TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

Similar documents
Table of Contents. October 2016 i

SOLID WASTE DISPOSAL FACILITY PERMIT

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE

Minnesota s Closed Landfill Program: 20 years of cleanup and long-term care. Douglas Day

Site Description. CCR Rule (a)(3), Emergency Action Plan (EAP)

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

SOLID WASTE DISPOSAL FACILITY PERMIT

First Annual RCRA CCR Unit Inspection Report January 2016 WASTE DISPOSAL AREA SURFACE IMPOUNDMENT

Standard Operating Procedure: Stormwater BMP Inspections

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012

City of Waterloo, Wisconsin. Request for Proposals. Municipal Engineering Services

ENFIELD BOARD OF EDUCATION ENFIELD, CONNECTICUT. USE OF AUTOMATIC EXTERNAL DEFIBRILLATORS (AED s) BY SCHOOL PERSONNEL

Erosion Control and Water Management Policy

TOWN OF GREENWICH Annual Department Operational Plan (FY )

SUBCHAPTER 59D - AGRICULTURE COST SHARE PROGRAM FOR NONPOINT SOURCE POLLUTION CONTROL SECTION AGRICULTURE COST SHARE PROGRAM

This RfP is also available on the CEMCO website under the Community Tab:

DEPARTMENT OF THE ARMY GENERAL PERMIT

PAL-MAR WATER CONTROL DISTRICT Security-Maintenance Services RFP Proposal Packet

FY 2016 Clean Water Fund Competitive Grants Policy

Commonwealth of Pennsylvania

DEPARTMENT OF THE ARMY JACKSONVILLE DISTRICT CORPS OF ENGINEERS 1002 WEST 23 RD STREET, SUITE 350 PANAMA CITY, FLORIDA

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

IGO GROUP SAFETY STANDARD 15 - ENERGY CONTROL AND ISOLATION INDEPENDENCE GROUP NL

RESERVOIR LEGISLATION IN NORTHERN IRELAND

Planning Commission Public Hearing Exhibits. Powers Ready Mix Plant Oldcastle SW Group, Inc.

HENRICO COUNTY ENVIRONMENTAL COMPLIANCE MANUAL CHAPTER 13

Solid Waste Facility Permit SW

FY 2018 Watershed-Based Funding Pilot Program Policy

City of Emeryville CA L IFORNIA

ANNUAL STANDARDS AND SPECIFICATIONS

CECIL COUNTY MARYLAND REQUEST FOR PROPOSALS. ENGINEERING SERVICES On-call Comprehensive Engineering Contracts Water and Wastewater

Request for Proposal (RFP) PUBLIC WELL SEALING GRANT

DAM AND LEVEE SAFETY

Santa Fe County, Santa Fe Association of REALTORS January 12, 2017

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT P.O. BOX 2946 PORTLAND, OREGON August 9, 2016

California Law and Regulations Addressing Williams Complaints

INFRASTRUCTURE GRANT PROGRAM (IGP)

SUMMARY OF MINUTES PUBLIC WORKS COMMITTEE. 6:00 p.m., Tuesday, July 14, 2015 COMMITTEE ROOM. Room 239, City Hall

STUDENTS First Aid/Emergency Medical Care. Use of Automatic External Defibrillators (AEDs)

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

Department of Defense Human Research Protection Program DOD INSTITUTIONAL AGREEMENT FOR INSTITUTIONAL REVIEW BOARD (IRB) REVIEW (IAIR)

Section 5 BMP Implementation and Evaluation 5.1 Introduction

Craig Lobins, PG District Manager Oil & Gas Program. Erin Wells Local Government Liaison NW Regional Office

General Permit Registration Form for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

PAGE R1 REVISOR S FULL-TEXT SIDE-BY-SIDE

BAY MEADOWS PHASE II Development Agreement (Effective 12/21/05) Annual Review Matrix

SECTION 4. Construction Site Runoff Control Program

If you have any questions or need additional information, please contact me by phone at (919) or via at

LOCAL STORMWATER BMP IMPLEMENTATION PROGRAM PROJECT APPLICATION INSTRUCTIONS

DGLVR Program Attachment E Approved March 22, 2018

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE

King County Flood Control District 2017 Work Program

Clean Water Assistance - Todd (SWCD)

REQUEST FOR PROPOSAL

MAINE STATE LEGISLATURE

Department of Defense Human Research Protection Program AF ISSUED DOD INSTITUTIONAL AGREEMENT FOR INSTITUTIONAL REVIEW BOARD (IRB) REVIEW (IAIR)

NC General Statutes - Chapter 90A Article 2 1

EMERGENCY MANAGEMENT PLANNING CRITERIA FOR HOSPITALS

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION

CEMP Criteria for Ambulatory Surgery Centers Emergency Management

Reg Conditions of Grant Reg Appeals of Grant Decisions CHAPTER FIVE: COMPUTER AND ELECTRONIC EQUIPMENT RECYCLING GRANTS

Water Quality Improvement Program. Funding Application Guide

NPDES PERMIT NO. The authority granted by coverage under this General Permit is subject to the following further qualifications:

Chapter 14 Emergency Projects

STATEMENT OF PRINCIPAL REASONS FOR ADOPTION OF RULES

Agricultural Waste Control Regulation Intentions Paper Response Form

AURORA POLICE DEPARTMENT DIRECTIVES MANUAL

AR No. IR No. EIELSON AFB ALASKA. Administrative Record Cover Sheet NOTES:

NH Rivers Management and Protection Program. Love Your River? Don t t Procrastinate Nominate!

