BP HUSKY TOLEDO REFINERY

Similar documents
BP HUSKY TOLEDO REFINERY

Salt Lake Community College

U.S. CONCRETE, INC. SAFETY POLICY and PROCEDURE MANUAL

A. General provisions and other electrical systems are specified in other Sections of Division 26.

BP OIL -- TOLEDO REFINERY

WC-OSH 109 Tagging and Isolation

QP29.20 Revision 15 Safety

IGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

GE Energy Connections

SEMEM3-05 Carrying out fault diagnosis on mechanical equipment

120 White Bridge Rd. Nashville, TN Control of Hazardous Energy Program OSHA (lockout/ Tagout) standard 29 CFR

Energy Isolation. Standards, Techniques and Best Practices Jul 2018, Dubai

PROMPR22 Carrying out fault diagnosis on mechanical equipment

ESSENTIAL SAFETY RESOURCES

320- HAZARD COMMUNICATION

Physics Division Work Governance

CLINICAL CHARTING USER INTERFACE

Student Orientation Post-Assessment

GET A PASSING GRADE IN BREWERY SAFETY

BHG Operational Awareness Program May 8, 1998 Surveillance Guideline OPS-9.12 Revision 0 Operations Turnover Page 1 of 8 OPERATIONS TURNOVER

Template F-circle lt grey 1

The University of Texas at San Antonio

Sample orientation checklist

2017 Business & Industry Training

GET A PASSING GRADE IN BREWERY SAFETY

Deriving Process Safety KPIs. Swiss Aviation Safety Conference SASCON, November 2012, Olten Safety Performance Indicators (SPI)

The University of Texas at San Antonio

Defective Backhoe Breaks Line

Personal Protective Equipment

Kern County Water Agency. Maintenance Worker/ Maintenance Mechanic I/II/Journeyman Mechanic $37,922-$60,616 Annually $1,459-$2,331 Biweekly

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

INCIDENT INVESTIGATION AND REPORT PROGRAM

(Company name) Health and Safety Plan

Technical Job Family: Technician Progression

Worker s Arm Pulled Into Belt and Pulley

INCIDENT INVESTIGATION PROGRAM

Bed Rail & Inspection Policy and Procedure Checklist

OSHA (PESH) Records. Presented by: Doug Miller. Occupational Safety Consultants, Inc.

Standard Development Timeline

OSHA: 45 years of Progress on Safety and Health

Sample worker orientation checklist

University Facilities Personal Protective Equipment Procedure

Contents of Spill Kits. Kamrul Zaman

CHATHAM COUNTY EMERGENCY OPERATIONS PLAN

The University of Texas at San Antonio

Outreach Training Program

INJURY AND ILLNESS PREVENTION PLAN (IIPP) October 2015

Student Affairs: Student Housing & Residence Life. Student Housing Residence Facilities Obz Square

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

USEPA Chemical Accident Prevention Inspection and Enforcement Processes

Laboratory Chemical Hygiene Plan Research Lab

TECHNICAL DAYS, APRIL 2017 ABB Plant Fingerprint Assessment Optimizing Operations. Fernando Tobar, Country Service Manager

Personal Protective Equipment Program. Risk Management Services

Chapter 9 Legal Aspects of Health Information Management

UNIVERSITY OF VICTORIA X-RAY EQUIPMENT SAFETY POLICIES AND PROCEDURES

Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017

ELECTRICAL TECHNICIAN I/II/III

The University of Iowa College of Liberal Arts and Sciences SCHOOL OF ART & ART HISTORY SAFETY MANUAL

Outreach Training Program

OSHA Compliance Update for Long Term Care

RADIOLOGICAL MONITORING AND SURVEYS

Continuing Education Credits

INSTRUMENTATION TECHNICIAN I/II/III

New Hire Safety Orientation Safety Through Involvement

Revision #: 0 Prepared By: Beth Eckert, Industrial Chemist Revision Date: 1/10/00 Approved By: Larry Cummings, Asst. Superintendent of WWTD

TRIP OF YALLOURN POWER STATION NO KV BUSBAR ON 6 DECEMBER 2015

Michigan State University Department of Chemical Engineering and Materials Science (CHEMS) SAFETY Documents

Laboratory Chemical Hygiene Plan -- Teaching Lab

Accident Prevention Process

Eastern Municipal Water District Date Adopted: 04/16/97 Date Revised: 07/06

SCALES NW, INC INCIDENT INVESTIGATION AND REPORTING

Health, Safety, Security and Environment

Who Is OSHA? Who Is PERRP?

HARVARD UNIVERSITY MINORS IN LABS POLICY STATEMENT

Perform Primary Voltage Live-Line Testing Status: Approved

Crane Bashes Pipes. Lessons Learned. Volume 03 Issue USW

Online Course Submission Instructions

ARMY AH-64A HELICOPTER

Worker Safety and Health Support Annex. Coordinating Agency: Mississippi State Department of Health (MSDH)

Healthcare Competency Skills/Evaluation (Page 1 of 5)

Wrong PSV Found Installed in Field

POLICY. Edith Cowan University (ECU) recognises that a safe and healthy working environment is conducive to job satisfaction and productivity.

