Planning for Improved Access and Orientation Anjali Joseph Jain EDRA 35

Similar documents
Welcome. A Guide for Patients and Visitors

Ambulatory Care Model

Effective Date. Patient Status Initial Inpatient Order. 1 of 5

Surgical Preadmission Information. Joint Replacement Hip. Knee

Computers for Visitor Use. Tips. Coffee Shop. Dining. Do Not Use Cell Phone. Restrooms. Gift Shop. Chapel. Parking.

New Regional Hospital Questions & Answers

Contents. Preface Acknowledgments About this Document Major Additions and Revisions. List of Acronyms. Part 1 General 1

Hendrick Medical Center significantly lowers turnover times with the help of OR Benchmarks Collaborative

Chest Pain Accredited. Transplant Program-Heart, Kidney, Liver. Hear Transplant Program serving San Antonio area for 25 years

Welcome to the Orthopedic Unit

Bethesda Hospital West Pre-op Guide

Corporate Medical Policy

MOHAWK VALLEY HEALTH SYSTEM INTEGRATED HEALTH CAMPUS UTICA, NY

Benefit Criteria for Outpatient Observation Services to Change for Texas Medicaid

Observation Services Tool for Applying MCG Care Guidelines

Photos/Plans. Go to Article

ORIENTATION HANDBOOK FOR AGENCY STAFF

2018 No. 7: Radiology and Pathology/Laboratory Services

Berne Knox Westerlo Central School District

Sarasota Memorial Hospital Laurel Road Update

Caldwell Medical Center Departments

How to Optimize ASC Efficiency Through Design

Management of the Surgical Patient Preoperative, Intraoperative and Postoperative

Observation Services Tool for Applying MCG Care Guidelines Policy

General Volunteer Self Study Tour

Unique Features. Poplar Avenue B C. EMERGENCY Department 59 Rooms Ambulance. Entrance. Satellite. Pharmacy. Emergency. Support.

PROVIDENCE SAINT JOHN S HEALTH CENTER GARDEN LEVEL

Final Report. Karen Keast Director of Clinical Operations. Jacquelynn Lapinski Senior Management Engineer

One Hospital, Two Campuses. Delivering more services and better care to all of Rockford.

TORRANCE MEMORIAL MEDICAL STAFF

Hospital Planning. Principles of. medical architecture planning systems. hospital planners & medical technology consultants

Critical Care & Surgery Waiting Room

DIGITAL SIGNAGE FOR HEALTHCARE APPLICATIONS. Prescription for Success: New Technology Options and Tools for both Patients and Staff.

BAY PARK HOSPITAL. CLIENT: ProMedica

OUR NEW ERA. Joseph Brant Hospital announces preferred proponent for phase two. Joseph Brant Hospital: Rebuilding to serve you better

Patient Safety (PS) 1) A collaborative process is used to develop policies and/or procedures that address the accuracy of patient identification.

Improving Mott Hospital Post-Operative Processes

We are growing to better serve you

Co C as a t s Pro r v o i v nce nc G eneral Hospi s tal Le L v e e v l 5 R 5 e R fe f rr r al a F ac a i c lity *** 9/2/2015 1

YOUR SURGERY MADE EASY

King Fahd Medical City, Riyadh. Healthcare:

St. Vincent s Health System Page 1 of 11. TITLE: Mass Casualty Plan Code Yellow 12/11/07 12/11/07

Deliver Value by Design with PFCC: Improve Experiences and Outcomes While Decreasing Costs Pamela K. Greenhouse Executive Director

Guidelines for Kuakini Medical Center General Surgery Rotation (Formulated by a previous Chief Surgical Resident)

High 5s Project: Action on Patient Safety. SOP Flow Charts. 20 th International Forum on Quality and Safety in Healthcare April 2015 London, UK

ABOUT THE CONE HEALTH NETWORK OF SERVICES

Incident Planning Guide: Infectious Disease

Successfully Transforming Outpatient Services with Intouch Solutions A Customer View

Carotid Endarterectomy

CRITICAL ACCESS HOSPITALS

HCA APR-DRG and EAPG Rebasing Revised February 2017

Increase Your Bottom Line by Eliminating Physician Driven Denials. Olakunle Olaniyan MD President Case Management Covenants

