Jacksonville Harbor Deepening

Similar documents
CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5L

National Environmental Policy Act/California Environmental Quality Act Scoping Meeting Summary

U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Implementing the Water Resources Development Act of 2007

Georgia Environmental Conference

U.S. Army Corps of Engineers Navigation Program Update

Ports 2010, a New Strategic Business Plan for Oregon's Statewide Port System. Presentation for Public Meetings October November, 2009

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

National Deep Draft Navigation Planning Center of Expertise (DDNPCX) Update

Corps of Engineers Feasibility Studies

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit

CURRENT AND FUTURE STUDIES

TEXAS MARITIME UPDATE

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

FLORIDA INLAND NAVIGATION DISTRICT INTRACOASTAL WATERWAY MAINTENANCE DREDGING SOUTH OF PORT OF PALM BEACH PALM BEACH COUNTY, FLORIDA

United States Coast Guard Marine Transportation Systems Management

SOUTH FLORIDA/CARIBBEAN COOPERATIVE ECOSYSTEM STUDIES UNIT AMENDMENT TWO TO COOPERATIVE AGREEMENT. between

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

U.S. Army Corps of Engineers Navigation Program Update

Shellfish Aquaculture Permitting Program Update

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

Public Notice of Re-Authorization for General Permit

Creating an L.A. Waterfront

US ARMY CORPS OF ENGINEERS PERMITTING ARTIFICIAL REEFS

U.S. Army Corps of Engineers Navigation Program Update

BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY

MISSISSIPPI RIVER MUSEUM &AQUARIUM

Gulf Intracoastal Waterway

BROWARD COUNTY PORT EVERGLADES

HOGANSAC th Annual Harbor Safety Committee Conference Seattle, Washington. Good Afternoon I am TF, chair of HOGANSAC

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Planning for the Beneficial Use of Dredged Material: A Success Story in Mississippi and an Opportunity in Texas

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising

CHICAGO AREA WATERWAY SYSTEM (CAWS) DREDGED MATERIAL MANAGEMENT PLAN

TEXOMA Same Conference

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data

Cooperative Ecosystem Studies Units

FIND Matching and Major Funding Requests. Mid Cycle Funding Requests

Florida Clean Marina and Clean Vessel Act Programs

WATER SUPPLY CHALLENGES: THE ACF CASE

Restoration of the Mississippi River Delta in a Post-BP Oil Spill Environment

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

jobs program earmark ban

State Project No. XXXXXX City Project No. c401807

The Sport Fish Restoration and Boating Trust Fund

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

Department of Army Permit Evaluation Process

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

JACKSONVILLE DISTRICT ENFORCEMENT OVERVIEW. Cynthia Ovdenk Project Manager, Enforcement Section

Steps 1 2 seek whether the project is feasible.

U.S. Army Corps of Engineers FY 16 Workplan and FY 17 Budget Navigation Program Update

SOUTH FLORIDA CARIBBEAN COOPERATIVE ECOSYSTEM STUDIES UNIT AMENDMENT TWO TO COOPERATIVE AGREEMENT

Thank you Deirdre. Ian [President], Deirdre, it s really my pleasure to be here today.

HARBOR INFRASTRUCTURE INVENTORIES Michigan City Harbor, Indiana

Providing Highway Safety and Security Through Excellence In Service, Education, and Enforcement FLORIDA LICENSE PLATES

New York & New Jersey Harbor Deepening Project S-AK-3 Contract Noise and Blast Monitoring and

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Water Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress

Update on USACE Civil Works Program Authorities, Policies, and Guidance

Direct Component Project Evaluation Form

CONTENTS. Follow us on

2017 Nationwide Permit Reissuance

GULF COAST ECOSYSTEM RESTORATION COUNCIL COMPREHENSIVE PLAN COMPONENT PROGRAM

GULF COAST COOPERATIVE ECOSYSTEM STUDIES UNIT. AMENDMENT TWO to. COOPERATIVE and JOINT VENTURE AGREEMENT

MANAGING COMPLEX WATER RESOURCES

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

Installations of Impact

DIRECTOR, ONSET BAY CENTER POSTED: March 27, 2017

Gary McAlpin. Naples, FL Dear Gary: This letter is. caused by. problem and. current. the existing. reports. nts. will be. edge of.

Savannah District Presentation

South Carolina Sea Grant Consortium Leadership by Staff on Boards and Committees

Chairman Farenthold, Ranking Member Plaskett, and Members of the Subcommittee:

Denis Leger, Commissioner, Transportation, Properties & Emergency Services. Speros Kanellos, Director, Real Estate & Construction Services

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

Dave (Sanford) always good to see you again. Ladies & Gentlemen, I m glad to be here

Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training Range Complex (NWTRC). An EIS/OEIS is con

NEPA AND PRIVATE AIDS TO NAVIGATION

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

Office of Coast Survey. Nautical Charting of Artificial Reefs

Florida Clean Marina and Clean Vessel Act Programs

Deepwater Horizon Oil Spill Draft Phase I Early Restoration Plan and Environmental Assessment

What is the Cooperative Ecosystem Studies Units Network? History

Sabine Pass to Galveston Bay, Texas

By the Capes -- A Primer on U.S. Coastwise Laws

Coastal America Partnership

Project Engineering Peer Review Within The U.S. Army Corps Of Engineers

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Mississippi State Port Authority Port of Gulfport Restoration Program Pre-Bid Meeting Ship to Shore Rail Mounted Gantry Cranes, Project No.

