Updating the BRAC Cleanup Plan:

Similar documents
Unexploded Ordnance (UXO)

Foreword. Mario P. Fiori Assistant Secretary of the Army (Installations and Environment)

DoD Environmental Guidance

Environmental Baseline Survey for Naval Weapons Station Concord

Army. Environmental. Cleanup. Strategy

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress

Final Environmental Restoration Program Recordkeeping Manual

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

Defense Environmental Funding

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

Office of the Inspector General Department of Defense

NUMBER Department of Defense INSTRUCTION ASD(C3I)

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994

Unexploded Ordnance Safety on Ranges a Draft DoD Instruction

Department of Defense

Office of the Inspector General Department of Defense

DEFENSE LOGISTICS AGENCY WASTEWATER TREATMENT SYSTEMS. Report No. D March 26, Office of the Inspector General Department of Defense

Template modified: 27 May :30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE JULY 1994.

Financial Management

Army Environmental Liability Recognition, Valuation, and Reporting June 2010

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

S One Hundred Seventh Congress of the United States of America AT THE FIRST SESSION

DEPARTMENT OF THE ARMY WASHINGTON, DC. 2031O. DASG-HS 26 March Expires 21 March 2003

Department of the Air Force

Defense Environmental Programs Annual Report to Congress for FY 2015

Army Environmental Cleanup Strategic Plan

Office of the Inspector General Department of Defense

Office of the Inspector General Department of Defense

FY2016 AFRC FORT WADSWORTH

Chapter 4 Implementation and Reuse

U.S. Army Garrison Michigan (Selfridge) Conveyance Progress Report

Office of the Inspector General Department of Defense

DEFENSE CLEARANCE AND INVESTIGATIONS INDEX DATABASE. Report No. D June 7, Office of the Inspector General Department of Defense

Kansas AAP, KS Conveyance Progress Report

ASSESSMENT OF PUBLIC COMMENTS - SUMMARY. Draft 6 NYCRR Part 375 ENVIRONMENTAL REMEDIATION PROGRAMS

Voluntary Remediation Program (VRP) Application

Information Technology

DOD INSTRUCTION DOD LOW-LEVEL RADIOACTIVE WASTE (LLRW) PROGRAM

Navy Non-DERP (Other Accrued) Environmental Liabilities (OEL) ~ Development and Outcomes

REVITALIZING COMMUNITIES & PROTECTING HUMAN HEALTH AND THE ENVIORNMENT: BROWNFIELDS FUNDING OPPORTUNITIES. Environmental Consultants and Contractors

MEMORANDUM OF UNDERSTANDING ON IMPLEMENTATION OF THE SOUTH BAY SALT POND RESTORATION PROJECT

Appendix D: Restoration Budget Overview

Steps for Successful Brownfields Redevelopment. Martha Faust Executive Director Minnesota Brownfields

Office of the Inspector General Department of Defense

Department of Defense DIRECTIVE. SUBJECT: Confinement of Military Prisoners and Administration of Military Correctional Programs and Facilities

Defense Environmental Restoration Program Manual

Report No. DODIG March 26, General Fund Enterprise Business System Did Not Provide Required Financial Information

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

Integrated Comprehensive Planning for Range Sustainability

Report No. D February 9, Internal Controls Over the United States Marine Corps Military Equipment Baseline Valuation Effort

FY2016 SIEVERS-SANDBERG USARC

Office of the Inspector General Department of Defense

Information Technology

APPLICATION FOR CITY OF MARIETTA. Community Development Block Grant Public Facilities Acquisition, Construction, and Renovation

Report Documentation Page

CJCSI B Requirements Generation System (One Year Later)

Department of Defense MANUAL

Environmental Program Priorities. Environmental Quality and Cleanup. Plan Do Check Act process Objectives, targets, success indicators Conclusion

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Opportunities to Streamline DOD s Milestone Review Process

WEATHER. User's Manual. January 1986 CPD-52. Generalized Computer Program. US Army Corps of Engineers Hydrologic Engineering Center

U.S. ARMY RESTORATION ADVISORY BOARD. and TECHNICAL ASSISTANCE FOR PUBLIC PARTICIPATION GUIDANCE

UNITED STATES ARMY DRUG AND ALCOHOL TECHNICAL ACTIVITY

Fort Monmouth, NJ. Conveyance Progress Report. Insert Picture of entire base if available

