MINUTES INSTITUTIONAL BIOSAFETY SUB COMMITTEE (2/17) 27 APRIL 2017 PRESENT:

Similar documents
BIOCONTAINMENT OCTOBER,

The Implementation of Biorisk compliance with International Standard

Biosafety and Exposure Control Plan

Health, Safety and Environment Management System. HSE-PRO-014 HSE Incident & Hazard Management

Maximizing Safety and Uptime at Kansas State University's Biosecurity Research Institute

SAINT LOUIS UNIVERSITY

Guidelines for Biosafety in Teaching Laboratories Using Microorganisms

COMPANY SAFETY PROTOCOL (DRAFT) Helping everyone who comes to Napier Port get home to their family safely every day.

Service Level Agreement

Health, Safety and Environment Management System

Standard for Zoo Containment Facilities

II. Responsibilities

Overview of Global Biosafety Tools (Regulations, Guidelines, Assessment Tools) Shanna Nesby-O Dell DVM, MPH September 2015

AUDIT REPORT. Audit of Official Controls carried out by the Health Service Executive (Regulation (EC) No 853/2004)

Ringwood Waldorf School

VIRGINIA TECH INSTITUTIONAL BIOSAFETY COMMITTEE

Premises Assurance Model

specialising in maths and computing Health, Safety and Environmental Policy Date March 2012 Review Date March 2014 Governor Committee Health & Safety

Practical Experience of Implementing New Laboratory Biorisk Standards in Indonesia

Occupational Health & Safety Policy

Access to the laboratory is restricted when work is being conducted; and

Sample CHO Primary Care Division Quality and Safety Committee. Terms of Reference

Infection Control Manual Section 9.2 Clinical Waste Policy. Infection Prevention Control Team

City of Boston Biological Safety Regulations and Laboratory Oversight

Registration Summary by Campus

University Health and Safety Consultative Committees Procedure

BROMLEY CLINICAL COMMISSIONING GROUP - GOVERNING BODY MEETING THURSDAY 20 NOVEMBER 2014

BOSTON PUBLIC HEALTH COMMISSION REGULATION BIOLOGICAL LABORATORY REGULATIONS

Na. Acceptable (some apologies) x. Yes. Narrative report of the key issues of the meeting

BASINGSTOKE AND NORTH HAMPSHIRE HOSPITALS NHS FOUNDATION TRUST

GOVERNMENT NOTICES GOEWERMENTSKENNISGEWINGS

CONTROLLED DOCUMENT. All Managers. All Employees. Page 1 of 30. Health and Safety Policy Issued: 26/01/2017

Risk Assessment for the TB Laboratory

AMERICAN SOCIETY FOR MICROBIOLOGY. Guidelines for Biosafety in Teaching Laboratories

2014-OCT-15 TORONTO GENERAL HOSPITAL 200 ELIZABETH STREET, TORONTO, ON, CANADA M5G 2C4. Telephone: JHSC Status: Work Force #: Completed %: COPY

Newsletter Issue 01 June 2013

Official Assurance Programme. Code of Practice: Pre-export Quarantine and Isolation

Minutes of the Meeting of the Health and Safety Committee held on 8 March 2012 in the Committee Room

NUMBER: / /2009

Internal Audit. Health and Safety Governance. November Report Assessment

Massey University Radiation Safety Plan Version

2016 APHL BIOSAFETY AND BIOSECURITY SURVEY

Quality, Safety & Experience (QSE) Committee. Minutes of the Meeting Held on Wednesday 29 th March 2017 in the Boardroom, Carlton Court, St Asaph

- General Safety (Parts A and B) 4. - Chemical Safety (Parts A and B) 5. - Biological Safety (Parts A and B) 6. - Use of Biological Safety Cabinets 7

Asbestos Remediation. Ref: ASBESTOS REMEDIATION HAZARD ASSESSMENT AND RISK CONTROL. Company Name: Company Address: Asbestos Coordinator:

Minutes of Trust Board Meeting held on Thursday 7 July 2016 at am in the Boardroom, Trust Headquarters, A Floor Belfast City Hospital

Request for Tender. Review and Development of Association for Services to Torture and Trauma Survivors Inc. (ASeTTS) Strategic Plan

