SECOND PROGRESS REPORT ON THE NON-GRANT INSTRUMENT PILOT

Similar documents
PROGRESS REPORT ON THE CAPACITY-BUILDING INITIATIVE FOR TRANSPARENCY

JOINT SUMMARY OF THE CHAIRS 49 TH GEF COUNCIL MEETING OCTOBER 20 22, 2015

SA GREEN FUND. OECD/AfDB, Green Growth in Africa Workshop: 16 January, 2013

The Green Climate Fund s. Private Sector Facility

GEF s Role and Activities for Climate Change Mitigation

Operational Modalities for Public Private Partnership Programs

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP)

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

Climate Investment Funds: Financing Low-Emissions and Climate-Resilient Activities

Overview of financial sources for mitigation actions, including support for NAMAs

53 rd GEF Council Meeting November 28 30, 2017 Washington, D.C. GEF/C.53/03 November 9, Agenda Item 14

ANNUAL PORTFOLIO MONITORING REPORT 2016

Accessing financing from the Green Climate Fund

Financing Development, Transfer, and Dissemination of Clean and Environmentally Sound Technologies

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND

AFRICA CLIMATE CHANGE FUND (ACCF)

Status of the GCF portfolio: pipeline and approved projects

FRAMEWORK OPERATIONAL GUIDELINES THE DEDICATED GRANT MECHANISM FOR INDIGENOUS PEOPLES AND LOCAL COMMUNITIES (DGM)

Global Environment Facility

THE GEF SMALL GRANTS PROGRAMME COMMUNITY ACTION GLOBAL IMPACT

Report of the Global Environment Facility on the progress made in carrying out the Poznan strategic programme on technology transfer

Approach Paper. Formative Process Review of the Sustainable Cities Integrated Approach Pilot (IAP) Program. 22 February 2017

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)

GEF/C.41/Inf.11 October 7, GEF Council Meeting November 8-10, 2011 Washington, D.C.

JOINT SUMMARY OF THE CHAIRS 52 ND GEF COUNCIL MEETING MAY 23 25, 2017

Introduction to the Green Climate Fund Florence RICHARD, Regional Advisor Africa

GEF SECRETARIAT REVIEW FOR PROGRAMMATIC FRAMEWORK DOCUMENT* THE GEF/LDCF/SCCF TRUST FUNDS

Report of the Global Environment Facility to the Conference of the Parties. Progress report on the Capacity-building Initiative for Transparency

REQUEST FOR CEO ENDORSEMENT PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND:Multi-Trust Fund

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND. GEF Focal Area (s): Climate Change.

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

DECISION B.14/10 DECISION B.14/11

Understanding Opportunities Available Through International Financial Institutions

GEF-6 FULL-SIZED PROJECT FOR ENDORSEMENT PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND:GEF Trust Fund

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia

Responding to countries requests for technical assistance and capacity building

The GEF. Was established in October 1991 as a $1 billion pilot program in the World Bank

Lessons learnt from fast-start finance

b. Inform the Secretariat that it has commenced consultations with the NDA or, if applicable, the focal point.

USER GUIDE INDIGENOUS PEOPLES AND GEF PROJECT FINANCING

The Global Environment Facility

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND

Green economy, finance, and trade studies an update

STATEMENT BY THE GLOBAL ENVIRONMENT FACILITY ON THE REPORT OF THE GLOBAL ENVIRONMENT FACILITY TO THE TWENTIETH SESSION

Global Climate Funds. The Climate Investment Funds and the Green Climate Fund CLIFFORD POLYCARP

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

WORLD BANK APPRAISAL STAGE: GEF DATA SHEET

STRENGTHENING THE GEF PARTNERSHIP

GEF Small Grants Programme: Implementation Arrangements for GEF-6

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS

Integra. International Corporate Capabilities th Street NW, Suite 555W, Washington, DC, Tel (202)