Health & Safety Policy & Procedures

Self Assessment Guide for an Effective Safety and Health Program

Production Device Registration

Safety, Health and Environment New Hire Orientation. Management Services

This document describes the University s processes for reporting and investigating health and safety Incidents and Near Misses.

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

FLOCO2, Ltd. Safety Management System. Preparation: Safety Mgr Authority: President Issuing Dept: Safety Page: Page 1 of 11

THIS MANUAL IS THE PROPERTY OF THE OWNER. PLEASE BE SURE TO LEAVE IT WITH THE OWNER WHEN YOU LEAVE THE JOB.

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

UNIT 6: CERT ORGANIZATION

Health and Safety Policy and Procedures

Health and Safety Plan (HASP) Sampling and Handling of Sediments from (Name & location of project site)

TELECOMMUTING AGREEMENT

MEDICAL-TECHNICAL SPECIALIST: BIOLOGICAL/INFECTIOUS DISEASE

INCIDENT INVESTIGATION & REPORTING BEST PRACTICES

Transcription:

BP HUSKY TOLEDO REFINERY Document Type: Procedure Effective Date: April 1, 2013 Owner: B. Schacht / J. Herbert Refinery Wide Developing Isolation Plans Auth. By: D. C. Durnwald (signature on file) Procedure No.: SAF 102 Rev. No.: 3 Page 1 of 6 SCOPE This procedure describes development and use of Isolation Plans. Isolations Plans support and enhance the LOTO process. HEALTH Special PPE & Special Hazards Any energy source that may cause unexpected movement of equipment or release of hazardous energy during maintenance. SAFETY Appropriate personal protective equipment needed to protect against exposures. REFERENCE DOCUMENTS SAF 037 Control of Hazardous Energy (Lock Out/Tag Out) Procedure Toledo Control of Work Policy Toledo Isolations Policy SPECIAL MATERIALS & EQUIPMENT Pre-determined Isolation Plans and Isolation Confirmation Certificates (Equipment Specific) Isolation Plan Template ICC Template QUALITY Annual Auditing of Program ENVIRONMENTAL N/A

OVERVIEW Isolation Plans and Isolation Confirmation Certificates (ICC s) are provided to assist operating personnel in achieving a consistent safe work practice that protects people, equipment, property and the environment. Isolation Plans and ICC s, when consistently applied: - Will make the isolation easier for the operator to optimize time utilization - Builds rigor into our approach - Helps maintain a high level of process and personnel safety - Keeps us in compliance with OSHA Regulation 1910.147 The Isolation Plan and ICC s when used with Control of Work and established operations procedures provides a complete system to safely apply Lock Out/Tag Out (LO/TO) objectives resulting in a safer facility. The Isolation Plan document: Identifies the equipment to be worked on. List and details isolation points (e.g. blank list) and/or marked up PID s or drawings. Sequence of isolation and de-isolation. Includes information on verifying the isolations (e.g. rod out, push stop/start buttons, or voltage test) Describes returning to service and any other reinstatement activities. The operational issues that involve shutdown/cleaning/start up of a system or particular piece of equipment should be directed by operating personnel and established procedures/guidelines. 1.0 Definitions - Energy control is the use of isolating devices to control and restrain energy sources in order for work to be safely done on that equipment or system. - An energy source is any source of energy that can be harmful to people. For example, but not limited to: chemical or hydrocarbons, including engulfment and displacement of oxygen, electrical, thermal, mechanical, springs, pneumatic, hydraulic, pressure, gravity and radiation. - Isolation device is a mechanical device that physically prevents the transmission or release of energy, including items such as: manually operated circuit breaker, a disconnect switch, line valves, or other similar devices that block energy. Push buttons, selector switches and other control circuit type devices are not isolation devices. 2.0 Purpose 2.1 The purpose of this policy is to ensure the safety of all personnel by systems, processes and capabilities to ensure compliance with legal requirements and the Toledo Isolations Policy. Routine adherence to pre-defined points will enable operations and maintenance personnel to achieve a high degree of safety, consistency and reliability during maintenance operations. The Isolation Plan also establishes documentation required by OSHA and Control of Work. Page 2 of 6

