,272 4 11,504 51 103 120 20 41 40 14 29 0 280 570 576 51 103 110 50 99 75 0 0 0 6,007 12,217 12,425 III. CONTRACT DATA: PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE YEAR FY11 FY12 FY13 TYPE 7/8 9/10/11/12 13/14/15/16 CONTRACTOR HARRIS HARRIS HARRIS TYPE FFP FFP FFP DATE APR-11 TBD TBD /OPTION OPTION TBD TBD QTY 2 4 4 UNIT COST 2,771 2,818 2,876 IV. DELIVERY DATE: PROGRAM SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED YEAR TYPE DELIVERY DATE BEFORE DELIVERY LEADTIME AWARD DATE FY11 7/8 OCT-14 10 14 OCT-12 FY12 9/10/11/12 AUG-15 10 14 AUG-13 FY13 13/14/15/16 AUG-16 10 14 AUG-14 V. COMPETITION/SECOND SOURCE INITIATIVES: Current sole-source contracts. NOTE: 11-8

Ship Type: LITTORAL COMBAT SHIP Equipment Item: SEARAM/RAM PARM Code: 3P/3D P-35 EXHIBIT MAJOR SHIP COMPONENT FACT SHEET (Dollars in Thousands) I. DESCRIPTION/CHARACTERISTICS/PURPOSE: The RAM program is designed to provide surface ships with an effective, low-cost, lightweight, self-defense system which will provide an improved capability to engage and defeat incoming antiship cruise missiles (ASCMs). SeaRAM is an Anti-Ship Missile Defense System and is an evolved Close-In Weapon System (CIWS) comprised of key attributes of both the existing Phalanx CIWS and the RAM. SeaRAM is designed to extend the battle space of the CIWS and enable the ship to effectively engage multiple targets. RAM is on the Lockheed Martin variant and SeaRAM is on the Austal variant. II. CURRENT FUNDING: P-35 Category FY 2011 FY 2012 FY 2013 Major Hardware 2 13,703 4 29,171 4 29,474 Software 89 195 205 System Engineering 699 1,560 1,591 System Test & Evaluation 617 1,179 1,195 Technical Data and Documentation 313 655 730 Technical Engineering Services 793 1,625 1,653 Program Management 306 660 671 Total 16,520 35,045 35,519 III. CONTRACT DATA: PROGRAM SHIP PRIME CONTRACT AWARD NEW HARDWARE YEAR FY11 FY12 FY13 TYPE 7/8 9/10/11/12 13/14/15/16 CONTRACTOR RAYTHEON RAYTHEON RAYTHEON TYPE SS/FFP SS/FFP SS/FFP DATE JUN-11 JAN-12 MAR-13 /OPTION OPTION OPTION NEW QTY 2 4 4 UNIT COST 6,851 7,293 7,369 IV. DELIVERY DATE: PROGRAM SHIP EARLIEST SHIP MONTHS REQUIRED PRODUCTION REQUIRED YEAR TYPE DELIVERY DATE BEFORE DELIVERY LEADTIME AWARD DATE FY11 7/8 OCT-14 10 22 FEB-12 FY12 9/10/11/12 AUG-15 10 22 DEC-12 FY13 13/14/15/16 AUG-16 10 22 DEC-13 V. COMPETITION/SECOND SOURCE INITIATIVES: NOTE: The availability of refurbished RAM units TBD. 11-9