Visitor s guide MOUNTAIN VIEW CAMPUS VISITING GUIDELINES

Waiting for a family member who is having surgery

ROLE OF THE ANESTHETIST IN ORGANIZING AMBULATORY SURGERY. Dr. Paul Vercruysse M.D. Belgium

Visitor s Guide. A complete guide to hospital facilities and their locations

Effective Use of Existing Licensed Healthcare Infrastructure During a Crisis or Catastrophe

Presence Mercy Medical Center: Patient Portal Frequently Asked Questions

... Real Time Demand Capacity (RTDC) Approach. Months: Shift/Add Capacity to Address Large Mismatches

Part 4. Change Concepts for Improving Adult Cardiac Surgery. In this section, you will learn a group. of change concepts that can be applied in

UNIVERSITY OF COLORADO HEALTH SCIENCES CENTER PULMONARY ELECTIVE HOUSESTAFF ROTATION CURRICULUM AND OBJECTIVES

4343 N. Josey Lane Carrollton, TX BSWHealth.com/Carrollton. A Patient s Guide to Surgery

PATIENT STATUS DEFINITIONS, 2 MIDNIGHT RULE AND 96 HOUR RULE

BANNER ESTRELLA medical center phoenix, ARizoNA

Section 3. Functional Diagrams. Outpatient Clinic Satellite / Community-Based January 2009

Submitted by Alexander Kolker, PhD, Outcomes Operations Project Manager, Children s Hospital of Wisconsin

A Patient s Guide to Surgery

Diagnostics for Patient Safety and Quality of Care. Vulnerable System Syndrome

ST. MARY S HEALTHCARE SYSTEM, INC. Case # GA6476 BlueChoice HMO Benefit Summary Effective: January 1, 2018

Charge Integrity of Surgical Services

High Risk Operations in Healthcare

Improving Hospital Performance Through Clinical Integration

A Prescription for the Free-Standing ED. Kimberly Nealon, St. Vincent Health; Steve Mombach, TriHealth; John Marshall, BremnerDuke Healthcare

Welcome to Baylor Scott & White Hillcrest. A Perioperative Services Orientation

Institutional Handbook of Operating Procedures Policy

* Indicates lot is available for associate parking from 5pm on Friday to 7:30am on Monday.

Course: Acute Trauma Care Course Number SUR 1905 (1615)

Emergency Department Patient Flow Strategies. University of Maryland Medical Center

Facility Demographic Report

Contents. Preface Acknowledgments About the Guidelines Major Additions and Revisions Glossary List of Acronyms. Part 1 General 1.

at OU Medicine Leadership Development Institute August 6, 2010

The Reasons for Cancellations of Elective Pediatric Surgery Cases at Queen Rania Al-Abdullah Children Hospital

Information Technology Report to Medical Executive Committee

Access to the Best Care Urgent Care Centre

UNIVERSITY OF MASSACHUSETTS MEDICAL SCHOOL ANESTHESIOLOGY RESIDENCY PROGRAM GOALS AND OBJECTIVES

New Hospital Preparedness Integrating Simulation-based Testing and Training

Using Clinical Criteria for Evaluating Short Stays and Beyond. Georgeann Edford, RN, MBA, CCS-P. The Clinical Face of Medical Necessity

PREPARING FOR SURGERY

A BETTER WAY. to invest in employee health

Calaveras County Alternate Care Site Plan. Set-up Diagrams REVISED: 02/28/11

Title: VERIFICATION OF PROCEDURES TO BE PERFORMED

LKH GRAZ WEST. This is the site plan with the existing. the casualty ward and the commercial sector, both situated. decks on two levels for visitors

Broad Category Injury Types Injury Causes Needle Stick Injuries Punctures Needle sticks

APPLICATION OF SIMULATION MODELING FOR STREAMLINING OPERATIONS IN HOSPITAL EMERGENCY DEPARTMENTS

About the Critical Care Center

For Large Groups Health Benefit Single Plan (HSA-Compatible)

