TVC RECORDS. NOVEMBER 11, TGA TRANSMISSION ROUNDTABLE SAN ANTONIO John A. Jacobi, P.E., J.D

Similar documents
2014 Oklahoma Seminar. Tulsa, Oklahoma November 2014

PHMSA Update. Kenneth Y. Lee API AGA Joint Committee Oil & Gas Pipeline Welding Practices. Engineering & Research Division

New England Pipeline Safety Seminar. October 19-20, Pipeline Safety Regulatory Update Portland, Maine

BEFORE THE MINNESOTA PUBLIC UTILITIES COMMISSION. Beverly Jones Heydinger. J. Dennis O'Brien Commissioner

Natural Gas Pipeline Safety Seminar

Copyright 2018 by CSI Knowledge Systems LLC. REGSAFE

Pipeline Operational Qualification (OQ) Crosswalks

Adopted Amendments: N.J.A.C. 14:7-1.4, 1.8, 1.9, 1.11, 1.12, 1.14, 1.20, 1.24, 1.25, and 2.3

2. Classification of Nuclear Items Ability to identify nuclear components, parts, and appurtenances.

COMMONWEALTH OF KENTUCKY BEFORE THE PUBLIC SERVICE COMMISSION

4.2.2 Transmission Owners Transmission Planners Transmission Service Providers Balancing Authorities.

Kern County Water Agency. Maintenance Worker/ Maintenance Mechanic I/II/Journeyman Mechanic $37,922-$60,616 Annually $1,459-$2,331 Biweekly

SOCALGAS REBUTTAL TESTIMONY OF BETH MUSICH GAS TRANSMISSION OPERATIONS AND MAINTENANCE. June 2015

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION (V, HV, UD, UV, UV3, UD3, TD, TV)

Wyoming Public Service Commission (WPSC) Biennium Strategic Plan

PIPES Act of 2006 Redline of 49 USC CHAPTER SAFETY 49 USC CHAPTER SAFETY 01/19/04 CHAPTER SAFETY

SOUTH HEIDELBERG TOWNSHIP - SUNOCO MARINER EAST II PIPELINE TALKING POINTS

Standard NUC Nuclear Plant Interface Coordination

QUALITY MANAGEMENT PROGRAM FOR HUMAN RESEARCH SUBJECT UNIVERSITY OF CINCINNATI

Final Operator Certification Rule

PIPELINE SECURITY INFORMATION CIRCULAR

Request For Proposal: Local Heating of Piping

Description of Company Operations. System Overview

Standard Development Timeline

FACILITIES MANAGEMENT

New York State Society of CPAs. Annual Report on Oversight

ASME Nuclear Conformity Assessment. Bernard E. Hrubala Sr. Vice President Code and Standards October 7, 2008

NOTE: The first appearance of terms in bold in the body of this document (except titles) are defined terms please refer to the Definitions section.

Childhood Lead Poisoning Prevention Authorization Procedures. Original Set. (Please make all copies and discard all previous forms)

ASSE International Seal Control Board Procedures

Attachment J-8 Contractor / Supplier Submittal Register

Saudi International Petrochemical Company Reliability & Engineering Department

07 Project Records Retention Schedule University of Portsmouth 2017

Red River Valley Water Supply Project. Request for Statement of Qualifications and Preliminary Proposal for Value Engineering Services.

130 FERC 61,211 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Public Service Commission

Vista Ridge Project Technical Advisor

DEPARTMENT OF DEFENSE

PROJECT FACT SHEET PROFESSIONAL SERVICES NATURAL GAS PIPELINE ENGINEERING

Standard CIP 004 4a Cyber Security Personnel and Training

SAFEGUARDING THE ENERGY PIPELINE TRANSPORTATION SYSTEM & THE PIPES ACT OF 2006

University of Chattanooga Respiratory Protection Program. Areas Affected: Employees whose duties require the use of a respirator

Georgia Water Supply Competitive Grant Program Program Guidelines

Powering our Success. Southern Company Supplier Diversity Program

EPEAT Requirements of PREs

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Bureau of Waste Management

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

Adult Family Care Home Top Ten Health Deficiency Citations Statewide October 8, 2009 Year Date Range: January 1, 2008 through December 31, 2008

Statewide Codes & Standards Program 1

APPENDIX D CHECKLIST FOR PROPOSALS

(Billing Code ) Defense Federal Acquisition Regulation Supplement: Costs. Related to Counterfeit Electronic Parts (DFARS Case 2016-D010)

The South African Council for the Project and Construction. Management Professions (SACPCMP)

SUP 08 Operational procedures for Medical Gas Pipeline Systems (MGPS) Unified procedures for use within NHS Scotland

The GCP Perspective on Study Monitoring

Is a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection?

