HEADQUARTERS 1st Battalion, 5th Marines 1st Marine Division, Fleet Marine Force c/o Fleet Post Office, San Francisco, California

Similar documents
Headquarters 1st Battalion, 5th Marines 1st Marine Division, Fleet Marine Force c/o Fleet Post Office, San Francisco, California

Headquarters 1st Battalion, 5th Marines 1st Marine Division, Fleet Marine Force c/o Fleet Post Office, San Francisco, California

Figure Company Attack of a Block

1st Battalion, 5th Marines 1st Marine Division, FMF, In the Field, Korea SPECIAL ACTION REPORT

CHAPTER 10. PATROL PREPARATION

Organizational Summary American Armored Division 12 February 1944 Table of Organization 17

Infantry Battalion Operations

Preparing to Occupy. Brigade Support Area. and Defend the. By Capt. Shayne D. Heap and Lt. Col. Brent Coryell

Obstacle Planning at Task-Force Level and Below

TACTICAL ROAD MARCHES AND ASSEMBLY AREAS

Tactical Employment of Mortars

Command and staff service

Chapter FM 3-19

[03:02:53;16] Shot: Sailor answers telephone, military men talking to each other. Explain: Less glamorous desk jobs are important too.

Approved: 1 July 1942 PARACHUTE BATTALION Table No. D-83 MARINE DIVISION Designation: Parchute Battalion

No Washington, September 15, cavalry reconnaissance squadron, mechanized

THE STRYKER BRIGADE COMBAT TEAM INFANTRY BATTALION RECONNAISSANCE PLATOON

Colonel Kiyono Ichiki The Battle of the Tenaru

[23:00:07.05] F-4 takes off. Aerial of A Shau Valley and Da Krong Valley. F-4 lands.

ROUTE CLEARANCE FM APPENDIX F

EXAMPLE SQUAD OPERATION ORDER FORMAT. [Plans and orders normally contain a code name and are numbered consecutively within a calendar year.

Armor Captain s Career Course TLO: Action: conduct movement to contact Conditions: Given an operation order (OPORD) with all applicable overlays and

United States Volunteers-Joint Services Command Official Headquarters Website

Beyond Breaking 4 th August 1982

Organization of Russian Armored Corps, Brigades, Regiments, Break Through Regiments and independent Battalions, Summer 1944

Assembly Area Operations

DECLASSIFIED. ,". rc~r--~ '-''''''''''--' HEADQUARTERS 2nd Battalion, 5th Marines 1st Marine Division, (Rein) FMF FPO San Francisco, California 96602

ARMY PROFICIENCY CERTIFICATE FOUR STAR SYLLABUS UM&C - STAR 1

Chapter 1. Introduction

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC

AND EQUIPMENT Washington 25, D.C. 16 December 1944 No. 7-31T. infantry regiment, parachute Designation:... Parachute Infantry. Headquarters Company

Chapter 3 Motorized Infantry and Infantry Brigades

HEADQUARTERS 39TH ENGINEER BATTALION (COMBAT)(ARMY) AMEICAL DIVIDION APO SUBJECT: After Action Report of Operation Multnomah and Lake

MECHANIZED INFANTRY PLATOON AND SQUAD (BRADLEY)

CHAPTER 2 THE ARMORED CAVALRY

AND EQUIPMENT Washington 25, D.C., 29 Februayr 1944 No ranger infantry battalion Designation: Ranger Infantry Battalion. Headquarters Company

Appendix E. Subterranean Operations

3/15/12. Chris attended St. Mary s Catholic School and Clarksville High School. As a senior in high school he decided he would join the army.

Tactics, Techniques, and Procedures for the Field Artillery Cannon Battery

The Bear Marches West Alternate Tables of Organization & Equipment for Optional Wargame Scenarios. Glenn Dean

DEC CCO 3571.lA 3B. COMBAT CENTER ORDER 3571.lA. From: To: Commanding General Distribution List. Subj: EXPLOSIVE ORDNANCE DISPOSAL

AND EQUIPMENT Washington 25, D.C., 26 February 1944 No infantry regiment Designation:... Infantry. Antitank. 3 battallions (each)

IDENTIFY THE TROOP LEADING PROCEDURE

USING TERRAIN MODELS B2B0331 STUDENT HANDOUT

No Washington September 5, glider infantry regiment Designation:...Glider Infantry. Headquarters (T/O 7-52) Headquarters company

List of abbreviations used in text (local common usage, standard Army).

