Emergency Contacts for Active Projects by Project Name

Similar documents
UNIVERSITY OF MASSACHUSETTS AMHERST BOSTON DARTMOUTH LOWELL WORCESTER MINUTES OF THE MEETING OF THE COMMITTEE ON ADMINISTRATION AND FINANCE

FORM B BUILDING MASSACHUSETTS HISTORICAL COMMISSION MASSACHUSETTS ARCHIVES BUILDING 220 MORRISSEY BOULEVARD BOSTON, MASSACHUSETTS

Alumnus Magazine Photograph Colleciton

Town: Address: Source: Style/Form: Roof: Condition: Moved: no X yes Date. Acreage: area

FORM B BUILDING MASSACHUSETTS HISTORICAL COMMISSION MASSACHUSETTS ARCHIVES BUILDING 220 MORRISSEY BOULEVARD BOSTON, MASSACHUSETTS

THE REDEVELOPMENT AGENCY OF THE CITY OF SAN JOSE

Facilities. Guide M ANAGEMENT. Facilities Management Directory of Services

FORM B BUILDING MASSACHUSETTS HISTORICAL COMMISSION MASSACHUSETTS ARCHIVES BUILDING 220 MORRISSEY BOULEVARD BOSTON, MASSACHUSETTS

Additionally, the committee was opened to anyone who wanted to participate.

CALIFORNIA STATE UNIVERSITY, OFFICE OF THE CHANCELLOR Telecommuting Policy and Guidelines For CSUEU Employees

City of Waterbury Safety & Security Assessment

DAVIS JOINT UNIFIED SCHOOL DISTRICT BOND MEASURE FULL BALLOT TEXT

I TOTAL MANASSAS CITY PUBLIC SCHOOLS PROJECTS DOLLARS IN THOUSANDS I

Building Coordinator and CSR List Summer 2018

UNIVERSITY OF MASSACHUSETTS VOTES BOARD OF TRUSTEES

annual electricity use in Kwhr 2, , , , E01201 Village Trailers B & C Loops 28,320 24,000 24,720 12,600 E02101 Village

Student Organization Housing. Project Initiation Request (PIR)

Attachment FC 08 (REVISED 5/17/2018) SBCC 05/18/2018. STATE BOARD OF COMMUNITY COLLEGES Construction and Property May 18, 2018 FY

Emergency and Continuity of Operations Plan (COOP)

School Safety Audit Checklist

Incident Planning Guide Tornado Page 1

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Dallas County Community College District Bond Program. July 10, 2007

OSHPD 3 CLINIC CERTIFICATION INSTRUCTIONS

Sorted by TSUS Component Capital Improvements Program FY

The Continuing Development of the Clinical Liaison Role at Parkland. Wednesday, October 3, 2012

SUBCHAPTER 31. MANDATORY PHYSICAL ENVIRONMENT

Waterford School District 2003 Bond Update

BCPS 2017 Bond Issue Frequently Asked Questions

Projects awarded to consultants under Annual Services agreements or to contractors under Job Order Contracting purchase orders are not listed.

Academic Affairs & Research Employee Relations Committee Wednesday, February 8, 2017, 1:30-3:00 pm Fred Brown Hall Room 146 C

FY 2017 Long Term Facilities Maintenance (LTFM) educa&on.state.mn.us

2014 VOLLEYBALL VISITING TEAM GUIDE

CENTRAL IOWA HEALTHCARE Marshalltown, Iowa HEALTH & SAFETY POLICY EMERGENCY MANAGEMENT POLICY

Current conditions/background Proposed service changes Title VI Program update

PRE-REGISTRATION BUILDING AND ENGINEERING DOCUMENTATION CHECK LIST. - for - NEW BUILD NURSING HOMES

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

HOME RENOVATION TAX CREDIT (HRTC)

BREMEN CITY SCHOOLS DISASTER RECOVERY PLAN

CALIFORNIA STATE UNIVERSITY, BAKERSFIELD Office of Human Resources


Maryland Municipal League Summer Conference How to Fund Energy Projects City of Salisbury

IMR Plan. IMR Funds available for 2017/2018 are as follows:

UNIVERSITY OF THE VIRGIN ISLANDS ADMINISTRATION AND CONFERENCE CENTER ST. THOMAS CAMPUS 9:00 A.M. CONSENT AGENDA

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Ballot Measures-J Section

FUNCTIONAL PROGRAM for General Hospital

EXISTING CONDITIONS

Bond Projects Update A. R. Rucker Middle

Virginia Beach Police Department General Order Chapter 2 - Personnel Information

REVISION RECORD FOR THE STATE OF CALIFORNIA EMERGENCY SUPPLEMENT

2018 Facility Master Plan

BUILDING COORDINATOR TRAINING DIRECTORATE OF PUBLIC WORKS. 27 October 2011

Effective Date: 5-July Table of Contents

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Custodian/Shop Utility Worker (Class III)

CUBICLE/STUDIO SPACE POLICIES AND GUIDELINES FALL & SPRING BID STUDIO CONTRACT

SAC FACILITIES MEETING MINUTES FEB 21, :30P.M. 3:00P.M.

