Clinical Utilisation Review Helps South Tees Hospitals NHS Foundation Trust Relieve Patient Flow Bottlenecks and Breakdown Barriers to Discharge

Similar documents
Whitby and the surrounding area

PERSPECTIVES. High Performing Emergency Pathways PERFORMANCE IMPROVEMENT

Luton Borough Council: Reducing DTOC rates attributable to Social Care

Key facts and trends in acute care

NHS performance statistics

NHS performance statistics

Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance

Mental Health Services - Delayed Discharges: Update

Redesign of Front Door

Workflow. Optimisation. hereweare.org.uk. hereweare.org.uk

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

NHS Performance Statistics

Hard Truths Public Board 29th September, 2016

Performance Improvement Bulletin

STP analysis Durham, Darlington, Teesside, Hambleton, Richmondshire and Whitby

HOW A PROVINCIAL APPROACH TO PATIENT FLOW IS REDUCING CONSERVABLE BED DAYS AND SAVING SIGNIFICANT COSTS CASE STUDY

HomeFirst. Most importantly, we patients prefer and hope to be at home not in hospital, so I think this service is the way of the future.

Nottingham University Hospitals Emergency Department Quality Issues Related to Performance

Utilisation Management

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

Northern Health - Acute Services. Evidence Based Practice Venous Thromboembolism Prevention

South Warwickshire s Whole System Approach Transforms Emergency Care. South Warwickshire NHS Foundation Trust

NHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018

Urgent Care Short Term Actions to Improve Performance

Waiting Times Report Strategic. Thematic Goals

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING ADULT AND CHILDREN CONTINUING HEALTHCARE ANNUAL REPORT

SOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST Trust Key Performance Indicators May Regular report to Trust Board

A collaborative approach to Specialist Palliative Care and the difference this is making in Dudley

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018

Transforming Mental Health Services Post Consultation Report

A Step-by-Step Guide to Tackling your Challenges

CAMDEN CLARK MEDICAL CENTER:

COPD SERVICE RE-DESIGN

Reducing Elective Waits: Delivering 18 week pathways for patients. Programme Director NHS Elect Caroline Dove.

SWLCC Update. Update December 2015

Safer Nursing and Midwifery Staffing Recommendation The Board is asked to: NOTE the report

The Royal Wolverhampton NHS Trust

Kingston Hospital NHS Foundation Trust Length of stay case study. October 2014

REASSESSING THE BED COORDINATOR S ROLE SHADY GROVE ADVENTIST HOSPITAL

Public Trust Board Meeting 22 November 2011

NHS WAITING TIMES IN WALES EXECUTIVE SUMMARY

Nurse Led End of Life Care. Catherine Malia- St Gemma s Hospice, Leeds Lynne Symonds- St Catherine s Hospice, Scarborough

NHS Greater Glasgow and Clyde Alison Noonan

Senior Leadership Development

Working in partnership to improve the identification and treatment of sepsis

Seven day hospital services: case study. South Warwickshire NHS Foundation Trust

1. March RN VACANCY RATE: Overall 2320 RN vacancy rate for areas reported is 13.8%

Influence of Patient Flow on Quality Care

BEDSIDE REGISTRATION CAPE CANAVERAL HOSPITAL

Mental Health Liaison Workshop

Quality Assurance Accreditation Scheme Assignment Report 2016/17. University Hospitals of Morecambe Bay NHS Foundation Trust

Mental health crisis care models

Safety in Mental Health Collaborative

Contents Page Executive Summary Introduction Rationale Methodology 6 Results Analysis

Patient safety in the NHS in England and the development of the Healthcare Safety Investigation Branch (HSIB)

Case Study: Cass Regional Medical Center

Operational Focus: Performance

North West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

WAITING TIMES AND ACCESS TARGETS

Proactive Anticipatory Care (PACe) in Guildford & Waverley. Shaping healthcare for you and your family

The UK s European university. Inpatient Services for People with Intellectual Disabilities and/or Autism

Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18.