ORGANIZATION AND OPERATION OF THE COMPANY COMMAND POST

New Artillery Sunday Punch

Awarded for actions during the Korean War

The SADF/UNITA commanders that can be played as are: Commandant Les Rudman (SADF) Major Pierre Franken (SADF) Lieutenant Oranje* (UNITA)

UNITED STATES MARINE CORPS Echo Company 2nd Battalion, 5th Marines Camp Pendleton, California 92055

Operation Neptune / Operation Overlord Teacher Guide

Section III. Delay Against Mechanized Forces

TABLES OF ORGANIZATION AND EQUIPMENT

3. TIME AND PLACE The competition will take place in Pärnumaa County The competition will be conducted in three phases:

US V Corps St. Mihiel Front and Operation 29 August - 16 September 1918

1st Marine Expeditionary Brigade Public Affairs Office United States Marine Corps Camp Pendleton, Calif

lahi FM 7-15 Copy 3 WAR DEPARTMENT INFANTRY FIELD MANUAL HEAVY WEAPONS COMPANY, RIFLE REGIMENT May 19, 1942

INFANTRY FIELD MANUAL

ARMORED CAVALRY PLATOON, TROOP AND SQUADRON

Organization of Marine Corps Forces

Sample file. Table of Contents. Organizational Notes 3. D Series USMC 4. Scenario #1 9. E Series USMC 11. Scenario #2 15.

* Appendix A Sample Tactical SOP for the Support Battalion and Support Squadron Command Post

Introduction RESPONSIBILITIES

MAKING IT HAPPEN: TRAINING MECHANIZED INFANTRY COMPANIES

The forces to deploy will include: 19 Light Brigade Headquarters and Signal Squadron (209) Elements of 845 Naval Air Squadron

Read the scenario below, and refer to it to answer questions 1 through 13.

Table of Organization/Equipment

Supporting South Korean Forces

Battle for Hill La Roumiere Hotton, Belgium. How Major John Sewanee Baskin, Jr. Spent Christmas 1944

US I Corps Aisne-Marne Operation 18 July - 6 August 1918

The Battle of LZ X-Ray: Personal Experience of a Company Commander

Battalion Commander s Comments

Amphibious Ships and Landing Craft Data Book

Chapter 4. Marine Divisions. c. CSS S Marine Division USMC Off Enl 1,021 15,890. USN Off Enl Tank Battalion.

(QJLQHHU 5HFRQQDLVVDQFH FM Headquarters, Department of the Army

The Russian Way of War: Force Structure, Tactics, and Modernization of the Russian Ground Forces. Chapter 4 The Offense

I MARINE EXPEDITIONARY FORCE Public Affairs Office United States Marine Corps Camp Pendleton, Calif

War Department, and Equipment No *

CHAPTER 2 DUTIES OF THE FIRE SUPPORT TEAM AND THE OBSERVER

Intelligence Preparation of the Battlefield Cpt.instr. Ovidiu SIMULEAC

Improving the Tank Scout. Contemporary Issues Paper Submitted by Captain R.L. Burton CG #3, FACADs: Majors A.L. Shaw and W.C. Stophel 7 February 2006

CHAPTER FIVE RECOVERY AND EVACUATION

Bathtub D-Day 6 th June, A Flames of War Grand Battle Scenario

January 31, 2011 Photo by Spc. Breanne Pye

NFPA 1001 Text from 2008 Edition

Video Log Roger A Howard W.W.II U.S. Army Born: 02/07/1923. Interview Date: 5/27/2012 Interviewed By: Eileen Hurst. Part I

DEPARTMENT OF THE ARMY HEADQUARTERS 8 TH INFANTRY DIVISION OFFICE OF THE COMMANDING GENERAL APO NEW YORK 09111

Headquarters, Department of the Army

OPERATIONAL TERMS AND GRAPHICS STUDENT HANDOUT

Battle Staff Graphics Workbook This workbook contains 36 pages of symbols to aid in your understanding of ADRP 1-02.