Rule R Nursing Facility Construction. Table of Contents. State Links: Utah.gov State Online Services Agency List Business.utah.gov Search.

New Hope-Solebury School District Facilities Committee Meeting Minutes April 19, 2017, 6:00 pm Upper Elementary School Room 105

School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP

Non-exempt employees that are paid monthly need to record all time worked and all leave taken.

BOARD OF REGENTS BRIEFING PAPER. 1. Agenda Item Title: Proposed Legislation Bond Issuance Meeting Date: April 19, 2013

Berne Knox Westerlo Central School District

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift High School (Class II)

Owner s Meeting Minutes /03/08

Frequently Asked Questions May 8, 2018 Sinking Fund Election

F Physical Environment The facility must be designed, constructed, equipped, and maintained to protect the health and safety of residents,

CAPITAL IMPROVEMENT PROGRAM (CIP)

NORWIN SCHOOL DISTRICT JOB DESCRIPTION. Head Custodian First Shift (Class II)

Network Communications Representative List by Department

ANGUILLA RAPID ASSESSMENT OF HEALTH FACILITIES

Department of Veterans Affairs VHA HANDBOOK HOME IMPROVEMENTS AND STRUCTURAL ALTERATIONS (HISA) PROGRAM

SOUTH DAKOTA BOARD OF REGENTS. Planning, Governance, and Resource Development

Comprehensive Service Analysis Recommended Implementation Plan Pioneer Valley Transit Authority May 29, 2014

REGULAR MEETING. November 17, 2008

Prince George Horse Society Presentation to City of Prince George Mayor and Council March 18, 2013

Minnesota State Colleges and Universities $110 million HEAPR List as of 4/4/2016

Access to V Block Guidelines

FORM B BUILDING MASSACHUSETTS HISTORICAL COMMISSION MASSACHUSETTS ARCHIVES BUILDING 220 MORRISSEY BOULEVARD BOSTON, MASSACHUSETTS

New and Significant Refurbishment guidelines. by Alexandra Davis

The Nickel Tax ESTILL COUNTY SCHOOL DISTRICT

SENIOR/ASSISTED LIVING FACILITY SPECIFIC QUESTIONNAIRE

Report No F Meeting Date: January 25, 2018 BOARD OF EDUCATION PASADENA UNIFIED SCHOOL DISTRICT PASADENA, CALIFORNIA

Lincoln County Board of Commissioner s Agenda Item Cover Sheet

Telecommuting Policy

G1 (Springfield, Chicopee)

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION

Park District of Oak Park

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

PRESENTORS Cyndi McCullough Andrew Yosten

Capital Projects Levy

Recommendation: I will update the Board as necessary. Recommendation: I will update the Board as necessary. Total time 1.5 hours.

Artist Application. Artist Live/Work Unit th Avenue Pinellas Park, FL 33781

Update Report on the Capital Outlay Plan for JOINT FINANCE AND RESOURCE MANAGEMENT COMMITTEE AND BUILDINGS AND GROUNDS COMMITTEE

Historic Preservation

Whitehouse Primary School. Health & Safety Policy

Repurposing Spaces! Academic Input into Spaces of Minnesota State Colleges and Universities Campuses. May 29, 2008

Bond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations

Make. Do. Workshop. Thursday, November 15

Transcription:

Emergency Contacts for Active Projects by Project Name As of: Friday, April 27, 2018 Contact Protocol In the event of an emergency, Emergency Contact 1 should be called FIRST; if Emergency Contact 1 is not available, then Emergency Contact 2 should be called; THEN, whether or not contact has been made with either or both Emergency Contacts, the FCS Project Manager should ALSO be called and informed of the situation; and if the FCS Project Manager is unavailable, then his or her Supervisor (FCS Supervisor) should be called. For all non FCS personnel (UMass Police, EHS, campus staff or other): in the event of an emergency involving an active construction project, the 24/7 FCS Solutions Center MUST be called 545 6401. Other emergency numbers: Amherst Police: 9 911 MA State Police: 584 3000 UMass Police: 911 EHS: 545 2682 Project Name 358 N. Pleasant, Doors and Card Access 758 N. Pleasant, 2nd Floor Split System Ag Eng Central, Rm 302 AV Upgrades Ag Eng Central, Rms 207, 205, 203 AC Arnold, Exit Stair 199B and 199E Door Replacement Arnold, Front Entry Porch Repair Craig Perrault 413 420 3523 Page 1 of 13