Status of the Fund s portfolio: pipeline and approved projects

Operation of the registry of nationally appropriate mitigation actions

EVALUATION OF THE EXPANSION OF THE GEF PARTNERSHIP FIRST PHASE

Photo credit: Boston Community Capital

AFRICAN DEVELOPMENT BANK CONGO BASIN FOREST FUND OPERATIONAL PROCEDURES

Funding Single Initiatives. AfDB. Tapio Naula at International Single Window Conference Antananarivo 17 September 2013

CO-FINANCING POLICY. POLICY: FI/PL/01 Issued on June 30, 2014

Workstream III: Operational Modalities Sub-workstream III.2: Managing Finance Background note: Thematic windows

HOW TO PREPARE BANKABLE PROJECTS FOR FINANCING CLIMATE CHANGE ADAPTATION IN TRANSBOUNDARY BASINS Dakar, Senegal, June 2017

with Environment and Sustainable Development Agency for Republic of Mali 17 March 2015 Strategic Frameworks and Country Programming

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

Procedure: PR/IN/04 May 21,2012. Procedure: Accreditation of GEF Project Agencies

Accessing the Capacity-building Initiative for Transparency (CBIT) GEF Expanded Constituency Workshop Hammamet, Tunisia July 12, 2017

Project Information Document/ Identification/Concept Stage (PID)

Argentine Republic's Readiness Preparation - Readiness Fund for Forest Carbon Partnership Facility (FCPF) FCPFR - Forest Carbon Partnership Facility

INDONESIA FOREST INVESTMENT PROGRAM (FIP)

GEF: Investing in Robust MRV Systems for Mitigation

Climate Innovation Center Business Plan: India. Contributing Authors: Anthony Lambkin Ashok K Das Julian Webb

UNIDO s INDUSTRIAL DEVELOPMENT PARTNERSHIPS WITH FINANCIAL INSTITUTIONS

Capacity Building Project for Measurement, Reporting and Verification (MRV) of Greenhouse Gas (GHG) Emission Reduction in Africa

A new initiative to catalyze high-impact NAMAs and create a vibrant practitioner network on low-carbon development

Bangladesh: Forest Investment Program (FIP) Technical Mission, October 16-20, 2016 Aide Memoire

CLIMATE CHANGE: CAPACITY BUILDING AND FINANCING

EXPO LIVE INNOVATION IMPACT GRANT PROGRAMME INNOVATION CAN COME FROM ANYWHERE, TO EVERYONE

UPDATED CO-FINANCING POLICY

33 C. General Conference 33rd session, Paris C/74 11 October 2005 Original: English. Item 5.20 of the agenda

National Dialogue Initiative

Deadline 15 March 2009

TechnoServe Report on the RMGC Potential Private Sector Impact. 8 July 2010

Global Agriculture and Food Security Program NICHOLA DYER, PROGRAM MANAGER

Costa Rica's Readiness Preparation Proposal Readiness Fund of the FCPF FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Coastal Protection for Climate Change Adaptation in Small Island States in the Caribbean

Biodiversity. People. Partnership. KEHATI: Biodiversity Conservation Trust Fund

International Scientific Colloquium on Cashew (CIESA)

International Coral Reef Initiative (ICRI) and UN Environment Grants Programme 2017 APPLICANT GUIDELINES

Carbon Finance in Africa

Original language: English SC70 Inf. 22 CONVENTION ON INTERNATIONAL TRADE IN ENDANGERED SPECIES OF WILD FAUNA AND FLORA

Financing Innovation AN OVERVIEW OF THE MAIN EU FUNDING PROGRAMMES. Eindhoven 24th May 2016 Djilali KOHLI

Attention: Suncorp Solar Potential Investors and Shareholders SMALL IPP PROGRAM SOUTH AFRICA RENEWABLE ENERGY MARKET

International Tree Foundation. Finance and Admin Assistant. Application Pack

Methodologies for the reporting of financial information by Parties included in Annex I to the Convention

Project Development and Financing Initiative Sub-Saharan Africa. Open Request for Proposals