From: Commanding Officer, Fighter Squadron TWO ZERO ONE, Naval Air Station, Dallas, Texas To : Chief of Naval Operations (OP-05D2)

n ED0 NEW YORK 0-1 y1 lllccv #nn TO:

COMBINED ARMS OPERATIONS IN URBAN TERRAIN

Organization of Marine Corps Forces

Army Assault Forces - Normandy 6-7 June 1944

Moving Up in Army JROTC (Rank and Structure) Key Terms. battalion. company enlisted platoons specialists squads subordinate succession team

Battalion Commander s

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES React to Contact 17 June 2011

INFANTRY FIELD MANUAL

Transcription:

HEADQUARTERS 1st Battalion, 5th Marines 1st Marine Division, Fleet Marine Force c/o Fleet Post Office, San Francisco, California 3/bfc A9-7 Ser 119 4 Feb 1951 From: To: Via: Commanding Officer Commandant of the Marine Corps (1) Commanding Officer, 5th Marines (2) Commanding General, 1st Marine Division, FMF (3) Commanding General, Fleet Marine Force, Pacific Subj: Historical Diary of January, 1951 Ref: (a) Para 11401, MCM (b) DivGenOrd #16-50 (c) A dd #1 to DivGenOrd #16-50 Map: AMS L751 KOREA, 1:50,000 SUMMARY: 1. This diary covers the activities of the 1st Battalion, 5th Marines during the period 1-31 January, 1951. From 1-11 January the battalion was in an assembly area at MASAN, KOREA. While located there the battalion mission was rehabilitation, resupply and retraining. On 12 January the battalion embarked aboard LST-Q079 at Pusan, Korea. The battalion remained aboard the LST-Q079 until 15 January. During the period 16-26 January the battalion was in an assembly area approximately five miles south of POHANG-DONG conducting both motorized and foot patrols in that vicinity. On 27 January the battalion moved to YONGCHON, KOREA with the mission of protecting and keeping open the MSR. The remainder of the period cover by this report was spent accomplishing that mission. CHRONOLOGICAL NARRATIVE: DATE 1-3. This period was utilized in re-equipping, resupply, and re-organization. The battalion provided platoon for regimental guard, motorized patrols, outposts, local MP duty, and MP duty in MASAN. No enemy contact during this period. Training consisted of calisthenics, conditioning marches, familiarization firing of individual weapons, machine guns, BAR's, 60 and

81mm mortars, and rocket launchers. Small unit training on squad and platoon level was conducted. Night training on platoon and company problems was conducted. 4. Normal camp routine was maintained by the battalion. "C" Company conducted an all day training schedule in the field which included platoon in the defense, platoon in the attack, platoon patrols, and company night attack problem utilizing illumination. "A" Company's duties were that of regimental guard, regimental perimeter outpost, and daily motorized patrol to ANMI-NI. "B", H&S, and Weapons Companies conducted school on basic infantry subjects. Supplies were received as requested except for requisitioned clothing. One (1) ¼ ton, 4x4 ambulance jeep was the only unserviceable piece of motor transport. The hard dirt roads in the area were in fair condition. Strength of the battalion on this date as follows: Off 35 2 0 0 0 0 0 0 Enl 716 45 0 0 5 0 0 0 Weather: Clear and warmer 5. The battalion conducted normal camp routine. "B" Company conducted an all day training period in the field with the company commander riding in a helicopter and utilizing a SCR-300 for contact with his troops. "A", "C", and H&S Companies conducted normal training in accordance with training schedules. Supplies continued to be received except clothing. One (1) cargo jeep was sent to regiment for installation of a new engine. There were two (2) vehicles unserviceable this date. The roads remained in fair condition. Strength of the battalion this date as follows: Off 35 2 0 0 0 0 0 0 Enl 716 45 0 3 0 2 0 0 Weather: Cool and cloudy 6. An inspection of personnel with clothing and equipment displayed on the cot or sleeping area was conducted by the battalion executive officer during the morning. The battalion followed a holiday routine the remainder of the period with shower facilities being available during the afternoon. Strength of the battalion this date as follows: Off 35 2 0 0 0 0 0 0 Enl 724 44 0 0 8 0 1 0 Weather: Cool and clear 7. Holiday routine was conducted this date with Weapons Company being assigned as duty company. They had the initial motorized patrol to the NAKTONG River in accordance with