Arnold, Rm 403 AC Arnold, Rm 405 AC Arnold, Rm 416 AC Arnold, SPHHS Upgrades Bartlett, Portable AC's Berkshire House, First Floor Res Life Renew Boyden, Exterior Cameras and Card Swipes Boyden, Rms 260, 266, 269 and 270 Academic Center Renovations Brack Structural Test Facility, Aux Support NFH Mark Gauthier Jeff Dalzell Doug Marshall (413) 326 9533 413 885 0381 Brown and Cashin, Finishes, Flooring and Doors Bill Trohon, Project Manager, James Conroy, Project Supt, Forish Construction Forish Construction James Morrissey Marty Smith Office, 413 568 8624; Cell 413 626 0120 Office 413 568 8624; Cell 413 237 4211 Campus, ATM Installation Page 2 of 13

Campus, EPLUS Upgrades 2017 2019 John Mathews Ray Jackson John Mathews 413 335 0701 413 545 3601 413 335 0701 Campus, IT and Telecom Electrical Capacity Campus, UMPD Radio System Upgrades Center for Early Ed, Card Swipe Security Central, Rm 106 Door Alterations Central, Rm 117 Suite Floor Renovations Central, Rm 123A Ceiling Replacement Chenoweth, Rm 110 Lab Benches and Outlets NFH R53336 Chenoweth, Rm 250 AC CHP, Conference Room AV Installation Cold Spring Orchard, Chandler Lab Doors Bill Lizotte 413 687 1196 Joseph Balzano (413) 835 5440 Page 3 of 13

Conte, Rm A631 Wall Conte, Rm B641 Sink and Bench Repairs Conte, Rms B122, B170 and B161 Card Readers Cranberry Station, Admin Bldg. Split AC Draper, Rm 122 AC DuBois, 27th Floor Cooling Tower Valves Access Mark Dunn Cell: 413 313 6980 / mtdunn@umass.edu DuBois, Lobby Security Cameras and Self Checkout Dubois, Rm 409 Sink Installation DuBois, Stairwell Handrail Repairs Elab I, Basement Cutter and Ventilation Elab I, Rm 110 Equipment Moves Craig Perrault 413 420 3523 Craig Perrault 413 420 3523 Mark Dunn 413 313 6980 Craig Perrault 413 420 3523 Marty Smith Page 4 of 13

FAC, Rm 125 Rand Theater Stage Outlet Installation Fernald, West Main Entrance Steel Supports James Morrissey Marty Smith Flint, Rm 204A AC Franklin DC, North Side Roof Repairs Furcolo, Cafe Sliding Door Repair Gladchuck, Field Hockey Restrooms Infrastructure Goessmann, Basement Locker Install Goessmann, Rm 06 NFH Renovation Arku R52762 Goessmann, Rms 162 and 114 Office 259A. Chem Eng NFH Betsy Blunt Jason Venditti 413 326 1661 Karlanne Bullens 413 374 9320 Jason Venditti 413 326 1661 413 687 5397 Goessmann, Roof Turbine Installation Hadley Farm, Equine Barn and Police Barn Support Beams Page 5 of 13

Hadley Farm, Lawrence Arena Rm 1 Cabinetry and Sink Hadley Farm, North and South Sheds Support Beams and Roofs Hasbrouck, Rm 132 AC Hasbrouck, Rms 201, 201A, 202, 204 and 206 Teaching Lab Renovations Hasbrouck, Rms 403A, B and 405A, B Walls NFH Herter, Card Access Herter, Rm 699E Kickplate Repairs and Renew Herter, Rms 021, 021C and 023 Renew Hicks, Repair Main Exterior Entry Steps Hills House and Blaisdell Trailer, Demolition Jason Venditti Shelley Allen Czepiel Craig Perrault 413 420 3523 John Mathews 413 335 0701 Jason Venditti John Mathews 413 335 0701 Jason Venditti 413 326 1661, venditti@umass.edu 413 362 9854, sallenczepiel@umass.edu 413 326 1661 413 326 1661 Horse Barn, Relocation to Ag. Learning Center Jeff Bouyea Dave Tracanna Stephen Lobik 413 426 5397 413 478 3892 413 326 1651 Page 6 of 13

