Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4

Similar documents
Amphibious Ships and Landing Craft Data Book

Employing Merchant Vessels for Offshore Presence and Launch of US Military Operations

US Navy Ships. Surface Warfare Officer First Tours

Littoral OpTech West Workshop

Pillar 3: Capability & Capacity to Meet DoD

Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports

Chapter 5 Crisis Response

Commander Naval Surface Force, U.S. Pacific Fleet Ships & Commands News Archives Events

OPNAVINST L N96 30 Mar Subj: REQUIREMENTS FOR AIR CAPABLE AND AMPHIBIOUS ASSAULT SHIPS TO OPERATE AIRCRAFT

States Pacific Command (USPACOM). Its secondary mission is to transfer the ammunition at sea using the Modular Cargo Delivery System (MCDS).

Expeditionary Warfare Division (N75) Brief. To NDIA Expeditionary Warfare Division

PMS 385 Strategic and Theater Sealift Program Office. Expeditionary Warfare Conference October 28, 2015 CAPT Henry W.

CD&I and CDD Organization Expeditionary Force 21 MEB CONOPS Combat and Tactical Vehicle Strategy & ACV Video Seabasing and Non-Standard Platforms

The Ship Acquisition Process: Status and Opportunities. NDIA Expeditionary Warfare Conference 24 October 07

DEPARTMENT OF THE NAVY USS TRENTON (LPDI4) FPO AE

Expeditionary Force 21 Attributes

Naval Vessel Historical Evaluation FINAL DETERMINATION. This evaluation is unclassified. None ship (helicopter)

CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO. An Analysis of the Navy s Fiscal Year 2017 Shipbuilding Plan

ACKNOWLEDGEMENTS. I would like to thank my thesis advisor, Dr. Joe. Caddell for his support and guidance throughout this

MINE WARFARE ASSOCIATION CONFERENCE 2007 Mine Warfare Challenges in the Littorals

April 25, Dear Mr. Chairman:

Expeditionary Warfare Conference

Recapitalizing Canada s Fleets. What is next for Canada s Shipbuilding Strategy?

Employing the USS HORNET MUSEUM. as an Emergency Response Center. during a major Bay Area disaster

SECNAVINST N8F 21 November (a) Defense Intelligence Agency DST-1200Z , Subj: Glossary of Naval Ships Types (GNST) (NOTAL)

From: Commanding Officer, Helicopter Mine Countermeasures Squadron FOURTEEN To : Director of Naval History, Aviation Branch, Washington, D.C.

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

ANNUAL REPORT FOR PROGRAM OBJECTIVE MEMORANDUM 2017 SEABASING. UNITED STATES MARINE CORPS Combat Development & Integration

Große Straße Bodenwerder Tel: Mobil: Web:

DEPARTMENT OF THE NAVY USS TRENTON (LPD-14) l$

Lieutenant Commander, thank you so much. And thank you all for being here today. I

Unmanned Systems Operational Demonstration along the Mississippi Gulf Coast

Annual Report 2016 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden

R Z SEP 17 FM CMC CDI MEXWID WASHINGTON DC TO RUJIAAA/COMMARFORCOM RUJIAAA/COMMARFORCOM G FOUR RUJIAAA/COMMARFORCOM G THREE G FIVE G SEVEN

LPD 17 AMPHIBIOUS TRANSPORT DOCK SHIP

DEPARTMENT OF THE NAVY COMMANDING OFFICER USS COMSTOCK (LSD 4!5) FPO AP

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012

Department of Defense DIRECTIVE

NDIA 10 th Annual Expeditionary Warfare Conference: Ship Acquisition. Presented by RADM Charles Hamilton 26 October 2005

Expeditionary Maneuver Warfare and Strategic Sealift: Ways to Improve the Marines Expeditionary Capability

UNCLASSIFIED R-1 ITEM NOMENCLATURE

NAVAL AVIATION MAINTENANCE PROFESSIONAL SYMPOSIUM VADM DAVID ARCHITZEL. 29 June 2011 COMMANDER, NAVAL AIR SYSTEMS COMMAND. Presented to: Presented by:

Bulldog Newsetter 10 December 14, December 14, 2014 THE BULLDOG Coast Guard Cutter ALEX HALEY News Search and Rescue Joint Operations

The Sikorsky fleet has provided safe and. July 2009 Visit us at Sikorskyarchives.com Contact us at

DEPARTMENT OF "rhe NAVY CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC

Maritime Prepositioning Force 2010 Student Design Presentation

Sikorsky Archives News

The Flying Shark Prepares to Roam the Seas: Strategic pros and cons of China s aircraft carrier program

