Panel Decision & Report. SRP MAPC Plymouth County, MA

Similar documents
Recent Career Highlights: University of Maryland, Center for Disaster Resilience WaterWonks LLC Prior Career Highlights

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

Sabine Pass to Galveston Bay, Texas

Distribution Restriction Statement Approved for public release; distribution is unlimited.

King County Flood Control District 2017 Work Program

Hazard Mitigation Assistance

Contingency Planning, Emergency Management & Marine Transportation Policy Leader

The recent support NGA has

U.S. Army Corps of Engineers Navigation Program Update

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

Deep Draft Navigation Planning Center of Expertise

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program

Section 3. LMS Team Organization and Operating Procedures

Part V - The Planning Process and Public Participation. Table of Contents

Project Engineering Peer Review Within The U.S. Army Corps Of Engineers

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

GULF COAST ECOSYSTEM RESTORATION COUNCIL COMPREHENSIVE PLAN COMPONENT PROGRAM

PUBLIC NOTICE.

U.S. Army Corps of Engineers Disaster Response Missions, Roles & Readiness

Memorandum. Trinity River Corridor Project Committee Members: David A. Neumann (Chairman) Vonciel Jones Hill Steve Salazar (Vice-Chair) Delia Jasso

Alabama Coastal Area Management Program Strategic Plan

Planning for the Beneficial Use of Dredged Material: A Success Story in Mississippi and an Opportunity in Texas

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

THE BROOKINGS INSTITUTION

Department of Homeland Security Office of Inspector General. The United States Coast Guard's Program for Identifying High Interest Vessels

Hazard Mitigation Assistance (HMA) Developing Hazard Resilient Communities February 29, 2012

Outreach and Adaptive Strategies for Climate Change: The Role of NOAA Sea Grant Extension in Engaging Coastal Residents and Communities

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469

TEXOMA Same Conference

Direct Component Project Evaluation Form

Midpeninsula Regional Open Space District 330 Distel Circle, Los Altos, CA Issued: Friday, January 27, 2017

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects.

Gulf Coast Restoration: RESTORE Act and Related Efforts

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

Restoration of the Mississippi River Delta in a Post-BP Oil Spill Environment

Georgia Environmental Conference

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Building and Preserving Alaska s Future

Update on USACE Civil Works Program Authorities, Policies, and Guidance

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA September 17, 2018 PUBLIC NOTICE

Integration of marine spatial data in Japan: "Japan's Marine Cadastre"

GULF COAST RESTORATION CORPS

Marine Minerals Program

CHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review

PUBLIC NOTICE Application for Permit

Lessons Learned from Prior Reports on Disaster-related Procurement and Contracting

DCMC PARTNERS. Alternative Procedures for Permanent Work (428) In Puerto Rico March 29, 2018

Corps Regulatory Program Update

Pre- and Post-Katrina Planning in Pearl River County. Pearl River County

Marine Emergency Preparedness and Response. Canadian Coast Guard Presentation at the First Nations and Oil Pipeline Development Summit

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

United States Coast Guard Marine Transportation Systems Management

GAO ARMY CORPS OF ENGINEERS. Peer Review Process for Civil Works Project Studies Can Be Improved

Emergency Management Assistance Compact (EMAC)

Create an account to get started build your profile, create or upload resumes and apply for jobs.

Senate Bill 379 Land use: general plan: safety element: climate adaptation Senator Hannah-Beth Jackson

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

OFFICE OF EMERGENCY MANAGEMENT ANNUAL REPORT

UNCLASSIFIED UNCLASSIFIED

Charting Restoration. Gulf Restoration Priorities and Funded Projects Seven Years After Deepwater Horizon. nature.org/gulf

APPENDIX D PUBLIC AND PRIVATE SECTOR PARTICIPATION PROGRESS REPORT. Hillsborough County Local Mitigation Strategy Appendix D-1

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

REVIEW PLAN. Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report. Jacksonville District

