losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized JUSTE SYSTEM REFORM PROGRAM GOODS PROCUREMNT PLAN FOR 2007/08 Loan No 3889 ET R 1 6 IT EQUIPMENTS Description Lot Estimated Cost in US $ 000 1 JSRP/G-01/08 703.04 1.1 Desktop computers 304 1 340.27 1.2 Desk Computer Roll out PIS 2 111.11 1.3 UPS for computer 214 3 39.78 1.4 UPS 1250 W 8 4 5.56 1.5 UPS 3000 W 1 5 2.78 1.6 Printers 161 6 115.77 1.7 Color Printer 24 7 57.78 1.8 Laser Jet Printer 30 8 13.33 1.9 Heavy Duty printer 2 9 13.33 1.10 Bar-Code Priner 1 10 3.33 LAPTOP COMPUTERS AND ACCESSORIES Quant ity Package 2 JSRP/G-02/08 725.73 2.1 Laptop 172 1 366.67 2.2 Stablizer 170 2 7.67 2.3 Stablizer 8KW 1 3 10.00 2.4 Server with SCSI & Controller 1 4 50.00 2.5 Data Base Server 1 5 155.56 2.6 LCD projector 12 6 35.67 2.7 Storage Tape Drive 2 7 16.67 2.8 LTO Storage Tape 16 TB 170 8 72.22 2.9 Mass Storage Device 1 9 0.33 2.10 Software PDF Maker 1 10 0.89 2.11 Adobe Photo Shop 1 11 0.89 2.12 CD Writer 56 12 2.49 2.13 Storage Work System with 6 TB.D.D 1 13 6.67 BAS DATA Procur ement Metho d B B B Pre-or Post Qualific ation Prior Prior Prior Prior or Post Review Prior Prior Prior vs. Draft Bid Documents, Prep & Submission by Ex Agency Dec.20/07 Jan.01/08 Jan.5/08 Jan.15/08 SPN Advert On-line UNDB Net Press Jan.15/08 Dec10/07 Jan10/08 Jan.15/08 Jan.30/08
BAS DATA Draft Bid Documents, SPN Advert R 1 6 Description Quant ity Package Lot Estimated Cost in US $ 000 3 OFFE EQUIPMENT JSRP/G-03/08 459.88 3.1 Heavy duty Photo copy machine 5 1 116.67 3.2 Normal Photo copier machine 23 2 52.00 3.3 Scanner 22 3 44.44 3.4 Bar Code Scanner 8 4 2.78 3.5 Office Scanner 4 5 4.44 3.6 Book Scanner 1 6 57.33 3.7 Flat Bed Scanner 1 7 2.22 3.8 Binding machine 14 8 8.89 3.9 Color Photographer with Accessories 1 9 55.56 3.10 Rack 40 U with complete Accessories 1 10 6.67 3.11 DAW 8 11 22.22 3.12 Switch 100/1000 MB 24 Port 1 12 4.44 3.13 Booth 13 77.78 3.14 Restaurant Dishs 1000 14 4.44 Procur ement Metho d B Pre-or Post Qualific ation Prior Prior or Post Review Prior vs. Prep & Submission by Ex Agency Dec.20/07 Jan.5/08 On-line UNDB Net Press Jan.15/08
BAS DATA Draft Bid Documents, SPN Advert R 1 6 Description Quant ity Package Lot Estimated Cost in US $ 000 Procur ement Metho d Pre-or Post Qualific ation Prior or Post Review vs. Prep & Submission by Ex Agency On-line UNDB Net Press 4 PRINTING MACHINE JSRP/G-04/08 355.55 NCB Post Post Dec.20/07 Jan.15/08 Jan.31/08 Jan.5/08 Feb.05/08 Jan.15/08 4.1 Offset printing Machine 1 1 22.22 4.2 Full Publishing machine with Accessories 1 2 333.33 OPTAL EQUIPMENT 5 JSRP/G-05/08 42.78 5.1 Digital video camera 6 1 34.44 LS Post Post DEC.24/07 NA Jan.15/08 5.2 Digital photo camera 8 2 6.67 6 5.3 Pinnacle Video Editing Card 1 3 1.67 NETWORKING EQUIPMENT AND ACCESSORIES JSRP/G-06/08 289.44 B Prior Prior Jan.10/08 Jan.25/08 Feb.5/08 6.1 Accessories Passive & ive 1 50.00 6.2 Broad Band Connectivity 2 44.44 6.3 Network Cables & its Accessories 3 178.33 7 6.4 Cable Data, Power and accessories 4 16.67 INTELEGENCE & SERVILLANCE EQPMENT JSRP/G-07/08 666.67 B Prior Prior Dec.25/07 Jan.15/08 Jan20/08 8 7.1 Intelegence & Servillance Equipment 2 1 666.67 AUDIO VISUAL EQUIPMENT AND ACCESSORIES JSRP/G-08/08 95.12 NCB Post Post Jan.15/08 NA Feb 8.1 Television 5 1 2.67 Television Micro Wave Link 1 ( Transmmiter & Receiver) 8.2 2 66.67 8.3 DVD Player 1 3 0.44 8.4 Walky Talky 30 4 4.00
BAS DATA Draft Bid Documents, SPN Advert R 1 6 Description Quant ity Package Lot Estimated Cost in US $ 000 Procur ement Metho d Pre-or Post Qualific ation Prior or Post Review vs. Prep & Submission by Ex Agency On-line UNDB Net Press 8.5 Video Deck 1 5 0.22 Digital Voice Recording & Transcription system 8.6 2 6 15.56 Dec.20/07 Jan.5/08 Jan.15/08 8.7 Motorized Satalite Dish 2 7 5.56
