SIMULATOR SYSTEMS GROUP

Similar documents
Value and Innovation in Acquisition and Contracting

Improving the Quality of Patient Care Utilizing Tracer Methodology

Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft

Opportunities to Streamline DOD s Milestone Review Process

terns Planning and E ik DeBolt ~nts Softwar~ RS) DMSMS Plan Buildt! August 2011 SYSPARS

Shadow 200 TUAV Schoolhouse Training

The Fully-Burdened Cost of Waste in Contingency Operations

Report No. D August 12, Army Contracting Command-Redstone Arsenal's Management of Undefinitized Contractual Actions Could be Improved

White Space and Other Emerging Issues. Conservation Conference 23 August 2004 Savannah, Georgia

Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL

Mission Assurance Analysis Protocol (MAAP)

A Scalable, Collaborative, Interactive Light-field Display System

ALLEGED MISCONDUCT: GENERAL T. MICHAEL MOSELEY FORMER CHIEF OF STAFF, U.S. AIR FORCE

The Coalition Warfare Program (CWP) OUSD(AT&L)/International Cooperation

United States Army Aviation Technology Center of Excellence (ATCoE) NASA/Army Systems and Software Engineering Forum

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

For the Period June 1, 2014 to June 30, 2014 Submitted: 15 July 2014

Electronic Attack/GPS EA Process

DDESB Seminar Explosives Safety Training

ASAP-X, Automated Safety Assessment Protocol - Explosives. Mark Peterson Department of Defense Explosives Safety Board

Cerberus Partnership with Industry. Distribution authorized to Public Release

Rapid Reaction Technology Office. Rapid Reaction Technology Office. Overview and Objectives. Mr. Benjamin Riley. Director, (RRTO)

The Effects of Multimodal Collaboration Technology on Subjective Workload Profiles of Tactical Air Battle Management Teams

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

DOING BUSINESS WITH THE OFFICE OF NAVAL RESEARCH. Ms. Vera M. Carroll Acquisition Branch Head ONR BD 251

Office of Inspector General Department of Defense FY 2012 FY 2017 Strategic Plan

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

CRS prepared this memorandum for distribution to more than one congressional office.

Army Aviation and Missile Command (AMCOM) Corrosion Program Update. Steven F. Carr Corrosion Program Manager

Laboratory Accreditation Bureau (L-A-B)

US Coast Guard Corrosion Program Office

AFRL-ML-WP-TP

Wildland Fire Assistance

Software Intensive Acquisition Programs: Productivity and Policy

Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance

Army Modeling and Simulation Past, Present and Future Executive Forum for Modeling and Simulation

Defense Acquisition Review Journal

The DoD Siting Clearinghouse. Dave Belote Director, Siting Clearinghouse Office of the Secretary of Defense

Award and Administration of Multiple Award Contracts for Services at U.S. Army Medical Research Acquisition Activity Need Improvement

Integrated Comprehensive Planning for Range Sustainability

Defense Health Care Issues and Data

GAO DEFENSE CONTRACTING. DOD Has Enhanced Insight into Undefinitized Contract Action Use, but Management at Local Commands Needs Improvement

AFRL-VA-WP-TP

Fiscal Year 2011 Department of Homeland Security Assistance to States and Localities

Preliminary Observations on DOD Estimates of Contract Termination Liability

Drinking Water Operator Certification and Certificate to Operate Criteria/Requirements for US Navy Overseas Drinking Water Systems

Report No. DODIG December 5, TRICARE Managed Care Support Contractor Program Integrity Units Met Contract Requirements

Military Health System Conference. Putting it All Together: The DoD/VA Integrated Mental Health Strategy (IMHS)

World-Wide Satellite Systems Program

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

Munitions Response Site Prioritization Protocol (MRSPP) Online Training Overview. Environmental, Energy, and Sustainability Symposium Wednesday, 6 May

Social Science Research on Sensitive Topics and the Exemptions. Caroline Miner

Biometrics in US Army Accessions Command

Contemporary Issues Paper EWS Submitted by K. D. Stevenson to

February 8, The Honorable Carl Levin Chairman The Honorable James Inhofe Ranking Member Committee on Armed Services United States Senate

U.S. ARMY AVIATION AND MISSILE LIFE CYCLE MANAGEMENT COMMAND

USAF Hearing Conservation Program, DOEHRS Data Repository Annual Report: CY2012

Unexploded Ordnance Safety on Ranges a Draft DoD Instruction

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

Research to advance the Development of River Information Services (RIS) Technologies

