Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM

Similar documents
Fiscal Year (FY) 2011 Budget Estimates AIR FORCE RESERVE FY 2011 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2015 Budget Estimates AIR FORCE RESERVE FY 2015 MILITARY CONSTRUCTION PROGRAM

AIR FORCE RESERVE COMMAND

Fiscal Year (FY) 2017 Budget Estimates AIR FORCE RESERVE FY 2017 MILITARY CONSTRUCTION PROGRAM

Fiscal Year (FY) 2006/FY 2007 Budget Estimates AIR FORCE RESERVE FY 2006 MILITARY CONSTRUCTION PROGRAM. February 2005

AIR FORCE RESERVE COMMAND

AIR FORCE RESERVE COMMAND

DEPARTMENT OF THE NAVY

AIR NATIONAL GUARD Fiscal Year (FY) 2017 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

Washington Headquarters Services Military Construction, Defense-Wide FY 2010 Budget Estimates ($ in thousands)

AIR NATIONAL GUARD Fiscal Year (FY) 2013 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2013

AIR NATIONAL GUARD Fiscal Year (FY) 2014 BUDGET ESTIMATES

Air Force Reserve Facilities Update Briefing FY10

FY 2013 MILITARY CONSTRUCTION PROJECT DATA 2. DATE Mar 13

AIR NATIONAL GUARD. Fiscal Year (FY) 2011 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2011

AIR NATIONAL GUARD REQUEST FOR ADDITIONAL FY 2017 APPROPRIATIONS MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2017

AIR NATIONAL GUARD. Fiscal Year (FY) 2016 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830 PROGRAM YEAR 2016

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)

Tricare Management Activity Military Construction, Defense-Wide FY 2006 Budget Estimates ($ in Thousands)

Military Construction Program

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2017 REQUEST FOR ADDITIONAL APPROPRIATIONS

AIR NATIONAL GUARD. Fiscal Year (FY) 2006/2007 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830

AIR NATIONAL GUARD. Fiscal Year (FY) 2005 BUDGET ESTIMATES MILITARY CONSTRUCTION APPROPRIATION 3830

DEPARTMENT OF THE NAVY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES

DEPARTMENT OF THE ARMY UNITED STATES ARMY RESERVE

SECTION 2.0 INSTALLATION DESCRIPTION

Military ConstructionProgram

Department of the Air Force. Military Family Housing. Fiscal Year (FY) 2017 Budget Estimate

Repair Project Approval

APPENDIX B UNIT AIRLIFT AFFILIATION, LOAD PLANNER CERTIFICATION

EXECUTIVE SUMMARY AIRCRAFT ACCIDENT INVESTIGATION C-17A, T/N FOB SHANK, AFGHANISTAN 23 JANUARY 2012

The Fifth Element and the Operating Forces are vitally linked providing the foundation that supports the MAGTF, from training through Operational

Military Construction Program

Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

DEPARTMENT OF THE ARMY Fiscal Year (FY) 2014 BUDGET ESTIMATES April 2013

DEPARTMENT OF THE AIR FORCE

Introduction. Background. Environmental Excellence in Weapon System Acquisition, Small Team Fairchild Air Force Base

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

515th Air Mobility Operations Wing

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

This publication is available digitally on the AFDPO WWW site at:

Welcome. Environmental Impact Statement for Multiple Projects in Support of Marine Barracks Washington, D.C.

Military Construction Program

2.0 PROJECT OBJECTIVES 2.1 Mission Statement

AIR FORCE RESERVE MISSION BRIEF. Lt Gen Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

Department of Defense INSTRUCTION

GAO DEFENSE INFRASTRUCTURE. DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities

BY ORDER OF THE COMMANDER AFRS INSTRUCTION AIR FORCE RECRUITING SERVICE 21 FEBRUARY 2003 COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Military Construction Program

Fiscal Year 2011 Defense Environmental Programs Annual Report to Congress

Military Construction Program

Impact of the War on Terrorism on the USAF

DoD Dependents Education Activity FY 2004 Military Construction Project Summary ($ in Thousands)

DEPARTMENT OF THE AIR FORCE

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Overview of Physical Security and Protective Measures

Department of the Navy

FORWARD, READY, NOW!

Fiscal Year 2012 Defense Environmental Programs Annual Report to Congress

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Subj: CHIEF OF NAVAL AIR TRAINING ANTITERRORISM PLAN

Report Documentation Page

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

DEPARTMENT OF THE NAVY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Contents. Chapter 3 $1 - $2,500 RMA Projects Purpose Actions required Lessons learned

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

Template For ANG Additional Duty Historians

STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE

COMPLIANCE WITH THIS PUBLICATION IS MANADATORY

Exhibit R-2, RDT&E Budget Item Justification

DEPARTMENT OF THE ARMY

AIR FORCE RESERVE MISSION BRIEF. Lieutenant General Maryanne Miller Chief of Air Force Reserve Commander, Air Force Reserve Command

Department of Defense

Emergency Support Function #9 Urban Search and Rescue Annex

Template modified: 27 May :30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE JULY 1994.

theater. Most airdrop operations will support a division deployed close to the FLOT.

