UNDP Ethiopia TOR. National Consultant On Climate Change and Renewable Energy ( house hold energy and/or improved cook stove expert )

Similar documents
REQUIRED DOCUMENT FROM HIRING UNIT

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND: GEF Trust Fund

GEF SECRETARIAT REVIEW FOR PROGRAMMATIC FRAMEWORK DOCUMENT* THE GEF/LDCF/SCCF TRUST FUNDS

The Ethiopian Climate Resilient Green Economy Facility (CRGE Facility) June, 2013 Lombok, Indonesia

Brief Description of Initiation Plan

GPROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND: GEF Trust Fund

Terms of Reference. International Consultant GEF Project Development Specialist

AFRICAN WOMEN ENERGY ENTREPRENEURS FRAMEWORK (AWEEF)

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE FOR PERSONNEL UNDER INDIVIDUAL SERVICE AGREEMENT (ISA)

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND. GEF Focal Area (s): Climate Change.

GEF-6 GEF SECRETARIAT REVIEW FOR FULL-SIZED/MEDIUM-SIZED PROJECTS THE GEF/LDCF/SCCF TRUST FUND

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE

GEF s Role and Activities for Climate Change Mitigation

PROCUREMENT NOTICE. Project name: Small Decentralized Renewable Energy Power Generation (DREG)

Request for 2018 Proposals

PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Full-sized Project TYPE OF TRUST FUND: GEF Trust Fund

MISSION INNOVATION ACTION PLAN

TERMS OF REFERENCE RWANDA LESSONS LEARNED ON DISASTER RECOVERY

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultant and consultant assigned by consulting firm/institution

Partnerships for sustainable energy- How to realise the full potential of the Champion District Partnership in rural Uganda

GENERAL INFORMATION Services/Work Description: Project/Program Title: Home-based with travel to Addis Ababa I. BACKGROUND

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

ENHANCED INTEGRATED FRAMEWORK EXECUTIVE SECRETARIAT FOR THE EIF (ES) AND EIF TRUST FUND MANAGER (TFM) PROCEDURES FOR FEASIBILITY STUDIES.

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

National Consultant Proposal Development Specialist, Integrated Solutions for Sustainable Development of Koh Tao Island

PROGRESS REPORT ON THE CAPACITY-BUILDING INITIATIVE FOR TRANSPARENCY

The GEF. Was established in October 1991 as a $1 billion pilot program in the World Bank

Terms of Reference (TOR) for Independent End of Project Evaluation

Local Energy Challenge Fund

National Dialogue Initiative

MINISTRY OF ENERGY KENYA ELECTRICITY MODERNIZATION PROJECT-IDA CR Terms of Reference Power Engineering Consultant

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

SGP. Small Grants Programme (GEF SGP) Global Environment Facility SOUTH AFRICA. implemented by United Nations Development Programme (UNDP)

Terms of Reference. 1. Introduction. 2. Background

The C40 Cities Finance Facility Information pack for cities

Climate change is an important issue in Indonesia. The country consists of thousands of islands with lowlying coastal areas liable to floods as well

Bangladesh: Forest Investment Program (FIP) Technical Mission, October 16-20, 2016 Aide Memoire

TERMS OF REFERENCE. Regional Off-Grid Electrification Project

Phnom Penh, Cambodia preferred, but work can be done remotely. Location : Application Deadline : July 20 th, Languages Required : English

Aide-Memoire for Scaling-up Renewable Energy Program in Low Income Countries (SREP) Joint MDB Scoping Mission to Zambia April 8-10, 2015

TERMS OF REFERENCE CONSULTANCY TO CONDUCT A TRAINING NEEDS ASSESSMENT ON HEALTHCARE WASTE MANAGMENT IN SELECTED HEALTH FACILITIES.

