REQUEST FOR QUALIFICATIONS RFQ NO Orange Coast College Classroom Modernization Project

Similar documents
RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS

SANTA ROSA CITY SCHOOLS DISTRICT. 211 Ridgway Avenue Santa Rosa, CA Request for Proposals For Architectural Services

REQUEST FOR QUALIFICATION FOR PREPARATION OF FACILITIES MASTER PLAN AND FUTURE ARCHITECTURAL SERVICES

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

Chabot-Las Positas Community College District

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

REQUEST FOR QUALIFICATIONS (RFQ) FOR ARCHITECTURAL SERVICES FOR THE CONSTRUCTION OF A NEW PUBLIC SAFETY BUILDING/SUBSTATION

Chabot-Las Positas Community College District

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

Request for Proposal (RFP) For. Architectural Services. Lauderdale County, MS. Board of Supervisors

REQUEST FOR QUALIFICATIONS ARCHITECTURAL SERVICES Burbank School District 111 March 2016

REQUEST FOR QUALIFICATIONS PROFESSIONAL ARCHITECTURAL SERVICES

Request for Qualifications (Architect / Engineer) State of Ohio Standard Forms and Documents

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Services

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

ARCHITECTURAL/ENGINEERING SERVICES

University of California, Merced Central Plant/Telecommunications Reliability Upgrade

January 2, 2018 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

Washington County Public Works, Building Services

REQUEST FOR QUALIFICATIONS

CITY OF BELL REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES FOR TREDER PARK RESTROOM AND STORAGE FACILITY

CITY OF INGLEWOOD Residential Sound Insulation Program

Request for Statements of Qualifications Architectural Services. University of California, Merced Classroom and Academic Office Building

Facilities Condition Assessment

Dakota County Technical College. Pod 6 AHU Replacement

City of Imperial On-Call Plan Check and Inspection Services. Released: September 13, Important Dates

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

San Mateo County Project Development Unit. Issued: August 4, 2017 Responses due: September 1, 2017 at 2:30 pm. Sam Lin, Manager

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS

ARCHITECTURAL SERVICES COLLEGEWIDE

SONOMA COUNTY JUNIOR COLLEGE DISTRICT. RFQ #1054 for Engineering & Design Services For Districtwide Energy Management/Sustainability Projects

Request for Proposal (RFP) The Klamath Tribes Youth Fitness Center Klamath Tribes Housing Department (KTHD) RFP # 09-KTHD17

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

REQUEST FOR QUALIFICATIONS

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES

FARMERSVILLE INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT SERVICES

REQUEST FOR QUALIFICATIONS

Galesburg Public Library, Galesburg, IL

REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington

May 18, 2016 REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL AND ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS AS-NEEDED EXECUTIVE ARCHITECTS

REQUEST FOR QUALIFICATIONS FOR ARCHITECTURAL / ENGINEERING SERVICES JPS HEALTH NETWORK RESPONSES DUE: Wednesday, September 30, :00 P.M.

BISHOP CONSOLIDATED INDEPENDENT SCHOOL DISTRICT REQUEST FOR QUALIFICATIONS FOR ARCHITECT

Westside Community Schools Request for Qualifications Architectural Design and Engineering Services Prairie Lane Elementary School March 1, 2018

Request for Qualifications

Attention Design Firms

Request for Qualifications Construction Manager

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

San Francisco Unified School District 135 Van Ness Avenue, Room 215 San Francisco, California, Phone

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

CITY OF PORT HUENEME COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR PROPOSAL FOR BUILDING & SAFETY SERVICES

REQUEST FOR PROPOSALS

Architectural Services

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

REQUEST FOR QUALIFICATIONS. Design Professional Services

Lexington Center Corporation Request for Qualifications for PROJECT COORDINATOR SERVICES

Request for Proposal. And Specifications For. Professional Design Services for. The New School of Business Administration WSU Project No.