White House Liaison, Communications, and Inspections

EPA Region 4 Brownfields Grant Writing Workshop. CLU-IN Sessions of August 22 and September 13, Attendees Questions and EPA Region 4 Answers

Report No. D February 22, Internal Controls over FY 2007 Army Adjusting Journal Vouchers

Report No. D May 14, Selected Controls for Information Assurance at the Defense Threat Reduction Agency

World-Wide Satellite Systems Program

ASAP-X, Automated Safety Assessment Protocol - Explosives. Mark Peterson Department of Defense Explosives Safety Board

Engineered Resilient Systems - DoD Science and Technology Priority

Quality Assurance Specialist (Ammunition Surveillance)

Department of Defense INSTRUCTION

MILITARY MUNITIONS RULE (MR) and DoD EXPLOSIVES SAFETY BOARD (DDESB)

EDWARDS AIR FORCE BASE ENVIRONMENTAL RESTORATION PROGRAM RESTORATION ADVISORY BOARD CHARTER

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger

Department of Defense INSTRUCTION

CERCLA SECTION 104(K) ASSESSMENT COOPERATIVE AGREEMENT WORK PLAN CITY OF DUBUQUE, IOWA BROWNFIELDS ASSESSMENT COOPERATIVE AGREEMENT

Advance Questions for Buddie J. Penn Nominee for Assistant Secretary of the Navy for Installations and Environment

Capability Planning for Today and Tomorrow Installation Status Report

Wildland Fire Assistance

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Office of the Inspector General Department of Defense

Mission Assurance Analysis Protocol (MAAP)

DoD and EPA Management Principles for Implementing Response Actions at Closed, Transferring, and Transferred (CTT) Ranges

terns Planning and E ik DeBolt ~nts Softwar~ RS) DMSMS Plan Buildt! August 2011 SYSPARS

Hunters Point Radiological Cleanup FAQs

City of Painesville, Ohio

AIR FORCE CONTRACT CONSTRUCTION

FMFADA Deputy Director, Operations

Safety Management Functions, Responsibilities and Authorities Manual (FRAM) Revision 1

DEPARTMENT OF DEFENSE. Strategy on Environmental Justice

ALLEGED MISCONDUCT: GENERAL T. MICHAEL MOSELEY FORMER CHIEF OF STAFF, U.S. AIR FORCE

Report No. D June 17, Long-term Travel Related to the Defense Comptrollership Program

Department of Defense INSTRUCTION

Department of Defense

DoD Scientific & Technical Information Program (STIP) 18 November Shari Pitts

Transcription:

BRAC Environmental Fact Sheet SPRING 1999 OFFICE OF THE DEPUTY UNDER SECRETARY OF DEFENSE (ENVIRONMENTAL SECURITY) Updating the BRAC Cleanup Plan: A Living Tool for Integrating Reuse and Cleanup Introduction/Purpose This fact sheet has been developed for Base Realignment and Closure (BRAC) Cleanup Teams (BCTs) that have completed a bottom-up review and prepared an initial BRAC Cleanup Plan (BCP) (i.e., Version 1 BCP). The final step in the BCP process is executing and maintaining the BCP as shown in the figure below. This fact sheet is intended to highlight sections of the BCP that should be updated and modified to keep the BCP a living document that helps the BCT to integrate reuse and manage restoration efforts. BCTs should use the information in this fact sheet to focus their efforts in updating their BCP every 9 to 18 months. What is the BCP? The BCP is a living document used to formalize the results of the bottom-up review process. It is a road map that the BCT uses to expedite and improve environmental response actions and integrate them with redevelopment activities, plans, and schedules. According to the BCP Guidebook, the BCP should be updated and modified regularly to reflect status, strategy, and schedule changes, as well as issue resolution. The BCP process is a five-step process, as outlined in the figure below (Figure 1-2 from the BCP Guidebook). The Five-Step BCP Process Step 1 Step 2 Step 3 Step Step 5 Form BCT and Assisting Project Team Conduct Internal Bottom-Up Review and Supplemental Reviews Compile and Adopt Recommendations Assemble BCP Execute and Maintain Integrity of BCP Define Roles Define Roles and and Responsibilities Responsibilities Include: Include: Base Base Transition Transition Coordinator Coordinator Contractors Contractors Others Others Involve Involve Restoration Restoration Advisory Advisory Board Board Review Review Protocol Protocol (section (section 3) 3) Identify Identify Need Need to to Conduct Conduct Supplemental Supplemental Review(s) Review(s) Incorporate Step 3 Incorporate Step 3 Recommendations Recommendations Format Format in in Section Section 1 1 2 2 3 3 5 5 Strategy Status Update Update BCP BCP Regularly Regularly Hold Ongoing Hold Ongoing Dynamic BCT Dynamic BCT Meetings Meetings Local reproduction of this fact sheet is authorized and encouraged 1