TERMS OF REFERENCE. Project Consultant - 9th GEF Biennial International Waters Conference. for

Call for a Consultant

AFRICAN DEVELOPMENT BANK UGANDA DECENTRALIZED RENEWABLES DEVELOPMENT PROGRAM

Report of the practitioners workshop on climate finance for low carbon development at EADB, Kampala

REQUEST FOR PROPOSALS EASTERN COACHELLA VALLEY S ACTION PLAN FOR CLIMATE RESILIENCE BACKGROUND AND GENERAL DESCRIPTION

INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE

1) PROJECT DESCRIPTION

JOINT SUMMARY OF THE CHAIRS 49 TH GEF COUNCIL MEETING OCTOBER 20 22, 2015

THE GREEN CLIMATE FUND AND NATIONAL CLIMATE PLEDGES LEADING TO PARIS Ned Helme, President

AEPC s Criteria and Tendering Process for Cookstove Procurement

Climate Investment Funds: Financing Low-Emissions and Climate-Resilient Activities

Credit: Incremental to Compliance, Urban-Think Tank ETHZ, 2017 SOCIAL INNOVATION IN PREVENTATIVE HEALTH FOR HUMAN SETTLEMENTS IN SOUTH AFRICA

Clarifications III. Published on 8 February A) Eligible countries. B) Eligible sectors and technologies

TERMS OF REFERENCE BRANCHLESS AND MOBILE BANKING REGULATORY EXPERT. Monrovia (Liberia), Vientiane (Lao PDR) and Off-Site

Ethiopia: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Terms of Reference Ref: PN/FJI

with Environment and Sustainable Development Agency for Republic of Mali 17 March 2015 Strategic Frameworks and Country Programming

Speech by United Nations Development Programme

CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2

Portfolio Holder for Environment and Sustainability. Llandrindod Wells Powys LD1 6NT

With the Global Green Growth Institute (GGGI) for Mongolia. 05 June 2017 Strategic Frameworks

Financing Development, Transfer, and Dissemination of Clean and Environmentally Sound Technologies

National Programme Submission Form Nigeria

CTF/TFC.14/3/Rev.1 November 14, Meeting of the CTF Trust Fund Committee Washington, D.C. November 17, Agenda Item 3

Assessing Energy Needs, Market Opportunities, and Distribution Strategies. Eric Verploegen D-Lab s Off-Grid Energy Group February 22 nd 2016

Annex Template for the call for input

GEF/C.41/Inf.11 October 7, GEF Council Meeting November 8-10, 2011 Washington, D.C.

Final MRP Endorsement Date. Implementing Country/Technical Partner. Comments/Remarks

CONNECTING LEADERS THE FOUR SEASONS RESORT AT JUMEIRAH BEACH PROGRAMME

REEEP: Global Strategy

GOVERNMENT OF COSTA RICA MINISTRY OF ENVIRONMENT AND ENERGY (MINAE) UNITED NATIONS DEVELOPMENT PROGRAMME (UNDP) GLOBAL ENVIRONMENT FACILITY (GEF)

GLOBAL NAMA FINANCING SUMMIT: SETTING THE STAGE FOR OUR DISCUSSIONS Copenhagen, Denmark

UNIDO and GEF Climate Change Projects. Alois P. MHLANGA

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultants and individual consultants assigned by consulting firms/institutions

Powering the Future We Want

Status of the GCF portfolio: pipeline and approved projects

AFRICA CLIMATE CHANGE FUND (ACCF)

Recommendations for Digital Strategy II

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX Evaluator (Crime Expert) Senior Specialist

Draft Concept of the International Conference and Training Seminar. Business Planning of Energy Efficiency and Renewable Energy Projects

TERMS OF REFERENCE Individual Contractor. National Consultant Post Disaster Needs Assessment in Cambodia

Terms of Reference. Type of Expert: Long Term Key Expert. Name of expert Aim of this assignment

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF/NPIF TRUST FUNDS

Climate Challenge Fund Ideas Bank Project Template Form and Guidance Notes for Proposing Organisations