Headquarters Air Mobility Command

NAVFAC Hawaii Construction Outlook

Air Force Reserve Mission Brief

NCNGA FY-17 Federal Legislative Initiatives. Repeal Conversion of National Guard Technicians to Title 5 (Section 1053 of FY-16 NDAA)

Emergency Support Function #9 Urban Search and Rescue Annex

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION. SUBJECT: Physical Security Equipment (PSE) Research, Development, Test, and Evaluation (RDT&E)

More Data From Desert

DEPARTMENT OF THE AIR FORCE

FY16 Senate Armed Services National Defense Authorization Act (NDAA)

Compliance Appendix E: Compliance Budget Overview

Laughlin. Air Force Base. Economic Impact Statement FY16

FY 2002 AMENDED BUDGET SUBMISSION ARMY NATIONAL GUARD MILITARY CONSTRUCTION PROGRAM FY 2002 JUSTIFICATION DATA SUBMISSION TO CONGRESS JUNE 2001

APPENDIX: FUNCTIONAL COMMUNITIES Last Updated: 21 December 2015

Administrative Changes to AFI , Professional Board and National Certification Examinations OPR: AF/SG1

ANNEX 3-34 ENGINEER OPERATIONS APPENDIX A: PRIME BEEF AND RED HORSE CAPABILITIES

Transcription:

Fiscal Year (FY) 2014 Budget Estimates AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROGRAM April 2013

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM JUSTIFICATION OF ESTIMATES FOR FISCAL YEAR 2014 TABLE OF CONTENTS Table of Contents... i FY 2014 Military Construction Projects List By State... ii FY 2014 Military Construction Projects New/Current Mission, Environmental List... iii SECTION 1 - SPECIAL PROGRAM CONSIDERATIONS FY 2014 Pollution Abatement/Energy Conservation Listing... b-i SECTION 2 - BUDGET APPENDIX EXTRACT FY 2014 Appropriations Language... c-i Special Program Considerations... c-ii SECTION 3 - INSTALLATIONS AND PROJECT JUSTIFICATION DATA DD FORMS 1391 AND DD FORMS 1390 Major Construction, Air Force Reserve...1 Unspecified Minor Construction, Air Force Reserve...17 SECTION 4 - PLANNING AND DESIGN Planning and Design, Air Force Reserve...19 SECTION 5 - FUTURE YEARS DEFENSE PROGRAM Future-Years Military Construction Projects List...21 i

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM (DOLLARS IN THOUSANDS) MAJOR CONSTRUCTION FY 2014 MILITARY CONSTRUCTION PROJECTS LIST STATE/ COUNTRY INSTALLATION AND PROJECT AUTH OF APPROP AMOUNT APPROP AMOUNT DD FORM 1391 PAGE # California March AFB Joint Regional Deployment Processing Center Phase 1 19,900 19,900 2 Oklahoma Tinker AFB Air Control Group Squadron Operations 12,200 12,200 7 Florida Homestead AFS Entry Control Complex 9,800 9,800 12 SUBTOTAL 41,900 41,900 TOTAL IN THE UNITED STATES 41,900 41,900 Unspecified Minor Construction 1,530 1,530 Planning & Design 2,229 2,229 GRAND TOTAL 45,659 45,659 ii

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM (DOLLARS IN THOUSANDS) MAJOR CONSTRUCTION FY 2014 MILITARY CONSTRUCTION PROJECTS NEW/CURRENT MISSION, ENVIRONMENTAL LIST LOCATION PROJECT COST NEW, CURRENT ENVIR FOOTPRINT California March AFB Joint Regional Deployment Processing Center Phase 1 19,900 Current New Oklahoma Tinker AFB Air Control Group Squadron Operations 12,200 Current New Florida Homestead AFS Entry Control Complex 9,800 Current New TOTAL 41,900 SUBTOTALS: New Mission 0 Current Mission 41,900 Environmental 0 Unspecified Minor Construction 1,530 Planning & Design 2,229 FY 2014 APPROPRIATIONS TOTAL: 45,659 iii

SECTION 1 SPECIAL PROGRAM CONSIDERATIONS

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM MAJOR CONSTRUCTION FY 2014 POLLUTION ABATEMENT/ENERGY CONSERVATION LISTING No special program considerations in FY 2014. b-i

SECTION 2 BUDGET APPENDIX EXTRACT

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM FY 2014 APPROPRIATION LANGUAGE MILITARY CONSTRUCTION, AIR FORCE RESERVE For construction, acquisition, expansion, rehabilitation, and conversion of facilities for the training and administration of the Air Force Reserve as authorized by Chapter 1803 of Title 10, United States Code, and Military Construction Authorization Acts, $45,659,000 to remain available until September 30, 2018. c-i

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM SPECIAL PROGRAM CONSIDERATIONS Pollution Abatement The military construction projects proposed in this program will be designed to meet environmental standards. Military construction projects proposed primarily for abatement of existing pollution problems at installations have been reviewed to ensure that corrective action is accomplished in accordance with applicable standards and criteria. Energy Conservation Military construction projects specifically designed for energy conservation at installations have been developed, reviewed and selected with prioritization by energy savings per investment costs. Projects include improvements to existing facilities and utility systems to upgrade design, eliminate waste, and install energy saving devices. Projects are designed for minimum energy consumption. Flood Plain Management and Wetlands Protection Proposed land acquisitions, disposals and installation construction projects have been planned to allow for the proper management of flood plains and protection of wetlands by avoiding long-term impacts, reducing the risk of flood losses, and minimizing the loss or degradation of wetlands. Project planning is in accordance with the requirements of Executive Order Nos. 11988 and 22990. Design for Accessibility of Physically Handicapped Personnel In accordance with Public Law 900-400, provisions for physically handicapped personnel will be provided for, where appropriate, in the design of facilities included in this program. Preservation of Historical Sites and Structures Facilities in this program do not directly or indirectly affect any district, site, building, structure, object or setting listed in the National Register of Historic Places, except as noted on the project s DD Form 1391. Environmental Protection In accordance with Section 102(2)(c) of the National Environmental Protection Act of 1969 (PL 91-190), the environmental impact analysis process has been completed or is actively underway for all projects in this Military Construction Program. c-ii