BAS DATA Draft Bid Documents, SPN Advert R 1 6 Description Quant ity Package Lot Estimated Cost in US $ 000 Procur ement Metho d Pre-or Post Qualific ation Prior or Post Review vs. Prep & Submission by Ex Agency On-line UNDB Net Press 9 OFFE FURINITURE JSRP/G-10/08 75.10 NCB Post Post Dec.20/07 Feb.20/08 Jan.5/08 NA Feb.26/08 Jan.15/08 9.1 File cabinet Large 24 1 12.22 9.2 File cabinet Midium 2 2 2.22 9.3 Manigerial Desk 3 3 8.33 9.4 Computer Desk 4 18.33 9.5 Secretarial Desk 3 5 1.00 9.6 Manigerial Swivel Chair 3 6 1.67 9.7 Secretarial Chair 3 7 0.67 9.8 Office Shelf 64 8 28.44 9.9 Office Furniture 9 2.22 10 PRINTING DOCUMENTS JSRP/G-11/08 485.21 B Prior Prior Dec.30/07 Jan.15/08 Jan.24/08 10.1 Publication ( ive Codified & Consolidated Laws, Final Criminal Policy) 1 30.56 10.2 Guideline Preparation 2 3.33 10.3 Stationery 3 2.22 10.4 Training Manual 4 8.44 10.5 Lable Paper 100x1000 100 5 3.33 10.6 Capturing Card 3 6 2.33 10.7 Different Books 6,400 7 426.11 10.8 Printing Ribban 100 8 8.89 11 GENERATOR JSRP/G-12/08 66.67 NCB Post Post Jan.01/07 NA Jan.14/08 1.1 Generator with installtion 1 1 55.56
BAS DATA Draft Bid Documents, SPN Advert R 1 6 Description Quant ity Package Lot Estimated Cost in US $ 000 Procur ement Metho d Pre-or Post Qualific ation Prior or Post Review vs. Prep & Submission by Ex Agency On-line UNDB Net Press 1.2 Water Pump 2 2 11.11 Dec.20/07 Jan.5/08 Jan.15/08 TOTAL COST 3,965.19 Notice:-convertion rate used is 9.00 per a unite of dollar
Bidding Period Bid Evaluation Finalization Bid Invitation Jan.16/08 Bid Closing- Opening Sub mission Bid Eval Rpt Contr act Amou nt in Birr Award Signature Mar.10/08 Apr25/08 May.20/08 Jun.20/08 Juy.8/08 Jan.15/08 Mar.15/08 Apr15/08 May.10/08 Jun15/08 Juy.10/08 Jan.30/08 Mar.20/08 May.10/08 May.25/08 Jun.25/08 Jul.10/08
Bidding Period Bid Evaluation Finalization Bid Invitation Bid Closing- Opening Sub mission Bid Eval Rpt Contr act Amou nt in Birr Award Signature Jan.16/08 Mar.10/08 Apr25/08 May.20/08 Jun.20/08 Juy.8/08
Bidding Period Bid Evaluation Finalization Bid Invitation Bid Closing- Opening Sub mission Bid Eval Rpt Contr act Amou nt in Birr Award Signature Feb.05/08 Jan.16/08 Mar.10/08 Mar.25/08 May.15/08 Apr25/08 May.30/08 May.20/08 Jun.30/08 Jun.20/08 Jul.15/08 Juy.8/08 NA JAN.30/08 NA NA FEB.22/08 NA Feb.5/08 Mar.25/08 May10/08 May.30/08 Jun.25/08 Jul.20/08 Jan.20/08 Mar.23/08 Apr.20/08 May.10/08 Jun.15/08 Jly.18/08 NA Feb.21/08 NA NA Mar.16/08 NA
Bidding Period Bid Evaluation Finalization Bid Invitation Bid Closing- Opening Sub mission Bid Eval Rpt Contr act Amou nt in Birr Award Signature Jan.16/08 Mar.10/08 Apr25/08 May.20/08 Jun.20/08 Juy.8/08
Bidding Period Bid Evaluation Finalization Bid Invitation Bid Closing- Opening Sub mission Bid Eval Rpt Contr act Amou nt in Birr Award Signature Mar.10/08 Jan.16/08 Mar.26/08 Mar.10/08 Apr.10/08 Apr25/08 May.20/08 NA Apr.25/08 Jun.20/08 May Juy.8/08 10/08 Jan.25/08 Mar.20/08 Mar.25/08 Apr.10/08 Apr.20/08 May.10/08 Jan.30/08 Jan.30/08 Mar.05/08 NA Apr.10/08 Apr.25/08
Bidding Period Bid Evaluation Finalization Bid Invitation Bid Closing- Opening Sub mission Bid Eval Rpt Contr act Amou nt in Birr Award Signature Jan.16/08 Mar.10/08 Apr25/08 May.20/08 Jun.20/08 Juy.8/08
JUSTE SYSTEM REFORM PROGRAM GOODS PROCUREMNT PLAN FOR 2006/07 Loan No 3889 ET Ser. No. Description Quant ity Package 1 IT EQUIPMENTS JSRP/G-01/07 2 OFFE EQUIPMENTS JSRP/G-02/07 3 NETWORKING EQUIPMENT, ACCESSORIES AND INSTALLATION JSRP/G-03/07 3.1 Net working Equipment (LAN and WAN) 3.2 Net working system installation 4 FORENS LABRATORY EQUIPMENT JSRP/G-04/07 5 INFORMATION SYSTEM EQUIPMENTS FOR AUTOMATED POLE POLE INFORMATION SYSTEM(TURNKEY) JSRP/G-05/07 6 AUDIOVISUAL EQUIPMENTS JSRP/G-06/07 6.1 Server 6.2 Projector 6.3 Tape recorder 6.4 Screen 6.5 Audiovisual Equipments
TOTAL COST NB:-Convertion rate used is 9.00 per a unite of dollar Goods are icorporated in 2006/07 P. and approved by the World
BAS DATA Draft Bid Do Lot Estimated Cost in US $ 000 Procur ement Metho d Pre-or Post Qualific ation Prior or Post Review vs. Prep & Submission by Ex Agency 171.68 198.22 B Prior Prior B Prior Prior Dec.20/07 Dec.20/07 1119.10 B Prior prior Dec.01/06 actual 1 1019.10 2 100.00 2,418.00 B Prior Prior Dec.01/06 actual 2,274.00 164.17 B Prior Prior Dec.20/07 1 22.86 2 59.24 3 6.30 4 71.43 5 4.34
6,345.07 ld Bank. Besides they are underprocess of action.