Implementing the Water Resources Development Act of 2007

JOINT PUBLIC NOTICE. October 1, 2018

Addendum No. 1 WEBB CREEK BRIDGE REPLACEMENT PROJECT (DESIGN)

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data

Structural Flood Mitigation

CHAPTER 2 PLANNING PROCESS

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

REQUEST FOR PROPOSALS HAZARD MITIGATION PLAN UPDATE FOR LOWNDES COUNTY, GEORGIA

DEPARTMENT OF THE TREASURY

TRCA Administrative Fee Schedule for ENVIRONMENTAL ASSESSMENT and INFRASTRUCTURE PERMITTING SERVICES February 1, 2018

CHAPTER 1. Chapter 1 Introduction Mobile County Multi-Hazard Mitigation Plan. 1.1 Background. 1.2 Authority

Idaho Statewide Implementation Strategy for the National Fire Plan

U.S. Department of Homeland Security

DEPARTMENT OF THE ARMY GENERAL PERMIT

United States of America Country Report to the

Community Recovery. Pat Forbes Louisiana Office of Community Development


November 20, 2017 PUBLIC NOTICE

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

[ CDBG-DR & FEMA Key Personnel ] Nearly 400 combined years of experience in disaster recovery

Emergency Management THERE WHEN YOU NEED US

Unmanned Systems Operational Demonstration along the Mississippi Gulf Coast

Whatcom County Request for Qualifications RFQ #15-01

Coastal America Partnership

2005 Hurricane Response

St. Bernard Parish Government Annual Coastal Report

Presentation 8 UNITED STATES COAST GUARD RADM STEVEN H. RATTI, COMMANDER, FIFTH COAST GUARD DISTRICT

FOR INFORMATIONAL PURPOSES ONLY DO NOT SUBMIT

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 484

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO

South Carolina Sea Grant Consortium Leadership by Staff on Boards and Committees

DIVISION 15. ENVIRONMENTAL STANDARDS FOR BEACH AND DUNE PROTECTION*

vessel prepares for and actively off-loads two new Post-Panamax gantry cranes to the

Transcription:

Panel Decision & Report SRP MAPC051914 Plymouth County, MA July 10, 2015

Table of Contents SUMMARY... 2 INTRODUCTION... 2 PANEL... 2 BASIS FOR APPEAL... 4 DATA SUBMITTED BY THE COMMUNITY AND FEMA... 4 SUMMARY OF PANEL PROCEDURES... 5 RECOMMENDATION... 7 RATIONALE FOR FINDINGS... 7 Page 1 of 7 July 10, 2015

Summary Based on the submitted scientific and technical information, and within the limitations of the SRP, the Panel has determined that the Community s (Scituate, MA and Marshfield, MA) data and methodology does not satisfy NFIP standards, therefore FEMA s data is not corrected, contradicted, or negated. Introduction This report serves as the recommendation to the Federal Emergency Management Agency (FEMA) administrator from the (NIBS) Scientific Resolution Panel (SRP). SRP s are independent panels of experts organized, administered and managed by NIBS for the purpose of reviewing and resolving conflicting scientific and technical data submitted by a community challenging FEMA s proposed flood elevations. The SRP is charged with helping to efficiently resolve appeal and protest issues between FEMA and communities by acting as an independent third party in an effort to obtain the best data possible for the community s Flood Insurance Rate Maps (FIRM s). Panel Panel ID: Panel Name: FEMA Region: Panel members: MAPC051914 Plymouth County, MA I Mr. Martin Brungard, P.E., D.WRE, Senior Project Manager, DLZ Corporation, Indianapolis, IN. Mr. Brungard has over 29 years of experience in engineering consulting. He holds advanced degrees in civil and environmental engineering from the University of Florida with specialization in water resources engineering. He was formerly chief coastal structure reviewer for Letter of Map Revision (LOMR) applications for FEMA where he reviewed and assessed dozens of coastal systems for wave and runup conditions. He also provided post-hurricane damage and flood assessments along the Florida Gulf coast in 2002 and 2005. He is experienced with ACES, WHAFIS, RUNUP, STWAVE, RCPWAVE, and GENESIS coastal modeling software. Mr. Douglas Hamilton, P.E., D.WRE, Foothill Ranch, CA. Mr. Douglas Hamilton is a Civil Engineer with extensive experience analyzing and solving complex problems related to water. His areas of expertise include hydrology, hydraulics, water resources, and natural hazards. Over the course of 30 years of professional experience, he has developed and applied a wide range of analytical techniques in order to explain the hydrologic impacts of natural hazards including the effects of wildfires, landslides, and seismic activity. He is an expert in the application of sediment transport, geomorphic, and hydrologic principles to the understanding of natural systems and for the design of constructed facilities and methods to Page 2 of 7 July 10, 2015

