Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing

Similar documents
Contents VeriSign, Inc. All rights reserved.

Small Business PC Refresh Survey - Japan. CONDUCTED FOR INTEL January 2018

Measuring the Cost of Patient Care in a Massachusetts Health Center Environment 2012 Financial Data

Rethinking Payroll Performance

THE CPA AUSTRALIA ASIA-PACIFIC SMALL BUSINESS SURVEY 2016

Driving Business Value for Healthcare Through Unified Communications

2018 SOX & Internal Controls Professionals Group State of the SOX/Internal Controls Market Survey

U.S. Department of Defense: Defense Logistics Agency (DLA) achieves unmatched agility through telework and BYOD strategy

Berger, S. (2008). Fundamentals of health care financial management (3rd ed.). San Francisco, CA: Jossey-Bass.

Moving from HASP HL to Sentinel LDK Migration Guide

California Community Clinics

University of Michigan Health System. Program and Operations Analysis. CSR Staffing Process. Final Report

Sage business index. Global trends. Executive summary. Sage Insights Smart thinking

real estate accounting outsourcing

WHITE PAPER. The four big waves of contact center technology: From Insourcing Technology to Transformational Customer Experience.

THE CASE FOR WHOLESALE OUTSOURCING

AMN Healthcare Investor Presentation

Unified Communications Improves Business Outcomes, Lowers Costs, and Enhances Environmental Sustainability

INTRODUCTION TO Mobile Diagnostic Imaging. A quick-start guide designed to help you learn the basics of mobile diagnostic imaging

EXECUTIVE SUMMARY THE ECONOMIC IMPORTANCE OF THE ARTS & CULTURAL INDUSTRIES IN SANTA FE COUNTY

Finance and Accounting function outsourcing analysis

Request for Proposal REQUEST FOR PROPOSAL

Yale University 2017 Transportation Survey Report February 2018

Analysis of Nursing Workload in Primary Care

WARFIGHTER FOCUSED. Training Systems

Joint Medicaid Oversight Committee Medicaid Behavioral Health Re-Design Panel Testimony

Journal of Business Case Studies November, 2008 Volume 4, Number 11

Application deadline: January 15, 2012

This memo provides an analysis of Environment Program grantmaking from 2004 through 2013, with projections for 2014 and 2015, where possible.

Moving from Sentinel SuperPro to Sentinel LDK Migration Guide

R&D Tax Credits. Energy and natural resources sector

R&D Tax Credits. Agricultural sector

R&D Update. Feedback on R&D Reform. Key themes of our feedback on R&D reform: Stability. Access. Modernisation. Control

Maximizing the Return on a Telepresence Investment

Courts Service ICT Strategy Statement

AN INVESTIGATION INTO WHAT DRIVES YOUR DONORS TO GIVE

Customer Success Story

SMALL AND MIDSIZE BUSINESSES IN ASIA-PACIFIC

REQUEST FOR PROPOSAL

R&D Tax Relief - The Essentials. 4 Minute Read

Measuring the Cost Effectiveness of Pharmacogenomic Testing

New Growth Strategy (Basic Policies)

WHITE PAPER. The Shift to Value-Based Care: 9 Steps to Readiness.

An Overview of NCQA Relative Resource Use Measures. Today s Agenda

Quick Facts VIP Survey: Trends in Federal Contracting for Small Businesses 1

Working Paper Series

Reducing emergency admissions

Digital Disruption meets Indian Healthcare-the role of IT in the transformation of the Indian healthcare system

New Insights from the Dept. of Labor PERM Labor Certification Database

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

AMN Healthcare Investor Presentation

Trends in Federal Contracting for Small Businesses

IRDG R&D Tax Credit Clinic. 19 th January 2016 Radisson Blu, Dublin Airport

It s time to claim your research and development (R&D) tax credits

Bangkok Hospital. Transforming the patient experience with smart practices that complement world-class hospitality. Leadership Spotlight

Final Report No. 101 April Trends in Skilled Nursing Facility and Swing Bed Use in Rural Areas Following the Medicare Modernization Act of 2003

EXECUTIVE SUMMARY. 1. Introduction

Hospitals. Complete if the organization answered "Yes" on Form 990, Part IV, question 20. Attach to Form 990.