regimental dispatch 061403. The motorized patrol to ANMI-NI was discontinued. The patrol to the NAKTONG River returned at 1315 reporting negative enemy contact and the roads in fair condition. Weapons Company also had the duties of regimental guard and regimental outpost. Strength of the battalion this date as follows: Off 35 2 0 0 0 0 0 0 Enl 722 40 0 2 0 0 4 0 8. Normal camp routine and small unit training was conducted. During period 1430-1600 instructions on demolitions were presented to "C" Company. H&S Company gave lectures on cold weather operations during the afternoon. Some equipment was issued to the companies. Strength of the battalion this date as follows: Off 34 2 0 1 0 0 0 0 Enl 722 40 0 2 1 2 0 0 Weather: Cloudy and cool 9. All activities of the battalion were confined to indoors this date due to rain. Companies conducted school on scouting and patrolling, compass, and message writing procedure. Strength of the battalion this date as follows: Off 34 2 0 0 1 0 1 0 Enl 737 40 0 2 17 0 0 0 Weather: Raining and cool 10. Normal camp routine was carried out this date. "A" Company conducted a company in the attack problem. Small unit tactics were conducted by "B" Company. "C" Company sent one patrol to the NAKTONG River. This patrol reported no enemy contact and roads in fair condition. "C" Company also assumed the duties of regimental guard and regimental outpost during period 101600 to 111600. At approximately 1900 a verbal order was received for the battalion to be prepared to strike camp and board an LST for movement to a new assembly area on three (3) hours notice. A staff conference was called at 2100 by the battalion commander and instructions given for breaking camp. Strength of the battalion this date as follows: Off 34 2 0 0 0 0 0 0 Enl 736 40 0 1 0 0 0 0 Weather: Raining and cool 3

11. At 0300 this date advance warning order from Commanding Officer, 5th Marines was received confirming verbal instructions received the previous day. No training was conducted as the companies prepared for movement on order. Supplies and equipment were being crated throughout the day. "C" Company was relieved of regimental outpost at 1445 and regimental guard at 1600. Roads remained in fair condition. Strength of the battalion this date as follows: Off 34 2 7 0 0 0 0 0 Enl 770 40 51 4 38 0 0 0 Weather: Cloudy and cold 12. Preparation for movement was continued throughout the early morning. At 1000 a dispatch order was received from Commanding Officer, 5th Marines for the battalion to move out immediately and board LST-Q079, which was tied up at the dock in MASAN, for further movement to new assembly area. Tents were struck, stoves dismantled, and all preparations made to depart. At 1130 loading of supplies commenced and continued throughout the day. At 1635, the battalion, (less motor vehicle convoy), began march to MASAN. Order of march was "A", "B", "C", Weapons, and H&S companies. The last element arrived on the dock at 2015 and boarded the LST immediately thereafter. Because elements of 5th Marines Headquarters and 1st Marine Division were also embarked on LST-Q079 the ship was over crowded and living conditions were poor. There was a total of one thousand, two hundred and twenty-three (1223) men embarked plus tanks, supplies, and equipment. Strength of the battalion this date as follows: Off 34 2 7 1 0 0 0 0 Enl 770 40 51 4 10 1 0 0 13. The motor vehicle convoy moved out at 0750 and at 1600 arrived at the new assembly area located at TA 3781-H, approximately five (5) miles south of POHANG-DONG. There were no difficulties during the trip and convoy commander reported the roads in fair condition. The remainder of the battalion remained embarked aboard LST-Q079. Loading was continued. At 1330 all loading was completed and the ship got underway for POHANG-DONG. There were 4

