Strategic Sustainability Fort Benning Committed to Sustainable Practices
Fort Benning Strategic Sustainability Sustainability "meets the needs of the present without compromising the ability of future generations to meet their own needs." Fort Benning s strategic approach is the interdependence between our Mission, our Community, and our Environment 5 Year and 25 Year Strategic Sustainability Plans
Fort Benning s Sustainable Focus Areas Air Land Water Energy Solid Waste
Energy Leadership in Energy and Environmental Design (LEED) U.S. Green Build Council s point system which insures the incorporation of energy life cycle cost savings and environmental considerations into design and construction. LEED promotes a wholebuilding approach to sustainability by recognizing performance in five key areas; sustainable site development, water savings, energy efficiency, materials selection, and indoor environmental quality SIS Sustainable Interiors Showcase LEED NC New Construction EB Existing Building
Solid Waste Battery recycling Paint stripping and coating removal Battery Emergency recycling Planning Paint Community stripping Reporting and coating removal Emergency Fluorescent light Planning recycling and Community Reporting Fuel filter and reuse Fluorescent Natural gas conversion light recycling of boilers Recycling non-hazardous waste Fuel filter and reuse Solvent recycling Natural Waste reduction gas conversion of boilers Recycling Weapons cleaning non-hazardous systems waste Solvent recycling Waste reduction Weapons cleaning systems
Construction on Fort Benning: $2.9B FY07 FY08 FY09 FY10 FY11 FY12 New Post Exchange Mall Maneuver Captains Career Course and Maneuver Advanced Non- Commissioned Officer courses conducted at Fort Benning & Fort Knox National Environmental Policy Act (NEPA)/EIS Biological Assessment Socio-economic Studies Cultural Studies Noise & Traffic Air Quality Wetlands EIS Record of Decision Environmental Impact Statement (EIS) Approval 1 2 Virtual Operating Capability: Dir of Tng & Doctrine (DOTD) Dir of Training (DOT) Capabilities Development & Integration Directorate (CDID) FY 07 Construction ($301M) Ranges projected: 1 tank, 2 small arms 19D One Station Unit Training (OSUT) barracks Basic Combat Training barracks 1 Armor Training Brigade Headquarters Training Support Brigade Phase I Child Development Center (6-10 yr old) 3 Ranges projected: 3 small arms Utility Infrastructure Phase I 19K & 63A/M barracks, Maneuver Simulation Center Training Support Brigade Phase II Unit Maintenance Activity 16th Cavalry Regiment Headquarters Troop Medical & Dental Clinic, Harmony Church Medical & Dental Clinic Expansion, Sand Hill General Instruction Facility Phase I Maneuver Center Reception Station Phase I Bldg Conversion to Training Support Center Digital Multi-Purpose Range Complex (DMPRC) Complete FY 08 Construction ($412M) 4 FY 09 Construction ($328M) Ranges projected: 1 tank, 1 small arms New Hospital Phase I (40% BRAC, 60% MEDCOM) Central Wash Facility, Tank Drivers Course Vehicle Maintenance Instructional Facility Maneuver Center Reception Station Phase II General Instruction Facility Phase II Combined Arms Collective Training Facility Basic Combat Training move NCOA 16th CAV 1 ATB 1-46, 2-462 Infantry Battalions 5 FY 10 Construction ($229M) Ranges projected: 2 small arms Maneuver Center Reception Station Phase III General Instruction Facility Phase III New Hospital Phase II (40% BRAC, 60% MEDCOM) Maneuver Center Headquarters Expansion Armed Forces Reserve Center / Equip Concentrn Site Construct Training Area Roads & Trails, Repair Paved Armor & Cavalry One Station Unit Training move Mechanic Training move 7 MCOE Full Operating Capability (FOC) FY 12 ($89M) CDID DOT Sustain MCCC Maint PCC MSTD Facility DOTD Battle Command Training Center Chapels 6 FY 11 Construction ($175M) Recreation Center, Harmony Church Physical Fitness Center, Harmony Church Ranges projected: 2 machine-gun & qualific 19D/K, 63A/M BNCOC M-ANCOC Armor Functional Armor BOLC III 63A/M OSUT 19K & 19D OSUT Basic Combat Tng FY07 MILCON 1 (design only) As of 26 Sep 06 2 EIS & mitigation requirements drive all 3 MILCON groundbreaking FY08 MILCON FY09 MILCON FY10 MILCON FY11 MILCON MCOE FOC 4 5 6 7 Transfer (NCOA, 1ATB & (BRAC critical) (AFRC) Complete 16 CAV) *Unfunded Requirements: Maneuver Battle Lab; Armor & Cavalry Museum