Attention Design Firms

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

WILLIAMSON COUNTY PURCHASING DEPARTMENT SOLICITATION Utility Coordination and Utility Engineering Services

City of Coquitlam. Request for Information and Qualifications RFIQ No Design Services for Maillardville Community Centre

2900 Mulberry Ave Muscatine, Iowa (563) Request for Proposal (RFP) Professional Architecture / Engineering Services

REQUEST FOR PROPOSALS

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

REQUEST FOR QUALIFICATIONS STRUCTURAL ENGINEER PROFESSIONAL SERVICES. June 19, 2017

SOLICITATION FOR PARTICIPATION IN A REQUEST FOR PROPOSALS FOR CHIEF EXECUTIVE OFFICER (CEO) SEARCH SERVICES JACKSONVILLE, FL SOLICITATION NUMBER 94414

REQUEST FOR QUALIFICATIONS AS-NEEDED CONSULTING PROJECT MANAGER

Knights Ferry Elementary School District

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

This request for qualifications seeks the following type of service providers:

REQUEST FOR PROPOSALS SELECTION OF EXECUTIVE SEARCH FIRM

Okeechobee Utility Authority Engineering Services for Water Treatment Plant Improvements

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

TABLE OF CONTENTS. Notice Inviting Qualifications Background Scope of Work Request for Qualifications (RFQ) Selection Process...

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE MARCH LANE/EAST BAY MUD BICYCLE AND PEDESTRIAN PATH CONNECTIVITY IMPROVEMENTS.

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

Addendum No. 2 April 15, 2015 Architectural Design Services Requirements Contracts Request for Qualifications Project No.

Request for Statements of Qualifications Architectural Services

Carey Park Playground Equipment. Submission Deadline July 13, :00 a.m. (CST)

Request for Qualifications Construction Manager at Risk Contract

REQUEST FOR PROPOSAL For East Bay Community Energy Technical Energy Evaluation Services

REQUEST FOR QUALIFICATIONS (RFQ)

Southern Kern Unified School District

REQUEST FOR PROPOSAL (RFP) Police Department Building Construction Manager at Risk, Guaranteed Maximum Price August 30, 2016

REQUEST FOR PROPOSAL FOR ARCHITECTURAL SERVICES PACIFICA LIBRARY PROJECT

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

CITY OF PORTSMOUTH, NH DEPARTMENT OF PUBLIC WORKS. RFP Peirce Island Pool House Design Project

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

PALM BEACH COUNTY BOARD OF COUNTY COMMISSIONERS FACILITIES DEVELOPMENT & OPERATIONS DEPARTMENT CAPITAL IMPROVEMENTS DIVISION

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services

SALADO INDEPENDENT SCHOOL DISTRICT

Transcription:

REQUEST FOR QUALIFICATIONS RFQ NO. 001-10 Orange Coast College Classroom Modernization Project COAST COMMUNITY COLLEGE DISTRICT Facilities and Planning Department 1370 Adams Avenue, Costa Mesa, CA 92626 Telephone (714) 438-4673 Fax (714) 438-4893 The Coast Community College District (the District) is inviting statements of qualifications from qualified firms, partnerships, and corporations to provide Professional Design Services to the District for Orange Coast College Classroom Modernization Project. This RFQ can be downloaded at our website: http://www.cccd.edu/measurec/facilities/projects.aspx RFQ submissions shall be delivered and addressed to the Coast Community College District, Facilities & Planning Department, Attention: Jerry Marchbank, 1370 Adams Avenue, Costa Mesa, CA 92626 and shall be labeled: RFQ No. 001-10 OCC Classroom Modernization Project. All statement of qualifications must be date/time stamped. Please send one (1) original and five (5) copies of requested materials with the length of each RFQ response limited to a maximum of twenty (20) pages. It is the responsibility of the Proposer to submit the response by the proper time. No oral, telegraphic, electronic, facsimile, or telephone statements will be considered. Proposals received after 5:00 p.m. on October 8, 2010 will not be considered and will be returned unopened. ALL RESPONSES MUST BE RECEIVED BY JERRY MARCHBANK BY October 8, 2010 Questions regarding this RFQ may be directed to Jerry Marchbank at (714) 438-4731 or by email at jmarchbank@mail.cccd.edu. Sincerely, Jerry Marchbank Assistant Director, District Facilities COAST COMMUNITY COLLEGE DISTRICT Page 1 of 6

