NAVSEA STANDARD ITEMS FY-19 CH-2 (26 MAR 2018)

Similar documents
NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

ANNEX 2 RESOLUTION MSC.216(82) (adopted on 8 December 2006)

NAVSEA STANDARD ITEM CFR Part 61, National Emission Standards for Hazardous Air Pollutants

Subj: CHANGE OR EXCHANGE OF COMMAND OF NUCLEAR POWERED SHIPS. Encl: (1) Engineering Department Change of Command Inspection List

2015 NAVSEA Standard Specifications for Ship Repair and Alteration Committee (SSRAC) Meeting

Incumbents may perform one or more of these functions in support of a wide range of equivalent marine engineering activities.

NAVSEA STANDARD ITEM. 2.1 S9AAO-AB-GOS-010, General Specifications for Overhaul of Surface Ships (GSO)

RELIABILITY CONSIDERATIONS FOR LAUNCH VEHICLE COMMAND DESTRUCT SYSTEMS

Joint Electronics Type Designation Automated System

DEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI

NAVSEA STANDARD ITEM. 1.1 Title: Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish

NSWCCD-SSES SSES COMMAND OVERVIEW. 12 June Patricia C. Woody Department Head Machinery Research and Engineering

Department of Defense INSTRUCTION

NAVY WEIGHT HANDLING PROGRAM FOR SHORE ACTIVITIES

Request for Proposals School Year Project Lafayette County School District 100 Commodore Drive Oxford, MS 38655

BSEE/USCG MOA: OCS-08 Effective Date: June 4, 2013

INSTRUMENTATION TECHNICIAN I/II/III

Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST

TAHOE CITY PUBLIC UTILITY DISTRICT Job Description

OPNAVINST L N96 30 Mar Subj: REQUIREMENTS FOR AIR CAPABLE AND AMPHIBIOUS ASSAULT SHIPS TO OPERATE AIRCRAFT

EXISTING CONDITIONS

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

COMDTPUB P16721 NVIC August 25, 2014

Chapter 12 Environmental, Safety and Health (ES&H) Regulatory Compliance and Contractor Oversight Program

FAMILIARIZATION AND ONBOARD TRAINING

STANDARD ITEM. 1.1 Title: Prevention of Radiographic-Inspection Ionizing-Radiation Hazard; accomplish

BY ORDER OF THE COMMANDER 911 AIRLIFT WING INSTRUCTION COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

1. General. 2. Background

TECHNICAL MANUAL UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL

HELICOPTER MECHANIC, HELICOPTER MECHANIC SUPERVISOR, 3749

Department of Defense INSTRUCTION. SUBJECT: Programming and Accounting for Active Military Manpower

Document source:

OPNAVINST B N96 29 Jul 2014

DISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE DISTRIBUTION UNLIMITED

Department of Defense DIRECTIVE

DEPARTMENT OF THE USS FRANK CABLE (AS 40)

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

Subj: Nuclear, Biological, and Chemical (NBC) Defense Equipment Test and Evaluation Program

Subj: DECK LANDING OPERATIONS BY CIVILIAN HELICOPTERS WITH CIVILIAN PILOTS ON U.S. NAVY VESSELS

Eastern Municipal Water District Date Adopted: 04/16/97 Date Revised: 07/06

July 2, TECHNICIAN POSITION VACANCY ANNOUNCEMENT # (Also advertised under AGR Position Vacancy Announcement )

Department of Defense DIRECTIVE. SUBJECT: Marine Sanitation Devices for Vessels Owned or Operated by the Department of Defense

CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

Department of Defense INSTRUCTION. Programming and Accounting for Active Military Manpower

Department of Defense DIRECTIVE

Vessel Response Plan Program Overview

CHAPTER 35 FIREMAN (FN) NAVPERS A CH-52

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

Get your OSHA and EHS training from an authorized OSHA Education Center OSHA & EHS Courses

Us Navy Shipboard Electrical Tech Manuals READ ONLINE

Laboratory Accreditation Program CRITERIA

Who Is OSHA? Who Is PERRP?