Form SF298 Citation Data Report Date ("DD MON YYYY") 00 Mar 1999 Report Type N/A Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle Updating the BRAC Cleanup Plan: A Living Tool for Integrating Reuse and Cleanup Authors Contract or Grant Number Element Number Project Number Task Number Work Unit Number Performing Organization Name(s) and Address(es) Office of the Under Secretary of Defense Acquisition and Technology 3000 Defense Pentagon Washington, DC 20301-2000 Sponsoring/Monitoring Agency Name(s) and Address(es) Performing Organization Number(s) Monitoring Agency Acronym Monitoring Agency Report Number(s) Distribution/Availability Statement Approved for public release, distribution unlimited Supplementary Notes Document has color Abstract This fact sheet has been developed for Base Realignment and Closure (BRAC) Cleanup Teams (BCTs) that have completed a bottom-up review and prepared an initial BRAC Cleanup Plan (BCP) (i.e., Version 1 BCP). The final step in the BCP process is executing and maintaining the BCP as shown in the figure below. This fact sheet is intended to highlight sections of the BCP that should be updated and modified to keep the BCP a "living document" that helps the BCT to integrate reuse and manage restoration efforts. BCTs should use the information in this fact sheet to focus their efforts in updating their BCP every 9 to 18 months. Subject Terms Document Classification unclassified Classification of Abstract unclassified Classification of SF298 unclassified Limitation of Abstract unlimited

Number of Pages

BRAC Environmental Fact Sheet What is the BCP Abstract? The BCP Abstract is the executive summary of the BCP. It is updated annually and is submitted by each Service Component to the Department of Defense (DoD) in November of each year. Although the abstract serves as the executive summary of the BCP, it can be prepared without updating the entire BCP. The abstract is used to review Fast- Track Cleanup efforts by identifying successes, issues, and areas in which further policy and guidance may be needed; the abstract is also used to analyze trends and track progress made. Where to Focus Updates of the BCP After Version 1 The following sections of the BCP should be reviewed every 9 to 18 months to determine whether they need revision: 1.3, BCT/Project Team 2.0, Property Disposal and Reuse Plan 3., Environmental Condition of Property 5.1, Environmental Restoration 1.3, BCT/Project Team A key element in the Fast-Track program is identifying all personnel that make up the Project Team and involving them, as needed, throughout the restoration process. Team members are identified during the initial bottom-up review and the preparation of the Version 1 BCP and are recorded in Table 1-1, Current BCT/Project Support Team Members. As the environmental restoration and redevelopment processes proceed, team members may change, new roles and responsibilities may be established, and contact information may require updating so that the appropriate team members are included in meetings for consultation. Table 1-1 of the BCP should be updated to reflect any changes. The BCP Distribution List also should be updated. In addition, team members who participated during the initial bottom-up review should be highlighted in Table 1-1 and may be called on to provide technical assistance in maintaining the integrity of the BCP. 2.0, Property Disposal and Reuse Plan Property cleanup, disposal, and reuse are iterative, interrelated processes. 2 is intended to provide information to help focus environmental restoration activities on supporting the communities redevelopment and property reuse efforts. The Base Transition Coordinator (BTC) serves as a DoD coordinator and facilitator to the DoD Component and the Local Redevelopment Authority (LRA). BTCs are ombudsmen and act as honest brokers and advocates for the base closure and community redevelopment process. The BCT should use the BTC as a resource to coordinate information needs and as a channel for accurate information regarding the cleanup, closure, and redevelopment processes Local Redevelopment Authority The LRA is usually created by elected local or state officials and recognized by DoD. The LRA is responsible for representing the community s interests. It has responsibility for preparing and implementing a redevelopment plan for the property made available to the community. The LRA works with the BTC, BCT, Installation Commander, and others to ensure that environmental issues are considered in making reuse decisions. It serves as the community s point of contact for all matters related to reuse, acting as an interface between the community, the installation, and the DoD Component (through the BTC). Redevelopment Plan This plan identifies the LRA s overall reuse strategy for the installation. The LRA and the community (through public input) must ensure that the redevelopment plan adequately balances local community and economic development needs with those of the homeless. This plan also incorporates environmental considerations such as cleanup activities, air emissions credits, natural resource concerns such as endangered or threatened species and habitat, and cultural and historical requirements. The comprehensive land-use plan, a component of the redevelopment plan, should be of particular use to the BCT in identifying land use assumptions. CERFA EBS The Service Component prepares an Environmental Baseline Survey (EBS) for each installation being closed or realigned. The EBS is based on all existing environmental information related to storage, release, treatment, or disposal of hazardous substances or petroleum products on the property to determine or discover the obviousness of the presence or likely presence of a release or threatened release of any hazardous substance or petroleum product. Although the Community Environmental Response Facilitation Act (CERFA) initially was concerned with storage of petroleum, storage is no longer a factor in classifying property, and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) excludes petroleum. Restoration Site A distinct area of an installation containing one or more releases or threatened releases of hazardous substances treated as a discrete entity or consolidated grouping for response purposes. A restoration site includes any building, structure, impoundment, landfill, storage container, or other site or area where a hazardous substance was or has come to be. Installations may have more than one site. 2