SPN Documents, Bidding Period Bid Evaluation Cont Advert On-line UNDB Net Press Bid Invitation Bid Closing- Opening Sub mission Bid Eval Rpt Amount in Birr Jan.5/08 Jan.15/08 Jan.16/08 Jan.5/08 Jan.15/08 Jan.16/08 Mar.10/08 Apr.30/08 May.20/08 Mar.10/08 Apr.30/08 May.20/08 Dec.10/06 Jan.01/08 Jan.01/08 Feb.20/08 Mar.05/08 Mar. 20/08 Dec.10/06 Jan.01/08 Jan.01/08 Feb.25/08 Mar.25/08 Apr.10/08 Jan.5/08 Jan.15/08 Jan.16/08 Mar.10/08 Apr.30/08 May.20/08
ntract Finalization Beneficiary Award Signature JLSRI HOP HOF H.RIGHT OMBODSMAN MOJ FPC FPA FE&AC Jun.20/08 Juy.8/08 Jun.20/08 Juy.8/08 April 10,08 Apr.25,08 April 20,08 Apr.30,08 Jun.20/08 Juy.8/08
PROGRAMS: JUSTE SYSTEM REFORM PROGRAM CONSULTANCY PROCUREMENT PLAN FOR 2007/08 Type Preparation Request for Proposals Request for EOI (when required) Short List Consultant Proposals S. No. Description* Package No. Selectio n Method or Time-Based Est. Amount in US$ 000 Prior/ Post Review vs. Prep & Subm by Ex Ag Online UNDB Gateway Nat. press Lead-time before shortlist Subm No-objection Invitation Subm/ Opening Submission Evaluation Report (T) 1 2 Undertake organizational structure,strategy,system and research policy study for the Justice & Legal System Research Institute Conduct research infrastructure study JSRP/C-01/08 JSRP/C-02/08 July15/07 Jau. 30/07 Aug.10/07 Aug.25,07 Aug.25/07 Sep.15/07 Oct.5/07 Nov.1/08 Nov.5/07 35.92 Post 0.60 Post Aug10/07 NA Aug25/07 NA Sep16/07 NA Oct.5/07 Nov.10/07 Nov.25/07 3 4 5 6 7 8 9 10 Evaluate and select the already revized laws and legislations Evaluate and select research studies in process Introduce a multi-midia broadband system conduct a Networking system (LAN) & Website development study and Implementation. Employement of planning, finance, M&E; procrument officers, project manager and Educational advisor Develop LLM program and LLD program Build a baseline data for laws schools Develop admission policy JSRP/C-03/08 JSRP/C-04/08 JSRP/C-05/08 JSRP/C-06/08 JSRP/C-07/08 JSRP/C-08/08 JSRP/C-09/08 JSRP/C-10/08 QBS 18.00 Post July10/07 Jau. 30/07 Aug.15/07 Aug.20,07 Aug.25/07 Sep.17/07 Oct.5/07 Dec.05/07 Nov.05/07 15.89 Post July15/07 NA Aug.10/07 Aug.25,07 Aug.25/07 NA Oct.5/07 Oct.20/07 Oct.30/07 5.02 Post July15/07 Jau. 30/07 Aug.10/07 Aug.25,07 Aug.25/07 Sep.5/07 Oct.5/07 Oct.20/07 Oct.30/07 34.44 Post July15/07 July. 30/07 Aug.10/07 Aug.20/07 Aug.20/07 Sep.15/07 Sep.25/07 Oct.25/07 Nov.05/07 July10/07 July. 30/07 Aug.5/07 Aug.15/07 Aug.25/07 Sep.20/07 Sep26/07 Oct.26/07 Oct.30/07 30.00 Post 1365.11 Prior Dec20/07 Jau. 10/07 Jan15/08 Jan31/08 Feb15/08 Mar.05/08 Mar.10/08 Apr.20/08 May.05/08 1.67 Prior 05Aug 07 Aug25/07 Aug31/07 Sep15/07 Oct15/07 Nov.5/07 Nov.15/07 Jan5/08 Jan.15/08 1.67 Post 18Aug 07 NA 13Sept. 07 28Sept.07 NA NA Nov.15/07 Jan5/08 Jan.15/08 11 12 13 Develop course discription for core and teaching material preparation JSRP/C-11/08 for elective courses Preparation of handbook Conduct organizational structure and human resource management policy JSRP/C-12/08 JSRP/C-13/08 QBS 24Aug 07 13 Sept.07 18 Sept.07 28 Sept. 07 05Oct.07 20Oct.07 28oct.07 Jan.31/08 Feb.10/08 430.22 Prior 1.67 Post 24Aug 07 NA 13 Sept.07 28 Sept. 07 NA NA 28Dec.07 Jan.10/08 Jan.15/08 35.83 Post 10 Jul.07 NA 5Aug. 07 20Aug 07 NA NA 20Nov.07 Dec.15/07 Dec.25/07
Type Preparation Request for Proposals Request for EOI (when required) Short List Consultant Proposals S. No. Description* Package No. Selectio n Method or Time-Based Est. Amount in US$ 000 Prior/ Post Review vs. Prep & Subm by Ex Ag Online UNDB Gateway Nat. press Lead-time before shortlist Subm No-objection Invitation Subm/ Opening Submission Evaluation Report (T) 14 Develop code of conduct and rules for disciplinary committee for academic staff JSRP/C-14/08 1.67 Post 8Sept. 07 NA 1 Oct.07 15 Oct. 07 NA NA 5 Dec.07 Jan.05/08 Jan15/08 15 16 17 18 19 Prepare mannual on acadamic appeals and student compliants Prepare career education and information services document Preparation of mannual for law libraries Develop law school building design Formulate policy for community service, research, publication and consultancy JSRP/C-15/08 JSRP/C-16/08 JSRP/C-17/08 JSRP/C-18/08 JSRP/C-19/08 1.67 Post 8Sept. 07 NA 1 Oct.07 15 Oct. 07 NA NA 5 Dec.07 Jan10/08 Jan.25/08 1.67 Post 1Aug 07 20Aug07 30Aug 07 15sept.07 Oct15/07 Oct.30/07 05Nov07 Dec5/07 Dec.15/07 3.33 Post July15/07 Jau. 30/07 Aug.10/07 Aug.25,2007 Aug.25/07 Sep.15/07 Oct.5/07 Nov.1/08 Nov.5/07 2.33 Post Aug10/07 NA Aug25/07 NA Sep16/07 NA Oct.5/07 Nov.10/07 Nov.25/07 1.67 Post July10/07 Jau. 30/07 Aug.15/07 Aug.20,2007 Aug.25/07 Sep.17/07 Oct.5/07 Dec.05/07 Nov.05/07
