BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO ADMINISTRATIVE ORDER BY CONSENT

Similar documents
GUIDELINES FOR BUSINESS IMPROVEMENT GRANT PROGRAM BY THE COLUMBUS COMMUNITY & INDUSTRIAL DEVELOPMENT CORPORATION

Colorado Oil and Gas Conservation Commission Enforcement Program

Last updated on April 23, 2017 by Chris Krummey - Managing Attorney-Transactions

MICHIGAN DEPARTMENT OF ENVIRONMENTAL QUALITY. June 2, 1997

THE PAYCHEX SEARCH FOR AMERICA S MOST UNIQUE SMALL BUSINESS OFFICIAL RULES

Farm Energy and Agri-Processing Program Terms and Conditions

TIFT REGIONAL MEDICAL CENTER MEDICAL STAFF POLICIES & PROCEDURES

Department of Defense INSTRUCTION

Community Dispute Resolution Programs Grant Agreement

NEXus - The Nursing Education Xchange Memorandum of Understanding Approved: October 17, 2007

LIBRARY COOPERATIVE GRANT AGREEMENT BETWEEN THE STATE OF FLORIDA, DEPARTMENT OF STATE AND [Governing Body] for and on behalf of [grantee]

COASTAL CONSERVANCY. Staff Recommendation June 16, 2005 MALIBU ACCESS: DAN BLOCKER BEACH. File No Project Manager: Marc Beyeler

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

NC General Statutes - Chapter 90A Article 2 1

ADVANCED MANUFACTURING FUTURES PROGRAM REQUEST FOR PROPOSALS. Massachusetts Development Finance Agency.

DRAFT. (Industry Name) (Industry Address) (Industry Address) (SIC NUMBER (S))

SUPREME COURT OF NEW JERSEY. It is ORDERED that the attached amendments to Rules 4:74-7 and 4:74-

EEOC v. ABM Industries Inc.

Unregulated Heating Oil Tank Program Guidance

OKLAHOMA STATE UNIVERSITY PUBLIC INFRACTIONS DECISION APRIL 24, 2015

Ch. 55 NONCARRIER RATES AND PRACTICES CHAPTER 55. NONCARRIER RATES AND PRACTICES

PATIENT RIGHTS TO ACCESS PERSONAL MEDICAL RECORDS California Health & Safety Code Section

ASSEMBLY BILL No. 214

ARLINGTON COUNTY, VIRGINIA

AGREEMENT BETWEEN THE BAKU-TBILISI-CEYHAN PIPELINE COMPANY AND THE GOVERNMENT OF GEORGIA ON THE ESTABLISHMENT OF A GRANT PROGRAM FOR GEORGIA

COLORADO INDIGENT CARE PROGRAM

RESIDENT PHYSICIAN AGREEMENT THIS RESIDENT PHYSICIAN AGREEMENT (the Agreement ) is made by and between Wheaton Franciscan Inc., a Wisconsin nonprofit

Academy Sports Football Scholarship Program Rules SPONSOR: ACADEMY SPORTS

ALABAMA DEPARTMENT OF MENTAL HEALTH BEHAVIOR ANALYST LICENSING BOARD DIVISION OF DEVELOPMENTAL DISABILITIES ADMINISTRATIVE CODE

PATIENT ADVOCATE DESIGNATION FOR MENTAL HEALTH TREATMENT NOTICE TO PATIENT

Collaborative Operations and Services Grant Program GUIDELINES Revised January 15, 2014

REQUEST FOR APPLICATIONS

LAS VIRGENES MUNICIPAL WATER DISTRICT 4232 Las Virgenes Road, Calabasas, California 91302

Mobile Mammo Registration Instructions

Section VII Provider Dispute/Appeal Procedures; Member Complaints, Grievances, and Fair Hearings

CALIFORNIA SCHOOL FINANCE AUTHORITY STATE CHARTER SCHOOL FACILITIES INCENTIVE GRANTS PROGRAM GRANT AGREEMENT NUMBER 10-14