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

Revision #: 0 Prepared By: Beth Eckert, Industrial Chemist Revision Date: 1/10/00 Approved By: Larry Cummings, Asst. Superintendent of WWTD

Tomoko OSAWA, Ph.D. Director for GCP Inspection Office of Conformity Audit PMDA, Japan

NORS TRAINING: PART III Verification, Disposition and Closing Cases

GUIDE FOR ASME REVIEW TEAMS FOR REVIEW OF APPLICANTS FOR ASME CERTIFICATES OF AUTHORIZATION {A, M, PP, S, E, H, HLW, U, UM, U2, U3, PRT and T}

Regulatory Inspections

NRC INSPECTION MANUAL STSB

FACILITIES MANAGEMENT

General Administration GA STANDARD OPERATING PROCEDURE FOR Sponsor Responsibility and Delegation of Responsibility

NN SS 401 NEURONEXT NETWORK STANDARD OPERATING PROCEDURE FOR SITE SELECTION AND QUALIFICATION

Standard FAC Facility Ratings. A. Introduction

Agency for Health Care Administration

Hazardous Materials Transportation Security Requirements

The South African Council for the Project and Construction. Management Professions (SACPCMP)

Initially Submitted on 11/24/2009 Final Submission By Test6 CA on 11/24/2009 1:51 PM Approval By student13 student13 on 11/24/2009 1:52 PM Attendees

Overview of Draft Final Revisions to GP-5A and GP-5. November 30, 2017

WIRBinar. How to Survive an FDA Inspection. Upcoming Trainings: Contact Us: (360)

ERN Assessment Manual for Applicants 2. Technical Toolbox for Applicants

Business Safety Leadership. Part 2: Incident and Root Cause Analysis

FDA's OMB supporting document for QSr recordkeeping, 7/20/01, page 1 of 7

Page. II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction... B. Technical Assistance Areas.. 1. Rate Design Consumer Programs...

Executive Summary 56,173 Purpose and Coverage of the Rule 56,173 Summary of the Major Provisions of the Rule 56,173 Costs and Benefits 56,175

COM Operating Personnel Communications Protocols

The DEP has four main regulations that relate to pipeline construction.

CNSC Type I Inspections of Activities and Devices for Nuclear Substances and Radiation Device Licensees Group 2.2 Licensees

FDA Medical Device Regulations vs. ISO 14155

Vista Ridge Integration Project Owner s Representative

Guidance for Industry ANDA Submissions Prior Approval Supplements Under GDUFA

MECHANICAL REPAIRER, 3773 SENIOR MECHANICAL REPAIRER, 3772 MECHANICAL REPAIR SUPERVISOR, 3795

Level 2 NVQ Diploma in Heating and Ventilating - Ductwork Installation ( )

5. Effective Date: See the Implementation Plan for IRO B. Requirements and Measures

BIMO SITE AUDIT CHECKLIST

PHMSA Damage Prevention & Excavation Enforcement

SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT COMPLIANCE DEPARTMENT COM 2035

2017 Custom Energy Efficiency Program Colorado Instructions and Guidelines

Emergency Response for Energy Emergencies The Incident Command Street Smart Command for Pipeline and Utilities. Michael Callan

SFHPCS14 - SQA Code HC7X 04 Prepare surgical instrumentation and supplementary items for the surgical team

ONADE s Data Quality Review

Pipeline Emergency Responders Initiative (PERI)

REPORT 2016/106. Audit of management of implementing partners at the International Trade Centre FINAL OVERALL RATING: PARTIALLY SATISFACTORY

Quantitative Findings from On-Site Evaluation of Energy Efficiency Program Service Delivery

Submission of a clinical trial for access to ECRIN services Notice to the Applicant

CAP Forensic Drug Testing Accreditation Program Standards for Accreditation

COGCC Databases, State s WebEOC

Transcription:

TVC RECORDS NOVEMBER 11, 2017 2017 TGA TRANSMISSION ROUNDTABLE SAN ANTONIO John A. Jacobi, P.E., J.D

REGULATORY REQUIREMENT 192.13(a) No person may operate a segment of pipeline readied for service after [1970 or 1971] unless: (1) The pipeline has been designed, installed, constructed; initially inspected, and initially tested in accordance with this part; or (2) The pipeline qualifies for use under this part according to the requirements in 192.14. 2

REGULATORY REQUIREMENT 192.13(b) No person may operate a segment of pipeline... that is replaced, relocated, or otherwise changed... unless that replacement, relocation, or change has been made in accordance with this part. 192.13(c) Each operator shall maintain, modify as appropriate, and follow the plans, procedures, and programs that it is required to establish under this part. 3