Hitwise US Research Note: Measuring Web 2.0 Consumer Participation

Business Globalization

AMN Healthcare Investor Presentation

Joint Distributed Engineering Plant (JDEP)

Research Notes. Cost Effectiveness of. Regionalization-Further Results. for Heart Surgery. Steven A. Finkler

EHR Implementation Best Practices. EHR White Paper

University of Michigan Health System

ASX CLEAR OPERATING RULES Guidance Note 9

Demand and capacity models High complexity model user guidance

Measuring the Information Society Report Executive summary

FY2016 RENEWABLE ELECTRIC STORAGE INCENTIVE PROGRAM STRAW PROPOSAL MAY 07, 2015

Leading Consulting Fee Schedule 2017

Patient Payment Check-Up

HEALTHCARE STAFFING EDUCATION & TRAINING SEARCH

Hospitals. Complete if the organization answered "Yes" on Form 990, Part IV, question 20. Attach to Form 990.

OVERVIEW. Helping people live healthier lives and helping make the health system work better for everyone

Succeeding with Accountable Care Organizations

Generating Business Value from Information Technology

California Community Clinics

ASX CLEAR (FUTURES) OPERATING RULES Guidance Note 9

THE NEW IMPERATIVE: WHY HEALTHCARE ORGANIZATIONS ARE SEEKING TRANSFORMATIONAL CHANGE AND HOW THEY CAN ACHIEVE IT

The shortest, clearest path to success. Business Incentives Practice

AMN Healthcare Investor Presentation

The Evolution of the Conference Room and the Technology Behind it

Trends in Federal Contracting for Small Businesses

WEST VIRGINIA HIGHER EDUCATION POLICY COMMISSION REQUEST FOR PROPOSALS VERIFICATION AND DOCUMENT MANAGEMENT SERVICES RFP #19007.

EXTENDING THE ANALYSIS TO TDY COURSES

Measuring Constituent Engagement to Drive Nonprofit Success

TENNESSEE TEXAS UTAH VERMONT VIRGINIA WASHINGTON WEST VIRGINIA WISCONSIN WYOMING ALABAMA ALASKA ARIZONA ARKANSAS

CAMDEN CLARK MEDICAL CENTER:

Digital Copier Equipment and Service Program

Chapter 29. Introduction. Learning Objectives. The Labor Market: Demand, Supply, and Outsourcing

Prepared for Becker s ASC + Spine Conference. Transforming Spine Service Line Performance. Powered by Collaboration and Analytics

Contact Center Costs: The Case for Telecommuting Agents

Let s Build a Rocket

Level 3 and tw telecom: Strengthening Level 3 s Position as a Premier Global Communications Company. Level 3 To Acquire tw telecom

Comparison of Army/Air Force and Private-Sector Physicians' Total Compensation, by Medical Specialty

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3

OUTSOURCING IN THE AGE OF INTELLIGENT AUTOMATION

Kx Technology Fund. Incubating Future Technology Leaders

Together. Free your energies. Cheuvreux Autumn Conference. September 29, Paul Hermelin, CEO

Successfully Transforming Outpatient Services with Intouch Solutions A Customer View

Transcription:

Intel Business Center Case Study Business Intelligence Pilot Study: Optimum Refresh Cycle and Method for Desktop Outsourcing SOLUTION SUMMARY The Challenge IT organizations working with reduced budgets often delay refreshing their desktop hardware. And to avoid lump-sum hardware costs, companies often refresh only a portion of their PCs at one time. But delaying the PC refresh can lead to higher support and productivity costs, and staggered refreshes can result in higher deployment costs for companies that outsource their IT infrastructure. Therefore, a question IT decision makers are inclined to ask is, What is the optimum PC refresh cycle, and what is the optimum refresh method? The Solution The Results The Optimum Refresh Cycle and Method for Desktop Outsourcing pilot study indicates that refreshing all PC desktop hardware at once (the forklift method) every three years provides the best cost savings all around. The pilot study participant company decided to perform a forklift upgrade and adhere to a three-year refresh cycle as a result of the study. Introduction As IT organizations are under continual pressure to reduce costs, many companies may choose to delay their PC refresh to decrease the frequency of spending for PC hardware. However, this study again validates what others have previously indicated, that there is strong evidence suggesting that delaying PC refresh increases support costs and reduces user productivity. Beyond that, this study went on to evaluate a new IT management dynamic, that for companies with outsourced PC environments, the common conception that a smooth refresh cycle even over a 3 year period is not the lowest cost approach. Although staggering the refresh may reduce upfront cash requirements by spreading them out over several years, there is also an associated increase in support and productivity