Food Service and Pool Sanitation

DEFINITIONS. Subpart 1. Scope. As used in this chapter, the following terms have the meanings given them in this part.

Charter The Charter of the County of Suffolk. Commissioner The Commissioner of the Suffolk County Department of Health Services.

City of Titusville Community Redevelopment Agency

A.A.C. T. 6, Ch. 5, Art. 50, Refs & Annos A.A.C. R R Definitions

2018 Terms and Conditions for Support of Grant Awards Revised 7 th June 2018

TITLE IV AMENDMENTS TO THE REHABILITATION ACT OF 1973

Executive Summary 56,173 Purpose and Coverage of the Rule 56,173 Summary of the Major Provisions of the Rule 56,173 Costs and Benefits 56,175

City of Coquitlam. REQUEST FOR PROPOSALS RFP No

Copyright 2018 by CSI Knowledge Systems LLC. REGSAFE

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

NOTICE AND CALL OF SPECIAL MEETING

CEMP Criteria for Adult Day Care Centers Emergency Management

For purposes of this Part and instruction of the department pertaining thereto, the following definitions of terms shall apply:

REQUEST FOR REQUEST FOR PROPOSAL (RFP) GIBSON ROAD PROJECT TOWN OF EASTON 1060 EASTON VALLEY ROAD EASTON, NH DATE FEBRUARY 1, 2016

This order was adopted by the Board at its meeting on.

SNOHOMISH HEALTH DISTRICT SANITARY CODE

Standard NUC Nuclear Plant Interface Coordination

Hawthorne Army Depot New Bomb Hawthorne, Nevada EPA ID# NV

ENVIRONMENTAL RESTORATION PROJECTS (BROWNFIELDS)

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR INSPECTION STAFF

Agency Information Collection Activities; 30 CFR 550, Subpart B, Plans and. ACTION: Notice of Information Collection; request for comment.

The following are the procedural steps required for a customer to apply for and receive a Steam Chiller Incentive payment:

NOTICE OF APPROVAL OF VOLUNTARY MANAGEMENT PROPOSAL

A Guide to. Starting a Business. Auburn, GA

Request for Proposal for Landscape Design. Village of North Scituate Low Impact Development Retrofit and Education Project

Hurricane Sandy Coastal Resiliency Competitive Grants Program

COMMUNITY PRESERVATION ACT (CPA)

Transcription:

TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 MONITORING AND MAINTENANCE 2 3.1 Final Cover Maintenance 2 3.2 Groundwater Monitoring System 2 4.0 POST-CLOSURE CONTACT 2 5.0 POST-CLOSURE PROPERTY USE 3 6.0 NOTIFICATION 3 7.0 POST-CLOSURE PLAN AMENDMENT 3 8.0 CERTIFICATION 4 9.0 COMPLETION OF POST-CLOSURE 4 ATTACHMENTS: Figures The Empire District Electric Co./Asbury Power Plant, CCR Impoundment Post Closure Plan

3.0 MONITORING AND MAINTENANCE 257.104(d)(i) A description of the monitoring and maintenance activities required in paragraph (b) of this section for the CCR unit, and the frequency at which these activities will be performed. The CCR Impoundment that serves the Asbury Power Plant is approximately 116.5 acres. The CCR Impoundment is subdivided into three (3) operational Ponds, identified as the Lower Pond, Upper Pond, and South Pond (Figure 2). The Lower Pond, Upper Pond, and South Pond are separated by interior earthen berms and can be hydraulically separated from one another for operational purposes. At this time it is anticipated that the Upper and South Ponds will be clean closed. This area encompasses approximately 36.5 acres. The Lower Pond area is approximately 80 acres and will be closed by leaving the CCR in place. This Post-Closure Plan is for the Lower Pond area, the 80-acre portion of the CCR Impoundment. Empire anticipates the clean closure of the remaining 36.4 acres if the CCR Impoundment. 257.104(a)(3) states that post-closure care is not required for the clean-closed area. Post-Closure care maintenance requirements for the Lower Pond area will be addressed below. 3.1 Final Cover Maintenance The final cover system will be maintained and repairs completed to maintain the integrity and effectiveness of the final cover system. The final cover system will be mowed semi-annually. As part of this activity the final cover system should be inspected to determine if any settlement, subsidence, and erosion has occurred. If necessary additional fill material should be placed and reseeding to establish vegetation. 3.2 Groundwater Monitoring System The Groundwater Monitoring System will be properly maintained and monitored. If any well or the entire system is no longer in use it should be properly abandoned. Groundwater should be monitored in accordance with EPA or MDNR requirements. 4.0 POST-CLOSURE CONTACT 257.104(d)(ii) The name, address, telephone number, and email address of the person or office to contact about the facility during the post-closure care period. The Post-Closure Contact is below: Director of Energy Supply Services The Empire District Company 602 S Joplin Avenue PO Box 127 Joplin, MO 64802 (417)625-5100 environmental.ccr@empiredistrict.com The Empire District Electric Co./Asbury Power Plant, CCR Impoundment Closure Plan Page 2