Type Preparation Request for Proposals Request for EOI (when required) Short List Consultant Proposals S. No. Description* Package No. Selectio n Method or Time-Based Est. Amount in US$ 000 Prior/ Post Review vs. Prep & Subm by Ex Ag Online UNDB Gateway Nat. press Lead-time before shortlist Subm No-objection Invitation Subm/ Opening Submission Evaluation Report (T) 20 21 22 23 24 25 26 27 28 Develop regulatory framework for distance education Develop regulatory framework for short term courses, trainings in law Develop regulatory framework for continuing legal education Study onorganizational Structure & working system Hiring Consultant Development of Softwar and Systems Creation of Datbase Finalization of Strategic plan of the Center Development of Record Management Software JSRP/C-20/08 JSRP/C-21/08 JSRP/C-22/08 JSRP/C-23/08 JSRP/C-24/08 JSRP/C-25/08 JSRP/C-26/08 JSRP/C-27/08 JSRP/C-28/08 1.67 Post July15/07 NA Aug.10/07 Aug.25,2007 Aug.25/07 NA Oct.5/07 Oct.20/07 Oct.30/07 1.67 Post July15/07 Jau. 30/07 Aug.10/07 Aug.25,2007 Aug.25/07 Sep.5/07 Oct.5/07 Oct.20/07 Oct.30/07 1.67 Post July15/07 July. 30/07 Aug.10/07 Aug.20/07 Aug.20/07 Sep.15/07 Sep.25/07 Oct.25/07 Nov.05/07 77.78 Post July10/07 July. 30/07 Aug.5/07 Aug.15/07 Aug.25/07 Sep.15/07 Sep25/07 Oct.25/07 Oct.30/07 64.44 Prior Aug10/07 Aug30/07 Sep.10/07 Sep20/07 Sep20/07 Oct.05/07 Oct.10/07 Nov.25/07 Nov.30/07 55.56 Prior 05Aug 07 Aug25/07 Aug31/07 Sep15/07 Oct15/07 Nov.5/07 Nov.15/07 Jan5/08 Jan.15/08 56.00 Prior 18Aug 07 3Sept. 07 13Sept. 07 28Sept.07 Oct10/07 Oct25/07 Nov.10/07 Jan5/08 Jan.15/08 56.00 Prior 24Aug 07 10 Sept.07 13 Sept.07 28 Sept. 07 Oct05/07 Oct20/07 10Dec.07 Jan.15/08 Jan.25/08 38.89 Post 24Aug 07 NA 13 Sept.07 28 Sept. 07 Nov.15/08 NA 28Dec.07 Jan.10/08 Jan.15/08 29 Digitalization of the Library JSRP/C-29/08 75.00 Prior 10 Jul.07 25 Jul.07 5Aug. 07 20Aug 07 10Sep.07 30 Sep.07 10Oct.07 Nov.15/07 Nov.25/07 30 31 Networking the Library * Develop working directives * Develop policies,procedures, workingtools, management system, reportingsystems, complaint handling process,information system development * Regional presence plan and studies developed for establishing of three regional offices JSRP/C-30/08 JSRP/C-31/08 75.00 Prior 8 Sept. 07 25 Sept. 07 1 Oct.07 15 Oct. 07 20 Oct. 07 10 Dec.07 15Dec.07 Jan.25/08 Jan31/08 05 Sept. 07 20 Sept. 07 1 Oct.07 15 Oct. 07 25 Oct. 07 10 Nov.07 15 Nov.07 Dec.20/07 Dec.31/07 333.33 Prior 32 Develop and implement a systemic investigation program JSRP/C-32/08 66.67 Prior 1Aug 07 20Aug07 30Aug 07 15sept.07 Oct15/07 Oct.30/07 05Nov07 Dec10/07 Dec.15/07 33 Consultant payment JSRP/C-32/08 3.33 Post Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08
Type Preparation Request for Proposals Request for EOI (when required) Short List Consultant Proposals S. No. Description* Package No. Selectio n Method or Time-Based Est. Amount in US$ 000 Prior/ Post Review vs. Prep & Subm by Ex Ag Online UNDB Gateway Nat. press Lead-time before shortlist Subm No-objection Invitation Subm/ Opening Submission Evaluation Report (T) 34 35 36 Prepare working manual in order to assist victims of human rights in civil proceedings to claim damages where such victims are JSRP/C-34/08 unable to institute such claim in the federal courts and to follow up the proceedings on their own. Prepare working manulal on the way of interveing in the cases that federal government organs andfederal public enterprises are parties Prepare working manual for lawyers, who are working in the government organs and public centerprises in order to do their job properly. JSRP/C-35/08 JSRP/C-36/08 3.33 Post 4.44 Post 1.67 Post Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08 Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08 Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08
Type Preparation Request for Proposals Request for EOI (when required) Short List Consultant Proposals S. No. Description* Package No. Selectio n Method or Time-Based Est. Amount in US$ 000 Prior/ Post Review vs. Prep & Subm by Ex Ag Online UNDB Gateway Nat. press Lead-time before shortlist Subm No-objection Invitation Subm/ Opening Submission Evaluation Report (T) 37 38 39 40 41 Prepare federal government and public enterprises purchasing contract model prepare studies on alternative dispute resolution me Prepare organizational structure Study the way of establishment on alternative dispute resolution organ Producing brochures, posters and pamphlets to educate the public on law, good governance and human rights JSRP/C-37/08 JSRP/C-38/08 JSRP/C-39/08 JSRP/C-40/08 JSRP/C-41/08 3.33 Post Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08 11.11 Post Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08 11.11 Post Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08 11.11 Post Nov.1/07 NA Nov.18/07 Dec4/07 Dec.10/07 NA Jan.20/08 Feb.7/08 Feb.15/08 July15/07 Jau. 30/07 Aug.10/07 Aug.25,2007 Aug.25/07 Sep.5/07 Oct.5/07 Oct.20/07 Oct.30/07 3.33 Post 42 43 44 45 46 47 48 49 50 51 52 Effecting the Publication of a professional journal and a newspaper Study the existing Filling & recording system Review & redesign system to codify & consolidate Ethiopian active laws See the Tor for NIJIS Employment of International Consultant and Project Manager Employment of Secretary Software Modification Study & installation LAN, WAN & Networking 6 Federal First Instance Prosecution Conduct computer training TOR preparation for setting standards for rehabilitation services Syllabi developed, Teachjing Modules Developed and Teachers/ JSRP/C-42/08 JSRP/C-43/08 JSRP/C-44/08 JSRP/C-45/08 JSRP/C-46/08 JSRP/C-47/08 JSRP/C-48/08 JSRP/C-49/08 JSRP/C-50/08 JSRP/C-51/08 JSRP/C-52/08 4.44 Post July15/07 July. 30/07 Aug.10/07 Aug.20/07 Aug.20/07 Sep.15/07 Sep.25/07 Oct.25/07 Nov.05/07 5.56 Post July10/07 July. 30/07 Aug.5/07 Aug.15/07 Aug.25/07 Sep.20/07 Sep26/07 Oct.26/07 Oct.30/07 11.11 Post Aug10/07 NA Aug25/07 NA Sep16/07 NA Oct.5/07 Sep.10/07 Oct.25/07 4444.44 Prior 05Aug 07 Aug25/07 Aug31/07 Sep15/07 Oct15/07 Nov.5/07 Nov.15/07 Jan5/08 Jan.15/08 60.00 Prior 18Aug 07 07Sept. 07 13Sept. 07 28Sept.07 Oct.1/07 Oct.15/07 Oct.20/07 Nov.30/07 Dec05/08 2.00 Post 24Aug 07 NA 13 Sept.07 28 Sept. 07 NA NA 28Dec.08 Jan.05/08 Jan.10/08 13.33 Post 24Aug 07 NA 13 Sept.07 28 Sept. 07 NA NA 28Dec.07 Jan.10/08 Jan.15/08 26.67 Post 10 Jul.07 NA 5Aug. 07 20Aug 07 NA NA 20Nov.07 Dec.15/07 Dec.25/07 6.67 Post 8Sept. 07 NA 1 Oct.07 15 Oct. 07 NA NA 5 Dec.07 Jan.05/08 Jan15/08 16.67 Post July15/07 Jau. 30/07 Aug.10/07 Aug.25,2007 Aug.25/07 Sep.5/07 Oct.5/07 Oct.20/07 Oct.30/07 222.22 Prior July15/07 July. 30/07 Aug.10/07 Aug.20/07 Aug.20/07 Sep.15/07 Sep.20/07 Oct.25/07 Nov.05/07