Economic Analysis Economics are an inherent aspect of project development and design of military construction projects included in this program. This program represents the most economical use of resources. Reserve Manpower Potential The Reserve manpower potential to meet and maintain authorized strengths of all Reserve flying/nonflying units in those areas in which these facilities are to be located has been reviewed. It has been determined, in coordination with all other services having Reserve flying/non-flying units in these areas, that the number of units of the Reserve components of the Armed Forces presently located in these areas, and those which have been allocated to the areas for future activation, is not and will not be larger than the number that can reasonably be expected to be maintained at authorized strength levels considering the number of persons living in these areas who are qualified for membership in those Reserve units. Potential Use of Vacant Schools & Other State & Local Facilities The potential use of vacant schools and other state and local owned facilities has been reviewed and analyzed for each facility to be constructed under this program. Congressional Reporting Requirements Page iii, titled "New/Current Mission, Environmental List, is in response to a Senate Appropriations Committee requirement contained on page 10 (New and Current Mission Activities) of Report #100-380. Unless otherwise noted, the projects comply with the scope and design criteria prescribed in Part II of Military Handbook 1190, "Facilities Planning and Design Guide." c-iii

SECTION 3 INSTALLATION AND PROJECT JUSTIFICATION DATA DD FORMS 1391 AND DD FORMS 1390 1

Air Force Reserve FY 2014 MILITARY CONSTRUCTION PROJECT DATA 4. PROJECT TITLE MARCH AIR FORCE BASE, CALIFORNIA 5. PROGRAM ELEMENT 52576F 6. CATEGORY CODE 141-786 JOINT REGIONAL DEPLOYMENT PROCESSING CENTER - PHASE 1 7. PROJECT NUMBER 9. COST ESTIMATE PDPG030130P1 ITEM U/M QUANTITY PRIMARY FACILITIES DEPLOYMENT PROCESSING FACILITY SUSTAINABILITY & ENERGY MEASURES SUPPORTING FACILITIES UTILITIES & PAVEMENTS SITE IMPROVEMENTS COMMUNICATIONS DEMOLITION OF BLDG S 265, 385 & 441 ASBESTOS & LBP ABATEMENT OF BLDG S 265, 385 &441 ENVIRONMENTAL SAMPLING AND ANALYSIS SUBTOTAL CONTINGENCY (5%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (5.7%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) 8. PROJECT COST ($000) UNIT COST 19,900 COST ($000) 12,230 (11,990) (240) 5,737 (1,300) (745) (350) (2,621) (671) ( 50) 17,967 898 18,865 1,075 19,940 19,900 EQUIPMENT FROM OTHER APPROPRIATIONS 3,085 10. DESCRIPTION OF PROPOSED CONSTRUCTION: Demolish and removal of Asbestos and Lead Base Paint at Building 265, 385 and 441. Construct 4,555 SM metal stud and stucco structure with a standing seam metal roof, HVAC, electrical, water/sewer, structural systems, mass notification system and interior finishes/features. All utilities and site improvements are included. New facility will include personnel deployment processing, classified briefing rooms, food services, passenger services and office areas. The proposed project shall be designed and constructed according to current AT/FP standards. Sustainable principles will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive orders. Air Conditioning: 200 Tons. 11. REQUIREMENT: 4,555 SM ADEQUATE: 0 SM SUBSTANDARD: 3,587 SM PROJECT: Regional Deployment and Passenger Terminal Facility. (Current Mission) REQUIREMENT: Under AFI 10-403 (13 Jan 2008), Para. 2.29.5., the Installation Deployment Plan (IDP) states: According to AMC Passenger Terminal Facility Design Guide, the site of the Passenger Terminal is important. Where local conditions permit, locate Passenger Terminals on the flight line, preferably near the center of the apron where the aircraft are parked. This will minimize travel time to and from aircraft. UFC 4-010-02 DOD states, all passenger terminals will implement single point entry and a sterile terminal at all times. All terminals will also implement anti-terrorism (AT) standoff zone around the terminal building at all times. The required standoff is 82 feet. Recent terrorist threats directed specifically at air transportation systems warrant serious consideration for Deployment Processing Center, especially during peak deployment rotations. Per AMCI 24-101, Volume 14 (2 Oct 09), holding areas shall be enclosed or kept under close surveillance. A new passenger deployment facility is needed to remain compliant and meeting AMCI 10-403 (22 Feb 07), Para. 5.5.1. & 5.5.3., which states: Lack of a new troop deployment facility not only compromises the desired protection posture of every crucial troop processing operation, but potentially endangers both safety and security of DoD facility, equipment and personnel. In addition, an enclosed and secured processing facility is key to safely support ongoing troop movement taking place at March ARB. Protection of personnel manifested for world-wide deployment is jeopardized whenever unauthorized entry occurs. Per AFI 31-101, (8 Oct 09), Para. 8.2.5.8.2.3., construct adequate fences, gates, and other barriers SM LS LS LS SF SF LS 4,555 60,958 60,958 DD Form 1391, DEC 76 Previous editions are obsolete. Page No. 2 4,521 43 11