mitigate hazards. For the past 10 years, Mr. Hamilton has been working on water projects in Iraq including Iraq s National Water Plan for 2015 through 2035. While in the Research Branch of the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers, Mr. Hamilton was in charge of the computer program HEC-6, Sediment Transport in Rivers and Reservoirs. He has taught a number of professional courses for hydraulic and sediment transport analysis techniques. He is a cooperating partner with the Chinese Academy of Sciences, Institute of Mountain Disasters and Environment (Sichuan, China), and has served as a committee member for the National Research Council s Water Science and Technology Board and the California Governor s Alluvial Fan Flooding Task Force. Mr. John Lally, P.E., Lally Consulting, LLC, Seattle, WA. Mr. Lally has over 24 years of experience in coastal engineering and construction throughout the United States and Canada, South America, Asia, Africa, and the Caribbean. He has worked as a consulting engineer for approximately half of his career, and as a marine contractor for the other half. In 2007, John founded Lally Consulting LLC, an engineering and environmental consulting firm that specializes in the design and implementation of coastal engineering, waterway restoration, and dredging projects. John has performed site physical and processes analyses, oceanographic data collection, hydrographic surveys, dive surveys, planning, numerical modeling, engineering design, evaluation of alternative construction methods, production and cost estimating, contract plans and specifications preparation, procurement support, environmental compliance monitoring, project management and construction oversight for a broad range of coastal and waterway engineering projects. John is a working group member of the World Association for Waterborne Transport Infrastructure (PIANC), a member of the American Society of Civil Engineers (ASCE) Coasts, Oceans, Ports and Rivers Institute (COPRI) Dredging Operations and Navigation Engineering Subcommittees, a past president of the Western Dredging Association (WEDA) Pacific Chapter, and a member of the Coastal, Education & Research Foundation (CERF). Mr. Spencer Rogers, Extension Specialist in Hurricane-Resistant Construction and Shoreline Erosion, North Carolina Sea Grant, Wilmington, NC. Spencer Rogers joined North Carolina Sea Grant in 1978 as a coastal engineering extension specialist in hurricane-resistant construction techniques, shoreline erosion, coastal management and marine construction. His faculty affiliations are with the University of North Carolina at Wilmington s Center for Marine Science and an adjunct with the North Carolina State University s Department of Civil Engineering. He was previously employed by Florida Bureau of Beaches and Shores. His education includes a BS in Engineering from the University of Virginia in 1973 and a MS in Coastal and Oceanographic Engineering from the University of Florida in 1975. Recent work includes participation in FEMA s Hurricane Katrina Mitigation Assessment Team Page 3 of 7 July 10, 2015