NIKE DESIGN WITH GRIND CHALLENGE OFFICIAL RULES

Giant Tiger s Home for the Holidays Christmas Contest Official Rules

Aberdeen School District No North G St. Aberdeen, WA REQUEST FOR PROPOSALS 21 ST CENTURY GRANT PROGRAM EVALUATOR

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO APPLICATION

Statement of Guidance: Outsourcing Regulated Entities

MEMORANDUM OF AGREEMENT Between The Commonwealth of Massachusetts And The United States Army and National Guard Bureau

County Transportation Infrastructure Fund Grant Program Implementation Procedures

Chapter 5 CIVIL DEFENSE*

Request for Proposals

TRUE AND EXACT COPY OF ORIGINAL

PUBLIC LIBRARY CONSTRUCTION GRANT AGREEMENT BETWEEN THE STATE OF FLORIDA, DEPARTMENT OF STATE AND [GOVERNING BODY] for and on behalf of [GRANTEE]

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

Chapter 90A. Sanitarians and Water and Wastewater Treatment Facility Operators.

Global Environment Facility Grant Agreement

79th OREGON LEGISLATIVE ASSEMBLY Regular Session. Enrolled. Senate Bill 58

ATTACHMENTS A & B GRANT AGREEMENT TERMS AND CONDITIONS DEPARTMENT OF EDUCATION

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

THIS AGREEMENT made effective this day of, 20. BETWEEN: NOVA SCOTIA HEALTH AUTHORITY ("NSHA") AND X. (Hereinafter referred to as the Agency )

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

Industrial Optimization Program: Feasibility Study

For Immediate Release October 7, 2011 EXECUTIVE ORDER

NORTH CAROLINA STATUTES : (4) NORTH CAROLINA GENERAL STATUTES: CHAPTER 90: MEDICINE AND ALLIED OCCUPATIONS ARTICLE 33: INDUSTRIAL HYGIENE

HOUSTON HOUSING AUTHORITY Public Housing Grievance Policy

A Bill Regular Session, 2017 HOUSE BILL 1430

Rhode Island Commerce Corporation. Rules and Regulations for the Innovation Voucher Program

I have read this section of the Code of Ethics and agree to adhere to it. A. Affiliate - Any company which has common ownership and control

Staff member: an individual in an employment relationship with CYM or a contractor who is paid for services to CYM.

Annotated Mississippi Code _Title 43. Public Welfare _Chapter 20. Child Care Facilities _Mississippi Child Care Licensing Law. Miss. Code Ann.


Glynn County Fire Department 121 Public Safety Blvd BRUNSWICK, GEORGIA PHONE (912) FAX (912)

NGAR REG Operating and Parking Vehicles on State Military Reservations

Business Improvement Grant Program. Application

SAN DIEGO COUNTY SHERIFF'S DEPARTMENT INTERIM POLICY AND PROCEDURE TESTING AND EVALUATION PHASE

RULES OF THE TENNESSEE DEPARTMENT OF HUMAN SERVICES ADMINISTRATIVE PROCEDURES DIVISION CHAPTER CHILD CARE AGENCY BOARD OF REVIEW

JAG COVER SHEET. FILE NAME : CampPend.pdf CAMP PENDLETON MARINE CORPS BASE. Title : DoD, Navy, Marines, California, CA. Author :

MEDICAID ENROLLMENT PACKET

RESEARCH GRANT AGREEMENT. Two Year Grant

AGENDA BILL. Beaverton City Council Beaverton, Oregon BUDGET IMPACT EXPENDITURE AMOUNT APPROPRIATION REQUIRED $60,000 BUDGETED $-0- REQUIRED $60,000*