Air Force Reserve FY 2014 MILITARY CONSTRUCTION PROJECT DATA MARCH AIR FORCE BASE, CALIFORNIA 5. PROGRAM ELEMENT 6. CATEGORY CODE 4. PROJECT TITLE JOINT REGIONAL DEPLOYMENT PROCESSING CENTER - PHASE 1 7. PROJECT NUMBER 8. PROJECT COST ($000) 52576F 141-786 PDPG030130P1 19,900 to provide boundary protection and to channel vehicle and pedestrian movement. In order to meet requirements mentioned this project is to construct a Joint Regional Deployment Facility and Passenger Terminal for military deployment personnel processing, passenger services, and response of Federal and State entities in support of national interests. This facility will receive and process Marine, Army Reserve and Total Air Force personnel in support of joint deployment operations world-wide. Demolish and remove Asbestos and Lead Base Paint at Buildings 265, 385 and 441. Consultation with the State Historic Preservation Officer (SHPO) will be performed as required in Section 106 of the National Historic Preservation Act, as codified in 36 CFR Part 800. CURRENT SITUATION: Current facilities do not meet UFC 4-010-02 DOD, Current work-flow on troop/baggage/manifest phase is ineffective as troop processing is geographically divided, utilizing two separate facilities (Bldg 265 and Bldg 385). The existing passenger terminal Building 265 was constructed in 1942 and has exceeded its life cycle. The facility has degraded infrastructure and utilities. The communications system is unable to support the volume of personnel utilizing the facility. The second facility being used for this process is Hangar 385, a historical facility built in 1929 that is adjacent to the passenger terminal. Hangar 385 is used for overflow of military personnel and equipment until embarkation. Building 385 is only capable of providing minimal accommodations and has significant deficiencies (plumbing, electrical, HVAC) that prevent this facility from meeting full mission requirements. Handicap access requirements cannot be achieved. AT/FP has deficiencies identified by JSIVA at Building 265 and 385. These facilities are used for mass gatherings of people and the standoff distances from the facilities and parking lots do not meeting regulations. Egress doors do not open in the path of travel and windows are not blast resistant. There is no mass notification system in place in case of emergencies. The HVAC system does not have a manual override shutoff switch. Facility 441 has seismic deficiencies which do not meet current seismic requirements and can create a possible unsafe environment in the event of an earthquake. IMPACT IF NOT PROVIDED: The facilities will continue to be unsuitable for the number of military personnel being processed for deployments. Frequently deploying troops from the 1 st Marine Expeditionary Force, 452 nd Air Mobility Wing, Army Reserves, and Federal and State entities for national interests are constrained to the outdoors for extended periods of time. The results are degraded capabilities and lengthy processing times. ADDITIONAL: POC: HQ AFRC/A7PP, DSN 497-1108. New Work: 4,555 SM = 49,012 SF. This project is a candidate for Comprehensive Interior Design (CID) and equipment from other appropriations: $3,085K for furnishings and $181K for CID, $980K for communications equipment. Cost estimate calculated using Historical Cost Data and R S Means. Demolition cost is based on past history of demolition on March ARB. Facilities on the base have a history of Lead Base Paint and Asbestos that must be removed prior to demolition. Facility supports annual throughput of over 1,800 missions transporting an average of 72,886 passengers and 6,837 Tons of cargo. Sustainable principles will be integrated into the design, development, and construction in accordance with Executive Order 13423 and other applicable laws and Executive Orders. JOINT USE CERTIFICATION: This facility can be used by other components on an as available basis; however, the scope of the project is based on Air Force requirements. DD Form 1391, DEC 76 Previous editions are obsolete. Page No. 3

AIR FORCE RESERVE MARCH AIR FORCE BASE, CALIFORNIA 4. PROJECT TITLE FY 2014 MILITARY CONSTRUCTION PROJECT DATA 5. PROJECT NUMBER JOINT REGIONAL DEPLOYMENT PROCESSING CENTER - PHASE 1 PDPG030130P1 12. SUPPLEMENTAL DATA: A. DESIGN DATA (Estimated) 1. STATUS a. Date Design Started: Oct 2012 b. Parametric estimates have been used to develop project cost. c. Percentage Complete as of January 1, 2012 0% d. Date Design 35% Complete Mar 2013 e. Date Design Complete - (If design-build, construction complete) Oct 2013 2. BASIS a. Standard or Definitive Design - Yes No X. b. Where Design Was Most Recently Used N/A. 3. COST (Total ) = c = a + b or d + e ($000) a. Production of Plans and Specifications (35% design) ( ) b. All Other Design Costs (Design-build) ( ) c. Total (1,791) d. Contract (A-E) (1,705) e. In-house (management) ( 86) 4. CONSTRUCTION START Mar 2014 B. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Systems Furniture 3740 FY 2015 3,085 Interior Design Services 3740 FY 2015 181 Communications Equipment 3740 FY 2015 980 DD Form 1391c Page No. 4

AIR FORCE RESERVE MARCH AIR FORCE BASE, CALIFORNIA FY 2014 GUARD AND RESERVE MILITARY CONSTRUCTION 4. AREA CONSTR COST INDEX 1.14 5. FREQUENCY AND TYPE UTILIZATION One unit training assembly per month, 15 days annual field training per year. Daily use by technician/agr force. Periodic use by Marine Corps and transient military services. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS None 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY COST DESIGN DESIGN CODE PROJECT TITLE SCOPE ($000) START COMPLETE 141-786 JOINT REGIONAL 4,555 SM 19,900 Oct 2012 Oct 2013 DEPLOYMENT PROCESSING CENTER - PHASE 1 8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION Approved for unilateral construction, 29 Mar 2012 9. LAND ACQUISITION REQUIRED (Number of Acres) NONE 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) YEAR None RPM BACKLOG AT THIS INSTALLATION ($000): $64,200 DD Form 1390 S/1 Page 1 of 2 Page No. 5