MV-22 Osprey: More than Marine Air s Medium-lift replacement. Captain D. W. Pope

Navy Ship Names: Background for Congress

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

OPNAVINST B N96 29 Jul 2014

CNO s. Navigation Plan WARFIGHTING FIRST

THIS BRIEF IS UNCLASSIFIED

UAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard

General Dynamics Awarded $66 Million for Planning Yard Services for DDG 51 and FFG 7 Ships

From: Conmanding Officer, Helicopter Mine Countermeasures Squadron FOURTEEN To: Chief of Naval Operations, Naval Aviation History Office (OP-05D2)

First East Coast Fleet Energy Training Event Focuses on Energy Awareness

1 of 9 2/1/2010 3:59 PM

Navy Shipbuilding Past Performance Provides Valuable Lessons for Future Investments

Good morning EPF Captains, Chief Engineers, Officers, and Engineers. We are witnessing a great deal of confusion in regards to the revalidation books.

Thi Directiveo: I

DEPARTMENT OF THE NAVY HELICOPTER MINE COUNTERMEASURES SQUADRON FOURTEEN (HM-14) UNIT AUTOVON w-4545 FPO AE MMM

The Integral TNO Approach to NAVY R&D

Annual Report 2015 Japan's Actions against Piracy off the Coast of Somalia and in the Gulf of Aden

For More Information

Presentation 8 UNITED STATES COAST GUARD RADM STEVEN H. RATTI, COMMANDER, FIFTH COAST GUARD DISTRICT

Navy Expeditionary Combat Command Executing Navy s Maritime Strategy

1st Marine Expeditionary Brigade Public Affairs Office United States Marine Corps Camp Pendleton, Calif

USS AVENGER (MCM-1) FPOAA

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

Navy Ship Names: Background for Congress

NDIA Expeditionary Warfare Operations Conference 13 October 2016

Navy Ship Names: Background for Congress

Estimated Impact of Corrosion on Cost and Availability of DoD Weapon Systems. FY18 Update

USN photo by Jason A. Pylarinos

Future Expeditionary Armor Force Needs

Naval Vessel Historical Evaluation INITIAL DETERMINATION. This evaluation is unclassified

Tanker Officer Training Standards

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS

5750 Ser LPD 15-PA0/ Jan 96

Watchkeeper Deck. This guideline is for new applicants for a Watchkeeper Deck certificate of competency

CRS Report for Congress

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1

FOSC Prince William Sound January 31, CDR Michael. R. Franklin CG Marine Safety Unit Valdez

Agenda. DoD as an Energy Consumer. Defense Energy Challenges. Adapting to a New Environment. DoD Operational Energy Strategy. Current Initiatives

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

TO: Related departments of CCS Headquarters; Branches and Offices; and Ship Companies

Selecting Maritime Disaster Response Capabilities

Great expectations: The US Navy's first Fordclass aircraft carrier prepares for debut

ASSIGNMENT 4. Textbook Assignment: Chapter 6 Naval Organization and chapter 7 Basic Seamanship.

Exhibit R-2, RDT&E Budget Item Justification February 2008

Navy Ship Names: Background for Congress

American Military Aviation: The Indispensable Arm By Charles J. Gross

STATEMENT OF MR. JOHN J. YOUNG, JR. ASSISTANT SECRETARY OF THE NAVY (RESEARCH, DEVELOPMENT, AND ACQUISITION) AND

Navy Ship Names: Background for Congress

Naval Vessel Historical Evaluation FINAL DETERMINATION. This evaluation is unclassified

Navy LX(R) Amphibious Ship Program: Background and Issues for Congress

SEALIFT. Operation Deep Freeze. McMurdo resupply mission marks 60 years. Our U.S. Navy s Military Sealift Command

I MARINE EXPEDITIONARY FORCE Public Affairs Office United States Marine Corps Camp Pendleton, Calif

Transcription:

Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4

In September 2015, the Secretary of the Navy Renamed Three Ship Classes, Creates Expeditionary Designator in Naming System. The ESD (Expeditionary Transfer Dock) and the ESB (Expeditionary Sea Base) USNS Montford Point (T-ESD 1) and USNS John Glenn (T-ESD 2) are configured with the Core Capability Set (CCS), which consists of a vehicle staging area, vehicle transfer ramp, large mooring fenders and up to three Landing Craft, Air Cushion (LCAC) vessel lanes to support its core transfer requirements. With a 9,500 nautical mile range at a sustained speed of 15 knots, these approximately 80,000 ton, 785-foot ships leverage float-on/ float-off technology and a reconfigurable mission deck to maximize capability. Additionally, the ships size allows for 25,000 square feet of vehicle and equipment stowage space and 380,000 gallons of JP-5 fuel storage. NASSCO PROPRIETARY/TRADE SECRET INFORMATION 2