Ensuring quality outcomes

Taming Length of Stay Challenges Through Analytics

PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, August 2016

North Central London Sustainability and Transformation Plan. A summary

BOARD OF DIRECTORS PAPER COVER SHEET. Meeting Date: 1 st December 2010

Moving an Enabled Patient to an Engaged Patient Our Patient Portal Experience

National Trends Winter 2016

Report to Patients. A summary of NHS Norwich Clinical Commissioning Group s Annual Report for 2014/15. Healthy Norwich. Patient

Sutton Homes of Care Vanguard Programme

Prime Contractor Model King s Fund Nick Boyle Consultant Surgeon 27 March 2014

Service Transformation Report. Resource and Performance

Learning from Patient Deaths: Update on Implementation and Reporting of Data: 5 th January 2018

Adult and Community Services Overview Committee

Iain Patterson. Associate Workforce Director Homerton University Hospital NHS Foundation Trust

NHS Borders Feedback and Complaints Annual Report

Ayrshire and Arran NHS Board

IMProVE Outline Business Case, Community Transformation across South Tees

Main body of report Integrating health and care services in Norfolk and Waveney

IMPROVING TRANSITIONS FROM ACUTE CARE TO REHAB: SPREADING CHANGE ACROSS GTA HOSPITAL SITES FOR PATIENTS POST-HIP FRACTURE

Sheffield Teaching Hospitals NHS Foundation Trust

Ann Klein, Wound Care Specialist Brenda Mundy, Manager, Skin and Wound Program. Innovative Strategies lead to a Reduction in Pressure Ulcer Incidence

On behalf of COMMIT Team

Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018

OUTLINE PROPOSAL BUSINESS CASE

An academic medical center is practicing wasteology to pare time, expense,

Board Briefing. Board Briefing of Nursing and Midwifery Staffing Levels. Date of Briefing January 2018 (December 2017 data)

Developing an urgent care strategy for South Tees how you can have your say July/August 2015

The Suffolk Marie Curie Delivering Choice Programme

Creating A Niche: Medical-Surgical Nurses Role in Succesful Program Development (Oral)

Emergency Department Waiting Times

ASPIRE. Allied Health Professions Supporting and Promoting Improvement, Rehabilitation and Enabling Others ADVANCED PRACTICE SPECIALIST GENERALIST

NHS Innovation Accelerator. Economic Impact Evaluation Case Study: Health Coaching 1. BACKGROUND

Delivering surgical services: options for maximising resources

2016/17 Activity Report April August/September 2016

Ambulatory Emergency Care Watford sees Impact of Ambulatory Emergency Care within a Fortnight. West Hertfordshire Hospitals NHS Trust

Community Pharmacy in 2016/17 and beyond

London Mental Health Payments and Outcomes. Programme Overview 17/18

Transcription:

Clinical Utilisation Review Helps South Tees Hospitals NHS Foundation Trust Relieve Patient Flow Bottlenecks and Breakdown Barriers to Discharge Daily patient assessment and appropriate level of care data helps ward staff and clinical and hospital management identify and clear patient flow obstacles and accelerate patient discharge to more-appropriate levels of care. South Tees Hospitals NHS Foundation Trust Liverpool Leeds United Kingdom Bristol London 1

Contents South Tees Gets Thumbs Up on Quality 3 The Challenges 4 CUR Reveals Big Opportunity for Improvement 5 The Solution 7 Pilot Medworxx & Case Management to Accelerate Discharge 7 The Approach 8 The Results 9 Case Management Model Still Evolving 9 Medworxx Provides Proof for Change 10 Extending Medworxx Benefits to Sub-Acute Care 13 2

South Tees Gets Thumbs Up on Quality England s South Tees Hospitals NHS Foundation Trust is the largest hospital trust in the Tees Valley, serving the people of Middlesbrough, Northallerton, Redcar and Cleveland, Hambleton and Richmondshire and beyond. In addition to general hospital services for the local population, the Trust provides a range of specialist services to 1.5 million people in the Tees Valley and surrounding region, with particular expertise in heart disease, neurosciences, children s services, renal medicine, cancer services and spinal injuries. In FY 2013/14, the Trust spent 550 million providing care and comfort for roughly 126,000 Accident & Emergency patients, 86,000 emergency admissions, 180,000 inpatient and day-case patients, 68,000 urgent-care and walk-in centre patients and 486,000 outpatients. As a result of numerous inspections throughout the year, England s Care Quality Commission found all South Tees Hospitals Foundation Trust (FT) acute and community sites to be fully compliant and the Trust to be among the best in England for its maternity services. The South Tees Hospitals NHS Foundation Trust organisation is comprised of: Two acute-care hospitals (900 adult beds): The James Cook University Hospital, Middlesbrough The Friarage Hospital Northallerton Seven community hospitals: Carters Bequest Primary Care hospital Guisborough Primary Care Hospital Redcar Primary Care Hospital East Cleveland Primary Care Hospital Lambert Memorial Community Hospital The Friary Community Hospital The Rutson Rehabilitation Unit Two CCGs: South Tees CCG Hambleton, Richmond and Whitby CCG Three Local Authorities: Middlesbrough Redcar & Cleveland North Yorkshire Health and Wellbeing Boards Specialist services: major trauma, cardiothoracic surgery, cancer centre, neurosurgery 550m annual turnover 3