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4516 Project Name. Threatened Species Partnership - Save Your Logo Region

Capacity building through training and development of financing proposals for climate-relevant projects and programs

Interim Progress Report on Activities Implemented Under. the UN-REDD Programme Fund. Report of the Administrative Agent of

PMR PROJECT IMPLEMENTATION STATUS REPORT (ISR)

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND: GEF Trust Fund

Terms of Reference (TOR) for Independent End of Project Evaluation

Transcription:

49 th GEF Council Meeting October 20 22, 2015 Washington, D.C GEF/C.49/Inf.12 October 13, 2015 SECOND PROGRESS REPORT ON THE NON-GRANT INSTRUMENT PILOT

TABEL OF CONTENTS Summary... 1 Background... 1 Update on Programming October 2015... 2 Annex 1: Overview of the Non-Grant Pilot Projects... 5 i

SUMMARY 1. This is the second progress report on the Non-Grant Instrument Pilot (the Pilot). The first progress report, GEF/C.48/Inf.04, was presented at the June 2015 Council meeting. This report documents the progress on the Pilot June 2015 through October 2015. 2. In June 2015, the GEF council approved three non-grant instrument projects in the work program, with GEF funding of $40.6 million (including agency fees) and co-financing of $289 million. 3. Following the approval by Council, the African Development Bank project Moringa Agroforestry Fund for Africa (#9051) has been CEO Endorsed and is beginning implementation. 4. The Secretariat continued to work with GEF Partner Agencies, countries and stakeholders for the second window for submissions. Nine formal submissions from seven agencies were received; two projects are submitted for Council approval as part of the October 2015 work program. A balance of $35 million for the Pilot is still available; a third window of opportunity for additional submissions is anticipated. BACKGROUND 5. The GEF Council, at its 47th meeting on October 28-30, 2014, having reviewed document GEF/C.47/06, GEF-6 Non-Grant Instrument Pilot and Updated Policy for Non-Grant Instruments, approved the implementation modalities for the Non-Grant Instrument Pilot, as well as the updated Policy on Non-Grant instruments. 1 Subsequent to the Council approval, the GEF Secretariat utilized multiple communication and outreach channels to inform potential public and private sector recipients, along with the GEF Partner Agencies, on the availability and scope of the Pilot. In promoting the Pilot, the GEF Secretariat used existing means of communication within the GEF network and pursued new channels for enhanced outreach. 6. Specifically, the GEF Secretariat prepared a flyer informing on several aspects of the Pilot, including its objectives, available financial terms and conditions for private and public sector recipients, the targeted areas of work, funding size, selection criteria and application procedures. The flyer was distributed to all GEF Operational Focal Points in the fall of 2014, accompanied by an official letter from the GEF CEO to invite potential recipients to take advantage of the Pilot. The flyer was further distributed at relevant events such as the twentieth Conference of the Parties of the UNFCCC in Lima, Peru, December 2014. At the same time, the GEF Secretariat also published a dedicated website informing on the GEF s non-grant financing, which can be accessed at: http://www.thegef.org/content/non-grant-instruments. 7. The GEF Secretariat worked with GEF Partner Agencies in an iterative process on their submission of non-grant proposals, including through upstream consultations and informal reviews, consistent with the Council approved Pilot. The first window for submissions was 1 Policy document FI/PL/02, Non-Grant Instruments, issued on October 30, 2014. 1