ISOM, Programming and Addition Jim Pimental Leftfield Craig Bolton Dimeo Construction 401 640 6696 401 641 9068 ISOM, Rm G20 Renew and Electrical ISOM, Rms G27 and G29 Reconfigure Lederle GRC, Fire Alarm System Terry Avery UWS Site Superintendent Steve Harris UWS Project Manager Bill Lizotte Marty Smith 978 602 5818 978 840 6460 413 687 1196 Lincoln CC Garage, Level 2 Ceiling Repair Lincoln CC, 1st Floor Storage Closet Lincoln CC, Rm 823 Ombuds Office Soundproofing LSL, IALS Moves 2017 Betsy Blunt (413) 687 5397 LSL, OIT Backup Data Center Ken Boutin, PDS Engineering & Construction Superintendent Bill Spooner, UMA Resident Engineer cell: 860 712 2547 cell: 413 687 1462 LSL, Rm N460 Special Research Temporary Fitout NFH, Alterations PM Karlanne Bullens 413 374 9320 Page 7 of 13

Machmer, Rm E25 AC Machmer, Rm W36 Steam Leak Damage Machmer, Rms E14 and E17 AV Installation Marcus, Rms 100 and 104A AC Marston, Rm 18 AC Marston, Rm 18C AC Middlesex, Renovations 2018 Morrill I and IV North 1st and 3rd Floor Microbiology Consolidation Jeff Casey, PM for Forish UMA PM Mark Dunn 413 313 6980 Marty Smith 413 454 3908 Morrill II, Rm 249 Structural Assessment Morrill II, Rms 335, 337A, 337E AC Morrill II, Rms 348 and 432 Renovations Page 8 of 13

Morrill III and Bartlett, Jakob Lab Relocation Morrill III, Rm 108 Renovation Morrill III, Rm 119 Aqueous Geoscience Renovation NFH R53848 Mike Aldrich Betsy Blunt (413) 687 5397 413 427 7863 Morrill III, Rm 301 Class Lab Renovation Morrill III, Rm 302 Class Lab Renovation Morrill III, Rm 303 Class Lab Renovation Morrill III, Rm 317 AV Upgrades Morrill III, Rm 416 Chilled Water Mullins, Retro Plumbing for Concession Stands Munson, Rm 108F Wall Renovation New Africa House, Augusta Savage Gallery AC Page 9 of 13

New Africa House, Basement Performance Fitout Steve Beaudry 413 834 5357 New Africa House, Exit Stairs 199A and 199D Door Replacement Paige Lab, Rm 116 Hand Dryer Parking Lot 44, Move In Conduits Physical Plant, Alterations Carpentry Shop Move Physical Plant, Rm 304 Renovation Dan Ryan Forish PM Fred Snyder Forish Site Super Bill Lizotte 413 687 1196 Cleve Carrens Marty Smith 413 568 8624 413 237 6762 413 326 1660 Physical Plant, Swipe Cards and Cameras PSB, Construction Mike Mishriky, Site Superintendent Jeff Veilleux, Project Manager Joseph Balzano Joseph Balzano Cell: 860 883 2535; Email: michael.mishriky@whitingturner.com Cell: 203 627 0697; Email: jeff.veilleux@whitingturner.com (413) 835 5440 (413) 835 5440 Rec Center, Rm 108 Checkout Camera Rec Center, West Side Security Cameras Page 10 of 13

S. Deerfield, Agronomy Research Farm Signage S. Deerfield, Commodity Shed Structural Repairs Springfield, Umass Center Crocker UPS Wiring Stockbridge Hall, 1st Floor Hand Dryers Stockbridge Hall, Front Stair Handrails Stockbridge Hall, Rms 105 and 318 Walls and Temperature Controls Studio Arts, Rms 010, 138, 142C and 156C AV Installation Telecom, Node 7 Renovation Thompson, High Rise 3rd and 10th Floor Renovations Jeff Bouyea Dave Tracanna John Mathews 413 335 0701 Cleve Carrens John Mathews 413 335 0701 413 575 5874 413 478 3892 413 326 1660 Tobin, Rms 657, 657A, 662B, 662C NFH Martins Req 52782 Totman, Rm 162 Renew Karlanne Bullens 413 374 9320 Page 11 of 13

UHC, Entrance Flooring UHC, Ground Floor Card Access UHC, Rm 181A Door UHC, Rms 10 and 351 Flooring UHC, Rms 299 and 399 Doors UHC, Various Locations Clock Removal Utilities, Hasbrouck Utility Corridor C. Kim Jaworski Bruschi John Welch Kim Jaworski Bruschi Jason Venditti 413 345 8020 Design & Construction Management Mobile: 413 335 4541 Office: 413 467 7711 john@masswestinc.com 413 345 8020 413 326 1661 Waste Water Treatment, AC's Whitmore, Cafe Electrical Circuit Whitmore, Reconfigure Rms 330, 330A, 343, 347 and 349C Whitmore, Rm 167 Renovation Page 12 of 13

Whitmore, Rm 232 Renovation Whitmore, Rms 320, 322, 323, 324 & 325 Renovations Wilder, Rm 102 Exterior Exit Door Repair Wysocki House, Front Porch Repairs Page 13 of 13