ROYAL COLLEGE OF ART HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY

Arizona Department of Health Services Licensing and CMS Deficient Practices

In Attendance: Arlene Sheppard (AMS) Note Taker WNCCG Sarah Haverson (SHv) Commissioning Support Officer WNCCG

RESEARCH LABORATORIES CONDUCTING HIV/HBV RESEARCH AND PRODUCTION

Safety Management Experience

DEVON COUNTY COUNCIL HEALTH, SAFETY & WELLBEING POLICY

Management Standard: Control of Legionella

Evolution of a Team-Run BSL-3 Facility Maintenance Program

PROGRAMMES AND AWARDS EXECUTIVE COMMITTEE (PAEC) Monday 4 September 2017 at 9.30am. Boardroom, QQI, Denzille Lane, Dublin 2

IGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL

KPCS Standard External Audit Checklist

Allied Health Assistant (Ongoing, Part Time position based in Windsor with travel around South East Queensland)

International Journal of Antimicrobial Agents

The Australian Council on Healthcare Standards NATIONAL REPORT ON HEALTH SERVICES ACCREDITATION PERFORMANCE

Consumer Codes Approval Scheme

A. Lococo Wholesale Ltd. Workplace Inspection Policy

Meeting the Challenges of BSL-2+

BIOSECURITY IN THE LABORATORY

Your Laboratory Specific Chemical Hygiene Plan

Health and safety management and organisation

PRE-REGISTRATION BUILDING AND ENGINEERING DOCUMENTATION CHECK LIST. - for - NEW BUILD NURSING HOMES

I. To make recommendations to the Vice President, Resources and Operations on actions and/or policies related to biosafety at Western University.

Administrative Burden of Research Compliance

Mrs Janet McKay, Non-Executive Board Member Cllr Douglas Reid, Non-Executive Board Member Board Member

Type: Policy Register No: Status: Public. Production and Use of Ice SOP

SOUTH AFRICAN NATIONAL ACCREDITATION SYSTEM

DEVON COUNTY COUNCIL HEALTH, SAFETY & WELLBEING POLICY

HEALTH AND SAFETY POLICY 2010

Airport Health Organisation Cochin International Airport Ministry of Health and Family Welfare Nedumbassery, Cochin

Faculty of Science Risk Assessment Procedure

Biological Agents and Toxins Act: Development and Enforcement of Biosafety and Biosecurity in Singapore

Health and Safety in the lab. Seyed Hosseini SA Pathology Chemical Pathology

Health and Safety Policy

Electronic Blood Tracking System

GENERAL HEALTH AND SAFETY POLICY

Code of Practice Controlling access to hazardous or sensitive areas

Guidance for MRC units on HTA licence applications for storage of human samples for research purposes

Root Cause Analysis Investigation Report. Clostridium Difficile Ian Monro Ward. The Royal National Orthopaedic Hospital

QUALITY IMPROVEMENT COMMITTEE

NZQA registered unit standard version 1 Page 1 of 5

Eastwood Community School. Health and Safety Policy

ST. AUGUSTINE S CATHOLIC PRIMARY SCHOOL

Occupational Health & Safety

RP COP001 Radiation Protection Supervisors

Biosafety Level 3 Laboratories in the US: Common Practices and Operations

Market Management & Procurement Meeting Thursday 4 th September 2014 Greenwich Park Street

STEP 1 Getting Started

HEALTH and SAFETY POLICY

OPERATIONAL HEALTH AND SAFETY GROUP

THE UNIVERSITY OF MELBOURNE EMPLOYEE HEALTH & SAFETY REPRESENTATIVE MEETING. MEETING NO 3/ th August 2017

Advancing Biosafety Across the U.S. Clinical Laboratory Community

CDC/APHL Laboratory Biosafety Competencies for the BSL-2, BSL-3 and BSL-4 Laboratories

Transcription:

INSTITUTIONAL BIOSAFETY SUB COMMITTEE (2/17) 27 APRIL 2017 PRESENT: ATTENDANCE: Geoff Gorton (Chair), Cathy Rush, Lynn Woodward, Bill Leggat, Carolyn Smith-Keune, Phil Walsh (Cairns), Emma Carson (Cairns), Peter Cowman, Chris Wright, Louise Costanzo, Sue Kelly (Cairns), Simon Leavers, Lorraine McKenzie-Ryrie (Minutes Secretary), Drew Kleier (Permanent Advisor). Shane Jorgensen DECLARATION OF CONFLICTS OF INTEREST: There were no conflicts of interest declared. APPROVAL OF PART B ITEMS 1. APOLOGIES: Sue Reilly, Aurelie Moya NOT PRESENT: 2. MINUTES: The minutes of Meeting (1-17) held on 7 February 2017 were accepted as a true and correct record. 3. ACTION REGISTER The following items were discussed: Item 1- Update List of different categories of containment facilities/labs on BioSafety Shared Drive: PAN/Riskware developing a reporting function for audit tool Drew Kleier advised still awaiting timeframes from PAN. Current list has been updated to include everything that has been registered including quarantine labs. This is available under the Biosafety drive OGTR/OGTR Annual Laboratory Inspections/2017. Will be completed in July. Item 2 Review of Autoclaves Carolyn Smith-Keune advised that the Chipmunk autoclave is being installed into the freezer room in the Science Place. Awaiting handover of Building. Geoff Gorton advised a replacement autoclave was going into CGC this was signed off yesterday; procurement plan has been done. Geoff Gorton to inform Estates so they can determine if the autoclave requires pressure vessel registration. Item 3 OGTR Matters Pest Control OGTR & Quarantine Laboratories Drew Kleier to organise meeting with Estates as no movement over the past few months. For completion by 3/17 Meeting. Item 4 Resources & Processes Implementation of BioSafety Procedure Drew Kleier to send email regarding implementation of the Procedure by 3/17 Meeting. Item 5 OGTR Matters Autoclaving Requirements Information is to hand and the full list of clinical waste bins is with Procurement and Estate. Contract for Townsville will be finalised in November and Cairns will be 2018. Biosafety procedure to be updated to reflect clinical waste requirements. Item 6 OGTR Matters 89-004 Building Works & PC2 Compliance Drew Kleier noted advised all outstanding matters now complete with the exception of air-conditioning systems. Specs provided to Estate office on air-conditioning requirements, and quote is to hand. Further meeting to be held with Estate. Item 7 OGTR Matters AITHM PC2/3 Laboratory Inspections PC2 Animal Floor Requirements Drew Kleier stated that the PC2 laboratory is complete and certified. PC2 Animal Facility form has been submitted awaiting OGTR formalisation, 90 day timeframe will be by early March. PC3 Cathy Rush advised that OGTR have advised that they will be

back to us by 21 March. 2/17. Close Item 8 OGTR Matters AITHM Quarantine Officer & Quarantine Certification The PC2 and PC3 quarantine manual has been updated by Chris Wright and needs reviewing by Drew. Quarantine certification application to be submitted. by 03/17. Item 9 OGTR Matters AITHM Thursday Island Inspection PC2 laboratory inspection to occur at the end of February by Lynn Woodward and Drew Kleier. Committee queried the need for OGTR classification. Cathy Rush stated that she felt that quarantine certification would be more relevant. The Chair, Geoff Gorton, advised that the initial need for the laboratory was to enable researchers to come back to the laboratory and prepare specimens for transporting to Townsville or Cairns. Lynn Woodward to ascertain what the usage plans are for the laboratory and report back to Committee. Facility inspected by Lynn Woodward and Drew Kleier. 2/17. Close Item 10 OGTR Matters Application Register Application Register to be added as a standing item. Item 11 OGTR Matters Application Requests Item 12 OGTR Matters Building 87 PC 3 OGTR Surveillance Audit Item 13 Compliance, Operational Activities & Hazards (Planning) Safety in Laboratories Part 3: Microbiological Safety & Containment Drew to provide report regarding changes to the standard. Item 14 Terms of Reference Terms of Reference 2017 2/17. Close Item 15 Terms of Reference Qld Health External Member Drew to contact Michael Sheridan from Qld Health. Item 16 General Business Schedule of Meetings Item 17 General Business Annual Report Item 18 General Business Project Application Form Drew to update Project Application form to include Dual Use Legislation. Include Dual Use in the full review of the Biosafety Application. 2