WEST VIRGINIA LEGISLATURE. Senate Bill 519

DPAS Defense Priorities & Allocations System for the Contractor

Case3:12-cv CRB Document224 Filed04/03/15 Page1 of 6

DEP Webinar. April 10, 2012

Appendix B-1. Feasibility Study Task Order Template

Department of Defense INSTRUCTION

2012/2013 ST. JOSEPH MERCY OAKLAND Pontiac, Michigan HOUSE OFFICER EMPLOYMENT AGREEMENT

Google Capture the Flag 2018 Official Rules

Department of Defense DIRECTIVE

WarmWise Audits & Rebates Contest Drawing PA-7 OFFICIAL RULES

EXHIBIT E DRDAP [ ATTACHED ]

NAS Grant Number: 20000xxxx GRANT AGREEMENT

Instructions to Bidders. Thailand Petroleum Bidding Round 2018 for Offshore Block G1/61

RULES AND REGULATIONS OF THE AMERICAN BOARD OF QUALITY ASSURANCE AND UTILIZATION REVIEW PHYSICIANS, INC.

WHEREAS, School engages in organized interscholastic sporting events in which School's students participate;

H 7608 S T A T E O F R H O D E I S L A N D

PROPOSED REGULATION OF THE PEACE OFFICERS STANDARDS AND TRAINING COMMISSION. LCB File No. R September 7, 2007

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO AMENDED APPLICATION

PRACTICE PARTICIPANT AGREEMENT

H 7297 S T A T E O F R H O D E I S L A N D

SEALED PROPOSAL REQUEST FOR PROPOSAL. Professional Archaelogical Services

MASTER RELATIONSHIP AGREEMENT FOR THE OWNERSHIP, OPERATION, AND MANAGEMENT OF THE ST. CROIX VALLEY BUSINESS INCUBATOR

SUBCHAPTER 03M UNIFORM ADMINISTRATION OF STATE AWARDS OF FINANCIAL ASSISTANCE SECTION ORGANIZATION AND FUNCTION

Chapter 14 COMPLAINTS AND GRIEVANCES. [24 CFR Part 966 Subpart B]

CHAPTER 6 Construction Traffic Management Program. Overview

FORM A-2 FINANCIAL PROPOSAL SUBMITTAL LETTER

Transcription:

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATIER OF ALLEGED VIOLATIONS OF THE RULES } CAUSE N0.1V AND REGULATIONS OF THE COLORADO OIL AND GAS } CONSERVATION COMMISSION BY BERRY PETROLEUM ) COMPANY, GARFIELD COUNTY, COLORADO ) ADMINISTRATIVE ORDER BY CONSENT (Pursuant to Rule 522.b.(3) of the Rules and Regulations of the Colorado Oil and Gas Conservation Commission. 2 CCR 404-1) FINDINGS RECEIVED JUN 2 0 2011 COGCC DOCKET NO. 1106-0V-13 ORDER NO. 1V- 1. On July 14, 2005, the Director ("Director") of the Colorado Oil and Gas Conservation Commission (the "Commission" or "COGCC") approved an Application for Permit-to Drill for the Chevron #12-213D Well {the "Well") (API #05-045-10938}, with the associated well pad (the "Well Pad"), located in the SW'Y4 NW'Y4 of Section 12, Township 6 South, Range 97 West, 6th P.M. The permit was reissued on September 5, 2006 and September 28, 2007. The location of the Well Pad is within the recharge area for a spring used by wildlife and seasonally by ranchers for livestock watering. Berry Petroleum Company ("Berry") began construction of the Well Pad in July 2007, including construction of a lined reserve pit. 2. On January 17, 2008, due to concerns that the reserve pit might be leaking, Berry collected samples of water discharging from the toe of the Well Pad. Following receipt of positive test results on January 21, 2008, Berry verbally notified COGCC and other state and federal agencies of the releases that same day. Also on January 21, Berry constructed a lined collection sump at the toe of the pit in order to capture and properly dispose of any leakage. 3. On March 17, 2008, COGCC Staff issued NOAV #200127625 (the "NOAV") to Berry alleging violations of certain COGCC Rules, in effect at the time of the releases, identifying three releases from the reserve pit (on November 28, 2007, December 19, 2007, and January 19, 2008), for which the COGCC Staff recommended Berry be penalized. The NOAV further alleged that: "the subject releases have impacted Waters of the State in a tributary to Garden Gulch & currently threaten to impact Garden Gulch. Prior to 01-21-2008, Berry Petroleum had not notified the NRC, the COGCC, & the CDPHE-WQCD." 4. Folllowing its January 21, 2008 report to COGCC, Berry fully cooperated with the COGCC Staffs response actions and requirements. Berry timely submitted and regularly updated the required Spill/Release Reports and Site Investigation and Remediation Work Plans. Further, Berry performed all required corrective actions and complied with the requirements of the NOAV. 5. From January 2008 to October 2008, Berry collected and tested numerous water samples, the analytical results for which were submitted to COGCC. A sample from the lined collection sump, taken February 7, 2008, indicated benzene contamination at a level of 6.5 parts per billion ("ppb"), which exceeded the drinking water standard of 5.0 ppb. No other water samples at any location exceeded the benzene drinking water standard. On January 21, 2008, Berry initiated the disposal of that water which was collected in the sump. Samples taken on February 15, 2008, at and below the spring, showed acetone from a low of non-detect to a high of 610 ppb. While there is no numerical water quality standard for acetone, the COGCC Staff alleges that the Colorado Department of Public Health and Environment, Water Quality Control Commission ("CDPHE-WQCC") Interim Narrative Standard was exceeded for acetone. 6. Berry took a number of steps in its efforts to operate responsibly and in a manner protective of the environment. Berry initially constructed the reserve pit with a 16 mm liner, thicker than the 12 mm required at that time. Berry repaired holes discovered in the liner (November 2007), and overlaid the initial liner with another 16 mm liner (December 2007). Berry then installed a second replacement liner (20 mm) in January 2008. Berry also installed a French drain below the pit; lined the collection sump; collected and properly disposed of the fluid collected in the sump; and conducted extensive water quality sampling. 7. Following this incident, Berry voluntarily implemented additional safeguards company-wide to prevent similar future events. Berry enhanced its existing environmental compliance and response plans and procedures as well as its existing environmental training program. Berry took additional measures to reduce the risk of pit releases, such as the use of

double Jiners. Berry is pilot-testing closed loop drilling and completion operations that could in many cases eliminate the future need for reserve pits. 8. On April 21, 2011, COGCC Staff issued a proposed Order Finding Violation ("OFV") to Berry relating to this incident. On May 24, 2011, the Director and COGCC Staff met with Berry representatives, and the parties agreed to the following settlement of the abovecaptioned matter. 9. Rule 523. specifies a base fine of One Thousand dollars ($1,000) for each day of violation of each Rule. Rule 523.a.(3) specifies that "the maximum penalty for any single violation shall not exceed Ten Thousand dollars ($10,000) regardless of the number of days of such violation," unless the violation results in significant waste of oil and gas resources, damage to correlative rights, or a significant adverse impact on public health, safety or welfare or the environment. 10. COGCC Staff believes that the release of fluids from the lined reserve pit on the Well Pad resulted in a significant adverse impact to the environment and public health, safety, and welfare. Berry does not agree that this release resulted in a significant adverse impact to the environment or public health, safety, or welfare. 11. COGCC Staff believes that Berry should be found in violation of Rules 324A.a., 902.a., 906.a., 906.b.(1 ), and 907a.(2), for failing to properly construct and maintain the lined reserve pit on the Well Pad so that E&P waste was not released, and reporting and containing the release tmmediately and cleaning up the release as soon as practicable. COGCC Staff believes that these violations occurred from November 28, 2007, the date of the first release of fluids from the lined reserve pit (consisting initially of water) on the Well Pad, through January 21, 2008, when Berry reported the releases of fluid to the COGCC and began remediation work. COGCC Staff has determined that a 48-day period of violation should be used in this matter, with base fines levied as compiled in the table below: Rule Violation Days of Violation Fine AmounWiolation 324A.a. 48 $48,000 902.a. 48 $48,000 906.a. 48 $48,000 906.b.(1) - $10,000 907.a.(2) 48 $48,000 Total Maximum Allowable Fine $202,000 12. Because the base fines for these violations are set at One Thousand dollars ($1,000) per day of violation, the aggravating factors set forth in Rule 523.d. are not applicable by their terms. 13. Pursuant to Rule 523.d., mitigation of 14.4% was applied to the total base fine in recognition of the foltowing factors: As is provided for by Rule 523.d.(2), Berry demonstrated a prompt, effective and prudent response to the violations, and the violations. Under Rule 523.d.(3), Berry cooperated with the Commission with respect to 14. Berry should be assessed a total adjusted fine of One Hundred Seventy Three Thousand dollars ($173,000) for the Rule violations described above at the Well Pad. 15. Berry does not admit to the alleged violations but agrees to pay the total fine set forth in Finding No. 14 to resolve this matter without the necessity of an extended contested hearing before the Commission. 16. Pursuant to Article IX of the Memorandum of Agreement between the CDPHE, Water Quality Control Division ("WQCD") and the COGCC, adopted February 15, 2000, COGCC Staff conferred with WQCD enforcement staff in determining the monetary penalty against Berry. WQCD indicated it agrees with the fine and the terms of this Administrative Order by Consent ("AOC") and wm not pursue any additional penalty against Berry. 2