no special activities conducted while the ship was underway. Strength of the battalion this date was unchanged. 14. The battalion remained embarked aboard LST-Q079 throughout the day. At 1000 the ship arrived at POHANG-DONG but due to inadequate unloading facilities, orders were received for the ship to proceed to KURYONG-PO. At 1030 the ship again got underway and arrived at KURYONG-PO at 1330. Movement of supplies and equipment was started to new assembly area and continued throughout the day. No troops of the battalion were debarked. The road from debarkation point to new assembly area was reported to be in fair condition. Strength of the battalion this date remained unchanged. 15. The unloading of supplies was continuous throughout the night. At 0430 the cable raising the lift from the tank deck to the main deck broke and unloading was held up until 0800 at which time supplies commenced being unloaded by hand. This was accomplished by lowering the supplies from the main deck to truck on the tank deck. At 0735 the battalion advance party debarked and arrived at 0915 at the new assembly area. H&S Company commenced debarking at 1200. At 1330 the lift was back in operation and unloading of supplies and equipment was resumed at a more rapid speed. All of H&S Company had arrived at the new assembly area at 1500 with the exception of personnel required to unload the ship. At 1800 one (1) platoon of "C" Company arrived at the assembly area followed by a platoon from "A" Company at 2000. At 2200 all supplies and equipment were unloaded from the ship. Strength of the battalion this date remained unchanged. 16. During the early morning of this date companies of the battalion arrived at the new assembly area in the following order: 0300 Weapons Company, 0400 "B" Company, 0500 "C" Company, 0700 "A" Company. Organizing and building up of the assembly area continued throughout the day. Roads were built in the battalion area but were of a poor nature due to freezing and thawing of soil. One electrical generator was received and lights provided for necessary tents. Strength of the battalion this date as follows: 5

Off 34 2 7 0 0 0 0 0 Enl 836 40 51 2 64 4 0 0 17. Normal camp routine began this date with improvement of the assembly area being continued. All companies cleaned and inspected weapons and equipment. One (1) man of "B" Company, while cleaning his BAR had an accidental discharge which wounded two (2) men. Supplies were received as requested. A motion picture projector was obtained and men off watch attended movies at 1840. At 2330 a dispatch order was received from Commanding Officer, 5th Marines directing this battalion to provide one reinforced platoon the following day to patrol the area north and northwest of the assembly area and return. "A" Company was designated and notified they would provide this platoon. Strength of the battalion this date as follows: Off 34 2 7 0 0 0 0 0 Enl 835 39 51 3 0 1 0 0 Weather: Clear and warmer 18. One (1) patrol consisting of a reinforced rifle platoon was conducted this date with negative enemy contact. The patrol was a combined motorized and foot patrol. The patrol returned to the battalion area at 2035. Small unit training was conducted and a lecture given by the supporting arms section an the organization, mission, and capabilities of supporting arms to selected personnel of the battalion. Improvement of the battalion area continued with additional; roads being constructed and more electrical facilities being installed. Normal supply was maintained. Strength of the battalion this date as follows: Off 34 2 7 0 1 0 0 0 Enl 855 39 51 2 20 0 0 0 Weather: Fair and warmer 19. The battalion maintained normal camp routine and conducted training throughout the period. Another lecture was given by the supporting arms section. Roads in the camp area 6

continued to improve as weather remained warm. Normal supply routine was maintained. Strength of the battalion this date as follows: Off 35 2 7 0 0 0 0 0 Enl 855 39 51 1 0 1 0 0 Weather: Fair and mild 20. During the period 0900-1100 the company commanders inspected their respective companies. All companies had organized athletics during the afternoon. Normal supply routine was maintained. At 1830, orders were received from Commanding Officer, 5th Marines directing the battalion to provide a security force for supplies and equipment going to 2/5's position at YONGCHON. "B" Company was notified they would provide the security elements. At 1900 the regimental commander and the battalion commander gave a talk on forthcoming operations and methods to be employed in accomplishing these operations to Company Commanders and the battalion staff. Major Dohterty of CIC gave a short talk on guerrilla activities and scouting and patrolling. Strength of the battalion this date as follows: Off 38 2 7 0 2 0 0 0 Enl 855 39 51 0 0 0 0 0 Weather: Cold and windy 21. At 0855 the security element provided by "B" Company and the 2/5 supply train departed the battalion area. At 1000 this battalion received 5th Marines Operation Order #1-51 concerning patrolling in assigned sectors. In accordance with this order the battalion Commander directed "C" Company to move to YONGCHON the following day and become attached to 2/5. At 1345 the advance party from "C" Company departed for 2/5's positions at YONGCHON. At 1615, "B" Company security elements for 2/5's supply train returned and reported negative enemy action and that the roads were in good condition. The remainder of 1/5 carried out holiday routine. Strength of the battalion this date as follows: Off 38 2 7 1 1 0 0 0 Enl 855 39 51 0 0 0 0 0 7