The CESU Network Strategic Plan FY

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

Message from the Commanding General. Marine Corps Installations East Marine Corps Base, Camp Lejeune

U.S. ARMY CORPS OF ENGINEERS REPORT TO CONGRESS HOPPER DREDGES

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

Transcription:

Jacksonville Harbor Deepening

Where will the St. Johns River be deepened? The federal channel will be deepened from approximately River Mile 0 (mouth of the St. John s River) to approximately River Mile 13 (near the cruise terminal). When will this project take place? The Chief of Engineers for the Corps is expected to make final approval of the report in April 2014. This date was established by the President of the United States as part of the We Can t Wait Initiative. From there it s expected that the final report will be forwarded to congress in fall of 2014 for authorization and appropriations.

N E W S St. John s River Bartram Island JEA Coal Dock Dames Point Terminal St. John s River JPA Blount U.S. Marine Island Terminal Terminal Atlantic Ocean JPA s Talleyrand Marine Terminal Mile Point Buck Island St. John s River entrance Mill Cove 295 Downtown Jacksonville Atlantic Blvd. Area to be Deepened Why does Jacksonville need a deeper harbor? The 47-feet depth is necessary to handle today s shipping fleet. As the worlds population continues to grow so does the demand on goods and services. To meet this demand shipping vessels also continue to grow and deeper water is required to transit ports of call. Who will benefit from a deeper harbor? Citizens of Northeast Florida will benefit directly or indirectly from a deeper harbor, as well as the nation as a whole. Deeper ports equate to more cargo, a higher distribution of goods through Jacksonville by truck and rail, additional jobs constructing new distribution centers, truck drivers moving goods, additional port jobs, and higher revenues for local businesses. This project will be a major economic engine for all of northeast Florida. What is the tentatively selected plan? The Corps recommended deepening to 45-feet from the Entrance Channel to approximately River Mile 13. The non-federal sponsor, JAXPORT, requested a locally preferred plan (LPP) of 47-feet which was approved by the Assistant Secretary of the Army for Civil Works. In addition to deepening, two areas of widening at the Training Wall Reach and St. Johns Bluff Reach are recommended to accommodate larger vessels. Also, two new turning basins are recommended at Blount Island and Brills Cut.

Where will you place the dredged material? Dredged material will primarily be placed within the Ocean Dredged Material Disposal Site. What will be the project s impact on Mile Point? For the deepening to be fully effective, the completion of Mile Point must occur. The Final Integrated Feasibility Report was submitted to Congress for authorization and approval in 2012. The report recommends construction of a relocated Mile Point training wall, restoration of Great Marsh Island, and the creation of a flow improvement channel in Chicopit Bay. This project remains in Congress and awaits authorization. Why not deepen the harbor to more than 47-feet? A depth of 47-feet is sufficient to keep Jacksonville s port competitive for many years to come. If additional depth is warranted in the future the Jacksonville Port Authority can request another study to be completed.

How much will this project cost and who will pay for it? Estimated costs to deepen the harbor to 47-feet are approximately $700 million. However, this is just an estimate and is subject to change during the review process. The federal government is responsible for approximately $350 million and the local sponsor is responsible for approximately $380 million. Who will conduct the dredging? The U.S. Army Corps of Engineers, Jacksonville District will coordinate the dredging project and oversee all related contracts. The project will be publically advertised and awarded in accordance with Federal regulations. Will there be any blasting for this project? It is anticipated that blasting will occur for this project. However, the Jacksonville District has a very high success rate for conducting confined blasting in environmentally sensitive areas, such as San Juan and Miami Harbor. The Corps commits to implement the same protective measures that were employed in Miami and San Juan for the Jacksonville Harbor Deepening project. Also, the Corps contractor will be required to meet all federal, state and local regulations.

What are the environmental impacts of this project? Early models indicate that there will be very minimal impacts to the environment on this project. However we understand that modeling is simply a tool that will predict what may or may not occur. That s why the Jacksonville District is proposing to monitor the rivers ecosystem during and after construction is completed. Who has this project been coordinated with other than Jaxport? This project has been coordinated with the following state and federal agencies: St. Johns River Water Management District Florida Department of Environmental Protection U.S. Fish and Wildlife Service U.S. Environmental Protection Agency Florida Fish and Wildlife Conservation Commission National Park Service National Oceanic and Atmospheric Administration National Marine Fishery

Does the current harbor depth pose any safety risks for cargo ships? The problem is that some cargo ships cannot use Jacksonville s port because they require more than 40-feet of water depth in which to operate, so they go elsewhere. Other ships which currently use Jacksonville s port must wait until high tide to enter the harbor with a full load of cargo, creating delays, while still other ships enter the harbor with less than a full load of cargo in order to make them light enough to navigate the channel. The harbor deepening project will resolve these problems and allow vessels to bring more containers into Jacksonville for nationwide distribution.

U.S. Army Corps of Engineers Jacksonville District P.O. Box 4970 Jacksonville, FL 32232 www.saj.usace.army.mil