Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Similar documents
Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

Future Development Plan:

Standard Development Timeline

The State of Interconnection in NYS:

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet

Bio Energy #1 Distribution Generator Interconnections Less than 35 kv

Implementation Plan Set Two of Phase III & IV Reliability Standards

To ensure system protection is coordinated among operating entities.

XXXXX Kwalsa Phase II Project. Interconnection Facilities Study and Project Plan

Small and Large Generator Interconnection Procedures

Energy. Request For Proposals for Renewable Power Supply Resources

OC Approved 2/17/05 SB/DS Stability Limits for the addition of 3.26% Series Reactor

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES

TRIP OF YALLOURN POWER STATION NO KV BUSBAR ON 6 DECEMBER 2015

NPCC Tasks Related to NERC Blackout Recommendations Timeline

Request for Proposals and Specifications for a Community Solar Project

May 6, 2002 Revision 2

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

The Narragansett Electric Company d/b/a National Grid

NPCC Tasks Related to NERC Blackout Recommendations Timeline

A. General provisions and other electrical systems are specified in other Sections of Division 26.

WECC Standard VAR-STD-2a-1 Automatic Voltage Regulators

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

TECHNICAL DAYS, APRIL 2017 ABB Plant Fingerprint Assessment Optimizing Operations. Fernando Tobar, Country Service Manager

2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting

STATE OF NORTH CAROLINA UTILITIES COMMISSION RALEIGH DOCKET NO. E-2, SUB 1089 BEFORE THE NORTH CAROLINA UTILITIES COMMISSION

Addendum to ESAH Version 3 Supply Application

Pilot Program Framework Proposal

107 FERC 61,053 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

If any queries arise ESB Networks DAC can be contacted at or

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project

Request for Qualifications. for. Electrical Substation Transformer Replacement. Stillwater Utilities Authority (SUA) City of Stillwater, Oklahoma

Standard FAC Facility Ratings. A. Introduction

Transmission Planning Attachment K Public Input Meeting

Executive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October

Solar Electricity For Community Buildings Pilot Program. Workbook

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs

The Narragansett Electric Company d/b/a National Grid

The University of Texas at San Antonio

Luis Fondacci. James Manning. Administrative. The November 14, 2016 OSC Meeting Minutes and Highlights were reviewed and approved with one edit.

July 1, 2006 Revision 2

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

TRANSMISSION TRANSMISSION SYSTEM OPERATIONS DIVISION

Comprehensive Interconnection Process Improvements

ADVERTISEMENT OF PUBLIC NOTICE

WarmWise Business Custom Rebates Program Manual

CITY OF COFFEYVILLE, KANSAS REQUEST FOR PROPOSALS FOR ELECTRICAL ENGINEERING, SUBSTATION MAINTENANCE, TESTING & SUPPORT SERVICES

Feed-in Tariff: Guidance for renewable installations (Version 5)

AMSP Guidebook. February 2017

CIP Cyber Security Incident Reporting and Response Planning

PER-005 System Personnel Training

COUNTY OF SANTA BARBARA

WECC Standard VAR-002-WECC-2 Automatic Voltage Regulators

This Letter. Re: PC Guide For Power System Protection Testing

Request for Proposals for Technical and Financial Feasibility Assessment of Community Microgrid Projects in Massachusetts

Greater Cambridge Partnership Executive Board. Chris Tunstall Interim Transport Director. Western Orbital

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM

j. Billing procedure k. Periodical Inspections Page 1

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

Enduring Connection Policy Stage 1 (ECP-1)

NATIONAL NUCLEAR REGULATOR

B. All of the documents in this RFP form the Basis-of-Design for this project.

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.

TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS

Community Update Brochure

Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers

CENTRAL MUNICIPAL POWER AGENCY/SERVICES

RG 102 Accreditation for the Inspection of Non-public High Voltage Electrical Systems

1st Workshop Federal Grid Code

Mulilo Renewable Energy Solar PV Prieska (PTY) LTD

Annual Performance Indicator (PI)

May 25, Request for Proposals No Offsite Virtual Net Metering

Production Device Registration

WIND AND SOLAR SPP SOLICITATION 2015 REQUEST FOR QUALIFICATION (RFQ) COMMERCIAL OPERATION OF WIND AND SOLAR SMALL POWER PROJECTS OCTOBER 2015 FOR

MLR Institute of Technology

Request for Proposal

Standard NUC Nuclear Plant Interface Coordination

UCF SOLAR FARM-UCF 584 Solar Developer Project Fact Sheet

CONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS SOLAR GENERATION PROJECTS. Bids Due: July 28, :00 noon EPT (Jackson, MI) Issued.

Page. II. TECHNICAL ASSISTANCE PROJECT DESCRIPTIONS.. 3 A. Introduction... B. Technical Assistance Areas.. 1. Rate Design Consumer Programs...

Refer to section 2.C. for more information on the evaluation criteria.