Type Preparation Request for Proposals Request for EOI (when required) Short List Consultant Proposals S. No. Description* Package No. Selectio n Method or Time-Based Est. Amount in US$ 000 Prior/ Post Review vs. Prep & Subm by Ex Ag Online UNDB Gateway Nat. press Lead-time before shortlist Subm No-objection Invitation Subm/ Opening Submission Evaluation Report (T) 52 Modules Developed and Teachers/ Trainers Oriented (Aleltu) 53 54 55 56 57 58 Implement full-fledged MIS using LAN and WAN; Develop working directives, procedures, management systems, reporting systems, compliant handling procedures; The Second Corruption Survey Conducted Study and develop the Ethics Infrastructures or Anti- Corruption Integration System Working Manual Published and distribute the procedure or system document; JSRP/C-52/08 JSRP/C-53/08 JSRP/C-54/08 JSRP/C-55/08 JSRP/C-56/08 JSRP/C-57/08 JSRP/C-58/08 Total Consultancy 8,330.59 22.22 Post July10/07 July. 30/07 Aug.5/07 Aug.15/07 Aug.25/07 Sep.20/07 Sep26/07 Oct.26/07 Oct.30/07 22.22 Post Aug10/07 NA Aug25/07 NA Sep16/07 NA Oct.5/07 Sep.10/07 Oct.25/07 50.00 Post 05Aug 07 Aug25/07 Aug31/07 Sep15/07 Oct15/07 Nov.5/07 Nov.15/07 Jan5/08 Jan.15/08 433.89 Prior 18Aug 07 05Sep07 13Sept. 07 28Sept.07 NA NA Nov.15/07 Jan5/08 Jan.15/08 33.33 Post 24Aug 07 NA 13 Sept.07 28 Sept. 07 NA NA 28Dec.08 Jan.05/08 Jan.10/08 11.00 Post 24Aug 07 NA 13 Sept.07 28 Sept. 07 NA NA 28Dec.07 Jan.10/08 Jan.15/08
Proposal Evaluation and Negotiation for Technical (T) & Financial (F) &Negotiation (N) Draft Finalization No-objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Negotiation Eval Report s (T) (F) Subm. Contr act Amou nt in US$ 000 Award Signature Nov.15/07 Dec.10/07 Dec.15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 NA Dec.20/07 Dec25/07 NA Jan.20/08 Jan31/08 NA Feb.15/08 Mar.10/08 Nov.15/07 Dec.1/07 Dec10/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 NA Dec.05/07 Dec.15/07 NA Jan.5/08 Jan10/08 NA Feb.5/08 Feb.20/08 Nov.15/07 Dec.11/07 Dec15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.25/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.2/07 Dec.15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.3/07 Dec.10/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 May20/08 May30/08 Jun10/08 Jun25/08 June30/08 July01/08 July15/08 July.25/08 Aug.10/08 28Jan. 08 13Feb.08 Feb.25/08 Mar15/08 Mar30/08 Apri17/08 Apr.25/08 Jun.10/08 Jly.15/08 NA 13Feb 08 Feb.25/08 NA Mar05/08 Mar10/08 NA Apr.30/08 Mar.10/08 Feb.25/08 10 Mar.08 20 mar.08 30Mar.08 10Apr.08 20Apr.08 05May08 15May08 28May08 NA 13 Feb.08 Feb.25/08 NA Mar01/08 Mar25/08 NA May05/08 Jun19/08 NA 5 Jan.08 NA NA Feb.15/08 Feb.25/08 NA Apr.30/08 May.10/08
Proposal Evaluation and Negotiation for Technical (T) & Financial (F) &Negotiation (N) Draft Finalization No-objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Negotiation Eval Report s (T) (F) Subm. Contr act Amou nt in US$ 000 Award Signature NA 1 Feb.08 NA NA Feb.15/08 Feb.28/08 NA May05/08 Jun10/08 NA 1 Feb.08 NA NA Mar10/08 Mar15/08 NA May10/08 Jul15/08 31Dec07 Jan10/08 Feb.10/08 Feb.25/08 Mar15/08 Mar25/08 30Mar08 May.5/08 May10/08 Nov.15/07 Dec.10/07 Dec.15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 NA Dec.20/07 Dec25/07 NA Jan.20/08 Jan31/08 NA Feb.15/08 Mar.10/08 Nov.15/07 Dec.1/07 Dec10/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08
Proposal Evaluation and Negotiation for Technical (T) & Financial (F) &Negotiation (N) Draft Finalization No-objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Negotiation Eval Report s (T) (F) Subm. Contr act Amou nt in US$ 000 Award Signature NA Dec.05/07 Dec.15/07 NA Jan.5/08 Jan10/08 NA Feb.5/08 Feb.20/08 Nov.15/07 Dec.11/07 Dec15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.25/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.2/07 Dec.15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.3/07 Dec.10/07 Dec.30/07 Jan.5/08 Jan10/08 Jan.25/08 Feb.5/08 Feb.20/08 Dec.15/07 Dec.30/07 Jan.10/08 Jan.25/08 Jan.31/08 Feb.10/08 Feb.25/08 Mar15/08 Mar.25/08 28Jan. 08 13Feb.08 Feb.25/08 Mar15/08 Mar30/08 Apri17/08 Apr.25/08 Jun.10/08 Jly.15/08 Jan31/08 15Feb 08 Feb.25/08 Mar10/08 Mar15/08 Mar20/08 Apr.10/08 Apr.30/08 May.15/08 Feb.10/08 15 Feb.08 Feb.20/08 Mar10/08 Mar15/08 Mar25/08 Apr.20/08 Apr.30/08 May.10/08 NA 13 Feb.08 Feb.25/08 NA Mar01/08 Mar25/08 NA May05/08 Jun19/08 5 Jan.08 15Jan.08 25Jan.08 Feb.10/08 Feb.15/08 Feb.25/08 Mar.15/08 Mar.30/08 Apr.10/08 Feb.15/08 25Feb.08 30Feb.08 Mar.15/08 Mar.25/08 Mar.30/08 Apr.15/08 Apr.30/08 May10/08 Jan15/08 Jan25/08 Jan.31/08 Feb.15/08 Feb.20/08 Mar05/08 Mar20/08 Apr10/08 Apr30/08 31Dec07 Jan10/08 Feb.10/08 Feb.25/08 Mar15/08 Mar25/08 30Mar08 May.5/08 May10/08 NA Mar 8/08 Mar26/08 NA Apr.10/08 May01/08 NA May10/08 May30/08