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultants and individual consultants assigned by consulting firms/institutions

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Architect (Building Permit Studio)

SADC Renewable Energy Entrepreneurship Support Facility

UNDP-GEF Guidance GEF Annual Monitoring Process

Case Study: EU Energy Initiative (EUEI)

Scaling Solar: An Update. Mr. Dana R. Younger Chief Renewable Energy Specialist Global Infrastructure & Natural Resources Department March 5, 2018

GEF SECRETARIAT REVIEW FOR FULL/MEDIUM-SIZED PROJECTS* THE GEF/LDCF/SCCF TRUST FUNDS

Covenant of Mayors for Climate and Energy

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

PRE-ANNOUNCEMENT OF CALL FOR PROPOSALS IN 2013

Uganda: Conservation of Biodiversity in the Albertine Rift Valley Forests (UNDP)

CALL FOR EXPRESSION OF INTEREST Applicants who have already applied for this position do not need to re-apply

Transcription:

UNDP Ethiopia TOR Title: Тype of contract: National Consultant On Climate Change and Renewable Energy ( house hold energy and/or improved cook stove expert ) National Consultant Payment: Lump sum Office/Project: Initiation Plan (IP) # 5200 Promoting Sustainable Rural Energy Technologies for Household and Productive Use Duty station: Addis Ababa, Ethiopia Contract Duration: Itinerary: Work and payment terms: 120 working days over the period 1 May 2014 30 September 2014 (i.e 4 months over a 5 months period) The national consultant on climate change and renewable energy should be based in Addis Ababa, Ethiopia throughout the entire duration of the assignment. Missions to project sites may be made over the course of the assignment The assignment will be a combination of in-country and out-of-country work. The national consultant on climate change and renewable energy udder the leadership of the international consultant( Senior expert ) and in coordination with the National Consultant On Climate Change and Renewable Energy ( solar energy expert ) is responsible for the following outputs Outputs: 1. Output 1.A detailed work plan outlining in detail the timeline for the production of all outputs and which includes a detailed agenda for coordinate with the international senior and national junior energy expert and stakeholder consultation workshop, consultation workshop, wrap up and LPAC meetings. 2. Output 2Report outlining the activities of all other donors in Ethiopia working in the area of rural energy services also outlining in detail how they might cooperate with this project 3. Output 3. Detailed comments are provided on the draft UNDP project document, GEF Request for CEO endorsement and draft Public Awareness Strategy report 4. Output 4 Draft and then Finalized Technology Selection and Justification Report which includes pre-feasibility study for establishment of the Energy Technology Institute 5. Output5.Draft and then Final Financial Support Mechanism Report 6. Output 6: Draft and then Final Business Incubator Report 7. Output 7 take a lead role in organizing all meetings and stakeholder consultations for the international consultant during the missions of this expert to Ethiopia. Schedule of work: Milestone 1 - Within 1 months of the start of the assignment, and a report outlining Activities of All Other Donors in this field for feeding into the detailed Baseline Report