ENFORCEMENT GUIDANCE O&M Part 192 166 pages updated 7-21-17 192.603(b) -Each operator shall keep records necessary to administer the procedures established under 192.605 192.619 Maximum allowable operating pressure - Steel or plastic pipelines TVC not specifically mentioned in enforcement guidance 4

INSPECTION PROTOCOL NONE 5

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Verification of Records Linda Daugherty Dep Associate Administrator for Policy and Programs Alan Mayberry Dep Associate Administrator for Field Operations July 12, 2012-6-

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration What does the ADB Require? The ADB information clarifies that adequate records should be: Traceable Verifiable Complete

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Traceable Traceable records are those which can be clearly linked to original information about a pipeline segment or facility. Examples might include: Pipe mill records, purchase requisition or as-built documentation indicating minimum pipe yield strength, seam type, wall thickness and diameter. Careful attention should be given to records transcribed from original documents. Information from a transcribed record, in many cases, should be verified with complementary or supporting documents. -8-

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Verifiable Verifiable records are those in which information is confirmed by other complementary, but separate, documentation. Two or more complementary records that are positively linked can be used together as a verifiable record. A single record which has all needed information does not need a separate, complementary, document. -9-

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration Complete Complete records are those in which the record is finalized as evidence by a signature, date or other appropriate marking. Incomplete or partial records are not an adequate basis for establishing MAOP or MOP. If records are unknown or unknowable, a more conservative approach is indicated. (Obviously, records must pass the red-faced test.) -10-

U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration What Does the ADB Advise? PHMSA hopes to use data from a revised gas transmission annual report to meet Congressional mandate due 7/2013. Act requires PHMSA to direct gas transmission operators to provide verification that their records accurately reflect MAOP of Class 3/4 location and Class 1/2 HCAs Information Collection Activity for revision of gas transmission annual report working through the process. PHMSA will later provide guidance on how to bring into compliance those pipelines without verifiable records. -11-

Safety of Gas Transmission and Gathering Pipelines RIN: 2137-AE72 Docket: PHMSA - 2011 0023 Gas Pipeline Advisory Committee Meeting June 6-7,2017 1 2

VOTING LANGUAGE FOR RECORDS 192.5(d), 192.227(c), 192.285(e), 192.619(f), 192.624(f) PHMSA proposed to add the word reliable in addition to traceable, verifiable and complete wherever records are required. New 192.5(d) PHMSA added a requirement for class location study records (permanent). New 192.227(c) & 192.285(e) PHMSA proposed to require permanent records for welder qualifications & plastic joiner qualifications. 13

Voting Language for Records 192.5(d),192.227(c),192.285(e),192.619(f), 192.624(f) The proposed rule as published in the Federal Register and the Draft Regulatory Evaluation, with regard to the provisions for records, are technically feasible, reasonable, cost-effective, and practicable if the following changes are made: Delete the word reliable from the records standard to now read traceable, verifiable and complete wherever that standard is used. In 192.5(d), clarify that documentation be required for the current class location. Modify 192.227 (Qualification of welders) and 192.285 (Qualification of persons joining plastic pipe) to include an effective date and change retention period to five years. 14

July 31, 2012 Letter from PHMSA to AGA 15

CRITICAL FACTORS Design factors (diameter, wall thickness, strength, and seam type) Pressure test records Pipe, Valves, Flanges, Fittings MAOP/MOP MUST be established on a segmentby-segment basis. Do not forget overpressure protection. 16

CRITICAL FACTORS Pre-code systems v. post-code systems Consistency Acquired systems Data gaps Start points and end points Class Location 17

RECORDS Mill or Material Test Records (MTRs) the Holy Grail for heat numbers, diameter, wall thickness, strength of steel, seam type, API 5L Pipe Tallys heat numbers, locations, NDE inspections, sequence numbers, signatures, dates, etc. Purchase Orders quantity of pipe, API 5L/ANSI rating, seam type, wall thickness, diameter, strength of steel, coating 18

192.517 PRESSURE TEST RECORDS (1) The operator's name, the name of the operator's employee responsible for making the test, and the name of any test company used. (2) Test medium used. (3) Test pressure. (4) Test duration. 19

192.517 PRESSURE TEST RECORDS (5) Pressure recording charts, or other record of pressure readings. (6) Elevation variations, whenever significant for the particular test. (7) Leaks and failures noted and their disposition. 20

192.517 PRESSURE TEST RECORDS Do not forget documentation of test equipment calibration! 21

QUESTIONS?? John Jacobi john.jacobi@g2-is.com (713) 260-4039 (Office) (832) 712-3098 (Mobile) Thank YOU!! 22