22. The motorized patrol to YONGCHON was conducted this date with negative enemy contact. At 0830 the battalion commander departed for 2/5's position at YONGCHON. At 1120, "C" Company departed for YONGCHON to become attached to 2/5. At 1330, school was conducted by supporting arms for selected personnel of the battalion and also personnel from the 1st Engineer Battalion. A normal camp routine was carried out this date with companies conducting school on scouting and patrolling. Supplies were received as requested. C" Company reported at 2/5's assembly area at 1400 and immediately dispatched foot patrols from that position in conjunction with 2/5. The battalion commander, who had arrived at 2/5's assembly area at 1100, remained there overnight. Strength of the battalion this date as follows: Off 38 2 7 0 0 0 0 0 Enl 854 39 51 1 0 0 0 0 23. A motorized patrol was conducted to YONGCHON this date with negative enemy contact. At 0830, foot patrols departed the battalion area via truck convoy to be dropped off at predesignated points along the MSR. These patrols to remain out overnight and reconnoiter of their assigned routes and to be picked up the following day at predesignated point along the MSR. At 1700 the battalion commander returned from 2/5's CP. Supporting arms continued to hold school for selected personnel. Strength of the battalion this date as follows: Off 38 2 7 0 0 0 0 0 Enl 859 40 51 4 6 4 0 0 Weather: Clear and warmer 24. A motorized patrol was conducted to YONGCHON this date with negative enemy contact. At 1220, foot patrols from "A" Company embarked aboard vehicles for movement to predesignated drop-off points along the MSR. These vehicles to pick up the foot patrols sent from "B" Company the previous day and return them to the battalion area. The battalion commander and assistant S-3 departed for 2/5 at 1300. The vehicles picked up "B" Company's foot patrols as scheduled and returned to the battalion area at 1800. The patrols reported 8

negative enemy contact. Payday was held for all personnel. Strength of the battalion this date as follows: Off 38 2 7 0 0 0 0 0 Enl 856 40 51 0 0 1 0 0 25. The battalion conducted daily motorized patrol to YONGCHON with negative enemy contact. The advance party consisting of two (2) officers and four (4) enlisted men departed for 2/5's assembly area at YONGCHON. At 1315 verbal orders were received from 5th Marines that movement of 1/5 to new assembly area at YONGCHON, would be delayed twenty-four (24) hours. At 1700 written orders were received confirming this message. At 1455 the battalion commander returned to the battalion area. At 1500 a ceremony was held for presentation of awards by the regimental commander to personnel of 1/5. At 185 vehicles returned with "A" Company's foot patrols embarked. Negative enemy contact was reported by the patrols. Throughout the day companies made preparations for movement to YONGCHON. Personnel were briefed on the type of patrolling to be conducted. Strength of the battalion this date as follows: Off 39 2 7 0 0 1 0 0 Enl 851 40 51 0 0 0 0 0 26. A motorized patrol was conducted to YONGCHON with negative enemy contact. At 1330 the battalion commander, S-2, and representatives from the S-3 departed for YONGCHON. The combat efficiency of the command continued to be excellent. Roads remained in fair condition. Supplies were received as requested. An enlisted representative from the 4.2" Mortar Company was attached to the battalion this date for liaison purposes. 27. At 0745 the battalion began movement to new assembly area at YONGCHON to assume duties of Unit "A" as set forth in Regimental Operations Order #1-51. The battalion completed the movement at 1230. The new CP was established at TA 9580-Q-4 at 1130. At 1200, "G" Company, 3/5, who had moved up during the morning, became attached to 1/5 for use as set forth in Regimental Operational Order #1-51. Other units became attached to 1/5 this date were 9