costs versus utilizing the forklift approach, where all PCs are refreshed at the same time. In addition, deployment costs (the average cost to deploy a PC) are reduced by the outsourcer s ability to employ massive economies of scale, scale that an IT organization could never approach. Faced with this critical IT decision, companies with an outsourced PC infrastructure must answer the following two questions: How often should a company refresh its PCs? Costs TCO Curve PC Acquisition Costs Maintenance Costs Training Costs What method of refresh should be used? To objectively find answers to these questions, Intel Corporation and A.T. Kearney, a management consulting firm, conducted a six-week pilot study at a leading financial services company in the UK. The study used the total cost of ownership (TCO) model to determine the optimal timing and mechanism of client refresh. During the pilot study, a survey was administered to 200 employees to collect data on the current computers they were using. The collected data was used to better understand some of the non-hardware cost elements, such as support and user productivity. It also helped determine how the age of the computer impacts hidden cost elements. Our user survey consisted of two components that looked at the following criteria: Historical performance. Current performance during the pilot study time period. Pilot Study Background TCO over the life of a PC tends to follow a U-shaped curve, as shown in Figure 1. Figure 1 shows the relationships between three components of TCO and how they relate to PC refresh timing: PC acquisition costs, which are typically amortized and decrease (or stay flat) over the life of the PC. Maintenance costs, which tend to rise over the life of the PC. Training costs, which tend to decrease slightly over the life of the PC. 1 2 3 4 PC Life Cycle (Years) Figure 1. Total Cost of Ownership (TCO) Curve Based on PC Life Cycle with Three Cost Variables Failing to refresh a PC after its maintenance costs have risen above a certain level can cause TCO to rise. Therefore, it is important to determine the point on the TCO curve where it is incrementally less expensive to replace a PC rather than to continue using it. In addition to considering the TCO curve, companies must also decide whether using a staggered refresh or a forklift refresh will result in overall lower costs. While a forklift refresh can result in higher PC cash acquisition costs for the first year, the deployment costs will be lower and the resulting PC environment will be almost totally homogenous, absolutely minimizing the costs associated with managing multiple PC platforms. Because both the timing and the method for PC refresh affect a company s TCO, the pilot study team decided to analyze the real-life working environment at an actual (non-laboratory) deployment site. Pilot Study Methodology A large financial services company in the UK was selected as the pilot study site. The bank had recently signed a desktop outsourcing agreement with a major company, and both teams were interested in developing refresh plans based on actual data obtained in the course of the pilot study. The population of the pilot study included approximately 200 employees. Those chosen for the pilot study had PCs that ranged from brand new to more than five years old.