Information Technology

Presented to: Presented by: February 5, Aviation and Missile Research, Development and Engineering Center

Report No. D September 25, Controls Over Information Contained in BlackBerry Devices Used Within DoD

Integrity Assessment of E1-E3 Sailors at Naval Submarine School: FY2007 FY2011

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

Report No. D May 14, Selected Controls for Information Assurance at the Defense Threat Reduction Agency

DoD Corrosion Prevention and Control

DoD Cloud Computing Strategy Needs Implementation Plan and Detailed Waiver Process

Report No. DODIG Department of Defense AUGUST 26, 2013

Marine Corps' Concept Based Requirement Process Is Broken

AMCOM Corrosion Program

Developmental Test and Evaluation Is Back

USAF TECHNICAL TRAINING NAS Pensacola Florida Develop America's Airmen Today --- for Tomorrow

United States Joint Forces Command Comprehensive Approach Community of Interest

Report No. D February 22, Internal Controls over FY 2007 Army Adjusting Journal Vouchers

MILITARY MUNITIONS RULE (MR) and DoD EXPLOSIVES SAFETY BOARD (DDESB)

Engineered Resilient Systems - DoD Science and Technology Priority

Complaint Regarding the Use of Audit Results on a $1 Billion Missile Defense Agency Contract

2011 USN-USMC SPECTRUM MANAGEMENT CONFERENCE COMPACFLT

Defense Acquisition: Use of Lead System Integrators (LSIs) Background, Oversight Issues, and Options for Congress

The Security Plan: Effectively Teaching How To Write One

TITLE: Vitamin D and Related Genes, Race and Prostate Cancer Aggressiveness

United States Military Casualty Statistics: Operation Iraqi Freedom and Operation Enduring Freedom

Joint Committee on Tactical Shelters Bi-Annual Meeting with Industry & Exhibition. November 3, 2009

Report No. D January 16, Acquisition of the Air Force Second Generation Wireless Local Area Network

DOD Native American Regional Consultations in the Southeastern United States. John Cordray NAVFAC, Southern Division Charleston, SC

Nuclear Command, Control, and Communications: Update on DOD s Modernization

United States Air Force 423 SCMS Hydraulic Actuator Chrome Replacement

User Manual and Source Code for a LAMMPS Implementation of Constant Energy Dissipative Particle Dynamics (DPD-E)

Acquisition. Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D ) June 4, 2003

Report No. D July 25, Guam Medical Plans Do Not Ensure Active Duty Family Members Will Have Adequate Access To Dental Care

Report No. D December 16, Air Force Space and Missile Systems Center's Use of Undefinitized Contractual Actions

Office of the Assistant Secretary of Defense (Homeland Defense and Americas Security Affairs)

Small Business Innovation Research (SBIR) Program

Choose to Lose. Tammy Lindberg, Lt Col, USAF, BSC

DODIG March 9, Defense Contract Management Agency's Investigation and Control of Nonconforming Materials

DoD Scientific & Technical Information Program (STIP) 18 November Shari Pitts

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Concept Development & Experimentation. COM as Shooter Operational Planning using C2 for Confronting and Collaborating.

Report No. D September 22, Kuwait Contractors Working in Sensitive Positions Without Security Clearances or CACs

Transcription:

SIMULATOR SYSTEMS GROUP Donna Hatfield 677 AESG/SYK DSN: 937-255-4871 Donna.Hatfield@wpafb.af.mil 1

Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 12 MAY 2009 4. TITLE AND SUBTITLE Changes in the Contracting Process 2. REPORT TYPE 3. DATES COVERED 00-00-2009 to 00-00-2009 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Air Force Materiel Command,677 AESG/SYK,Wright Patterson AFB,OH,45433 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 11. SPONSOR/MONITOR S REPORT NUMBER(S) 13. SUPPLEMENTARY NOTES 2009 USAF Advance Planning Briefing to Industry (APBI), 12 May 2009, Wright Patterson AFB, OH 14. ABSTRACT 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Same as Report (SAR) 18. NUMBER OF PAGES 12 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

KEY POINTS Reason for Change Process Changes Peer /Multi-Functional Independent Teams (MIRTs) Undefinitized Contractual Actions (UCAs) PEO/AC UCA Results New UCA Policy Integrated Product Team Pricing Policy Recommendations to Improve 2