"B" Battery, 11th Marines, one (1) platoon of "A" Company, 1st Engineers and a detachment of three (3) tanks from the 1st Tank Battalion. At 1400 patrol leaders for both motorized and foot patrols were briefed by the assistant S-3 and Battalion Executive Officer. At 1800 the motorized patrol with foot patrols embarked departed for UISONG, This patrol was divided into two (2) sections with one (1) traveling the main MSR and the other traveling the alternate MSR. The foot patrols embarked were to be dropped off at predesignated points along both routes. There was a total of seven (7) patrols embarked. The battalion S-3 departed the battalion area via helicopter at 1445 for 1st Battalion, 1st Marines CP and 7th Marines CP to establish liaison. Overlays for this battalion's patrols for 27 to 29 January were submitted to both units who in turn submitted patrol overlays and enemy situation information to this battalion. The S-3 returned at 1820. The companies were set in a defense perimeter around the CP with a check point being established at TA 9580-N. A ten per cent (10%) watch of the perimeter was maintained at all times. At 1900 the motorized patrol arrived at the 1st Battalion, 1st Marines area located at UISONG and reported the patrols had been dropped off at designated points and no enemy contact encountered. Supplies were received as requested. Strength of the battalion this date as follows: Off 38 2 7 0 0 1 0 0 Enl 853 40 52 1 0 0 0 0 Weather: Clear and warmer 28. The motorized patrol to UISONG the previous day returned at 1205 and reported negative enemy contact. Captain Jones, "C" Company Commander, departed via helicopter for 1st Battalion, 1st Marines CP and 7th Marines CP at 1400. Information was exchanged concerning both friendly and enemy situation and he returned at 1800. Improvement on the battalion perimeter defense was continued throughout the day. Liberty was granted to twentyfive (25) per-cent of the personnel between the hours of 1230 and 1730. This liberty not to exceed the boundaries of YONGCHON, KOREA. Strength of the battalion this date as follows: Off 39 2 7 0 0 1 0 0 Enl 994 40 52 1 0 137 5 0 Weather: Clear and warmer 10

29. One motorized and seven (7) foot patrols were sent out in assigned sectors. The foot patrols were to remain out until 31 January. At 1730 the Regimental Commander arrived at the battalion CP and issued oral orders to send one (1) company (rein) to town of CHACHON- DONG. This move was to be made under cover of darkness. "C" Company was ordered to undertake this mission. At 1900, "A" and "B" Companies assumed "C" Company's portion of the perimeter and at 2100 "C" Company started marching for CHACHON-DONG. A written order from Command Officer, 5th Marines was received at 2140 confirming the oral orders for this move. Strength of the battalion this date as follows: Off 39 2 7 0 0 0 0 0 Enl 994 40 52 0 0 0 0 0 30. At 0130, "C" Company reported they had reached there destination, town of CHACHON- DONG, and were preparing defense positions that would keep them under concealment during hours of daylight. At 1730 the daily motorized patrol departed for UISONG. The battalion commander departed via helicopter at 1010 to make an aerial reconnaissance. He returned at 1145 and reported all roads clear to UISONG. At 1730 the motorized patrol returned from UISONG. Supplies were carried to "C" Company by the motorized traveling the alternate MSR. This was done in order to avoid giving away "C" Company's presence in CHACHON-DON. All roads remained in fair condition. Strength of the battalion this date as follows: Off 39 2 7 0 0 0 0 0 Enl 994 40 52 0 0 0 0 0 31. The daily motorized patrol with seven (7) foot patrols embarked departed at 0730. The foot patrols were dropped off in designated sectors. 81mm mortars were teat fired during the period 0930-1030. "C" Company maintained their defense positions in CHACHON-DONG with no enemy activity being reported. The motorized patrol returned at 1730 after picking up the foot patrols that had been sent out the 29th. These foot patrols made reports of enemy in the area, mostly consisting of raiding parties on small villages and information of a general enemy movement southwest with the mission of cutting supply lines. Strength of the battalion this date as follows: 11

Off 39 2 7 0 0 0 0 0 Enl 994 40 52 0 0 0 0 0 /s/john L. Hopkins John L. Hopkins All diaries were copied exactly from photo copies received from the Historical Section, Headquarters, Marine Corps. Only change made was the addition of a header to maintain page placement. 12