VIA ELECTRONIC FILING

New Jersey Energy Resilience Bank

SMART ENERGY DISTRIBUTION SYSTEMS

ELECTRONICS TECHNICIAN I ELECTRONICS TECHNICIAN II

Town Center Distributed Energy Resource Microgrid Feasibility Study Incentive Program

POLICY FOR DEVELOPMENT OF SOLAR PARKS IN THE STATE OF MADHYA PRADESH

Electric Reliability Organization Event Analysis Process Phase 2 Field Test Draft May 2,

Siemens Power Academy Lagos Course Schedule

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

DEPARTMENT OF FACILITIES MANAGEMENT MAINTENANCE AND SERVICES INVITATION TO TENDER

REQUEST FOR PROPOSALS

MCE Feed-In Tariff for Distributed Renewable Generation

Re: NPCC Response to a Request for Criteria Interpretation on Regional Reliability Directory# 8 System Restoration.

Transcription:

Generator Interconnection System Impact Study Report Carteret County, NC 120.8 MW Queue #297 Original Submittal Revision 1

PURPOSE The purpose of this study is to assess the impacts of a combined wind/solar farm interconnection request on the reliability of the (DEP) transmission system with respect to power-flow, stability, short circuit, and power factor requirements issues. The proposed project was studied as a Network Resource Interconnection. Estimates of the cost and time required to interconnect the generation as well as to resolve the impacts as determined in this system impact analysis are also included. The DEP internal system analysis consists of an evaluation of the internal DEP transmission system utilizing documented transmission planning criteria. The request is described in Table 1 below. DEP Generator Interconnection Queue No. MW Table 1: Request In-Service Date Queue #297 120.8 12/31/14 County Carteret County, NC Facility Havelock Morehead Wildwood 230 kv Line The 120.8 MW total is comprised of 42 Nordex N117 2.4 MW wind turbines and 20 Solaron inverters rated at 1 MW each. Interconnection to DEP s breaker station is via a customer supplied 230 kv tap line. A Scoping Meeting was held on January 23, 2013. ASSUMPTIONS The following system impact study results are from the DEP internal power-flow models that reflect specific conditions of the DEP system at points in time consistent with the generator interconnection requests being evaluated. The cases include the most recent information for load, generation additions, transmission additions, interchange, and other pertinent data necessary for analysis. Future years may include transmission, generation, and interchange modifications that are not budgeted for and for which no firm commitments have been made. Further, DEP retains the right to make modifications to power-flow cases as needed if additional information is available or if specific scenarios necessitate changes. For the systems surrounding DEP, data is based on the ERAG MMWG model. The suitability of the model for use by others is the sole responsibility of the user. Additional assumptions are addressed in the following results for each area of analysis (i.e. power-flow, stability, and short circuit). The results of this analysis are based on Interconnection Customer s queue requests including generation equipment data provided. If the facilities technical data or interconnection points to the transmission system change, the results of this analysis may need to be reevaluated. This study was based on the following assumptions: The Customer would have one interconnect point to a new breaker station off the Havelock Morehead Wildwood 230 kv Line. The Customer would construct, own and operate the electrical infrastructure that would connect their generation to the new breaker station off the Havelock Morehead Wildwood 230 kv Line, including any step up transformers and lines from - 2 -

RESULTS the generation project, but excluding the 230 kv circuit breaker in the new breaker station. Power-flow Analysis Results Facilities that may require upgrade within the first three to five years following the in-service date are identified. Based on projected load growth on the DEP transmission system, facilities of concern are those with post-contingency loadings of 95% or greater of their thermal rating or low voltage of 0.92 pu and below, for the requested in-service year. The identification of these facilities is crucial due to the construction lead times necessary for certain system upgrades. This process will ensure that appropriate focus is given to these problem areas to investigate whether construction of upgrade projects is achievable to accommodate the requested interconnection service. As requested, the 120.8 MW wind farm was studied interconnected to a new breaker station off the Havelock Morehead Wildwood 230 kv Line. Contingency analysis study results show that interconnection of this generation facility does not result in any thermal issues on the DEP system. Stability Analysis Results A stability evaluation was performed to determine the impact of the proposed generation addition on the DEP transmission system and other nearby generation. The proposed 120.8 MW addition is comprised of 100.8 MW of wind generation and 20 MW of solar generation. The wind generation consists of 42 Nordex N117 wind turbines rated at 2.4 MW each. The solar generation consists of a solar collector array with 20 Solaron inverters rated at 1 MW each. Each solar inverter has a 1.12 MVA capacity at 1.0 per unit voltage. The wind turbines and solar inverters are connected via a single 34.5 kv collector array to a single 34.5/230 kv step-up transformer. For modeling purposes the wind turbines and solar inverters were represented as one lumped equivalent wind generator and one lumped equivalent solar generator, each connected via an individual step up transformer to the 34.5 kv collector system, which in turn is connected to the transmission system via an individual 34.5/230 kv step up transformer. A number of representative faults were simulated at the POI and at nearby substations to determine stability and voltage and frequency ride through capabilities. The results of the evaluation did not identify any stability related problems. Note that the dynamic models used for both the Nordex wind turbines and the Solaron inverters did not have an automatic voltage regulator voltage control mode. Additional discussions will be needed to determine how this function will be implemented in the installed machines and how to more appropriately model this required function. If the Customer provided data or new information on the actual operating limitations of the wind and solar machines change the stability performance, these results will need to be reevaluated. - 3 -