USNS Montford Point (T-ESD-1) The USNS Montford Point (MLP-1) was delivered in May 2013. The ship achieved initial operational capability (IOC) in 2015. Because the Montford Point is basically a semi-submersible cargo ship, once all her deck gear is stripped away she can also act as a transport dock for very large ships or ocean platforms. Although such a capability has been around for decades, we saw its use to a spectacular degree when the MV Blue Marlin transported the Arleigh Burke Class Destoryer USS Cole from the coast of Yemen back to America with a giant hole blown in her hull. NASSCO PROPRIETARY/TRADE SECRET INFORMATION 3

USNS JOHN GLENN (ESD-2) The 764-foot John Glenn, a Mobile Landing Platform like its predecessor USNS Montford Point (MLP-1) is based on an Alaska-class crude oil carrier design and is planned to be a centerpiece of the Navy s and U.S. Marine Corps future seabasing plans. The ship can take on sea water and lower itself in the water to allow Navy Landing Craft Air Cushion (LCAC) hovercraft to take on rolling stock and other material from other MSC ships joined by a bridge between both ships. NASSCO PROPRIETARY/TRADE SECRET INFORMATION 4

USNS Lewis B. "CHESTY" Puller (ESB-3) USNS Lewis B. Puller (MLP-3/AFSB) based on an Alaska-class commercial crude carrier is designed to host special operations forces (SOF) and mine countermeasure (MCM) helicopters as part of the Navy, U.S. Military Sea Lift Command and the Marines push to more capability for amphibious forces and capacity for seabasing with less expensive ships. NASSCO PROPRIETARY/TRADE SECRET INFORMATION 5

Secretary of the Navy Names Expeditionary Sea Base Ship (ESB-4) WASHINGTON (NNS) -- Secretary of the Navy Ray Mabus announced the Navy's newest Expeditionary Sea Base (ESB) ship, T-ESB 4, will be named USNS Hershel "Woody" Williams during a ceremony in Charleston, West Virginia, Jan. 14, 2016 NASSCO PROPRIETARY/TRADE SECRET INFORMATION 6

USNS Hershel Woody Williams ESB-4- Under Construction General Dynamics NASSCO-San Diego! As of 4/1/2017: 66 % Complete! 8/19/2017: Undock! 10/2017: Tentative Christening! 2/22/2018: Delivery NASSCO PROPRIETARY/TRADE SECRET INFORMATION 7

USNS HERSHEL "WOODY" WILLIAMS ESB-4 (Details) The new 784-foot-long vessel will feature a 52,000 square foot flight deck, fuel and equipment storage, repair spaces, magazines, and mission-planning spaces. Able to accommodate up to 250 personnel, the new ESB ship will support multiple missions, such as air mine counter measures (AMCM), counter-piracy operations, maritime security operations, humanitarian aid and disaster-relief missions, and crisis response operations. In addition, the vessel will be capable of supporting MH-53 and MH-60 helicopters, with an option for future upgrades to support MV-22 tilt-rotor aircraft and drones. NASSCO PROPRIETARY/TRADE SECRET INFORMATION 8

NASSCO PROPRIETARY/TRADE SECRET INFORMATION 11

NASSCO gets $324M for work on Expeditionary Sea Base (ESB) 5 General Dynamics NASSCO started work on the fifth mobile sea base to act as a lily pad for Marine, special operations forces and Navy mine countermeasure aircraft, the company announced. The latest in the U.S. Navy s Expeditionary Transfer Dock (ESD)/Expeditionary Sea Base (ESB) program began construction on Wednesday following an award of $106.2 million long lead contract for the program in June. The ship, ESB 5, is the fifth to be added to a contract between NASSCO and the U.S. Navy that originally called for two Expeditionary Transfer Docks: USNS Montford Point (T-ESD-1) and USNS John Glenn (T-ESD-2), and three Expeditionary Sea Bases, (ESB-3 and ESB-4) The ship which will be based on an Alaska-class oil tanker will feature a 52,000 square-foot flight deck to accommodate MH-53, MH-60 helicopters and MV-22 tilt-rotor aircraft and will be the third of three planned ESB. The ship will also host fuel and equipment storage, repair spaces, magazines, mission planning spaces and accommodations for up to 250 personnel. NASSCO PROPRIETARY/TRADE SECRET INFORMATION 14