SPRING 1999 between the BCT and the LRA. The BTC also helps in building consensus and understanding of issues pertaining to environmental restoration and community redevelopment. Knowing the LRA s proposed intended use of the property, the BTC and the BCT can better identify any potential inconsistency between the proposed use, the environmental condition of property, and the planned cleanup activities that may require the LRA to reexamine reuse and land use decisions. For example, the LRA s initial proposal may include a housing area located on a 100-acre open space. On examining the environmental condition of that property, the BCT may discover that the past use of the open space may not be compatible with the proposed reuse. In a collaborative effort among the LRA, the BTC, and the BCT, the reuse plan can be modified to place the residential area in an alternate, more suitable location. To ensure that cleanup and redevelopment are integrated, the LRA must provide the BCT with key information, including the LRA s comprehensive land-use plan, any changes to reuse plans, specific parcels identified for early reuse, and a redevelopment schedule and phasing plan. Reuse and redevelopment information is evaluated against the environmental condition of property gathered by the BCT for the requirements discussed in 3. of the BCP Guidebook. The Finding of Suitability to Transfer and Finding of Suitability to Lease schedules should be developed and reviewed by the BCT and the LRA to ensure compatibility and identify potential delays and problems. For additional information, see BCP Guidebook, Table 3-1, Review Roadmap, Steps 27 through 33. 3., Environmental Condition of Property The environmental condition of property changes as additional information becomes available. The DoD Component makes the initial determination during the Community Environmental Response Facilitation Act (CERFA) Environmental Baseline Survey (EBS). This determination is based on records review, interviews, site reconnaissance, restoration of sites, and review of aerial photographs. A map showing the condition of property is generated to provide a visual understanding of the property. The initial review may identify property that requires additional evaluation (Category 7). As the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) investigation continues, these Category 7 areas are reclassified. The BCT must keep this map updated as the CERCLA investigation continues. This map, with updated information, should be a useful tool in the LRA s continuing reuse planning and redevelopment activities. Figure 3-1 of the BCP Guidebook, Environmental Condition of Property, maps the environmental conditions, while Figure 3-2, Suitability of Property for Transfer by Deed, maps property according to whether it can be transferred by deed (Categories 1-) or not (Categories 5-7) under CERCLA. However, Category 5-7 properties may be leased, or transferred using Early Transfer procedures, for appropriate reuse. These maps should be overlaid on the LRA s land reuse plans and the disposal parcel plan. This important exercise provides the BCT with the opportunity to visualize and focus restoration work on areas planned for reuse. BCTs should review the overlay with the LRA to ensure a clear understanding of the order or priority for restoration activities. Another useful tool in discussions with the LRA on integrating reuse and cleanup is provided in the February 199 Guide to Assessing Reuse and Remedy Alternatives at Closing Installations. These types of exchanges with the LRA will help build a solid relationship and open dialogue between the two groups and reduce the likelihood of later misunderstandings regarding reuse plans and possibilities and the environmental restoration requirements. For additional information, see BCP Guidebook, Table 3-1, Review Roadmap, Step 9. Environmental Condition of Property Categories 1 Areas where no release or disposal of hazardous substances or petroleum products has occurred (including no migration of these substances from adjacent areas) 2 Areas where only release or disposal of petroleum products has occurred 3 Areas where release, disposal, and/or migration of hazardous substances has occurred, but at concentrations that do not require a removal or remedial action Areas where release, disposal, and/or migration of hazardous substances has occurred and where all remedial actions necessary to protect human health and the environment have been taken 5 Areas where release, disposal, and/or migration of hazardous substances has occurred and where removal or remedial actions are under way, but where all required remedial actions have not yet been taken Areas where release, disposal, and/or migration of hazardous substances has occurred, but where required actions have not yet been implemented 7 Areas that have not been evaluated or require additional evaluation 3