targeted for the June 2015 work program. The GEF Secretariat conducted upstream review and provided informal feedback for over 20 non-grant concepts. By the formal deadline of March 13, 2015, eight submissions from six GEF Partner Agencies were received, requesting a total of $93 million in non-grant funding from the GEF Trust Fund. The GEF Secretariat reviewed these proposals against the criteria in GEF/C.47/06, GEF-6 Non-Grant Instrument Pilot and Updated Policy for Non-Grant Instruments. Reviews also included participation of GEF Secretariat s focal area technical experts to ensure eligibility and accordance with GEF-6 focal area objectives and priorities. 8. These reviews were complemented by an independent appraisal by three internationally recognized senior financial experts who provided comment on each proposal regarding their financial soundness and reasonability. The review process employed by the Secretariat was fully consistent with GEF processes and procedures for work program constitution, and enhanced by strong coordination and engagement from all GEF s focal areas and program managers in their respective areas of expertise. This review process culminated in a set of high-quality, innovative project proposals as presented in document GEF/C.48/08, Work Program. (See Table 1). UPDATE ON PROGRAMMING OCTOBER 2015 9. A second window for submissions and re-submissions under the Pilot were targeted for the October 2015 work program. The GEF Secretariat again conducted upstream review and provided informal feedback on seven (7) additional non-grant project concepts. By the formal deadline of July 31, 2015, nine (9) submissions from seven (7) GEF Partner Agencies were received, requesting a total of $118 million in non-grant funding from the GEF Trust Fund. These included four (4) re-submissions requesting $51 million and five (5) new submissions requesting $67 million. As described above, the reviews for the proposed projects included focal area technical experts and independent appraisal by financial experts. There were a number of high-quality and innovative project proposals considered during the review. Submissions included proposals for private sector equity investments, risk mitigation instruments, and a public loan. Unfortunately, due to resource constraints in the total work program envelope, only two project proposals were able to be included in the October Program (GEF/C.49/05, Work Program). The Secretariat is targeting to obligate the $35 million balance of non-grant pilot funding in the next work program. 10. The Secretariat has been gratified with the strong interest from GEF Partner Agencies, GEF recipient countries, private sector and NGO stakeholders in the Pilot. In the two windows for submissions, GEF has received formal requests for more than $160 million in non-grant funding and numerous informal requests that are well in excess of the resources available for the Pilot. Project proposals have been innovative in design and addressed numerous focal areas. Based on the diversity and high-quality of the submissions, it is clear that GEF partner agencies are developing creative and innovative designs to apply non-grant instruments across the full spectrum of GEF focal areas and in most cases deliver multiple focal-area global environmental benefits. 2

11. As requested by the GEF Council, the GEF Secretariat, in consultation with Agencies, will report on the Pilot s implementation status after 24 months of the date of effectiveness of the new policy; that is, for the 51st Council meeting, October 2016. Table 1: Non-Grant Pilot at a glance (as approved through June 2015) Project International Lighting Efficiency Facility #6980 Moringa Agroforestry Fund for Africa (#9051) Impact Investment in Support of the Implementation of the Nagoya Protocol Equity Fund for the Small Projects Independent Power Producer (#9058) (#9085) Total GEF Agencies World Bank AfDB IADB DBSA Program financing Program financing approved (USD) 1,200,000 12,000,000 10,000,000 15,000,000 38,200,000 Project preparation grants approved (USD) 0 0 70,000 200,000 270,000 Agency fees approved (USD) 114,000 $1,080,000 956,650 1,368,000 3,518,650 Total financing approved (USD) 1,314,000 $13,080,000 11,026,650 16,568,000 41,988,650 Indicative co-financing (USD) Number of countries (directly involved) Geographical coverage 50,250,000 51,000,000 48,000,000 190,000,000 339,050,000 5 7 5 1 18 Global Africa Latin America Africa Indicative, expected global environmental benefits Land under integrated n/a n/a n/a n/a n/a management (ha) Sustainable Land Management n/a 200,000 800,000 n/a 1,000,000 (ha) GHG emissions avoided or 1 9.5 n/a 5.0 15.5 reduced (MtCO2e) Genetic diversity of crops and n/a n/a n/a n/a n/a animals maintained or increased in the production landscape (%) Land cover (increase, %) n/a n/a n/a n/a n/a Improved management of landscapes and seascapes (hectares of coastal marine areas with EEZs under n/a n/a 100,000 n/a 100,000 3

sustainable fisheries management regimes) % (by volume) of globally overexploited fisheries moved to more sustainable levels n/a n/a n/a n/a n/a 4