The pilot study team collected both historical and current data; current data was collected bi-weekly over the course of six weeks. The elements of the current data included down time in the previous week, number of help desk calls and hourglass wait time. For the historical data collection, users were asked to comment on the performance of their PCs over the previous 12 months. When gathering current and historical data, we collected current hard costs at the pilot study site, as well as additional cost information based on current and historical account costs, for the following areas: hardware and software acquisition consistent office environment (COE) development application management deployment support. We also validated costs against current and historical outsourcer negotiated internal costs. When generating the outsourcer cost models, we collected data from the deployment costs model that was developed for the study participant by the outsourcer. We also reviewed additional outsourcer costs models (such as TCO models) for similarly sized companies to determine cost estimates. Total Cost of Ownership (TCO) Cost Model The data obtained from the pilot study was fed into a detailed TCO cost model. The model was developed using multiple sources including more than 50 interviews with desktop outsourcing experts and 20 or more detailed reports on desktop management costs. Several Intel and A.T. Kearney subject matter experts, as well as the outsourcer, contributed to the development of the TCO cost model. The TCO cost model considered two broad cost categories: Hard costs hardware acquisition costs, maintenance costs and other quantifiable costs Soft costs user productivity, down time, security breaches, delays, etc. Figure 2 summarizes these cost elements. Once the cost variables in the TCO cost model were defined, the team proceeded to conduct the pilot study and input the data into the TCO cost model. Hard Elements of TCO Cost Model Support: Software and hardware support, including help desks, desk-side visits and IMACs Deployment: Activities related to getting new environment up and running COE Development: Development of the consistent office environment (COE) for client Application Management: Porting of legacy server applications to new desktop environment Software Acquisition: Purchase or lease of software assets Hardware Acquisition: Purchase or lease of hardware assets Figure 2. Cost Elements of the TCO Cost Model Productivity Elements of TCO Cost Model Insufficient Software on Desktop: User productivity costs due to inability to collaborate or run latest versions of software Down Time / Lost Data: Costs related to down time or lost data Security Costs: Costs related to deploying security solutions for older machines Hourglass Time: Costs related to user time spent on waiting for machine to complete processes Typically part of monthly per-seat charge Typically part of lump-sum payment amortized over term of contract (except for leased equipment)

Pilot Study Results: Timing of Refresh The results of the pilot study showed that a three-year refresh has a demonstrably lower TCO than a five-year refresh. Table 1 analyzes the various cost elements and how refresh timing relates to them. Cost Component Three-Year Cycle Cost Advantage Five-Year Cycle Cost Advantage Notes Support Frequency of help desk calls increases significantly in year 5. Therefore, the threeyear cycle has a cost advantage. Deployment Deployments occur once per refresh. The five-year cycle reduces the frequency of deployments and hence lowers costs. Consistent Office Environment (COE) Development: Engineering consistent disk images COE support costs tend to rise in year 5. Thus, the three-year cycle has a slight cost advantage. Application Management Applications need to be tested and in some cases ported once per refresh. The fiveyear cycle reduces the frequency of this process and is therefore lower cost. Hardware and Software A staggered refresh has a reduced effect on cash flow. Productivity Costs All productivity costs favor a three-year cycle. Table 1. Cost Advantage Comparison with Respect to Refresh Cycle Table 2 presents the quantitative comparisons between a three-year and a five-year refresh cycle. The costadvantaged numbers in the table are blue. Note that the total cost for a three-year refresh cycle saves between $450 and $500 per user per year compared to the five-year cycle. A company that employed 50,000 people could save up to $25M per year by using a three-year refresh cycle instead of a five-year refresh cycle a significant savings! Cost Category Three-Year Cycle ($/User/Year) Table 2. Quantitative Comparisons between Three-Year and Five-Year Refresh Cycles Five-Year Cycle ($/User/Year) Support and Productivity Costs 1152 1770 Deployment 83 61 COE Development 41 52 Application Management 600 585 Hardware 296 222 Software 200 150 Total 2372 2840

Cost Component Support Deployment Consistent Office Environment (COE) Development Application Management Hardware and Software Forklift Cost Advantage Staggered Cost Advantage Notes Table 3. Cost Advantage Comparison with Respect to Refresh Method Support costs are higher in the staggered refresh due to an inconsistent fleet. Deployments occur once per refresh, allowing outsourcers to take advantage of massive economies of scale resulting in production line level of efficiencies in deploying PCs. Also, the forklift refresh reduces the frequency of deployments and hence lowers costs. COE support costs are significantly higher in the staggered refresh due to the several environments that must be concurrently maintained. Applications need to be tested, and in some cases ported, once per refresh. Therefore, the forklift refresh has a cost advantage. A staggered refresh has a reduced effect on cash flow. However, this effect can be eliminated by leasing the hardware. Productivity Costs All productivity costs slightly favor the forklift refresh. Pilot Study Results: Refresh Method Staggered versus Forklift The results of the pilot study showed that the forklift refresh has an advantage over the staggered refresh method. Table 3 analyzes the various cost elements and how the refresh method relates to them. Table 4 presents the quantitative comparisons between a staggered and a forklift refresh. A staggered refresh assumes refreshing one-third of the fleet refreshed every year for three years, while the forklift refresh assumes the entire fleet is replaced every three years. The cost-advantaged numbers in the table are blue. The differential represents a net present value (NPV) of $275 per PC over three years (utilizing a 10% discount rate). Cost Category Forklift Refresh ($/User/Year) Table 4. Quantitative Comparisons between Forklift and Staggered Refresh Staggered Refresh ($/User/Year) Support and Productivity Costs 1152 1186 Deployment 83 120 COE Development 41 66 Application Management 600 611 Hardware 296 294 Software 200 191 Total 2372 2468