(MAT), damage assessments for ASCE following Hurricanes Katrina and Ike, as well as damage assessment projects for the Corps of Engineers following Sandy. Mr. George Sills, P.E., Manager, George Sills Geotechnical Engineering Consultant, L.L.C., Vicksburg, MS. Mr. Sills is retired from the U.S. Army Corps of Engineers (Corps) where he worked for over 36 years. He has extensive experience in the evaluation, design, and construction of dams, levees, and pumping plants. George has lead several investigations into the causes and mechanisms of seepage distress along levees and has helped the Corps develop a comprehensive understanding of these issues. He has lectured and published numerous technical papers on levee seepage distress and levee design. In 2005, George was selected to serve on the Corps Interagency Performance Evaluation Task Force (IPET) following Hurricane Katrina as a member of the Perishable Data Team and also as a member of the Performance Analysis Team. He made major contributions to these efforts and to the IPET document that summarized the team s findings. In 1999, Mr. Sills was selected as the U.S. Army Corps of Engineers Federal Engineer of the Year and was then selected by NSPE as one of the top ten Federal Engineers of the Year. He has a BSCE from Mississippi State University, a MSCE from Texas A & M, and has advanced graduate work in Civil Engineering at Louisiana State University, toward Ph.D. Basis for Appeal By letters dated October 2, 2013 and October 15, 2013, the Towns of Scituate, MA and Marshfield, MA, respectively, submitted appeals of the preliminary revised Flood Insurance Rate Map (FIRM) issued for Plymouth County, MA by FEMA on May 1, 2013. The appeals are focused on narrow geographic locations and technical issues. In Scituate, the appeal involves areas in the vicinity of coastal transects PL-40 and PL-49 from the Flood Insurance Study (FIS). In Marshfield, the appeal involves areas in the vicinity of coastal transects PL-64 and PL-66 from the FIS. The technical issues disputed in both appeals are the incident wave height and wave period used to compute the wave setup along those transects. Altering the wave setup alters the wave height and wave runup computed in the final Base Flood Elevations and flood zones. The appellants, through their consultant, Ransom Consulting, Inc., contend that FEMA should not use deep-water wave characteristics for these computations. The appellants contend in the Marshfield FEMA Appeal (top of page 2 from that appeal) that nearshore wave height and period should be selected where the density of wave contours increased (suggesting breaking) and was approximately equal to one wave length out from the shore. Data Submitted by the Community and FEMA The following data used to generate the challenged flood elevations and the contesting data submitted by Marshfield and Scituate, MA has been provided to the Panel: Page 4 of 7 July 10, 2015

Marshfield Scientific Resolution Panel Request Letter, dated January 10, 2014 Scientific Resolution Panel Request Form, dated January 10, 2014 Appeal Data with Attachments 1 through 11, dated October 15, 2013 Appeal Data with Attachments 12 through 19, dated October 15, 2013 Shore profile and wave calculations, Excel file, undated Scituate Scientific Resolution Panel Request Letter, dated January 9, 2014 Scientific Resolution Panel Request Form, dated January 9, 2014 Appeal Data with Attachments 1 through 20, dated October 2, 2013 Shore profile and wave calculations, Excel file, undated FEMA Marshfield Acknowledgement Letter, dated October 31, 2013 Scituate Acknowledgement Letter, dated October 31, 2013 Marshfield Resolution Letter, dated December 13, 2013 Scituate Resolution Letter, dated December 13, 2013 Preliminary FIRM Panels: 25023C0231K, 25023C0232K, 25023C0233K, 25023C0234K, 25023C0128K, 25023C0136K, dated May 1, 2013 Preliminary Flood Insurance Study Volumes: 25023CV001B, 25023CV002B, 25023CV003B, 25023CV004B, (Volumes: 1 through 4), dated May 1, 2013 Summary of Panel Procedures The SRP was selected in January 2015 and a kickoff meeting was held on February 12, 2015 via webbased teleconference. Ms. Dominique Fernandez, Director for (Institute), presented the procedures to be used by the Panel, panel members were introduced, and a panel chair was selected. The responsibilities of the Chair were presented. The proposed schedule for the challenge presentation, review, and resolution was reviewed. A discussion of communication protocol between the Panel, Communities, FEMA, and the Institute was also conducted. The Panel Chair s responsibility for leading the review of Communities and FEMA submissions was discussed. The Panel was tasked to review only the technical information and appeal data provided to the Panel. Those data were conveyed to Panel members via the Institute s web-based portal. Deliberations were to be focused on the scientific and technical issues presented and the correctness of the appeal data. The Panel s objective was to determine which of the two provided analyses was more scientifically and or technically correct. Panel members were instructed that they cannot request additional information, Page 5 of 7 July 10, 2015