Proposal Evaluation and Negotiation for Technical (T) & Financial (F) &Negotiation (N) Draft Finalization No-objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Negotiation Eval Report s (T) (F) Subm. Contr act Amou nt in US$ 000 Award Signature NA Mar 8/08 Mar26/08 NA Apr.10/08 Apr.15/08 NA Feb.5/08 Feb.5/08 NA Mar 8/08 Mar26/08 NA Apr.10/08 Apr.15/08 NA May10/08 May30/08 NA Mar 8/08 Mar26/08 NA Apr.10/08 Apr.20/08 NA Jun05/08 Jun15/08
Proposal Evaluation and Negotiation for Technical (T) & Financial (F) &Negotiation (N) Draft Finalization No-objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Negotiation Eval Report s (T) (F) Subm. Contr act Amou nt in US$ 000 Award Signature NA Mar 8/08 Mar26/08 NA Apr.10/08 Apr15/08 NA May15/08 Jun25/08 NA Mar 8/08 Mar26/08 NA Apr.18/08 Apr22/08 NA Jun05/08 June27/08 NA Mar 8/08 Mar26/08 NA Apr25/08 Apr.30/08 NA May20/08 June25/08 NA Mar 8/08 Mar26/08 NA Apr.15/08 Apr.20/08 NA May25/08 June15/08 Nov.15/07 Dec.11/07 Dec15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.25/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.2/07 Dec.15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.3/07 Dec.10/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 NA Dec.15/07 Dec30/07 NA Jan.20/08 NA NA Feb.15/08 Mar.10/08 28Jan. 08 13Feb.08 Feb.25/08 Mar15/08 Mar30/08 Apri17/08 Apr.25/08 May.10/08 Jun.25/08 Dec20/08 10Jan 08 15Jan 08 Jan.31/08 Feb05/08 Feb10/08 Feb25/08 Mar10/08 Mar25/08 NA 10 Feb.08 Feb.20/08 NA Mar10/08 Mar25/08 NA Apr.30/08 May.10/08 NA 13 Feb.08 Feb.25/08 NA Mar01/08 Mar25/08 NA May05/08 Jun19/08 NA 5 Jan.08 NA NA Feb.15/08 Feb.25/08 NA Apr.30/08 May.10/08 NA 1 Feb.08 NA NA Feb.15/08 Feb.28/08 NA May05/08 Jun10/08 Nov.15/07 Dec.11/07 Dec15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.25/08 Feb.5/08 Feb.20/08 Nov.15/07 Dec.2/07 Dec.15/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08
Proposal Evaluation and Negotiation for Technical (T) & Financial (F) &Negotiation (N) Draft Finalization No-objection Evaluation Report (T) Opening Financial Proposals Submission Eval Report (T) (F) No-objection Negotiation Eval Report s (T) (F) Subm. Contr act Amou nt in US$ 000 Award Signature Nov.15/07 Dec.3/07 Dec.10/07 Dec.20/07 Jan.5/08 Jan10/08 Jan.15/08 Feb.5/08 Feb.20/08 NA Dec.15/07 Dec30/07 NA Jan.20/08 NA NA Feb.15/08 Mar.10/08 28Jan. 08 13Feb.08 Feb.25/08 Mar15/08 Mar30/08 Apri17/08 Apr.25/08 Jun.10/08 Jly.15/08 NA 13Feb 08 Feb.25/08 NA Mar05/08 Mar10/08 NA Apr.30/08 Mar.10/08 NA 10 Feb.08 Feb.20/08 NA Mar10/08 Mar25/08 NA Apr.30/08 Mar.10/08 NA 13 Feb.08 Feb.25/08 NA Mar01/08 Mar25/08 NA May05/08 Jun19/08
JUSTE SYSTEM REFORM PROGRAM TRAINING PLAN FOR 2007/08 LOAN NO. 3899 ET S.No. Package No. ivities Type of Training 1USD = 9:00 BIRR Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 1 JSRP/T-01/08 2 JSRP/T-02/08 Undertake a training program on PSCAP framework, research methodology, basic computer application, records management, property management etc. Conduct working visit program semi-anually at Regional and Federal leveles Generic JSRP A.A. 3 days x 40 11.43 Special JSRP EMI 3 days x x x x 2 9.56 3 JSRP/T-03/08 Conduct overseas tour for experience sharing Special JSRP EMI 20 days x x x 1 35.22 4 JSRP/T-04/08 Conduct training for quality assurance mechanisms In house JSRP CSC 2 days x 2 1.67 5 JSRP/T-05/08 Conduct pedagogical training for law school instructors Special JSRP CSC 15 days x x x 130 663.22 6 JSRP/T-06/08 Conduct leadership training for law schools for deans/department heads Special JSRP CSC 5 days x x 13 14.80 7 JSRP/T-07/08 Formulation of association of Ethiopian law schools Special JSRP JSRP 7 days x x 50 1.10 8 JSRP/T-08/08 Study Tour to four Benchmarked countries Special JSRP India 15 days x x 10 62.22 9 JSRP/T-09/08 Short term Training -Human Resource Management In house JSRP CSC 5 Days x x 30 5.56 10 JSRP/T-10/08 Short term Training -Service Delivery In house JSRP CSC 5 days x 300 10.00 11 JSRP/T-11/08 Short term Training -Ethics In house JSRP CSC 5 days x x 300 8.89 12 JSRP/T-12/08 Training on Management of Government Expenditure In house JSRP CSC 5 days x 50 3.33 13 JSRP/T-13/08 Leadership training for Top Management Generic JSRP CSC 4 days x 40 16.67 14 JSRP/T-14/08 Training on Business Process Reenigineering(BPR) In house JSRP JSRP 15days x x 60 111.11 15 JSRP/T-15/08 Study tour to gather experiences (Benchmarking) Special JSRP China,US A 4 weeks x 7 84.44 16 JSRP/T-16/08 Rules of procedures and Members Code of Conduct In house JSRP EMI 1 weeks x x 550 8.33 17 JSRP/T-17/08 Training on Legal review In house JSRP EMI 4 days x 260 33.33 18 JSRP/T-18/08 Oversight mechanism In house JSRP CSC 3 days x 260 26.78