AIR FORCE RESERVE FY 2014 GUARD AND RESERVE MILITARY CONSTRUCTION MARCH AIR FORCE BASE, CALIFORNIA 11. PERSONNEL STRENGTH AS OF AUG 2010 PERMANENT (ARTs, AGRs, Non-ART Civilians) GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 1,015 90 624 301 3,251 492 2,759 ACTUAL 932 71 593 268 3,201 429 2,772 12. RESERVE UNIT DATA UNIT DESIGNATION 4 Air Force 452 Mobility Wing 452 Operations Group 452 Operations Support Flight 729 Airlift Squadron 336 Air Refueling Squadron 452 Aeromedical Evacuation Squadron 452 Maintenance Group 452 Maintenance Squadron 452 Aircraft Maintenance Squadron 452 Maintenance Operations Squadron 452 Mission Support Group 452 Civil Engineer Squadron 452 Security Forces Squadron 452 Force Support Squadron 452 Logistics Readiness Squadron 452 Communications Squadron 452 Contracting Flight 452 Airlift Control Flight 452 Medical Group 452 Aerospace Medical Squadron 452 Air Operation Squadron 50 Aerial Port Squadron 56 Aerial Port Squadron 4 Combat Camera Squadron 701 Combat Operations Squadron Total AUTHORIZED 92 187 53 217 197 94 129 45 528 359 101 15 314 267 205 213 97 14 46 6 187 188 209 211 143 149 4,266 STRENGTH ACTUAL 124 166 45 186 192 91 115 42 497 331 93 13 297 420 186 210 97 13 40 6 162 173 198 199 118 119 4,133 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED C-17A 8 8 KC-135R 12 12 DD Form 1390 S/2 Page 2 of 2 Page No. 6

Air Force Reserve FY 2014 MILITARY CONSTRUCTION PROJECT DATA 4. PROJECT TITLE TINKER AIR FORCE BASE, OKLAHOMA 5. PROGRAM ELEMENT 52576F 6. CATEGORY CODE 141-753 AIR CONTROL GROUP SQUADRON OPERATIONS 7. PROJECT NUMBER 9. COST ESTIMATE WWYK129000 ITEM U/M QUANTITY PRIMARY FACILITIES SQUADRON OPERATIONS & OPERATIONS GP FAC SUSTAINABILITY & ENERGY MEASURES SUPPORTING FACILITIES UTILITIES PAVEMENTS SITE IMPROVEMENTS COMMUNICATIONS ELEVATOR SUBTOTAL CONTINGENCY (5%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (5.6%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) 8. PROJECT COST ($000) UNIT COST 12,200 COST ($000) EQUIPMENT FROM OTHER APPROPRIATIONS 1,997 10. DESCRIPTION OF PROPOSED CONSTRUCTION: Construct a multi-story consolidated squadron operations and Air Control Group management facility. The facility will have a special pier and reinforced concrete foundation, reinforced concrete and steel frame, and an exterior compatible with base architectural standards. The project will provide operations and training as well as administrative space. Supporting facilities include site work, utilities, access road and parking. The new facilities will be designed in accordance with Unified Facilities Criteria (UFC) 4-5 10-01 (Military Handbook 1191), DoD Minimum Antiterrorism Standards for Buildings UFC 4-0 10-01, and Americans with Disabilities Act and Architectural Barriers Act Accessibility Guidelines (ADA/ABAAG). Sustainable principles will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive orders. Air Conditioning: 100 Tons. 11. REQUIREMENT: 2,973 SM ADEQUATE: 0 SM SUBSTANDARD: 688 SM PROJECT: Construct 513 th Air Control Group Facility (CURRENT MISSION) REQUIREMENT: This project was validated during the FOCUS assessment conducted in July 2009. This project will provide space for flight crews, and administrative support personnel for the Reserve associate AWACS flying squadron at Tinker AFB. Space will be provided for mission planning, scheduling, tactics, pilot and operator work space, intelligence operations, along with storage and locker room facilities. Facility will be located proximal to active duty flying squadron in order to enhance integration of the associate mission. CURRENT SITUATION: Existing facility is not properly configured for squadron operations or life support functions and is not integrated with the associated active duty squadron. AFRC space in Building 00240 is severely degraded, lacks adequate climate control, lacks adequate utility service, and is undersized to the functional requirements. Additional squadron elements are located in Building 001056 which is located over two miles away from Building 00240 and does not enable efficient squadron operations. AFRC Squadron Operations are distant from their active duty associates and the flightline, resulting in lost time and significant operational inefficiencies. There are no active duty facilities that are available to meet this need. SM LS LS LS LS LS LS 2,973 2,630 7,975 (7,819) (156) 3,020 (1,035) (805) (718) (287) (175) 10,995 550 11,545 647 12,191 12,200 DD Form 1391, DEC 76 Previous editions are obsolete. Page No. 7

Air Force Reserve FY 2014 MILITARY CONSTRUCTION PROJECT DATA 4. PROJECT TITLE TINKER AIR FORCE BASE, OKLAHOMA 5. PROGRAM ELEMENT 6. CATEGORY CODE 52576F 141-753 AIR CONTROL GROUP SQUADRON OPERATIONS 7. PROJECT NUMBER 8. PROJECT COST ($000) WWYK129000 12,200 IMPACT IF NOT PROVIDED: Reserve flying squadron personnel will not have adequate facilities and will continue to be separated from their active duty associates. Opportunities for operational and training efficiencies will not be realized due to dispersed and separated squadron operations. ADDITIONAL: POC: HQ AFRC/A7PP, DSN 497-1108. Construct 513 th Air Control Group Facility : 2,973 SM = 32,000 SF. This project is a candidate for comprehensive interior design, (CID). Costs from other appropriations; $1,280K for furniture and $77K for CID, $640K for communications equipment. Sustainable principles will be integrated into the design, development, and construction in accordance with Executive Order 13423 and other applicable laws and Executive Orders. Base Civil Engineer is Mr. Thomas Griffith, phone: 405-734-3451. JOINT USE CERTIFICATION: This facility can be used by other components on an as available basis; however, the scope of the project is based on Air Force requirements. DD Form 1391, DEC 76 Previous editions are obsolete. Page No. 8

