MEMORANDUM TO SCHOOLS DIVISION SUPERINTENDENTS H 9 FROM SUBJECT IMPLEMENTATION OF DEPED COMPUTERIZATTON PROGRAM (DCP) FOR BATCHES 35, 36, 40, 41 AND 44 E- CLASSROOM FOR PUBLIC ELEMENTARY AND SECONDARY SCHOOLS. DATE JULY 11, 2017 1. The Department of Education through Information and Communications Technology Services (ICTSJ has facilitated the procurement of equipment needed for the implementation of DepEd Computerization Program (DCP) for batches 35, 36, 40, 41 and 44 e-classroom for public elementary and secondary schools. 2. For effective and efficient deployment of these e-classroom packages, the Division Information Technology Officers shall perform the following functions: a. validate the readiness of the schools and compliance to the counterpart requirements using the enclosed School Readiness Checklist Form; b. assist the schools in preparing for the delivery of e-classroom c. supervise and coordinate the delivery of e-classroom equipment to target recipients; d. submit reports on the implementation of the DCP and the e-classroom equipment. 3. The School Heads of recipient schools are advised to prepare their counterpart requirements immediately. The Regional and Schools Division Offices, through the Division!T Officers/!CT Coordinators, shaj! accomplish
and submit School Readiness Checklist Form on or before the 16th of August 2017 for all the recipient schools prior to the deployment the e- packages. The IT Officers/ICT Coordinators will also be. notified of the delivery schedule. 4. Enclosed are the following documents for reference: Enclosure No. 1 Configuration Table Enclosure Nos. 2a & 2b Enclosure No. 3 Summary per Division List of Recipient Schools School Readiness Checklist Form 5. Transportation, per diems and incidental expenses relative to this activity shall be charged against local funds/mooe subject to the usual accounting and auditing rules and regulations. 6. For immediate and wide dissemination.
Enclosure No. 1. Configuration Table DCP BUDGET 2016 BATCH No 35 36 40 PACKAGE ITEM QTY REMARKS e-classroom for New Host PC 7 Classroom JHS Thin Client 42 readiness e-classroom for Host PC 7 required regular SHS Thin Client 42 New e-classroom for KtoG3 Laptop 1 Do not require Projector 1 designated Multimedia Speaker 1 (school readiness) Host PC 2 2017 41 UPS 2 Mobile devices 2-in-l Tablet PC 50 with storage cart, New e-classroom for Charging and Storage cart 2 may or may not JHS/SHS Laptop 1 require Television 2 designated Wifi Router 1 3-in-l Inkjet printer 1 Host PC 12 LED Monitor 12 Keyboard and Mouse 12 Classroom New e-classroom for 42 UPS 12 readiness G4 to 6 Laptop 2 required 44 e-classroom for JHS (augmentation) Television 2 Wifi Router 1 2-in-l Tablet PC 50 Mobile devices Wifi Router 1 with storage cart, Charging and Storage cart may or may not 2 require designated ictrvmemo20l7*002
Enclosure No. 2a Summary per Division DIVISION Batch 35 Batch 36 Batch 40 Batch 41 Batch 42 Batch 44 Albay 12 46 202 6 89 5 Camarines Norte 4 48 94 8 52 4 Camarines Sur 20 140 324 28 155 16 Catanduanes 3 21 100 3 49 1 Iriga City 1 6 40 9 Legaspi City 2 10 43 1 4 LigaoCity 1 9 55 3 4 Masbate 7 91 363 20 142 21 Masbate City 1 6 34 3 1 Naga City 4 29 3 Sorsogon 4 29 189 17 101 3 Sorsogon City 2 15 67 1 5 1 Tabaco City 1 1 39 1 8 GrandTotal 58 426 1579 88 624 52
Enclosure No. 3 - School Readiness Checklist Republic of tljc ipijuipptnes JBepartment of imcation INFORMATION AND COMMUNICATIONS TECHNOLOGY SERVICE Pasig City, Philippines SCHOOL ID : NAME OF SCHOOL: _ Classification (if recipient pis. check): Main Annex Annex A Annex B Campus A campus B Campus C Region: Province: ' District: Division: Superintendent:. Principal/School Head: Contact No./Cellphone No.: ; School Property Custodian: Name of Computer Laboratory In-Charge: Contact No./Cellphone No.: Tel. No. (of the school): Fax No.. City/Municipality:. E-mail:. Contact No:. E-mail: In compliance to DepEd Memo No. 280, series of 2011, the school's readiness for the DCP shall be assessed by the Division IC T Coordinator according to the following criteria. Please tick appropriate box. Criteria Yes No 1. Multi-media Classroom o 2. Computer Tables 3. Windows and Doors with grills o 4. Proper electrical wirings and outlets duly certified by the Municipal/City Electrician 5. Provision of adequate security mechanisms 6. School Inspectorate team were organized o 7. 50 pieces (HS)/ 40 pieces (ES) mono chairs 8. At least 2 units of stand fan 9. Sufficient electrical lighting a a Based on the assessment above, the school is: Ready All criteria (1-9) were satisfactorily met p»i+i»!iv Rpar1v, _ Criteria 1-6 were met but criteria 7-9 are to be complied d y y with prior to the installation of equipment Not Ready o At least one of critical 1-6 is not met Recommendations: Assessed by: Concurred by: (Name and signature of Division IT Officer) (Name and signature of School Head) Ground Floor. Bonifacio Bide.. DenFd f!omnl#»y APacia rhu