Subj: SURFACE SHIP AND SUBMARINE SURVIVABILITY TRAINING REQUIREMENTS

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II

1. Definitions. See AFI , Air Force Nuclear Weapons Surety Program (formerly AFR 122-1).

Technical Circular. To Whomsoever it may concern. Subject: Report of MSC 94. No.: 026/2014 Date: 25 th November 2014

H. R. ll [Report No. 115 ll]

JOINT FLEET MAINTENANCE MANUAL VOLUME VII CONTRACTED SHIP MAINTENANCE LIST OF EFFECTIVE PAGES

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY. SUMMARY OF REVISIONS This document is substantially revised and must be completely reviewed.

Labor Chapter ALABAMA DEPARTMENT OF LABOR ELEVATOR SAFETY RULES ADMINISTRATIVE CODE CHAPTER LICENSING AND FEES TABLE OF CONTENTS

Pipeline Operational Qualification (OQ) Crosswalks

(2) Ensure measures are established to control health and safety hazards from ionizing radiation sources and radioactive material.

Army Standardization Activities and Initiatives

ST. VINCENT AND THE GRENADINES

Request for Proposal: Cabling

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

DOD MANUAL , VOLUME 1 DOD MANAGEMENT OF ENERGY COMMODITIES: OVERVIEW

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Outreach Training Program

USF OSHA Training Institute Education Center

The University of Texas at San Antonio

PROPERTY IMPROVEMENT PROGRAM

Subj: UNIFORM MATERIEL MOVEMENT AND ISSUE PRIORITY SYSTEM

ASSIGNMENT 4. Textbook Assignment: Chapter 6 Naval Organization and chapter 7 Basic Seamanship.

UNITED STATES MARINE CORPS MARINE CORPS BASE QUANTICO, VIRGINIA

Private Gas Well Policy and Incentive Program

COMDTPUB P16721 NVIC JAN Subj: GUIDELINES FOR QUALIFICATION FOR STCW ENDORSEMENTS FOR ADVANCED FIREFIGHTING

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON DC

Fluorine Gas Mist Pot Fails

ANDREW J. HIGGINS, EUGENE M. STONER, AND DONALD ROEBLING AWARDS FOR ACQUISITION INNOVATION AND EXCELLENCE

West Virginia University

1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT U 1 3

3. Mission. This Manual provides procedures and defines responsibilities for:

Draft Regulation. 23. This Regulation comes into force on the fifteenth. 18. The IQPF will recognize or refuse to recognize

MERIT PROMOTION OPPORTUNITY ANNOUNCEMENT Announcement # MP Title, Series, Ordinary Seaman (W) WM East Coast Vessels

OPNAVINST F N4 5 Jun 2012

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

ISM COMPLIANCE MATRIX

NOTE ON PERFORMANCE TESTING

FIRE OFFICER TRAINING

Marine Engineer Class 3 (MEC 3)

Public Lands Committee Briefing

From SBIR Phase I to Phase III Fleet Insertion: A Case Study on the Development of an In-Line Fuel Contamination Sensor for the US Navy

CERTIFICATES OF ELECTRICAL SAFETY RESPONSIBILITY OF RECs AND ELECTRICIANS

Department of Defense DIRECTIVE. SUBJECT: Single Manager Responsibility for Military Explosive Ordnance Disposal Technology and Training (EODT&T)

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DISTRICT II EXHIBIT D DISTRICT TWO BRIDGE TENDER QUALIFICATIONS MANUAL

MERIT PROMOTION OPPORTUNITY ANNOUNCEMENT Announcement # MP Title, Series, First Officer WM

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07.