ANNEX 1: OVERVIEW OF THE NON-GRANT PILOT PROJECTS (Approved as of June 2015) 1. The International Lighting Efficiency Facility (ilef) (World Bank) will help launch and support a new financing facility for energy efficient lighting and equipment for cities. The focus is to build a systemic solution to bridge the gap between institutional investors seeking exposure to real asset classes and the idiosyncratic investment needs related to increasing efficiency and bringing down carbon emissions in cities around the world. The ilef is a singlepurpose facility financing the conversion of traditional urban street lighting technologies (generally, mercury vapor and sodium vapor lamps) to more efficient lighting emitting diodes (LEDs) and by doing so realizing the associated greenhouse gas emission benefits as well as budgetary savings for municipalities, globally. It accelerates a transformative process in the area of highly efficient urban lighting. After successful investments in lighting the facility will expand into other types of energy efficient equipment. Estimated emissions reductions will be 1 million tco2e. (Endorsed by CEO January 2015) 2. The Moringa Agro-forestry Fund for Africa (AfDB) will promote sustainable land management in production landscapes in Burkina Faso, Cote d'ivoire, Kenya, Mali, Tanzania, Zambia, and Congo DR. Specifically, the project will scale up investment in agroforestry activities in for biodiversity conservation and reduced land/forest degradation. The Fund will invest in 5-6 scalable, replicable agroforestry projects that combine plantation forestry with agricultural elements to capture most of the value chain. Under the non-grant pilot, GEF will receive an estimated risk-adjusted equity return of 6 percent along with its principal. Reflows to the GEF trust fund will be confirmed at CEO endorsement; estimated to begin soon after the project is completed and fully returned within twelve years. The project also targets 79,000 hectares to maintain significant biodiversity and associated ecosystems goods and services, and more than 200,000 hectares of production systems under sustainable land and forest management. This is estimated to yield GHG emissions benefits of 9.5 million tons CO2e. (Approved by Council June 2015; endorsed by CEO August 2015). 3. The project on Impact Investment in Support of the Implementation of the Nagoya Protocol on Access and Benefit Sharing (IADB) will support efforts in Latin America and the Caribbean to develop Small and Medium Enterprises (SMS) that are actively implementing the Nagoya Protocol. It will focus on 20 SMEs that are taking part in the production and valorization of genetic resources by means of research and development or that are part of value chains linking users and producers of these genetic resources. The investment will facilitate improved capacities for the valorization of genetic resources or commercialization of value-added products, effectively linking users and producers of these genetic resources. The project will bring on board the experience of the Union for Ethical Biotrade (UEBT). Under the non-grant pilot, GEF will invest $10 million and will receive an estimated risk-adjusted equity return of 13 percent-15 percent along with its principal. Reflows to the GEF trust fund will be confirmed at CEO endorsement; estimated to after the project is completed and fully returned within ten years. The project yields estimated benefits of 100,000 ha under improved management of 5

landscapes and seascapes; 800,000 hectares under sustainable land management; and 2 freshwater basins with water-food-ecosystems security and conjunctive management of surface and groundwater. (Approved by Council June 2015). 4. The Equity Fund for the Small Projects Independent Power Producer Procurement Programme (DBSA) will support efforts in South Africa to promote renewable energy in South Africa by small and independent power producers. This project will be the first of its kind in South Africa, and create several innovations: a debt fund, a GEF funded equity fund, and a securitization platform, all of which helps share risk among the partners. Under the non-grant pilot, GEF will receive an estimated risk-adjusted equity return of 6 percent along with its principal. Reflows to the GEF trust fund will be confirmed at CEO endorsement; estimated to be fully returned within fifteen years. The proposed investments will result in installation of close to 100MW of renewable energy, reducing approximately 260,000 tons CO2e per year, resulting in an estimated 5 million tons CO2e over an assumed average project useful lifetime of 20 years. (Approved by Council June 2015). 6