3.0 Isolation Plans 2.2 This directive details: The key responsibilities of all personnel involved in the use of the Isolation Plan and the Isolation Confirmation Certificate (ICC). The control and management of Isolation Plans including future revisions Action to take if equipment does not have a pre-determined Isolation Plan 3.1 BP Husky Refining in Toledo has developed Isolation Plans for process equipment in each section of the refinery. 3.2 The Isolation Plan is a document that defines where locks and tags are to be placed in order to properly isolate each piece of equipment in the COW process. Each Isolation Plan is specific to the piece of equipment listed by: the Maximo location number, location description, purpose for isolation, and the isolation diagram. For work on equipment that has a pre-determined Isolation Plan, the specific Isolation Plan can be found on the Operations Page under Isolations. For work on equipment that does not have an Isolation Plan, the Isolation Plan Template can be found on the Operations Page under Isolations. 4.0 Responsibilities 4.1 Key Responsibilities Note: Prior to work, that requires isolation; all temporary piping/connections/equipment/totes shall be identified and properly isolated. Unit Isolating Authority (Unit Operators) Knows the location of the Isolation Plans including the sketch or drawing of the equipment and how to obtain a paper copy or an electronic copy of the Isolation Plan or Isolation Plan Template. Reviews the scope and accuracy of all Isolation Plans used. Determines the level of isolation needed. Risk assesses the isolation plan prior to putting the isolation in place. Isolates equipment in accordance with an approved isolation plan. Tracks isolation with Isolation Plan and ICC. Develops an Isolation Plan for equipment that does not have a pre-determined Isolation Plan, including a sketch of the equipment. Notifies the Unit Shift Supervisor that the Isolation Plan is developed. Completes the Isolation Plan Level 1 Risk Assessment UIsA Checklist prior to isolating the equipment. Notifies supervision of any changes to an approved Isolation Plans. Page 3 of 6

Documents any changes to an approved Isolation, both on the Isolation Plan and the ICC (this includes the both the isolation and de-isolation section). Unit Shift Supervisors Reviews and field validates the Isolation Plan for accuracy and content. Notifies the Unit Isolating Authority (UIsA)that an Isolation Plan needs developed. Verifies and approves changes with the UIsA to an already approved Isolation Plan. Notifies the Unit Operations Coordinator of changes to the approved Isolation Plan. Notifies the Unit Operations Coordinator to the original Isolation Plan has been developed, reviewed, and approved by the UIsA and the Unit Shift Supervisor. Approves / sanctions an Isolation Plan to be carried out in emergency situations or on behalf of the Operations Coordinators. Confirms that the isolation on equipment or lines is executed. Confirms that work is dependent on the isolation is complete and isolations can be removed. Unit Operations Coordinator (Asset Coordinator) Reviews and approves any new Isolation Plans and any changes or modifications to existing Isolation Plans. Notifies the Process Safety Management (PSM) Coordinator that a new or existing Isolations Plan is ready to be added to the library. Tracks the status of the Isolation Plan for readiness. Process Safety Management (PSM) Coordinator -- Create the revision history on the last page of the Isolation Plan, to capture changes to an approved Isolation Plan. Library the approved or modified Isolation Plan to the share point site. Ensure all drawings/sketches are converted into Visio. Ensure actions from MOC s are incorporated and updates are made to the Isolation Plan. Site Engineering Coordinate the development of Isolation Plans for new projects with the Area Authority. Page 4 of 6

5.0 Use 5.1 Modification of an approved Isolation Plan Any modification of the approved Isolation Plans will be done either by using the coordination process described in 4.0 with the UIsA, Shift Supervisor, and Operations Coordinator or by using the MOC process, except for administrative changes. It is the responsibility of the MOC initiator to determine the necessary participants and assign action items. Changes are approved by the Unit Operations Coordinator after review by the Shift Supervisor and Unit Operator. The Shift Supervisor can proceed with a plan change in the event the Operations Coordinator is unavailable or during off shift. 6.0 Control 6.1 Control of Isolation Plans Isolation Plans will be controlled using management systems already in place at Toledo: All Isolation Plan changes must be approved by the Operations Coordinator after review by the Shift Supervisor and UIsA or by completing the MOC process. When the Operations Coordinator is unavailable or during off shift. The Isolation Plans should be reviewed prior to their use by the UIsA and Shift Supervisor to ensure accuracy. For new projects, a Process Safety Startup Review is required before commissioning equipment. The PSSR should require that related Isolation Plans be identified, developed, reviewed, and updated before startup. 7.0 Management of ECP s and New Isolation Plans 7.1 Management of Isolation Plans Isolation Plans are maintained in Microsoft Word and Visio form. All Isolation Plans for one unit are contained and are accessible on that unit s web site under the heading Isolation Plans. Any approved changes to the documents should be posted by the assigned PSM Coordinator and will only be done after approval by the Operations Coordinator (after review by Shift Supervisor and UIsA) or after the completion of the MOC approval process. 8.0 Non-process areas 8.1 Isolation Plans may need to be developed for areas where there is no Unit Operator, Shift Supervisor or Operations Coordinator (such as fire field or POW). People would need to be assigned to fill each role in developing and approving the Isolation Plan or ICC. The people acting as Unit Isolating Authority, Shift Supervisor and Operations Coordinator, for the purpose of Isolation Plans and ICCs, would all need to be trained as Isolating Authorities. Page 5 of 6

Revision history The following information documents at least the last 3 changes to this document, with all the changes listed for the last 6 months. Date Revised By Changes 2/26/2013 J. Herbert Procedure updates include: 3.2 - Location of isolations online. 4.1 - Responsibilities updates, all temp connections shall be documented and properly isolated. 5.1 - Shift Supervisors authority during off hrs. 6.1 - Control of isolations plans. MOC# M2013789-001 Page 6 of 6