4. OGTR MATTERS Audits, Approvals of Projects & Procedures NLRD Update list from OGTR Drew to update NLRD Listing Building 87 PC3 Laboratory (Cert 3029) OGTR surveillance audit AITHM Researcher Andreas Kupz AITHM researcher progressing with a DNIR application. OGTR PC3 Certification (Cert 4200) for building 48 (AITHM Townsville) received. OGTR PC2 Animal Facility certification (Cert 4212) received for Building 48 (AITHM Townsville) received. Building D1, 121A Dentistry laboratory (Cert 3496). Recertified and suspension lifted. OGTR IBC Forum Drew Kleier, Phil Walsh and Chris Wright to attend. Participants to report back. Bill Warren Laboratory De-certification (Cert 426, Cert 425) Alex Baxter organising decontamination once complete Drew Kleier and Bill Leggat to inspect. Building 87 PC3 Shutdown (Cert 3029) Scheduled for May 15 th. ACTION ITEM: Drew to update NLRD Listing Drew, Phil and Chris to report on OGTR IBC Forum Drew Kleier and Bill Leggat to inspect and decertify Bill Warren Labs. 5. COMPLIANCE, OPERATIONAL ACTIVITIES & HAZARDS (PLANNING) Update on Sector & Industry HSE Standards & Practices DR AS/NZS 2243.3:2016 Safety in laboratories Part 3: Microbiological safety & containment (revision of AS/NZS 2243.3:2010) Standard Review & Comment Template 6. RESOURCES & PROCESS Nil to Report 7. REPORTING & VERIFICATION Riskware Report Incidents & Hazards, Notifiable Events, High/Very High Risks Report noted. 8. GENERAL BUSINESS Business Arising HSEAC Interested in getting the OGTR signed off. Update on JCU & Sector HSE Standards & Practices Nil RW3455 Unauthorised access to laboratory with live crazy ants Estate Office personnel entered a building containing crazy ants. Building may not have had adequate signage which has now been provided. Quarantine regulator has conducted inspection of building 87 PC3 (Q2078). Inspection was passed successfully. Inspection of Thursday Island AITHM PC2 Laboratory has occurred. Minor items 3

required attention. Applications for Quarantine Approved Arrangements for building 48 (AITHM Townsville) PC2 and PC3 are in progress. Quarantine regulator will inspect next week. Corrective actions raised by Quarantine regulator for Cairns Quarantine laboratory closed out (Q1995, Q1590). Closed Building 89, 004 rectification of ventilation to meet PC2 requirements in progress. Meeting needs to be held with Estate to determine scope of works and approval to proceed. Discussion held with DTHM and Estate Directorate regarding plant species that pose biosecurity risk in the Vet and biomedicine area. Management plan for the biosecurity relevant plan species has been formulated. Drew to follow up. Representative with knowledge of plant biosecurity and biosafety issues to be approached and invited onto the committee on an ad hoc basis. Drew Kleier and Geoff Gorton to follow up. Approved applications Noted Biosafety Application Process Phil Walsh now included to assess biosafety applications. Drew to do up a roster of when members are responsible for assessing biosafety applications. Biosafety application form being reviewed. Building 48 PC3 Mechanical Contractor Simon Leavers agreed to meet with the JCU stakeholders to discuss options. Biosafety Cabinet Servicing Simon Leavers to speak to Ritchie re procurement plan. Drew to facilitate obtaining a complete list of biosafety and laminar flow cabinets. ACTION ITEM: Drew Kleier to follow up the progress of the actions from the management plan for the biosecurity plant species. Drew Kleier and Geoff Gorton to follow up on plant biosafety representative. Drew Kleier to do up a roster of when members are responsible for assessing biosafety applications. Drew Kleier to arrange meeting with Simon Leavers and stakeholders for Building 48 PC3 ventilation. Drew to facilitate obtaining a complete list of biosafety and laminar flow cabinets. Meeting closed at 3.10p.m.. Confirmed: Chairperson 4

27 April 2017 5