The Challenges Like hospitals worldwide, including other acute-care trusts across the U.K., the South Tees Hospitals FT has continually faced financial constraints as well as patient flow challenges. An especially harsh winter in 2011/2012 exacerbated what was already a difficult situation, driving up bed-occupancy rates and increasing the number of delayed discharges, patient outliers and the number of operations needing to be cancelled. To get a clear picture of bed utilisation and problems related to patient flow through the hospital and into the community, the Trust engaged ModelAdvice DC Consulting Ltd. to perform a Clinical Utilisation Review (CUR) audit. Such an audit would give the Trust better visibility into internal, physician- and hospital-related obstacles to timely patient discharge and opportunities to improve efficiency. External, community- and social services-related barriers to discharge, on the other hand, were already well understood and being reported regularly to NHS England in the Delayed Transfer of Care (DTOC) report. To conduct the CUR review, ModelAdvice chose to use the Medworxx Clinical Criteria Module tool, which it uses regularly when conducting similar assessments for other NHS Trusts. The Medworxx tool is based on a short, daily assessment of each patient, using predefined criteria sets corresponding to the patient s level of care to identify the patient s current status (e.g. receiving appropriate care, readiness for discharge, suitable for alternative levels of care) and to indicate the cause of service delays, barriers or interruptions in the progression of care. In spite of an earlier review by McKinsey & Company indicating that ours was an efficient operation, we often seemed to be in crisis mode and were constantly having to juggle many issues related to patient discharge, says Gill Collinson, Associate Director of Transformation & Service Redesign, South Tees Hospitals NHS Foundation Trust & CCG, who was familiar with CUR from working in a previous organization and aware of its potential. We wanted the audit to clearly identify the problems so we could see what could be done. 4

CUR Reveals Big Opportunity for Improvement The bed utilisation review conducted by ModelAdvice using Medworxx revealed significant opportunities for South Tees Hospitals FT to improve the way patients are managed. At the Trust s two acute-care hospitals, for example, which represent a total of roughly 1,000 beds, 32% of patients occupying beds did not meet the criteria for that level of care and were actually Ready for Discharge/Transition (RFD/T). Across the Trust s seven community hospitals, an average of 49% of patients a high of 90% in one case were RFD/T. In total, that s roughly 400 patients who were occupying beds unnecessarily, exclaims Collinson, who goes on to say that the CUR also provided actionable information on the source of the delays and blockages in patient flow. For example, the review pointed to medical staff-related reasons as the main source of delay in patient flow at the James Cook University Hospital. According to Karen Dunwell, Director of ModelAdvice, this is somewhat to be expected at a teaching hospital such as this because junior doctors are often in control of the patient pathway and flow but need ongoing guidance from the consultants assigned to the patients, which results in delays. What we did find that seemed a little unusual at first, however, was that at the organisation s smaller hospital, the Friarge Hospital Northallerton, there was no significant difference between the number of medical staff-, hospital- or communityrelated delay reasons, states Dunwell. The reason became clear when we walked the halls this hospital was very team-oriented and everyone was pulling together to achieve patient goals. 5

Figure 1: South Tees Hospitals NHS Clinical Utilization Review April, 2012 140 120 100 Reasons for delay: Hospital Doctor Community Home support Patients 80 60 40 20 0 Acute-Care Hospitals Community Hospitals The CUR identified community-related reasons as the second largest contributor to discharge delays, including shortages in available beds in long-term care facilities 20 patients occupied acute-care beds unnecessarily, awaiting community beds. The audit also highlighted inefficiencies and delays inherent in the step-down process, not the least of which is the time it can take for families to make decisions about appropriate alternate care for patients. In addition, for patients able to be sent home but needing continuing care such as respiratory management or wound care, connecting the patient to a community nurse and making arrangements for those services adds to the discharge delay. And for patients earmarked for a bedded facility, such as long-term care, arranging the meeting for a funding decision and securing an available bed both add to discharge delays. 6

The Solution Pilot Medworxx & Case Management to Accelerate Discharge A small team from South Tees Hospitals FT that included senior leadership and members of the Discharge Team went to see the Medworxx Patient Flow platform in action and how things were done at the Royal Liverpool and Broadgreen University Hospitals (NHS Trust), another large, busy hospital trust in the northwest of England (750 beds). By looking at how Royal Liverpool was using Medworxx, we wanted to see how we could reduce delays and get better throughput within our own Trust, and we quite liked what we saw, explains Jennifer Slater, Clinical Lead, Case Management, Operational Services, James Cook University Hospital. Slater goes on to say that to strengthen their discharge process, they also decided to conduct a Case Management pilot alongside the implementation of the Medworxx system. The review found a group of patients that was not adequately covered by our existing discharge process, so they were staying in hospital longer than necessary, she reports. 7