5.0 POST-CLOSURE PROPERTY USE 257.104(d)(iii) A description of the planned uses of the property during the post-closure period. Post-closure use of the property shall not disturb the integrity of the final cover, liner(s), or any other component of the containment system, or the function of the monitoring systems unless necessary to comply with the requirements in this subpart. Any other disturbance is allowed if the owner or operator of the CCR unit demonstrates that disturbance of the final cover, liner, or other component of the containment system, including any removal of CCR, will not increase the potential threat to human health or the environment. The demonstration must be certified by a qualified professional engineer, and notification shall be provided to the State Director that the demonstration has been placed in the operating record and on the owners or operator s publicly accessible Internet site. It is currently planned to clean close the Upper Ponds and South Pond. No Post-Closure care is required of these ponds. It is planned to utilize these clean-closed ponds as stormwater control basins. The Lower Pond will have the CCR closed in place and will require post-closure care as outlined in this plan. At this time this area will be maintained as an open vegetated area. 6.0 NOTIFICATION 257.104(d)(2) Deadline to prepare the initial written post-closure plan (i) Existing CCR landfills and existing CCR surface impoundments. No later than October 17, 2016, the owner or operator of the CCR unit must prepare an initial written post-closure plan consistent with the requirements specified in paragraph (d)(1) of this section. 257.104(d)(2)(iii) The owner or operator has completed the written post-closure plan when the plan, including the certification required by paragraph (d)(4) of this section, has been placed in the facility s operating record as required by 257.105(i)(4). Empire will post the written Post-Closure Plan to their website by October 17, 2016. In addition, the State Director will be notified of the completion of this plan and subsequent placement on the website. 7.0 POST-CLOSURE PLAN AMENDMENT 257.104(d)(3) Amendment of a written post-closure plan. (i) The owner or operator may amend the initial or any subsequent written post-closure plan developed pursuant to paragraph (d)(1) of this section at any time. 257.104(d)(3)(ii) The owner or operator must amend the written closure plan whenever: (A) There is a change in the operation of the CCR unit that would substantially affect the written post-closure plan in effect; or (B) After post-closure activities have commenced, unanticipated events necessitate a revision of the written post-closure plan. The Empire District Electric Co./Asbury Power Plant, CCR Impoundment Closure Plan Page 3

257.104(d)(3)(iii) The owner or operator must amend the written post-closure plan at least 60 days prior to a planned change in the operation of the facility or CCR unit, or no later than 60 days after an unanticipated event requires the need to revise an existing written post-closure plan. If a written post-closure plan is revised after post-closure activities have commenced for a CCR unit, the owner or operator must amend the written post-closure plan no later than 30 days following the triggering event. The Post-Closure Plan will be changed should there be a change of the operation of the CCR unit that would have a substantial impact to the current Post-Closure Plan. These amendments will be completed as required by 257.104(d)(3)(iii). 8.0 CERTIFICATION 257.104(d)(4) The owner or operator of the CCR unit must obtain a written certification from a qualified professional engineer that the initial and any amendment of the written post-closure plan meets the requirements of this section. This Post-Closure Plan has been certified in Section 2.0 of this report. Any amendments to the original Post-Closure Plan will also be certified by a qualified professional engineer. 9.0 COMPLETION OF POST-CLOSURE 257.104(e) Notification of completion of post-closure care period. No later than 60 days following the completion of the post-closure care period, the owner or operator of the CCR unit must prepare a notification verifying that post-closure care has been completed. The notification must include the certification by a qualified professional engineer verifying that post-closure care has been completed in accordance with the closure plan specified in paragraph (d) of this section and the requirements of this section. The owner or operator has completed the notification when it has been placed in the facility s operating record as required by 257.105(i)(13). 257.104(f) The owner or operator of the CCR unit must comply with the recordkeeping requirements specified in 257.105(i), the notification requirements specified in 257.106(i), and the Internet requirements specified in 257.107(i). Empire will prepare a Notification of Completion of the Post-Closure Care Period in accordance with the requirements of 257.104(e). Empire will post the completion of the Post-Closure Care Period to their website as required by 257.107(i). In addition, the State Director will be notified of the completion of this plan and subsequent placement on the website. The Empire District Electric Co./Asbury Power Plant, CCR Impoundment Closure Plan Page 4

FIGURES