S.No. Package No. ivities Type of Training Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 19 JSRP/T-19/08 Policy formulation and Analysis In house JSRP CSC 5 days x 260 11.11 20 JSRP/T-20/08 Human Right & Good governance In house JSRP CSC 3 days x 550 11.11 21 JSRP/T-21/08 Gender policy and Main Streaming In house JSRP JSRP 3 days x 260 7.67 22 JSRP/T-22/08 Training for public Accounts Standing Committee In house JSRP EMI 10 days x 50 23.33 23 JSRP/T-23/08 Training on budget Cycle,basic computer and English Language. Generic JSRP CSC 5 days x 600 119.67 24 JSRP/T-24/08 Monitoring the Implementation of PASDEP Generic JSRP CSC 5 days x 260 26.78 25 JSRP/T-25/08 Conduct training on Basic Concept of Law/ Certification,Economics,research methedology, Bill review and drafting, Police analysis,project Proposal,geneder plicy,law,sociology,polotical Science and Mangement. Generic JSRP CSC 15 days x 120 138.54 26 JSRP/T-26/08 Workshop on constitutional awareness creation In house JSRP CSC 30 days x x 512 80.31 27 JSRP/T-27/08 Conduct translation & publication of constitution in 4 regenal languages In house JSRP CSC 10 days x x 100000 175.56 28 JSRP/T-28/08 Publication and translation of brochures in 5 languages Special JSRP JSRP 5 days x 100000 34.44 29 JSRP/T-29/08 Education of general public by public media through contests In house JSRP A.A. 3 days x 11.00 30 JSRP/T-30/08 Workshop on good governance, conflict prevention In house JSRP EMI 3 days x 160 35.11 31 JSRP/T-31/08 Workshop on good governance for HoF standing committee members In house JSRP EMI 5 days x 43 7.41 32 JSRP/T-32/08 Research on Revenue Sharing In house JSRP CSC 5 days x 1 4.44 33 JSRP/T-33/08 Study tour to different regions and conducting of workshop. In house JSRP CSC 15 days x 7 69.00 34 JSRP/T-34/08 Conducting research on the implimentation of JSRP programs. In house JSRP CSC 5 days x 17 15.22
S.No. Package No. ivities Type of Training Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 35 JSRP/T-35/08 Training for language experts Generic JSRP JSRP 2 days x 45 8.59 36 JSRP/T-36/08 Training on cultural event In house JSRP EMI 5 days x 22.22 37 JSRP/T-37/08 Training for Civil Society on conflict prevention In house JSRP CSC 19 days x 60 20.33 38 JSRP/T-38/08 ITC Training Generic JSRP CSC 5 days x 3 0.67 39 JSRP/T-39/08 40 JSRP/T-40/08 41 JSRP/T-41/08 42 JSRP/T-42/08 Staff short term Local training on the ADR, Case handling & Investigation, Systemic Investigation, ning and management, Performance & Change management Staff short term Local training on the ADR, Case handling & Investigation, Systemic Investigation, ning and management, Performance & Change management Conduct Overseas training programmes and study tours on: good governance, public education, human rights, protection of children and disabled rights, HIV/AIDS International relations,advanced Journalism and media communication, Research Methodology,conflict management Condact Distance education program on relevant field of studies for professionals and officials of ELO Generic JSRP CSC 10 days x 5 22.22 Generic JSRP CSC 5 days x 60 15.56 Special JSRP CSC 5 days x x 50 55.56 Special JSRP JSRP 12 months x x x 15 55.56 43 JSRP/T-43/08 Conduct awarness creation training In house JSRP A.A. 5 days x x 88.89 44 JSRP/T-44/08 Training on trafficking in women, children and Integrated rape case management In house JSRP EMI 10 days x 50 6.67 45 JSRP/T-45/08 Preparation of gender main streaming workshop In house JSRP EMI 10 days x 50 6.67 46 JSRP/T-46/08 On-Job training to up grade Women s MOJ supporting staff. In house JSRP CSC 5 days x 203 6.89 47 JSRP/T-47/08 Conduct work shop on ADR In house JSRP CSC 3 days x 100 37.78 48 JSRP/T-48/08 International training to prosecutors Special JSRP CSC 15 days x 2 6.67
S.No. Package No. ivities Type of Training Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 49 JSRP/T-49/08 Training managerial staff on management skills, change management and performance management system Generic JSRP JSRP 25 days x 30 28.64 50 JSRP/T-50/08 51 JSRP/T-51/08 52 JSRP/T-52/08 Training for public prosecutors on change writing and litigation skills Training for police officers on crime investigation and human rights Training on crime data collection & compliation for federal & regional data collector In house JSRP EMI 5 days x 100 27.33 In house JSRP CSC 10 days x 100 27.33 In house JSRP CSC 5 days x 100 16.67 53 JSRP/T-53/08 Training on basic computer skills for MOJ staffs In house JSRP CSC 15 days x 30 2.67 54 JSRP/T-54/08 Conducting impacts assessment study on the various training programs undertaken by the Ministry of Justice In house JSRP CSC 12 days x 20.00 55 JSRP/T-55/08 Educating the general public in different legal and human rights issues through electronic media Education In house JSRP CSC 10 days x 16 44.44 56 JSRP/T-56/08 Train staff on modern filing & recording system Generic JSRP JSRP 4 days X X X 50 1.33 57 JSRP/T-57/08 58 JSRP/T-58/08 Organize workshop for stakeholders, collaborators & otherconcerned bodies ondraft & final criminalpolicy Training on Criminal Investigation Skills and techniques, Criminallaw criminal procedure law, Evidence & evidence collection & human right In house JSRP A.A. 5 days X 200 22.22 Generic JSRP EMI 12 days X X X X 180 53.33 59 JSRP/T-59/08 Study tour abroad for sharing experience Special JSRP SAF,USA 20 days X X 9 72.22 60 JSRP/T-60/08 Training on introduction & ND In house JSRP CSC 12 days X X X 10 3.56 61 JSRP/T-61/08 Training on Swithing In house JSRP CSC 5 days X X 10 3.89 62 JSRP/T-62/08 Training on Advanced Routing Special JSRP CSC 7 days X X 10 3.89 63 JSRP/T-63/08 Training on Remote access Generic JSRP JSRP 5 days X X 10 3.89 64 JSRP/T-64/08 Training on Support and troubleshooting Special JSRP EMI 12 days X X 10 3.89