Transcription:

NAVSEA STANDARD ITEMS FY-19 CH-2 (26 MAR 2018) CAT II NAVSEA Standard Items 009-59 and 009-64 were CANCELLED. CAT I NAVSEA Standard Items 009-94 and 009-102 were CANCELLED. NAVSEA Standard Items 009-65 and 009-79 were changed from a CAT I to a CAT II. The Following is a SUMMARY of the Changes: 009-05 Temporary Access; accomplish --Added (See Note 4.4 and 4.5) after last sentence in 3.1. --Added 4.4 Drawings provide detailed representations of the proposed area of the access cut rendered to scale. They include exact dimensional data and are normally produced using drawing instruments (i.e., from compasses to computers). --Added 4.5 Sketches are simplified or basic drawings. They are normally locally produced but still fulfill all requirements from this NSI (3.1.2.1 through 3.1.2.6) for the proposed area of the access cut. 009-08 Shipboard Fire Protection and Fire Prevention; accomplish --Deleted 3.3.1 Fire pump manual(s), operating instructions, and performance specifications. --Deleted 3.3.3 List of each ship compartment (by space number) and corresponding uniquely numbered temporary fire hose manifold station(s) providing coverage to that compartment. --Renumbered 3.3.2, 3.3.4, and 3.3.5-3.3.5.3 to 3.3.1-3.3.3.3. --Changed 3.3.3.2 to Location of each temporary fire hose manifold station. ( and its elevation relative to the fire pump(s) was deleted). --Added 3.3.3.4 Coverage for all spaces where ship s firemain is inoperative. --Changed 3.5 Provide information on the operation and use of the Temporary Firemain and the Shipboard Temporary Fire Protection Plan at least one day prior to securing ship s firemain and no later than one day prior to entering dry dock, graving dock, or marine railway. --Attachment A Added ARST Salvage Tender 1,000; Attachment A deleted FFR Radar Picket Frigate 1,000, and LKA Amphibious Cargo Ship 1,500. 009-16 Electronic Equipment; repair --Added Record and retain electrical hook-up data at end of 3.1.

--3.3.1 Deleted first word Visually. --Added Record results. at end of 3.1.4. --Deleted 3.1.4.1 (submit report). --Added Record results. at end of 3.2. --Changed 3.2.1 Remove existing and install new electrical and mechanical components, assemblies, subassemblies, internal circuitry, and enclosure hardware in place of those identified to be defective; install new where missing. New material shall conform to the requirements of 2.1. --Changed 3.2.1.1 and 3.2.1.2 to start sentence with a verb Accomplish; Changed 3.2.1.3 to start sentence with a verb Ensure. --Deleted (V) INSPECT SHIELDING TERMINATION prior to 3.3. --Deleted (V) INSPECT WIRE CONNECTIONS prior to 3.4. --Changed 3.4.1 Remove existing and install new lugs in place of those identified to be defective, using 2.5 for accept or reject criteria; install new where missing. New lugs shall conform to SAE-AS7928. --Deleted (V) INSPECT WIRE MARKERS prior to 3.5. --Changed 3.5.1 Remove existing and install new conductor identification sleeving in place of those identified to be defective, using 2.5 for accept or reject criteria; install new where missing. New conductor identification sleeving shall conform to SAE-AMS-DTL-23053, Class One, white, marked with indelible ink. --Changed 3.5.1.1 Mark conductor identification sleeving in accordance with 2.1.; --Deleted (V) INSPECT FOR SLACK prior to 3.7. --Moved 3.9 to 3.8; Added new 3.9 Submit one legible copy, in approved transferrable media, of a report listing inspection and test results of 3.1 through 3.5 and 3.7, to include the applicable EMI fixes not installed and EMI fixes that have been improperly installed, a list of discrepancies corrected, and a list of new components and wiring installed, to the SUPERVISOR. --Renumbered 3.8 and 3.10 through 3.16 to 3.10 through 3.17. --Added (V)(G) OPERATIONAL TEST prior to 3.16. 009-17 Rotating Electrical Equipment; repair --To summarize, changes were incorporated from 2.REFERENCES to chronological order revised, extensive paragraph renumbering, some deletions, redundancies eliminated, reports combined, added (G), 14 vice 17 pages in length. Please read NSI. 009-19 Provisioning Technical Documentation (PTD); provide --Changed 3.4 Submit data for PPLs and SLPPLs via 2.2, or in accordance with the ICAPS compatible format identified in Appendix K of 2.1 to the SUPERVISOR. Submit SPSs in approved