BRAC Environmental Fact Sheet SPRING 1999 5.1, Environmental Restoration This section is used to develop the overall restoration schedule for the installation. The overall restoration schedule must be based on identified restoration sites, the community s intended reuse schedule phasing, and the cost-to-complete estimates submitted to DoD for the restoration database. Cost directly affects the BCT s efforts to investigate, remediate, and make land available for reuse. Properly scheduling and executing cleanup requires a yearly update to determine and verify the accuracy of cost-to-complete data and identify any changes in reuse that may affect the cost-to-complete. The cost-to-complete update should be used by the BCT to program work within installation budgetary constraints. The overall restoration schedule should always be tied to the planned reuse ( 2) and the environmental condition of the property ( 3.). A Gantt-type chart format is used to lay out the schedule. For additional information, see BCP Guidebook, Table 3-1, Review Roadmap, Step 17. Summary This fact sheet is only a guide for streamlining BCP updates after Version 1. It focuses on updating the project team listing and the Environmental Condition of Property map, and constant monitoring of reuse schedules and phasing to ensure an appropriate overall restoration schedule. In updating the BCP, the BCT should seek input from the RAB and other stakeholders in addition to having discussions with the LRA. Because the BCP is a living document, the BCT may determine that it is necessary to update other chapters and sections of the BCP as additional environmental and reuse information is received or installation conditions change. It is not necessary to reprint and recopy the entire BCP each time a change is made. Changes may be tracked by pen and ink or by reprinting the modified page. Contact your Component for specific policies and guidance related to updating your BCP. References BRAC Cleanup Plan Guidebook (Fall 95) http://www.dtic.mil/envirodod/brac/toc.html 1998 BRAC Cleanup Plan Abstract format and instructions (October 98) http://www.dtic.mil/envirodod/brac/publish.html Fast-Track Cleanup at Closing Installations (May 9) http://www.dtic.mil/envirodod/brac/reissued.html Guide to Assessing Reuse and Remedy Alternatives at Closing Installations (February 199) http://www.dtic.mil/envirodod/brac/guide.html Management Guidance for the Defense Environmental Restoration (March 98) http://denix.cecer.army.mil/denix/public/es-s/cleanup/derp/guide.html Overview of the Fast-Track Cleanup (Spring 97) http://www.dtic.mil/envirodod/brac/cleanup.html This and other documents on the BRAC Environmental Cleanup are available at: http://www.dtic.mil/envirodod/brac/ We welcome and invite your comments on this fact sheet, as we seek ways to improve the information provided. Please send comments to the following address: OADUSD (Environmental Cleanup) Attn: Fast-Track Cleanup 300 Defense Pentagon Washington, DC 20301-300 printed on recycled paper