S.No. Package No. ivities Type of Training Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 65 JSRP/T-65/08 66 JSRP/T-66/08 67 JSRP/T-67/08 68 JSRP/T-68/08 69 JSRP/T-69/08 70 JSRP/T-70/08 Training one understanding cisco voice over IP,IP telephony part 1and 2,implimentation of CISO quality of service,ip telephony trouble shoting, Implementing Cisco voice gateways of gate keepers,security CISCO network devices,security CISCO network devices,security network with ASA and PIX firewall,implementing Cisco intrusion prevention system,cisco virtual private networks Short term training on managing of maintaining a MSwindows server 2003 (70-290) Short term training on Implementing, managing & maintaining Ms-Win Server 2003 network infrustructure (70-291) Short term training on planning & Maintaining a MS-win server 2003 network /70-293/ Training on Designing active directory infrustructure or designing network security with Directory /70-294/ Training on Designing active directory infrustructure or designing network security with microsoft servers/ Generic JSRP CSC 30 days X X 10 8.88 Generic JSRP CSC 12 days X X 10 3.33 Generic JSRP CSC 12 days X X 10 3.33 Generic JSRP CSC 3 days X X 10 3.33 Generic JSRP CSC 12 days X X 10 3.33 Generic JSRP JSRP 12 days X 10 4.44 71 JSRP/T-71/08 Training on Microsoft Win-XP or Microsoft win 2000 Generic JSRP A.A. 12 days X 10 2.22 72 JSRP/T-72/08 Short term training on Microsoft exchange /ISA/SQL server Generic JSRP EMI 5 days X 10 2.22 73 JSRP/T-73/08 Short term training on project planing management Generic JSRP EMI 12 days X X 1 0.27 74 JSRP/T-74/08 Short term training on office management Generic JSRP CSC 12 days X 5 1.33 75 JSRP/T-75/08 Short term training on computer application Generic JSRP CSC 5 days X X X X 37 9.87 76 JSRP/T-76/08 Short term training on Strategic planning & management Generic JSRP CSC 5 days X X 10 2.67 77 JSRP/T-77/08 Short term training on leadership Dev t Generic JSRP JSRP 2 weeks X X X X 2 0.72 78 JSRP/T-78/08 Short training on performance management Generic JSRP EMI 2 weeks X X 4 1.07
S.No. Package No. ivities Type of Training Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 79 JSRP/T-79/08 Short term training on Human resource management/hrm Generic JSRP CSC 2 weeks X 10 2.67 80 JSRP/T-80/08 Short term training on Records management Generic JSRP CSC 10 days X 10 2.67 81 JSRP/T-81/08 Short term training on BPR In house JSRP CSC 10 days X 10 2.67 82 JSRP/T-82/08 Short term training on Basic accounting Generic JSRP CSC 10 days X 10 2.67 83 JSRP/T-83/08 Short term training on purchasing management Generic JSRP CSC 1 week X 7 1.87 84 JSRP/T-84/08 Short term training on SPSS program Generic JSRP JSRP 10 days X 20 5.24 85 JSRP/T-85/08 Short term training on management transformational leadership Generic JSRP A.A. 10 days X 13 3.47 86 JSRP/T-86/08 Short term training on facilitating change through term building 87 JSRP/T-87/08 Short term training on Strategic planning & management In house JSRP EMI 10 days X 10 2.67 Generic JSRP EMI 10 days X 10 2.67 88 JSRP/T-88/08 Short term training on total materials management Generic JSRP CSC 10 days X 7 1.87 89 JSRP/T-89/08 Short term training on transport management In house JSRP CSC 10 days X 12 3.20 90 JSRP/T-90/08 Short term training Human Resource management In house JSRP CSC 10 days X 4 1.07 91 JSRP/T-91/08 Short term training on procurement management Generic JSRP JSRP 5 days X 7 1.87 92 JSRP/T-92/08 Short term training on change management Generic JSRP EMI 6 days X 8 2.13 93 JSRP/T-93/08 Short term training on strategic financial management Generic JSRP CSC 19 days X 3 0.80 94 JSRP/T-94/08 Short term Training on management accounting Generic JSRP CSC 12 days X 6 2.67 95 JSRP/T-95/08 Short term Training on budgetary planning Generic JSRP CSC 3 days X X X X 7 2.67 96 JSRP/T-96/08 Short term Training on project planning implementation, monitoring & evaluation Generic JSRP CSC 5 days X X 8 2.13 97 JSRP/T-97/08 Short term Training on recond management Generic JSRP CSC 7 days X X X 10 2.67
S.No. Package No. ivities Type of Training Organi zer Venue (Town & Country) Duration Period Q1 Q2 Q3 Q4 of Particip ants Estimat ed Cost in USD 98 JSRP/T-98/08 Training on performance Audititng Generic JSRP JSRP 12 days X X X 13 3.47 99 JSRP/T-99/08 Training on human resource statistics records supervision In house JSRP A.A. 5 Days X X X 10 2.67 100 JSRP/T-100/08 Training on BPR In house JSRP EMI 12 days X X X 8 2.13 101 JSRP/T-101/08 Training for person administrators and staff 102 JSRP/T-102/08 Training for management and staff Head Office 103 JSRP/T-103/08 Providing tainting on Prevention, Investigation, Prosecution, Ethics Education and HRM activities of FEAC using study tour, local and foreign training; In house JSRP EMI 5 days X X 46.67 In house JSRP CSC 5 days X 2.13 In house JSRP CSC 4 days 2.13 104 JSRP/T-104/08 Study tour on experience sharing Special JSRP CSC 12 days X 111.11 105 JSRP/T-105/08 Local training; In house JSRP EMI 4 weeks X X X 33.33 106 JSRP/T-106/08 Foreign training; Special JSRP South Africa 8 weeks X X X 55.56 Origanizing workshops and training for 107 JSRP/T-107/08 stakeholders and collaborators on the draft & final asset and financial interests regulation and procedures; In house JSRP JSRP 4 days 42.22 108 JSRP/T-108/08 Publish the final regulation and procedures of assets and financial interests of public officials; In house JSRP JSRP 5 days X X 11.11 109 JSRP/T-109/08 Organizing and Launching the Forum In house JSRP JSRP 5 days X 101.67 110 JSRP/T-110/08 Transmit ethics education and aware peoples using sports, dramas and other methods on radio and televission In house JSRP A.A. 12 days X X 288.89