REASON FOR CHANGE Source selections too complex, too long Measure key discriminators, pass/fail requirements, elevate importance of cost Inappropriate use of T&M, LOE, CPAF, UCAs when FFP could be used Long service contracts (exceeding 3-5 yrs) weakens competition/change Significant criticism for programs over cost & not delivering capability 3

PROCESS CHANGES USAF and General Contracting Authority now within the contracting chain Strengthens role & independence of AF Contracting All Business/Contract Clearances in contracting Specific Changes: OSD Pre & Post Award Peer - > $1B (Competitive & Sole Source) AF MIRT - > $50M (Competitive) Senior Acquisition Exec approval of PCO & Source Selection Evaluation Team chair for ACAT 1 - $1B UCAs under scrutiny and increased reporting IPT Pricing gone 4

PEER REVIEWS OSD pre- and post-award review IAW: OUSD(AT&L)/DPAP 29 Sep 08 direction Section 808 of the National Defense Authorization Act for FY08 All sole source & competitive contracts > $1B team of multi-functional OSD personnel Pre-award review prior to: Issuance of the RFP Request for final proposal revision (FPR) Contract Award IMPACT - Additional contract award schedule needed 5

MULTI-FUNCTIONAL INDEPENDENT REVIEW TEAMS (MIRTs) IAW AFFARS Mandatory Procedure MP5301.9001(b) and ASAF(A) direction All competitive acquisitions > $50M Team consists of Air Force personnel IMPACT - Additional contract award schedule needed to conduct reviews of: - ASP brief (or Acquisition Plan) - Sections L&M of RFP - Competitive Range Brief to Source Selection Authority (SSA) - Request for FPR brief to SSA - Decision Brief to SSA 6

MILESTONE REVIEWS: STANDARD SOURCE SELECTION PEER REVIEW THRESHOLD $1B IRT REVIEW THRESHOLD $50M Prior to Solicitation Issuance Prior to Request for FPR Prior to Contract Award MIRT Formation Draft ASP/AP RFP Draft Comp Range/ Award w/o Discussions/ or Pre-Release of Interim Ratings Draft FPR of Draft Source Selection Decision Brief SSA Appoints SSET and SSAC Market Research/ Acquisition Planning Sufficiency ASP Issue Draft RFP Issue RFP/ Evaluate Proposals Business Clearance: Approval to Issue RFP Discussions w/ Offerors Request FPRs and Evaluate Contract Clearance: Approval to Request FPR STANDARD SOURCE SELECTION MILESTONES Draft PAR & SSDD Contract Clearance: Approval to Award Contract Award Contract 7

UNDEFINITIZED CONTRACTUAL ACTIONS (UCAs) Increased PEO/AC (Gen Hudson) oversight on use & definitization PEO/AC approves all UCAs over $10M More PEO/AC reporting 90 day look ahead briefed weekly Oldest 25 briefed every six weeks Wing s UCA status included with all new requests 8

PEO/AC UCA REVIEW RESULTS Late user requirement changes cause 20% of overage UCAs UCAs for Urgent Operator Needs & GWOT actions often cannot be projected/avoided Incremental program decisions force UCAs (to prevent production gaps) Inadequate, late proposals drive need for UCAs and lengthen definitization Contractors are not submitting timely and complete analyses of supplier proposed prices 9

NEW UCA POLICY Request UCA approval after receipt of qualifying proposal If issued prior to proposal, plan required to stop payments if proposal not delivered on time Proposals must comply with Proposal Adequacy Checklist Obligation of 50% of NTE is not automatic Funding should be consistent with spend plan Profit/fee should match risk of to-go effort not incurred cost Note quality, time issues in CPARS, award fees 10

INTEGRATED PRODUCT TEAM (IPT) PRICING IPT pricing was concurrent requirements refinement, proposal development, fact-finding, and preliminary agreement IPT pricing tool rescinded IAW 27 Apr 09 AFMC Policy letter 2009-PK-003 New direction - traditional approach: Serial process RFP to contractor Contractor then independently prepares proposal Govt establishes negotiation objective after audit and tech eval Govt obtains approval to enter into negotiations 11

RECOMMENDATIONS TO IMPROVE Better requirements definition upfront brings better understood/priced contracts Timely proposal submittal Follow proposal adequacy checklist Strengthened Industry/Govt overview process Increased emphasis on business deal thru MIRTs/Peer s More to come 12