The Approach The implementation of Medworxx and Case Management at South Tees Hospitals FT began as a one-year pilot on seven acute-care wards, including Medical & Surgical wards at James Cook University Hospital and two wards at the Friarage Hospital in Northallerton. South Tees Hospitals FT opted to have the Medworxx Clinical Criteria software module implemented as a solution hosted by a leading U.K. managed services provider whose hosting service complies with the U.K. s N3 national broadband network connecting all NHS locations. This approach facilitated rapid deployment since the browser-based system could be deployed with minimal impact on, or resource requirements from, the hospital s own IT organization, apart from the need to add HL7 links to the hospital s Patient Administration System. The Case Managers, who were assigned by ward and included new hires as well as Discharge Coordinators made available by the amalgamation of existing discharge teams, were trained by Medworxx clinical consultants on the case management model and how to use Medworxx. We may have been the first hospital to implement Case Management using therapy staff, such as physio and occupational therapists, as Case Managers and not just nurses, suggests Slater. Although many of the Case Managers held positions there previously as Discharge Coordinators and were already well known, they would now be carrying new information, talking in new terms (Met/Not-Met, Ready for Discharge) and having to be more assertive in solving delays and clearing discharge obstacles. After initial orientation, the new Case Mangers received additional training from the Medworxx clinical team on how to use the Clinical Criteria and daily patient assessment software. Training was also provided to IT staff and hospital management on how to use the Medworxx reporting capabilities. The Case Managers would use the Medworxx software to conduct daily assessments on each patient, enter the patient data into Medworxx and then carry that data into the hospitals daily bed management and multidisciplinary team meetings conducted on each ward. Once Case Managers had been using the Medworxx system for some time, statistical results information could be fed back to clinical leadership and hospital management to highlight successes and identify opportunities to further streamline patient flow and accelerate discharge. 8

The Results Case Management Model Still Evolving The South Tees Hospitals FT pilot project involving Medworxx and Case Management is still going on after two years. This is largely because the funding required for a broader, more permanent rollout had not yet been agreed to, and also because: Clinical leadership and hospital management have been unsure of how best to integrate and use the information they can get from the Medworxx system; and The Case Manager model, which, while effective with the complex discharges frequently found in the unplanned care environment, would potentially not be cost-effective across the whole organisation. As part of the planned further rollout of Medworxx across the organisation, a pilot for another deployment model was launched on two wards, whereby ward nurses would conduct the daily patient assessments instead of Case Managers. The results would then be discussed with the medical staff, therapists, dieticians and anyone else involved in the patient s care, and reasons for discharge delays would be agreed to. The Ward Manager or Coordinator would then enter the assessment data into Medworxx during the routine daily rounds, along with reasons for discharge delay. We felt that if the ward took responsibility for inputting the Medworxx data and the medical staff had more input, they would be more likely to feel they own the data and thus more likely to agree with and take action based on the reports coming out of the system, explains Slater, quickly adding that Case Managers continue to play a vital role overseeing the quality and consistency of data and supporting Medworxx users and expediting patient discharge. 9

Medworxx Provides Proof for Change Even though the Medworxx implementation continues in rollout mode, the system has been in use sufficiently long for the patient assessment and bed utilisation data to be comprehensive, accurate and reliable within the cohort of wards under regular assessment. This is enabling South Tees Hospitals FT to not only tackle patient flow barriers and bottlenecks at both the ward level and organization-wide but also to identify process efficiencies and potential savings for re-allocation and or re-investment. Perhaps more important, Medworxx is helping us deliver improved outcomes, including accelerated discharge and reduced bed usage where it is not clinically indicated, thus improving the experience for those using our services, says Slater. As an example, she cites the Trust s number of RFD/T or avoidable bed days, which has been reduced to roughly 20% on most of the pilot wards (Figure 2). Patients are considered Ready for Discharge when they pass the Medworxx standardized, evidence-based RFD/T assessment, indicating they are clinically stable and ready for discharge or transition to a lower level of care. Figure 2: % RFD/T of Assessed Days = Avoidable Bed Days 23 22 22.35% 83,233 RFD days Assessed days RFD Percent (%) 21 20 19 18 17 28,021 6,264 2013 20.24% 16,845 2014 19.13% 7,840 1,500 2015 10