Cigna Medical Coverage Policy

REQUEST FOR INFORMATION (RFI) PATIENT CARE FACILITY SHUTTLE SERVICES DATE ISSUED: DECEMBER 1, 2006 DUE DATE: DECEMBER 15, 2006

Summary of Benefits CCPOA (Basic) Custom Access+ HMO

University Hospital Crosshouse Day Surgery and Endoscopy Unit. Follow us on Find us on Facebook at

Transcription:

Hospital planning strategies for improving patient access and orientation within the hospital Anjali Joseph, College of Architecture, Georgia Institute of Technology Most hospitals have been designed through a process of accretion where new areas are constantly added or modified to account for increasing volumes, changing technologies, codes and patient populations. The result is a very complicated building which poses several difficulties in terms of wayfinding and orientation to patients, visitors as well as staff. This paper describes the results from a programming and planning project at a large hospital where the focus was on relocating the admissions department within the hospital to improve patient access and orientation. The study was conducted during a one-month period at a private non-for-profit tertiary care hospital in Atlanta, Georgia. The hospital offers most major medical, surgical and diagnostic services. It has 500 beds, 3,000 employees and a medical staff of more than 800 board certified physicians. It has grown incrementally over the last 46 years, at its current location, with periodic vertical and horizontal expansions as well as continual renovation projects. This growth and expansion has resulted in a complicated building layout, and there are problems with patient access and movement through the building. The admissions department - the focus of this study is plagued by several problems: Inadequate space for waiting and consultation Difficult to reach from parking structures: the admissions department is located near the main front entrance where there is no parking, only a drop off area; the parking is located on the opposite end of the site, behind the hospital. Functional areas are not well connected resulting in more wayfinding problems The admissions department comprises the inpatient admissions and outpatient admissions. Currently, these are two physically separate entities and their functions do not overlap much. The inpatient admissions department is responsible for registering and admitting inpatient surgery, outpatient surgery and direct admit patients, while the outpatient admissions registers patients receiving outpatient services at the hospital (such as x-rays, blood tests etc.). Study Objectives: To propose a planning strategy to address patient access and orientation problems at Piedmont Hospital. Focus on the location of the admissions department within the hospital and how a move to an alternative location may improve patient access. Scope of Project: Departments and activities on first floor Site circulation and access issues. Method: Analysis of floor plans Observations Interviews with staff and department heads

Current Situation The problem of access and movement through the building starts at the site level. The hospital, built in the 1960s, was much smaller and designed to be accessed by pedestrians and a small number of cars. Currently, most people use cars to come to this site, though it is also accessible by public transportation. There are two main access roads. The main entrance to the hospital faces Peachtree Street, an important busy street. Visitors entering from this street may drop off patients at the drop off circle at the front entrance and proceed around the building to the back where two parking structures North and South Parking are available for public parking. Visitors may also enter from Collier Road and proceed directly to the parking structures (see plan 1) North Parking Deck From Peachtree Street South Parking Deck From Collier Road Patients then walk a long distance from the parking structures to the inpatient They walk a long way to Inpatient Admissions (circled in red) along the path shown in red. The outpatient admissions department (circled in blue) is located in a remote corner of the hospital and is very difficult to find from the North Parking Deck or the front entrance. Inadequate space for waiting is a problem in both these areas. The tight space in