transferrable media (spreadsheet or document) to the SUPERVISOR within 20 days after the installation of the contractor's component or equipment. --Deleted 3.4.1 and moved to 4.4. --Added 4.4 PTD data submit to the SUPERVISOR is forwarding to: NSWCCD-SSES Attn: Code 9451 5001 S. Broad St. Philadelphia, PA 19112-5083 009-21 Alteration Verification, Logistics and Technical Data; provide --To summarize, incorporated contents of 009-102 (cancelled) with this NSI. 009-33 Rotating Electrical Equipment; rewind --To summarize, changes were incorporated from 2.REFERENCES to chronological order revised, extensive paragraph renumbering, some deletions, redundancies eliminated, reports combined, added (G), 14 vice 17 pages in length. Please read NSI. 009-36 Controller; repair To summarize, deleted 2.5, renumbered 2.6 to 2.5, then changed some paragraphs, some combined, chronological order revised, extensive paragraph renumbering, some deletions, some additions, combined reports, added a (G), redundancies eliminated. Please read NSI. 009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide --Changed 3.7 Develop and maintain on site a critical lift plan in accordance with Attachment A. --Changed 3.7.1 Complete and maintain a copy of Attachment B for each lift. --Added new Attachment A. --Renumbered Attachments A and B to B and C. 009-59 Organotin Antifouling Material; control (CANCELLED). 009-64 Synthetic Fire Resistant Hydraulic Fluid; control (CANCELLED). 009-65 Polychlorinated Biphenyls (PCBs); control --Changed from CAT I to CAT II. --Changed 3.1 Verify equipment identified as containing PCBs for leaks, deterioration, and corrosion prior to opening, removing, or installing equipment.

--Changed 3.2.1 Submit one legible copy, in approved transferrable media, of a report verifying wool felt (gasket or damping material), location, and approximate quantity to the SUPERVISOR. 009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish --Changed 3.1.1.1 Comply with additional requirements NAVSEA Standard Items when accomplishing work in Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) tanks, spaces, or associated piping. (See Note 4.6). --Added 3.1.3.7 Allow Navy civilian and military personnel to enter under the certificate or test / inspection record for inspection purposes. --Changed 3.4.2 Liquid oxygen (LOX) tanks shall be staged in designated locations on the quay wall/pier to be determined jointly by the contractor, Ship's Force, and the SUPERVISOR. --Changed beginning of 3.5: Each inert gas/oxygen depleting (OD) fuel gas.. --Deleted fuel gas and oxygen from 3.5.1 through 3.5.5. --Deleted 3.6 (pertaining to inert gas/oxygen depleting (OD) hoses). --Renumbered remaining paragraphs. --Added 3.7.3 Provide a safety representative to accomplish the fire prevention and housekeeping inspection who at a minimum has completed the training required in para 3.1.2 and the following OSHA Training Institute (OTI) courses or NAVSEA approved equivalents: 5410; Occupational Safety and Health Standards for the Maritime Industry, 3095; Electrical Standards. --Added 3.7.3.1 Submit one legible copy, in approved transferrable media, of the certificates of completion for the required courses upon request by the SUPERVISOR. --Changed 3.10.1.7 Each Shipboard firefighting organization, systems, drills, and equipment to include rehabilitation procedures. --Added 4.5 The term annual means once a year, not-to-exceed 12 months. --Added 4.6 When accomplishing work in Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) tanks, spaces, or associated piping is required; the use of Standard Item 009-88 of 2.1 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS-Contaminated Tanks, Spaces, and Piping; certify will be specified in the Work Item. 009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair --To summarize, changes were incorporated in 3.REQUIREMENTS and