introduce new data, suggest alternative methods, or conduct alternative analyses, nor could the Panel offer any alternative determination as a resolution. After reviewing all Community and FEMA data, the Panel was to arrive at a majority decision regarding the data. A written report of the analysis and findings was to be prepared. All internal Panel deliberations were to be considered confidential until the final Panel decision was made public by the Institute or FEMA Administrator. All subsequent Panel meetings and presentations were conducted via web-based teleconference calls. The second Panel meeting was held on March 6, 2015 to review the appeal items and discuss questions generated by Panel members. A review of FEMA s modeling methodology and their comments on the Community s methodology were discussed. Ransom s analysis methods and results were discussed. The applicability of other potential wave models and methods was discussed. However that discussion was not allowed to guide the deliberations. Presentations to the Panel by FEMA and the Communities were conducted on April 2, 2015. Panel members posed questions to the presenters to clarify the information presented and to evaluate the issues. Prior to the presentations, the following questions from the Panel were directed to the presenters for response during their presentations. 1. Was the use of H b (breaking wave height) for wave setup in Maine in the original mapping contract or was it used for an appeal? 2. Did FEMA explicitly acknowledge the switch from H o (deepwater wave height) or was it a detail buried in the volume of the larger report? 3. What is the source of the Still Water Elevation (SWEL)? 4. Is it appropriate to use STWAVE less than one wavelength from the coast? 5. Ransom Consulting referenced a compromise solution that FEMA had adopted for Coastal Flooding in Maine. Could Ransom provide addition data information, etc. that documents this? Or could they show us in the existing information where such data are located? A third Panel meeting was held on April 22, 2015 to discuss the information from the Community and FEMA presentations and to assess the correctness of the data and analyses presented via a vote. The presentations, technical procedures, and preliminary Panel decision were discussed. A vote in accordance with SRP procedures was held and a unanimous vote of the five panel members resulted. A draft Report was prepared by the Panel Chair containing the conclusions of the Panel. The draft Report was distributed and the Panel members convened for a fourth time on July 09, 2015 via email exchange to complete the Report and conclusions. Page 6 of 7 July 10, 2015

Recommendation Based on a unanimous Panel vote, the Panel recommends denial of the Communities (Marshfield and Scituate, MA) appeal. The Community s data does not satisfy NFIP mapping standards defined in FEMA's Guidelines and Specifications for Flood Hazard Mapping Partners (NFIP standards, (FEMA 2003 & 2007)). Rationale for Findings The Panel reviewed the methodology proposed by Ransom and could not find evidence that the methodology had technical basis or support for use in the Communities coastal setting. The offshore and nearshore settings for the Communities are similar to those assumed in the FEMA Coastal Flooding Analyses and Mapping Guidance (relatively smooth and consistent offshore bottom profile). Ransom presented an alternative methodology to FEMA s Direct Integration Method (DIM). The DIM method has been reputed to occasionally overestimate wave setup using deep water wave height and period. However, no technical support was provided to indicate that the nearshore wave conditions used in the appeal were more accurate or appropriate than produced by DIM. The appeal referred to the use of nearshore wave conditions for setup calculations in Maine flood mapping studies. FEMA indicated that similar methods had been submitted in Maine, but had not been accepted, in part, pending this review. Plymouth County representatives provided no evidence that the proposed setup methods had been accepted in Maine or elsewhere. The breaking wave height methodology proposed by Ransom was not found to be more correct than the FEMA analyses used to produce the preliminary mapping products. References FEMA, April 2003. Guidelines and Specifications for Flood Hazard Mapping Partners, Appendix D. Guidance for Coastal Flooding Analyses and Mapping. FEMA, April 2007. Atlantic Coast and Gulf of Mexico Guidelines Update. Page 7 of 7 July 10, 2015