PROJECT DESCRIPTION Surrounding Area Orange Coast College is located at 2701 Fairview Road, Costa Mesa, California. The Orange Coast College campus is located south of the 405 Freeway on Fairview Road bordered by Adams Avenue to the north, Merrimac Street to the south and just east of Harbor Boulevard. The entrance to Orange Coast College is located west of the Orange County Fairgrounds on Arlington Avenue. Project Site The Orange Coast College campus Buildings 8, 9, 12, 13, 14, 35, 36, 37, 40, and 41 will be buildings to undergo modernization during the Summer 2011. Project Scope This project includes the preparation of design and bid documents for Buildings 8, 9, 12, 13, 14, 35, 36, 37, 40, and 41. Modernization will include such items as flooring, wall coverings, acoustical ceilings, interior lighting, audio/visual, data/electrical and building signage. This project has a total project budget of $2,500,000 with bid documents completed between November 2010 to February 2011, anticipated public bid in March 2011, and construction to be completed between June 1, 2011 and August 12, 2011. SCOPE OF SERVICES The District is seeking an Architecture/Engineering team to provide professional design services for the OCC Classroom Modernization Project. The architectural/engineering firm shall, without limitation to the District s right to require other services not listed herein, carry out the responsibilities delineated in the scope of services set forth below. Such services shall be performed, consistent with the highest standard care for professionals performing similar scopes of services. The Architectural/Engineering firm shall, as a minimum, undertake the following responsibilities, and any additional responsibilities reasonably necessary and customarily provided by Architectural/Engineering firm conducting business in the Southern California area, to ensure that all Coast Community College District project goals, standards, policies and procedures are adhered to over the course of the project. The Architectural/Engineering Services are governed by the terms and conditions of the CCCD Architectural Agreement (www.cccd.edu/facilities/documents.htm) and include, but are not limited to, the following: 1. Prepare a building program document and utilize the document as the basis for design. 2. Review and validate existing conditions at the proposed site and utilize it in the preparation of the design documents. Page 2 of 6

3. Prepare the design documents in accordance with the Architectural Agreement. 4. The basic design phase services to be provided shall include: a. Schematic Design, Design Development, Construction Documents, Bid Phase support, Construction Administration, Project Management and Documentation (via Primavera Expedition Software), and post-occupancy building commissioning phase support. b. Prepare schematic design documents including cost estimate and basis of design. c. Basic design phase services for this project to include the following disciplines: Civil, Structural, Architectural, Mechanical HVAC, Plumbing, Electrical, Fire Protection, and Hardware. The design of the facility and site shall meet all requirements of the applicable jurisdictions, codes and regulations and be consistent with campus design standards. d. At conclusion of all design phases, required deliverables shall include but may not be limited to the following: drawings, specifications, basis of design report, and cost estimates. Submit progress updates of design documents for review as requested by the Director of Facilities and Planning. 5. Initiate and participate in discussions with the relevant College building user groups, utility providers, the Board of Trustees and community groups regarding this project as required. 6. Prepare and coordinate design phase meetings with College building user groups, other College representatives, the District Facilities Team, the Project Manager and contractors. Attend project meetings as requested through bidding, award and construction, closeout and post-occupancy phases of the project, as required. 7. Prepare and distribute meeting minutes of all meetings held with the District, the College, the Project Manager, or governmental agencies. 8. Submit design documents to District Director of Facilities and Planning, College Vice President of Administrative Services, Project Manager, and other government entities and/or utility providers for plan checks and approvals as required. 9. Assist CCCD Facilities Team in Bid Phase by preparing addenda, responding to Requests For Information (RFI s) and other documents as required. 10. Facilitate weekly construction meetings, prepare detailed work plans indicating required and recommended milestones, deliverables and submittals, review timeframes, and critical actions or decisions required of the College, District Facilities Team or Project Manager. Make modifications and updates to the work plan as requested by the Project Manager. The Architect/Engineer shall work closely and in cooperation with CCCD team, including the campus Facilities Construction Manager, campus Maintenance & Operations department, and the District Facilities department, and shall be readily accessible at all times for review and project coordination. Page 3 of 6