Principal Cost Factors The principal drivers for costs associated with older PCs include: Calls to the help desk, and length of call. PC down time. Figure 3 shows how help desk calls increase significantly as a PC ages. Calls per User 2.0 1.8 1.6 1.4 1.2 1.0 0.8 0.6 0.4 0.2 0.0 34 39 1.0 1.0 Calls per User Avg. Length of Call 36 1.2 < 12 24-36 36-48 >48 Age of PC (Months) Length of Call (Minutes) 56 60 1.8 Figure 3. Number of Help Desk Calls Related to Age of PC 50 40 30 20 10 0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 0.0 Approximately 3 out of 10 users had a computer down in last 12 months 0.3 0.3 0.5 <12 24-36 36-48 >48 Age of PC (Months) 0.8 Figure 4. Computer Down Time Related to Age of PC Figure 4 shows that for computers older than four years, down time was twice that of three-year-old computers. However, the down time remained constant for users with PCs that were between one and three years old. Other cost factors, although not as significant as help desk calls and computer down time, include the following: Loss of data Security breaches As displayed in Figure 3, users with desktop PCs more than four years old made twice as many help desk calls as did users with desktop PCs that were less than three years old. Users with older PCs also spent more time on the phone with the help desk. However, the number of help desk calls remained essentially constant for users with PCs that were between one and three years old. Similarly, computer down-time increased significantly in year 5, as displayed in Figure 4. 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.07 0.04 0.23 0.32 <12 24-36 36-48 >48 Age of PC (Months) Figure 5. Loss of Data Related to Age of PC

Figure 5 and Figure 6 illustrate how these cost factors relate to PC age. As displayed in Figure 5, users with PCs older than four years lost data three times more often than users with PCs that were less than three years old. In fact, the lost data occurrence rate was actually less in year 3 than it was in year 1. Number of Security Breaches per User 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0.00 0.05 0.18 Figure 6 shows that users with PCs older than four years had security breaches three times more often than users with PCs less than three years old. 0.28 <12 24-36 36-48 >48 Age of PC (Months) Figure 6. Security Breaches Related to Age of PC Conclusions for Outsourcers Some conclusions can be drawn from the data shown in Figures 3-6, both in terms of PC refresh timing and PC refresh method. Refresh Timing: There is a significant savings opportunity for outsourcers if they can convince clients to move to shorter refresh cycles. Two reasons for this are: Outsourcer costs associated with a three-year refresh cycle are significantly less than costs associated with a five-year refresh cycle. Many outsourcer contracts have a flat-fee component, where the revenue for the outsourcer is constant regardless of the number of support calls. Therefore, a reduced number of help desk calls will increase margins for the outsourcer. A three-year refresh cycle provides the least number of support calls per user. Refresh Method: Similarly, a forklift (all-at-once) refresh results in lower TCO for outsourcers. The difference in cost between the forklift and staggered methods is more pronounced when the client has a diverse PC population. While an outsourcer can pass on some of the cost increase to its customers, the outsourcer is nevertheless likely to incur decreased margins by avoiding forklift refreshes.

Intel Corporation 2200 Mission College Blvd. Santa Clara, CA 95052-8119 USA Intel and the Intel logo are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States and other countries. *Other names and brands may be claimed as the property of others. Copyright 2004, Intel Corporation. All rights reserved. 302227-001