ORDER NOW, THEREFORE, IT IS ORDERED, that Berry shall be found in violation of the following Rules at the Well Pad, located in the SW'Y4 NW'Y4 of Section 12, Township 6 South, Range 97 West, 6th P.M.: a. Rule 324A.a., for failure to take precautions to prevent the unauthorized discharge or disposal of E&P waste, chemical substances, trash, discarded equipment or other oil field waste; b. Rule 902.a., which required that pits used for exploration and production of oil and gas shall be constructed and operated to protect the waters of the state from significant adverse environmental impacts from E&P waste; c. Rule 906.a., which required spills/releases of E&P waste to be controlled and contained immediately upon discovery and impacts resulting from spills/releases to be investigated and cleaned up as soon as practicable; d. Rule 906.b.(1 ), which required reporting of spills/releases of E&P waste or produced fluid exceeding five barrels to the COGCC on Spill/Release Report, Form 19, within ten days of discovery; and e. Rule 907.a.(2), for failure to conduct E&P waste management activities and failure to construct and operate E&P waste management facilities to protect the waters of the state from significant adverse impacts from E&P waste. IT IS FURTHER ORDERED, that Berry and the Director, having come to an agreement, cognizant of the complexities of the above-captioned matter, confident that this agreement satisfies both the Director and Berry, and wishing to avoid further uncertainties and costs associated with litigation of the above-captioned matter, enter into this AOC. IT IS FURTHER ORDERED, that Berry shall pay One Hundred Thousand dollars ($100,000) in settlement of the NOAV and in response to the proposed OFV, which shall be payable within thirty (30) days of the date this AOC is approved by the Commission. IT IS FURTHER ORDERED, that Berry shall further pay Seventy Three Thousand dollars ($73,000) to fund a public project in Colorado in accordance with Rule 523.e. Berry and COGCC Staff shall work in good faith to choose a project within sixty (60) days of the date this AOC is approved by the Commission. Berry shall have the option of paying all or a portion of this $73,000 in cash to the Commission. A. The execution of this public project, including but not limited to the management, planning, contracting, and inspection shall be the responsibility of Berry and its contractors. COGCC Staff reserves the right to request status reports or any other documentation related to the project at any time. B. Berry shall not deduct the expenses associated with the implementation of the above-described public project for any tax purpose or otherwise obtain any favorable tax treatment of such payment or project. Berry hereby certifies that, as of the date of this AOC, it is not under any existing legal obligation to perform or develop, nor will it receive any credit for, any public project that it may propose to the Director, except as provided in this AOC. C. The public project must be completed to the satisfaction of the Commission by January 31, 2013. Berry shall submit a Public Project Completion Report to the Division by that date, describing the project and the associated benefits, itemizing and documenting the costs, and certifying that the project was completed in compliance with this order and Rule 523.e. D. In the event that Berry makes any public statement, oral or written, about the public project, BERRY shall include the following language in such public statement: "This project was undertaken as part of settlement of an enforcement action taken by the Colorado Oil and Gas Conservation Commission." IT IS FURTHER ORDERED, that Berry is fully released from any and all claims for violations of COGCC rules, the Colorado Oil and Gas Conservation Act, or any other rule, law, BerryPetroleum.Chevron.12.213D.AOC.6.13.201 1 3