REQUIRED INFORMATION AND FORMAT In order to be considered for selection as a Architectural/Engineering Services consultant for Coast Community College District, the respondent individuals, firm or firms shall submit a Statement of Qualifications (SOQ), and using as a minimum the following criteria, the individual or firm(s) should state why it believes it is qualified to provide the services requested in this RFQ. Provide in the SOQ the following items in the specified order: 1. Letter of Introduction a. Provide a letter of introduction signed by an authorized officer of the organization. b. If submitting as a team, note which team is the prime consultant or lead joint venture partner (if applicable). c. Specify the individual leading the Architectural/Engineering Services and Construction Administration team. 2. Firm Information a. Type of organization or company structure. b. Certification that the Architectural/Engineering Services firm is legally permitted or licensed to conduct business in the State of California for the services offered. c. Number of years the firm has been in business. d. Location of principal office that will be responsible for the implementation of this contract. e. Litigation: The firm or firms must have an acceptable history of working proactively to avoid litigation. Provide specific information on termination for default, litigation settled or judgments entered within the last five (5) years, and civil judgments or criminal convictions for false claims within the last five (5) years. f. List company or individual team members experience in providing same services. Include name of projects, client, city, and state. g. Provide a list of at least 3 references; name of organization, job title, addresses, and phone numbers. 3. Project Team Qualifications a. Identify the following key members within the firm and provide their resumes with qualifications especially as it relates to upper division school projects: 1. Principal-in-Charge 2. Project Manager 3. Cost Estimator Page 4 of 6

b. Identify any proposed consultants and any other relevant disciplines for this project. List license numbers and dates as well as business address, phone number and fax number. Include resumes and related experiences for appropriate members of these firms. 4. Firm Resources a. Provide a statement demonstrating your firm s or team s ability to accomplish the scope of services in comprehensive and thorough manner with an aggressive schedule in order to meet a client s goal. b. Explain the firm s design capabilities as they relate to: 1. Experience with classroom modernization projects of similar size and scope. 2. Integration of flexibility and future technology into the design. 3. Work plan with the current workload and available staffing. c. Explain the firm s technical capabilities in the following areas (please provide specific references as appropriate): 1. CAD capability and software proposed to be used to produce the deliverables for the project; and the ability to provide the District with electronic CAD files. 2. Cost estimate history, comparing cost estimates versus actual bid amount. 3. Quality control / assurance procedures, including coordination of design disciplines, complying with program requirements and conformance with Federal/State/Local applicable code requirements. 4. Experience working with State/Local agencies, including Division of State Architect, City Public Works and Fire Departments. 5. Experience with upper division educational facility design. SUBMITTAL REQUIREMENTS The individual or official of the firm who has the power to bind the firm contractually must sign the SOQ. The SOQ preparation and associated direct costs are the sole responsibility of the Consultant and will not be reimbursed by the District. One (1) original and five (5) copies of the SOQ shall be submitted. Each submittal shall not contain more than twenty (20) pages, excluding front and back covers and tabs. Submittals containing more than twenty (20) single sided pages or ten (10) double-sided pages will not be considered. Page 5 of 6

BASIS OF AWARD The SOQs will be evaluated based on each firm s qualifications and relevant experience with similar work. All SOQs will be evaluated by the Campus Selection Committee and selected firms will be contacted for an interview and preparation of cost proposal. It is anticipated that the Selection Committee s recommendation will be presented to the Coast Community College District Board of Trustees for approval on November 3, 2010. OUTREACH The Board of Trustees recognizes the importance of promoting economic growth in the communities it serves and therefore encourages the involvement of small and emerging businesses in every aspect of the execution of all services covered by this RFQ. EVALUATION & ACCEPTANCE OF SOQ The District reserves the right to reject any and all SOQs, to amend the RFQ and the RFQ process, and to discontinue or re-open the process at any time. NON-LIABILITY OF DISTRICT The District shall not be liable to the Consultant for personal injury or property damage sustained in the performance of these services, however caused. Page 6 of 6