Figure 3 illustrates another example of how the Medworxx process and data have helped South Tees Hospitals FT address bed utilisation and discharge challenges. In this case, it is the discharge delays caused by delays in the nursing assessments required before a patient s case can be reviewed for funding to support discharge to long-term or residential care (referred to as the DST process). Medworxx data provided proof of the need for additional nursing staff to reduce these assessment delays, which directly equate to avoidable bed days, and is being used to track subsequent reductions in those delays. Figure 3: Potentially Avoidable Bed Days by month in 2014 due to Nursing Assessment Delays 250 200 150 Days 100 50 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Using the clinical criteria and patient assessment data we enter, the Medworxx tool has been able to pinpoint a number of delay sources because of the great granularity of the Delay Reasons & Details that the Medworxx people have configured for us in the system, states Slater, referring to Figure 4 as an example of the community-based delay reasons. 11

Figure 4: Avoidable Bed Days in 2014 Community Delay Reasons 3500 3000 2500 Community delay Hospital delay 2938 2000 Days 1500 1724 1000 1197 1033 908 500 0 Decision Support Tool Meeting (DST) (DTOC Code A) Bed Availablity (DTOC code C) Family Issues (DTOC code G) Service Availability (DTOC code E) Nursing Home (DTOC code D) Residential Care Home (DTOC Code D) Equipment (DTOC code F) Respite (DTOC code D) Legal Issues (DTOC code O) Hospice (DTOC code O) 563 Home Environment Barriers (DTOC code O) 476 Patient Issues (DTOC code G) 205 Funding (DTOC code B) Community Staff Training (STOC code O) Assements (STOC code A) 122 68 57 52 38 32 2 Commenting further on discharge delays, Julie Poultney, Friarage Hospital Northallerton and Service Improvement Manager, South Tees Hospitals NHS Foundation Trust, contends that delays are often attributed to the community and to social work. However, the Medworxx data is showing that this not necessarily true. This is a good example of how hospital management, with the help of Medworxx evidence, is finding that commonly held beliefs are not always accurate, says Poultney, who goes on to describe the following additional example of opportunities for improvement brought to light through use of the Medworxx Patient Flow Platform. 12

Medworxx data is showing that a lot of patients end up staying in the hospital just for IV antibiotics therapy, thus occupying acute-care beds even though daily assessment shows they no longer meet the clinical criteria for this level of care. We ve provided this data to hospital management and to the Clinical Commissioning Group responsible for local service provision, with the recommendation that rather than providing IV antibiotics therapy in the hospitals, the Trust should train existing home care nurses to deliver this service in the community. Extending Medworxx Benefits to Sub-Acute Care Even though things are definitely starting to work better in our two acute-care hospitals, we don t want to neglect our seven community hospitals, where we also find many patients who don t need to be there, proclaims Slater. We want to extend the acute-care momentum to the sub-acute-care facilities, and feel that if we use Medworxx there as well, significant improvement can be achieved. When specifically asked about working with the Medworxx people, Slater reports that they continue to provide regular training and speak with South Tees Hospitals FT staff almost weekly to help fine-tune their Medworxx reporting and Delay Reasons & Details configuration. The Medworxx team is very helpful, and even though some live a fair distance away, we are still able to reach them right away and they come regularly to sit with us and discuss things, enthuses Slater. I can t say enough good about them, and they seem really passionate about their work and how their system can help us achieve our patient flow and discharge goals. Summing up the feelings of many on the South Tees team, Mandy Headland, the Trust s Managing Director of Integrated Care, says, If I didn t have Medworxx, I would need to invent it. 13

About Medworxx Medworxx, an Aptean Company, delivers health information technology solutions to over 350 hospitals internationally, including Canada, United States, United Kingdom, France and Australia. Medworxx helps hospitals meet patient flow challenges and requirements for compliance and education. Medworxx Clinical Criteria the flagship component of Medworxx Patient Flow, which also includes electronic bed management and independent assessment components is currently used to manage 32% of the acute care beds in Canada as well as acute care beds in the United States and a rapidly increasing number of beds in Trusts and CCGs in the UK. Visit: www.medworxx.com 14

Medworxx Headquarters 700-121 Richmond Street West Toronto, ON, Canada, M5H 2K1 416.642.1278 US Toll Free: 1-800-274-0432 medworxxinfo@aptean.com United Kingdom 0207730 9614 Australia - Aspen Medical 0408 995028 2016 Medworxx An 2016 Aptean Medworxx Company. An All Aptean rights Company. reserved. All rights reserved. 3/16 15