extensive paragraph renumbering, some deletions, 12 vice 13 pages in length. Please read NSI. 009-76 Waveguide and Rigid Coaxial Lay-Up; accomplish --Deleted 2.1 Equipment Technical Manual. --Renumbered 2.2 to 2.1. --Changed 3.1, 3.2, 3.2.1 to delete reference to use equipment tech manual; added 3.1.1.1 Use of ship s dry air control/monitor panels may be an option, but only when lay-up conditions permit, and verified that equipment's dry air control/monitor panels are operational for continuous monitoring of temporary dry air in the equipment space(s).; --3.2.2 Changed 2.2 to 2.1. --Changed 3.2.3 Pressurize each line as specified for that equipment. --Changed 3.3 Remove temporary pressurization when directed by the SUPERVISOR. If any ship s dry air control/monitor panels were utilized, restore each and verify operational. --Changed 3.3.1 Connect each dry air.. --3.3.2 Changed 2.2 to 2.1. --Deleted 4.1 and 4.2. 009-79 Government Owned Material (GOM) Status for Multi-Ship Multi- Option availabilities; report --Changed from CAT I to CAT II. --Changed title. --Deleted previous 4.1 (included in title) and changed to 4.1 None. 009-82 Installation of Equal Component Vice Specified Component; report --Changed 3.1.7 Submission of the reports shall be no later than the 50% Conference. 009-83 Wire Rope Assembly; fabricate --Changed title verb to lowercase. --Changed 3.4 Submit one legible copy, in hard copy or approved transferrable media, of a report listing the certification and testing of each wire rope to the SUPERVISOR. The report shall list the following information: --Added 3.4.1 Wire Rope testing results in accordance with 2.1. --Added 3.4.2 Certification documentation of qualified assembly personnel in accordance with 2.1 if required. --Deleted 3.6 (report of test results, and certification of qualified personnel). 009-90 Technical Representative; provide --Changed 3.5 Notify the SUPERVISOR upon initial arrival and prior to final departure of the Technical Representative.

009-94 General Environmental Work at Contractor Facility; accomplish (CANCELLED). 009-101 Ship Transit and Berthing; accomplish --Changed 3.1 to delete 2 nd sentence (moor iaw 009-69; was added as 4.2). --Added 4.2 Mooring requirements are prescribed in 009-69 of 2.1. 009-102 Alteration Verification; provide (CANCELLED) 009-107 Piping System Cleanliness Restoration and Flushing (Non- Nuclear); accomplish --Changed title. 009-113 Rotating Electrical Equipment with a Sealed Insulation System (SIS); rewind -- To summarize, changes were incorporated from 2.REFERENCES to chronological order revised, extensive paragraph renumbering, some deletions, redundancies eliminated, added (G), 14 vice 16 pages in length. Please read NSI. 009-117 Combat Systems, Light-Off Support; provide --Changed title; changed 3.1.1 to no later than A-30 vice during the planning phase and no later than A-60 --3.1.2 Added Alteration Installation Teams (AIT), Ships Force, Government-Contracted Third Party Maintenance Providers near end of 2 nd sentence. --Changed 3.2.1 to submit report at the 50 Percent Review Conference. Submission can be concurrent with reports required by 009-60 and 009-81 of 2.1. vice at A+30. --Changed 3.2.3 Accomplish a joint inspection of the compartments to be released with the SUPERVISOR, PEO IWS designated Combat Systems Project Engineer (if assigned), and Ship's Commanding Officer (or designated representative), upon completion inspection, and acceptance of industrial work and prior to the required release date per the CRS. Inspection can be accomplished concurrent with that required by 009-81 of 2.1. --3.2.3.4 Added Ensure at beginning of sentence. --Changed 2 nd sentence in 3.3.2 to: In these cases, install/remove temporary decking to allow safe use of the space will be installed, and final decking installation will occur at a time that does not impede the test program, as authorized by the SUPERVISOR. 009-123 Fiber Optic Component; inspect, install, repair, remove, and test

--To summarize, changes made to title, changed 3.1.2, deleted 3.1.2.1, added main paragraph 3.3 for cable inspection, revised 3.3.17 (now 3.4.12), some additions, chronological order revised, extensive paragraph renumbering, some deletions, added verb at beginning of some paragraphs, combined some reports (see 3.11), added 4.2.6 and 4.2.7 definitions. Please read NSI.