AIR FORCE RESERVE TINKER AIR FORCE BASE, OKLAHOMA 4. PROJECT TITLE FY 2014 MILITARY CONSTRUCTION PROJECT DATA 5. PROJECT NUMBER AIR CONTROL GROUP SQUADRON OPERATIONS WWYK129000 12. SUPPLEMENTAL DATA: A. DESIGN DATA (Estimated) 1. STATUS a. Date Design Started: Oct 2012 b. Parametric estimates have been used to develop project cost. c. Percentage Complete as of January 1, 2012 0% d. Date Design 35% Complete Apr 2013 e. Date Design Complete - (If design-build, construction complete) Dec 2013 2. BASIS a. Standard or Definitive Design - Yes No X. b. Where Design Was Most Recently Used N/A. 3. COST (Total ) = c = a + b or d + e ($000) a. Production of Plans and Specifications (35% design) ( ) b. All Other Design Costs (Design-build) ( ) c. Total (1,098) d. Contract (A-E) (1,043) e. In-house (management) ( 55) 4. CONSTRUCTION START Mar 2014 B. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Systems Furniture 3740 FY 2015 1,280 Interior Design Services 3740 FY 2014 77 Communications Equipment 3740 FY 2015 640 DD Form 1391c Page No. 9

AIR FORCE RESERVE TINKER AIR FORCE BASE, OKLAHOMA FY 2014 GUARD AND RESERVE MILITARY CONSTRUCTION 4. AREA CONSTR COST INDEX 0.91 5. FREQUENCY AND TYPE UTILIZATION One unit training assembly per month, 15 days annual field training per year, daily use by technician/agr force. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS None 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY COST DESIGN DESIGN CODE PROJECT TITLE SCOPE ($000) START COMPLETE 141-753 AIR CONTROL GROUP 2,973 SM 12,200 Oct 2012 Dec 2013 SQUADRON OPERATIONS 8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION Approved for unilateral construction, 18 Aug 2011 9. LAND ACQUISITION REQUIRED (Number of Acres) NONE 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) YEAR None RPM BACKLOG AT THIS INSTALLATION ($000): $12,100 DD Form 1390 S/1 Page 1 of 2 Page No. 10

AIR FORCE RESERVE FY 2014 GUARD AND RESERVE MILITARY CONSTRUCTION TINKER AIR FORCE BASE, OKLAHOMA 11. PERSONNEL STRENGTH AS OF AUG 2010 PERMANENT (ARTs, AGRs, Non-ART Civilians) GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 397 73 296 28 1,610 222 1,388 ACTUAL 345 67 258 20 1,529 200 1,329 12. RESERVE UNIT DATA UNIT DESIGNATION 10 Flight Test Squadron 35 Combat Communications Squadron 72 Aerial Port Squadron 507 Air Refueling Wing 507 Operations Group 465 Air Refueling Squadron 507 Operation Support Flight 507 Maintenance Group 507 Maintenance Squadron 507 Aircraft Maintenance Squadron 507 Maintenance Operations Flight 507 Mission Support Group 507 Civil Engineer Squadron 507 Security Forces Squadron 507 Force Support Squadron 507 Logistics Readiness Squadron 507 Medical Squadron 513 Air Control Group 513 Aircraft Maintenance Squadron 513 Maintenance Squadron 513 Operation Support Flight 907 Airways & Air Communications Squadron Total AUTHORIZED 36 113 138 84 27 72 51 25 154 189 43 9 158 80 103 91 115 29 117 131 44 198 2,007 STRENGTH ACTUAL 30 110 132 67 24 65 43 25 141 166 36 7 142 158 96 74 101 26 106 126 35 164 1,874 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED KC-135R 12 12 E-3 None Reserve Classic Associate Squadron DD Form 1390 S/2 Page 2 of 2 Page No. 11

AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROJECT DATA 4. PROJECT TITLE HOMESTEAD AIR FORCE STATION, FLORIDA 5. PROGRAM ELEMENT 6. CATEGORY CODE ENTRY CONTROL COMPLEX 7. PROJECT NUMBER 8. PROJECT COST ($000) 52576F 730-837 KYJM07-9014 9. COST ESTIMATES ENTRY CONTROL COMPLEX VEHICLE INSPECTION AND ROADWAY VISITOR CONTROL CENTER GATEHOUSE AND SHELTER OVERWATCH AND BARRIERS ACCESS ROADWAYS SUSTAINABILITY & ENERGY MEASURES SUPPORTING FACILITIES COMMUNICATIONS SITE IMPROVEMENTS, FENCING UTILITIES CONTAMINATED SOIL CLEANUP AND DISPOSAL SUBTOTAL CONTINGENCY (5%) TOTAL CONTRACT COST SUPERVISION, INSPECTION AND OVERHEAD (5.7%) TOTAL REQUEST TOTAL REQUEST ROUNDED EQUIPMENT FROM OTHER APPROPRIATIONS ITEM U/M QUANTITY UNIT COST EA SM SM EA EA LS LS LS LS 1 200 100 1 1 - - - - - $9,800 1,291,251 2,585 2,585 231,256 4,124,000 COST ($000) 6,421 (1,291) ( 517) ( 258) ( 231) (4,124) 130 2,245 (125) (475) (650) (995) 8,796 440 9,236 526 9,762 9,800 50 10. DESCRIPTION OF PROPOSED CONSTRUCTION: Construct new Entry Control Complex to comply with UFC-4-022-01. Complex includes Main Gatehouse, Commercial Vehicle Inspection, Pass & ID, pavements, security cabling, vehicle barrier systems, landscaping, and static display. All facilities shall comply with base architectural standards and include all supporting HVAC, electrical, water/sewer, communications, security features, backup generator, and interior finishes. Demolish existing entry gate. Construction shall comply with AT/FP and Hurricane standards contained in the Florida Building Code. Sustainable principles will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive orders. Air Conditioning: 15 Tons 11. REQUIREMENT: 1 EA ADEQUATE: 0 EA SUBSTANDARD: 2 EA PROJECT: Entry Control Complex (Current Mission) REQUIREMENT: Per AFH 32-1084, an entry control complex is required for Air Force installations. Security police require a complex that will incorporate Smart Gate technology allowing accurate validation of credentials for occupants of private and commercial vehicles. A Pass & ID center, truck inspection facility, gatehouse and overwatch are needed to process vehicles and personnel. This complex of roads, facilities, barriers and check points will provide safe, secure and efficient processing of vehicles and personnel during peak hours. CURRENT SITUATION: Homestead ARB has two entry control points; however the Coral Sea gate is closed due to AT/FP concerns with its proximity to on base Lodging and failure to meet AT/FP standards. The remaining Westover gate is substandard and was not designed to serve as a primary entry control point. Pass & ID is not currently located within physical or visual control of gate security personnel, thus opening up the possibility of unauthorized access to base facilities. Truck inspection is conducted outdoors during all weather conditions, with inadequate space, and within close proximity to the bulk POL storage compound. IMPACT IF NOT PROVIDED: Lack of an adequate Entry Control Complex will increase Homestead ARB s vulnerability to terrorist activities. This is a recurring CVAMP finding that was first identified in 2002. ADDITIONAL: POC: HQ AFRC/CEP, DSN 497-1108. This project is a candidate for comprehensive interior design. Equipment from other appropriations: $50K for furniture. BX mart facility ( 93,202sf ) is to be divested JOINT USE CERTIFICATION: This facility will serve tenant organizations such as Florida Air National Guard, US Customs, and Special Operations Command South; the scope of this project is based on Air Force Reserve requirements. Page No. 12

AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROJECT DATA HOMESTEAD AIR FORCE STATION, FLORIDA 4. PROJECT TITLE 5. PROJECT NUMBER ENTRY CONTROL COMPLEX KYJM07-9014 12. SUPPLEMENTAL DATA: A. DESIGN DATA (Estimated) 1. STATUS a. Date Design Started: Oct 2012 b. Parametric estimates have been used to develop project cost. c. Percentage Complete as of January 1, 2012 0% d. Date Design 35% Complete Mar 2013 e. Date Design Complete - (If design-build, construction complete) Oct 2013 2. BASIS a. Standard or Definitive Design - Yes No X. b. Where Design Was Most Recently Used N/A. 3. COST (Total ) = c = a + b or d + e ($000) a. Production of Plans and Specifications (35% design) ( ) b. All Other Design Costs (Design-build) ( ) c. Total ( 882) d. Contract (A-E) ( 829) e. In-house (management) ( 53) 4. CONSTRUCTION START Mar 2014 B. EQUIPMENT ASSOCIATED WITH THIS PROJECT WHICH WILL BE PROVIDED FROM OTHER APPROPRIATIONS: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) Furniture 3740 FY 2014 50 DD Form 1391c Page No. 13

AIR FORCE RESERVE FY 2014 GUARD AND RESERVE MILITARY CONSTRUCTION HOMESTEAD AIR FORCE STATION, FLORIDA 5. FREQUENCY AND TYPE UTILIZATION Daily use by all AFRC and tenant activities accessing the installation. 4. AREA CONSTR COST INDEX 0.88 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS None 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY COST DESIGN DESIGN CODE PROJECT TITLE SCOPE ($000) START COMPLETE 730-837 ENTRY CONTROL COMPLEX 300 SM 9,800 Oct 2012 Oct 2013 8. STATE RESERVE FORCES FACILITIES BOARD RECOMMENDATION Approved for unilateral construction, 29 Jan 2009 9. LAND ACQUISITION REQUIRED (Number of Acres) NONE 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY COST CODE PROJECT TITLE SCOPE ($000) YEAR None RPM BACKLOG AT THIS INSTALLATION ($000): $115,400 DD Form 1390 S/1 Page 1 of 2 Page No. 14

AIR FORCE RESERVE FY 2014 GUARD AND RESERVE MILITARY CONSTRUCTION HOMESTEAD AIR FORCE STATION, FLORIDA 11. PERSONNEL STRENGTH AS OF AUG 2010 PERMANENT (ARTs, AGRs, Non-ART Civilians) GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 666 35 394 237 1,941 171 1,770 ACTUAL 553 28 315 210 1,933 152 1,781 12. RESERVE UNIT DATA UNIT DESIGNATION 482 Fighter Wing 482 Operations Group 482 Operations Support Flight 93 Fighter Squadron 482 Aerospace Medical Squadron 482 Maintenance Group 482 Maintenance Squadron 482 Aircraft Maintenance Squadron 482 Maintenance Operations Flight 482 Mission Support Group 482 Civil Engineer Squadron 482 Security Forces Squadron 482 Force Support Squadron 482 Logistics Readiness Squadron 482 Communications Squadron 70 Aerial Port Squadron 482 Contracting Flight Total AUTHORIZED 128 31 72 61 165 35 540 453 50 18 237 229 154 128 108 184 14 2,607 STRENGTH ACTUAL 109 28 59 55 147 32 491 403 39 7 219 363 141 117 95 170 11 2,486 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED F-16C/D 24 24 DD Form 1390 S/2 Page 2 of 2 Page No. 15

DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM JUSTIFICATION OF ESTIMATES FOR FISCAL YEAR 2014 APPROPRIATION: MILITARY CONSTRUCTION, AIR FORCE RESERVE PROGRAM 341.020 UNSPECIFIED MINOR CONSTRUCTION $1,530,000 PART I - PURPOSE AND SCOPE The funds requested for unspecified minor construction will finance new construction projects having cost estimates less than $2,000,000. PART II - JUSTIFICATION OF FUNDS REQUESTED The funds requested for unspecified minor construction will finance unforeseen projects generated during the year and are necessary to support mission requirements. 16

AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROJECT DATA 4. PROJECT TITLE VARIOUS LOCATIONS 5. PROGRAM ELEMENT 6. CATEGORY CODE UNSPECIFIED MINOR CONSTRUCTION 7. PROJECT NUMBER 8. PROJECT COST ($000) 52576F 962-000 UNSPECIFIED MINOR CONSTRUCTION SUBTOTAL TOTAL CONTRACT COST TOTAL REQUEST PAYZ 140341 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST 1,530 COST ($000) LS - - 1,530 1,530 1,530 1,530 10. Description of Proposed Construction: 11. REQUIREMENT: As required. PROJECT: Unspecified Minor Construction REQUIREMENT: This appropriation provides a lump sum amount for unspecified minor construction projects, not otherwise authorized by law, having a funded cost less than $2,000,000. Work includes construction, alteration or conversion of temporary facilities in accordance with Title 10, USC 18233 and 18233a. These projects are not now identified but are expected to arise in FY10. IMPACT IF NOT PROVIDED: No means to accomplish exigent projects costing less than $2,000,000 will exist, severely degrading the ability of the Air Force Reserve to efficiently and effectively address unforeseen facility modifications, alteration and conversion requirements. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No. 17

SECTION 4 PLANNING AND DESIGN 18

AIR FORCE RESERVE FY 2014 MILITARY CONSTRUCTION PROJECT DATA 4. PROJECT TITLE VARIOUS LOCATIONS 5. PROGRAM ELEMENT 6. CATEGORY CODE PLANNING AND DESIGN 7. PROJECT NUMBER 8. PROJECT COST ($000) 52576F PLANNING AND DESIGN SUBTOTAL TOTAL CONTRACT COST TOTAL REQUEST 961-000 PAYZ 140313 9. COST ESTIMATES ITEM U/M QUANTITY UNIT COST 2,229 COST ($000) LS - - 2,229 2,229 2,229 2,229 10. Description of Proposed Construction: 11. REQUIREMENT: As required. PROJECT: Planning and Design. REQUIREMENT: Funds for architectural and engineering services and construction provide for the completed design of facilities and evaluation of designs in terms of technical adequacy and estimated costs. In addition, these funds are required to prepare site surveys, develop master plans, working drawings, specifications, project planning reports, and designs required for those construction projects included in the Air Force Reserve (AFR) Military Construction (MILCON) Program. The advanced age and continued deterioration of the AFR physical plant and infrastructure have generated numerous facility requirements, requiring these architectural and engineering services for design. In addition, there are numerous new mission beddown projects that received no previous planning and design funds. It is essential the AFR be funded at the requested level to ensure operational readiness is not hampered or degraded due to inadequate facilities. IMPACT IF NOT PROVIDED: Continued design on this fiscal year program, as well as future year MILCON programs, will be impossible. DD FORM 1391, DEC 76 Previous editions are obsolete. Page No. 19

SECTION 5 FUTURE YEARS DEFENSE PROGRAM 20

FY Stat e Base DEPARTMENT OF THE AIR FORCE AIR FORCE RESERVE MILITARY CONSTRUCTION PROGRAM FUTURE YEARS MILITARY CONSTRUCTION PROGRAM ($000) Project 15 GA Robins AFB Consolidate AFRC, Phase 1 Current Mission New 27,700 15 TX Lackland AFB Medical Training Annex to Clinic Current Mission New 9,900 Type Footprint PA Total Projects 37,600 Planning and Design 1,800 Unspecified MC 1,400 Total FY15 Program 40,800 16 MA Westover AFB Maintenance Shop Complex Current Mission New 32,000 Total Projects 32,000 Planning and Design 4,800 Unspecified MC 4,000 Total FY16 Program 40,800 17 GA Robins AFB Consolidate AFRC, Phase 2 Current Mission New 35,500 Total Projects 35,500 Planning and Design 3,300 Unspecified MC 2,000 Total FY17 Program 40,800 18 SC Charleston AFB Airlift Control Flight Current Mission New 7,700 18 18 NC OH Seymour Johnson AFB Youngstown AFS Tanker Parking Apron Expansion Indoor Small Arms Firing Range Current Mission Current Mission New New 9,800 9,400 18 HI Hickam AFB Consolidated Training Facility Current Mission New 4,100 Total Projects 31,000 Planning and Design 4,000 Unspecified MC 4,000 Total FY18 Program 39,000 21