the outpatient waiting area also results in confidentiality problems during consultations with staff. Since a key aspect of this project involved proposing a design solution within an overall systems framework, it was critical to understand how patients interacted with different spaces in the process of receiving care at the hospital. Here, I will briefly outline the steps involved for an inpatient surgery patient. Inpatient: Process ATA WAITING CONSULATION ROOMS Inpatient surgery: pre-surgery visit Step 1: Surgery scheduled by physician s office Step2: Patient is given a map with directions to admissions Step3: Patients goes over to inpatient admissions 30 to two days before surgery Step 4: Patient registers with the admissions desk Step 5: Patient discusses demographic, financial and insurance related information with the admissions staff in room. Photocopy of insurance card is taken Step 6: Patient waits in admission area Step 7: Patient is called in for pre-surgery testing in the Admit Testing Area (ATA). Basic lab work, EKG etc done based on physicians orders. If chest x-ray or additional procedures are required, patient is sent to other inpatient departments. Step 8: Patient leaves for home Fig. 2: Pre-surgery visit Inpatient surgery: day of surgery Step1: Patient checks in at the admissions desk 2 hours prior to surgery, is given a wristband and papers are checked to see if all is in order Step 2: Patient waits in admissions waiting area until AM admit calls admissions for the patient Step 3: Admissions staff give directions to the AM admit Step 4: Long confusing walk with misleading signs Step 5: After preoperative procedures in AM Admit are completed patient goes to the operating room for surgery Step 6: Patient goes to Post Anesthesia Care Unit (PACU) Step 7: Patient taken to inpatient bed or Intensive Care Unit (ICU) Breakdowns, in terms of disorientation and communication problems occur during both visits, though during the second visit the problems with location of functional areas become more evident: Fig 3: Day of surgery visit

AM admit calls the admissions desk to let them know that a patient is to be sent over. Problem occurs when no one is at the desk to take the call as a result of the lack of proper communication the patient keeps waiting. The waiting area fills up quickly with pre-surgery patients and surgery patients who are waiting to be sent to AM admit. The long walk to AM Admit is confusing without adequate signage. Also, it is not clear when one reaches ones destination AM Admit is not marked clearly.m Unaccompanied ambulatory surgery patients are stressed as it is, this walk adds to their confusion and disorientation. Outpatient The figure below shows the location of the outpatient admissions and the different outpatient departments that patients must find their way to. Clearly, the outpatient admissions is very remotely located. According to staff members it is a nightmare to give directions to patients to the different departments. The neuro-physiology and respiratory Radiology CSU Neuro Physiology, Respiratory Nuclear Medicine Fuqua Hear Center Fig. 4: Location of outpatient registration and outpatient departments

departments were cited as the most difficult destinations as they are at the opposite corner of the building and a floor below the admissions level. Outpatient admissions staff said that many people needed physical assistance in getting to these places and they did not have enough staff to do such tasks. Key Planning Considerations Based on the assessment of the existing situation, we identified key factors that must be addressed in the new design solution: Good visibility and presence from main entry points (North and South Parking Decks) Ease of access from North and South Parking decks as well as front entrance. Short and simple connections to outpatient services (cath lab) surgery pre-op, pre admit testing to increase efficiency and patient convenience. Additional waiting areas to accommodate pre-surgery as well as surgery patients and family Create direct connection between AM admit area (surgery pre-op) and patient waiting area to remove admissions as the coordinator New Location We decided to relocate admissions to a more central part (hatched in red) of the facility based on the following factors: Easily accessed from North and South Parking Deck and main entrance Opportunity to utilize space vacated by laboratory (1) Build upon proposal to develop new lobby/entrance area opposite N. Parking deck More central location closer to radiology, surgery (4), outpatient departments Opportunity to utilize open space over doctor s dining area Fig. 5: New location of admissions and support areas (hatched in red)

Design Strategy New Lobby Admissions ATA Preop waiting AM Admit (Inpatient surgery Preop) Fig. 6: New design for admissions area and support services Patient entrance/ lobby connects N. Parking Deck and ground floor to admission Admissions, AM Admit and Admissions Testing Area (ATA) are located near each other eliminating walk from admissions to AM Admit Inpatient and Outpatient Admissions to be located in one area Admissions and AM admit to utilize space vacated by lab ATA to utilize open space over doctors dining area Waiting areas created for Admissions, ATA and AM Admit

Potential benefits of modified patient flow: Equidistant location from North Parking Deck, South Parking Deck and front entrance Good visibility from main circulation paths and new patient lobby Separate waiting spaces for Admissions and AM Admit (inpatient surgery preop). Direct connection between admission and AM Admit walk removed Ease of communication between admissions, ATA and AM Admit. Good connection between AM Admit area and operating rooms (located to right of AM Admit) Single stop for outpatient and inpatient Centrally located with respect to outpatient services Fig. 7: New circulation route A visual comparison of movement paths before and after relocation of admissions department BEFORE AFTER