LGIP Power Factor Requirements DEP s generator interconnection requirements stipulate that proposed generation additions be capable of delivering the proposed power to the point of interconnection at a 0.95 lagging power factor. The Customer provided data for the wind turbines, solar inverters, transformers and 34.5 kv collector array configuration were used to evaluate the capability to meet the 0.95 lagging power factor requirement. The results of this analysis indicate that the proposed installation, as a whole, does not meet the power factor requirement. Individually, the solar inverters appear to be capable of meeting the requirement but the wind machines do not appear to be capable of meeting the requirement. Additionally, based on the dynamic models provided, it is not clear that either the wind or solar units can be operated in the automatic voltage regulator- voltage control mode. This would also be a requirement since dynamic reactive power support is necessary (i.e. the proposed generation should be capable of providing reactive power immediately and automatically in response to voltage perturbations on the transmission system). DEP and the Customer have discussed potential solutions for meeting the power factor requirement. It has been determined that if the proposed 20 MVar Customer capacitor bank were increased to 23 MVar then the power factor requirement would be met. Estimate to Meet LGIP Power Factor Requirements The costs, if any, of meeting the LGIP Power Factor requirements will be associated with the design and installation of Customer owned equipment. Since these costs will be incurred by the Customer, they are not included in this estimate. Short Circuit Analysis Results A short circuit evaluation was performed to assess the impact of the proposed generation addition on transmission system equipment capabilities. The evaluation indicates that no short circuit equipment capabilities will be exceeded as result of the proposed generation addition. The results of the short circuit study are based on Customer provided generation equipment data and location. If the Customer provided technical data or interconnection points to the transmission system changes, the results of this analysis may need to be reevaluated. Interconnection of Customer s Generation The point of interconnection for Queue #297 would be at a new DEP breaker station off the Havelock Morehead Wildwood 230 kv Line, as shown in Figure 1. The new generation will be connected to the 230 kv point of interconnection via a Customer provided 230 kv line from the plant. The customer should verify that the MVA ratings of their lines are sufficient to accommodate delivering the total wind/solar farm MVA output to the point of interconnection at the required 0.95 power factor. - 4 -

Estimate of Interconnection Cost Total Interconnection Cost Estimate: $1,750,000 (total) The estimate includes the assumption that DEP will acquire and use a portion of the property that the Customer will secure for the addition of the facility. The specifics of the property needed for the DEP facilities will be further identified in the Interconnection Agreement (IA). Tap Line Estimated Cost: $300,000 New Breaker Station Estimated Cost: $700,000 Tap DEP s Havelock-Morehead Wildwood 230 kv Line and Construct Line to New Breaker Station adjacent to DEP ROW. Construct new 1-230 kv breaker station at generation new connection point. Install Transfer Trip Scheme at New Breaker Station and Transmission Substations It will be necessary to separate this generation facility from the DEP system for faults on the Havelock-Morehead Wildwood 230 kv Line. Install protection system and transfer trip for coordination between DEP s Havelock-Morehead Wildwood 230 kv Line and proposed generation facility. Estimated Cost: $250,000 New Wave Traps on Tap Line to New P.O.I. Install Wave Trap at new Tap off of DEP s Havelock-Morehead Wildwood 230 kv Line at new connection point. Estimated Cost: $100,000 Line Switches in DEP s Transmission Line to be Tapped for New P.O.I. Install required Line Switches on DEP s Havelock-Morehead Wildwood 230 kv Line at New Tap Point. Estimated Cost: $400,000 SUMMARY Below is a summary of DEP s estimated costs to interconnect the Customer s generation and resolve the identified DEP transmission system impacts. Actual solutions, cost estimates and implementation schedules for Queue #297 will be finalized in the Customer s Interconnection Facilities Study if requested. The results of the analysis indicate that the planned installation, as originally proposed, does not meet the power factor requirement but increasing the size of the Customer capacitor bank is a viable solution. Current estimates are that the proposed upgrades can be completed to meet the Customer s schedule. This is based on an assumption that DEP would have a firm commitment from the customer no later than 12 months prior to the In Service Date of the proposed generation. - 5 -

The additional cost for telecommunications and metering can be estimated as a monthly charge of $3,000/month. Power-flow $0 Stability $0 Short Circuit $0 Interconnection $1,750,000 Total Estimate $1,750,000-6 -

-Figure 1- - 7 -