order, or directive set out or that could have been set out in the NOAV, the pending OFV, or any other instrument now or in the future existing, and any fine, remedial order, sanction or other potential liability, including but not limited to those contemplated by the above-captioned matter presented to the Commission or COGCC Staff, arising from any unauthorized activity or activities on or related to the Well Pad (including the reserve pit, the lined pond, the wells themselves, and any and all other equipment or infrastructure on the Well Pad), whether related to permitting and construction of the Well Pad or operations on the Well Pad (including but not limited to fluid disposition, handling, and transportation) that occurred any time before and including the date this AOC is approved by the Commission. This AOC does not grant any release of liability for any violations, regardless of when they occurred, that are not cited in this AOC. IT IS FURTHER ORDERED, that nothing in this AOC shall constitute or be construed as an admission by Berry that any discharge occurred from the Well Pad or that it committed any violations of any rules of the COGCC or other applicable law. IT IS FURTHER ORDERED, that, unless otherwise specified, any report, notice or other communication required under the AOC shall be submitted digitally to: For the COGCC: Debbie Baldwin Environmental Manager Debbie.baldwin@state.co. u. Chris Canfield Environmental Protection Specialist, Northwest Area Chris.canfield@state.co.us For Berry: Chris Freeman Rocky Mountain Environmental Manager cpf@brv.com IT IS FURTHER ORDERED, that Berry shall execute this AOC no later than fourteen (14) days after the date it is executed by the Staff for recommendation of expedited approval by the Commission. The parties agree to the terms and conditions of this AOC and acknowledge that this AOC constitutes an order issued pursuant to 2 CCR 404-1, Rule 523.a. The Parties acknowledge that this AOC constitutes a full and final resolution of the matters addressed herein, and further agree not to challenge the terms and conditions of this AOC whether by way of direct judicial review or collateral challenge. This AOC is binding upon the Parties and their corporate subsidiaries or parents, their officers, directors, agents, attorneys, employees, contractors, successors in interest, affiliates and assigns. The undersigned warrant that they are authorized to bind legally their respective principals to this AOC. This AOC may be executed in multiple counterparts, each of which shall be deemed an original, but all of which shall constitute one and the same AOC. IT IS FURTHER ORDERED, that under the State Administrative Procedure Act the Commission considers this order to be final agency action for purposes of judicial review within thirty (30) days after the date this order is mailed by the Commission. IT IS FURTHER ORDERED, that the provisions contained in the above order shall become effective forthwith. - 2oH. - RECOMMENDED this day of June, 2011. OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO Dated at Suite 801 1120 Lincoln St. Denver, Colorado 80203 4

AGREED TO AND ACCEPTED this :1. 0 1'h day of June, 2011. uthorized Company Representative Print Signatory Name Daniel G. Anderson Vice President. Production Title - ---------------------------------------------------------------------------- ---------------------------------------------------------------------------- This cause came on for hearing before the Commission on the day of, 20, in, Colorado, for the approval of this Administrative Order by Consent. ENTERED this day of, 20 _, as of the day of, 20. OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORAD Dated at Suite 801 1120 Lincoln Street Denver, Colorado 80203 By_~--------~------ Robert A Willis, Acting Secretary 5