ADDENDUM NO. 1 SECURITY CAMERA SYSTEM AT 4 HIGH SCHOOLS AND 1 BRIDGES LEARNING CENTER BID NO. 15-06-05 Moreno Valley Unified School District Moreno Valley, California 10/08/2015 GO ARCHITECTS, INC. 276 North Second Avenue Upland, CA 91786 Godwin Osifeso, C-22239 1. PART 1 - GENERAL 1.1. THE FOLLOWING REVISIONS AND/OR CLARIFICATIONS SHALL BE MADE TO THE BIDDING REQUIREMENTS AND CONTRACT DOCUMENTS. REVISE AND AMEND THE DOCUMENTS FOR THE ABOVE NAMED PROJECT IN ACCORDANCE WITH THIS ADDENDUM. THE BID SHALL REFLECT THESE ADDENDUM CHANGES AND EACH BIDDER SHALL MAKE REFERENCE IN THEIR BID TO THIS ADDENDUM. 1.2. ALL BIDDING REQUIREMENTS AND CONTRACT DOCUMENTS SHALL APPLY TO THIS ADDENUDUM AS ORIGINALLY INDICATED IN THE APPLICABLE PORTIONS OF THE CONTRACT DOCUMENTS, UNLESS OTHERWISE MODIFIED BY THIS ADDENDUM. 1.2.1. No previous Addendum issued. 1.3. GENERAL CLARIFICATIONS 1.3.1. Network switches will be provided by the District. 1.3.2. Moreno Valley Unified School District does not currently have an enterprise wise Video Management System (VMS). 1.3.3. This project is prevailing wage per California Public Contract Code 1770. Requirements must be followed. 1.3.4. Trenching work varies at each site, contractor to field verify. Security Camera System ADDENDUM NO. 1 Moreno Valley Unified School District - Bid No.15-06-05 10/8/15 GO # 2015-0105-0 Page 1 of 4
1.3.5. Underground cable will be required. See site plans for areas requiring trenching. 1.3.6. Exterior conduit is to be rigid. Flexible conduit is not acceptable. 1.3.7. Conduits to be painted to match existing surroundings. 1.3.8. Pathways will be via conduits and / or J-hooks (accessible ceiling space). 1.3.9. Need of man-lift to de determined by installing contractor. 1.3.10. Cameras are located on plans, symbols list identifies whether cameras are to be wall or ceiling mounted. Contractor to verify quantities. 1.3.11. Cat 6 male plug will be used for direct connection to cameras. 1.3.12. Cables are to be terminated on existing patch panels. 1.3.13. Avalan Ethernet Bridge (P/N AW58300HTP-PAIR) per note # 8 on E1.1 Vista Del Lago HS is to be provided by contractor. 1.3.14. Notes referring to a 2-socket 2U rack server is a Dell Server Edge #R7030xd as noted in specifications, contractor shall provide and install. 1.3.15. Cameras will be attached to the buildings with the arm attachments noted on the drawings. 1.3.16. Attached for reference please find the plan holders list per IB Reprographic s Online Plan room. 1.3.17. Attached for reference please find the mandatory Pre-Bid Conference sign-in sheet. Please confirm attendance list with the District. 2. PART 2 - PRODUCTS 2.1. CHANGES TO PROJECT MANUAL 2.1.1. Division 00, Procurement and Contracting Requirements 2.1.1.1. Project Information Make the following changes: 2.1.1.1.1. License Classification: C7 and C10 and be BICSI and RCDD certified and registered. Add the following: Prime Contractor must be an authorized representative of the manufacturer and hold all required licenses, qualifications and certifications. 2.1.1.1.2. Additive / Bid Alternates (See Instruction to Bidders): Revise to read: The lowest bid shall be the lowest total of the bid prices on the base contract (Vista Del Lago HS) plus the following additive items taken in order as listed below depending upon the available funds for this Project which is estimated at $1,750,000: Security Camera System ADDENDUM NO. 1 Moreno Valley Unified School District - Bid No.15-06-05 10/8/15 GO # 2015-0105-0 Page 2 of 4
1) Bridges Learning Center 2) Valley View High School 3) Moreno Valley High School 4) Canyon Springs High School The project will be awarded to one (1) contractor for the base bid and the accepted alternates. 2.1.1.1.3. Contract Time: Revise to read: Base Bid - Vista Del Lago High School: 60 Days with a start date of November 2, 2015 with a completion date of December 31, 2015; working hours are after school hours 3PM 10PM during the week and weekends and holidays 7AM 4PM. 1) Bridges Learning Center: 30 Days with a start date of January 4, 2016 with a completion date of February 2, 2016; working hours are after school hours 3PM 10PM during the week and weekends and holidays 7AM 4PM. 2) Valley View High School: 30 Days with a start date of February 3, 2016 with a completion date of March 3, 2016; working hours are after school hours 3PM 10PM during the week and weekends and holidays 7AM 4PM. 3) Moreno Valley High School: 30 Days with a start date of March 4, 2016 with a completion date of April 2, 2016; working hours are after school hours 3PM 10PM during the week and weekends and holidays 7AM 4PM. 4) Canyon Springs High School: 30 Days with a start date of April 3, 2016 with a completion date of May 2, 2016; working hours are after school hours 3PM 10PM during the week and weekends and holidays 7AM 4PM. 2.1.1.1.1. Request for Information Deadline: Revise to read: Monday October 12, 2015 at 4:00 p.m. 2.1.1.1.2. Add the following: Mandatory Site Visit Verification with I.T. Department (David Cumbow, Network Manager) Bidders will be required to sign-in at each site. Date: Friday October 9, 2015 Time: 8:00 a.m. Location: 1. Valley View High School 13135 Nason Street 2. Vista Del Lago High School 15150 Lasselle Street Security Camera System ADDENDUM NO. 1 Moreno Valley Unified School District - Bid No.15-06-05 10/8/15 GO # 2015-0105-0 Page 3 of 4
3. Bridges Learning Center 24501 Cactus Avenue 4. Moreno Valley High School 23300 Cottonwood Avenue 5. Canyon Springs High School 23100 Cougar Canyon Drive 2.1.1.2. Notice Inviting Bids Make the following changes: 2.1.1.2.1. Revise bid due date to read: 10:00 a.m. Friday, October 16, 2015 2.1.2. Division 28, Video Surveillance 28 23 00 2.1.2.1. 2.02. Manufacturer: Revise to read the following: A. Acceptable Manufacturer: Subject to compliance with requirements, provide products by the following: 1. Samsung Security Systems, Inc. B. Substitutions: 1. Equal by Bosch Security Systems, Inc. 2. No other substitutions will be accepted. 2.1.2.2. 2.06. A. Dell PowerEdge #R730xd server. Add the following: for 14 days of recording. 3. PART 3 - DRAWINGS 3.1. CHANGES TO DRAWINGS 3.1.1. Narrative changes to Electrical Drawings are issued as follows: 3.1.1.1. Drawing 7/E4.1, add the following general note: Cameras are to be terminated on the rightmost available ports on the AP patch panels. Enclosures: END OF ADDENDUM #1 INCLUDING REFERENCED ENCLOSURES I. Plan Holders list per IB Reprographics s Online Plan Room II. Mandatory Pre-Bid Conference Sign-in Sheet Security Camera System ADDENDUM NO. 1 Moreno Valley Unified School District - Bid No.15-06-05 10/8/15 GO # 2015-0105-0 Page 4 of 4