of the Senior Expert prepared and completed Milestone 2 - Within 3 months of the start of the assignment, (i) Detailed comments on the draft reports of all other consultants including draft UNDP project document and draft GEF Request for CEO endorsement and draft Public Awareness Report; Milestone 3 Within 4 months of the start of the assignment, a second mission to Ethiopia is successfully carried out and prior to mission two a draft and then finalized Technology Selection Report and Justification of Selection Report is prepared Milestone 4 Within 5 months of the start of the assignment a short report on the Financial Support Mechanism (in draft and finalized format) explaining how the Financial Support Mechanism under the project will operate and function, also exploring alternative options. Key information from this report will be used in the formulation of the UNDP project document and the GEF Request for CEO endorsement Milestone 5 Within 5 months of the start of the assignment a report explaining the modalities by which the Business Incubator will operate once the full project is operating. Key information from this report will be used in the formulation of the UNDP project document and the GEF Request for CEO endorsement Payment Terms The lump sum contract amount will be paid in five equal installments as follows: 1) 20% of the Total Contract Amount within 20 business days of the completion of Output 1(Report on Activities of other Donors)&2 Detailed Comments on Draft UNDP Prodoc and GEF RCE and Public Awareness Strategy) 2) 30% of the Total Contract Amount within 20 business days of the completion of Output 3 (Technology Assessment Report) and Output 4 (Financial Support Mechanism Report) 3) 50% of the Total Contract Amount within 10 business days of the completion of Output 5 (Business Incubator Report) Qualifications - University advanced degree (to at least Masters degree) in climate change, renewable energy, environmental economics, business, environment, environmental engineering or environmental law; - 6-7 years relevant work experience related to climate change and renewable energy - Experience with working on renewable energy projects and investment in renewable energy would be preferred - Experience in working with international organizations, including UNDP, is preferred but not required - Experience on working with the Global Environment Facility (GEF) is preferred but not required - Previous working experience in Africa would be an advantage and previous experience working in Ethiopia would be an evening bigger advantage and preferred although not required Competencies: - Extensive knowledge related to climate change, environment, sustainable development and renewable energy is preferred - Fluency in written and spoken English which includes very strong writing skills - Full computer literacy General background information on the context of the assignment: Encouraging greater investment in small scale renewable energy technologies and improved cook stoves to off-grid areas throughout Ethiopia is an important priority of the Government of Ethiopia. By substituting away from fuel

wood use and charcoal use towards renewable energy, there are important economic, social and global environmental benefits. The global environment benefits associated with this switch are estimated to be significant. This new UNDP GEF project, when it starts, will aim to reduce Ethiopia s energy related CO 2 emissions by promoting renewable energy and low Green House Gases (GHG) producing technologies as a substitute for fossil fuels and non-sustainable biomass utilization in the country with a focus on rural household appliances for cooking, lighting and heating. The activities proposed in the project are designed to remove barriers that hamper the widescale use of off-grid renewable energy technologies in households and productive uses in rural areas of Ethiopia where extending the grid is simply not feasible in the short run and where the ability to pay for larger scale solutions is often limited. The barrier removal activities of this project aim to accelerate the provision of small scale renewable energy technologies to rural communities in Ethiopia which without this project would otherwise not have had the opportunity to benefit from such services, thereby providing them with access to modern energy. Thermal energy supply for households in rural areas is mostly still by users (i.e - households collect and transport their fuel requirements for cooking and baking.) Very little of the supply in rural areas is commercial (purchased). There are essentially no intermediaries for fuel supply of thermal fuels in rural areas. In urban areas the largest share of the energy used for cooking and baking is purchased. Biomass fuels are brought in by collectors from urban peripheries (for wood) and further away (for charcoal). The Government of the Federal Democratic Republic of Ethiopian has a vision to achieve middle-income status by 2025 and to create a climate resilient green economy with zero net carbon emission. In order to meet this challenge, the country needs to reach its economic goals in a sustainable manner which includes increased levels of access to modern energy. Fuel wood use, by far the largest source of rural energy in Ethiopia and the second largest contributor to GHG emissions, can be reduced by the introduction of small scale renewable technologies, thereby increasing household income and promoting sustainable development at the same time. However, a number of significant market barriers associated with low (or no) return on investment, high up-front costs and lack of access to capital, high risk and non financial barriers (e.g. lack of information and capacity) make it difficult to attract investment that increases access to modern energy while creating new economic opportunities. As a result, small scale renewable energy solutions have not taken off in rural areas in Ethiopia. This project will aim to remove these barriers and help transform the market in Ethiopia for small scale renewable energy technologies in a sustainable manner. This project proposes a more holistic and market based approach is undertaken towards promoting renewable energy technologies in rural communities in Ethiopia. This more holistic approach would clearly not take place without the GEF project. The four components described as follows consisting of a combination of de-risking instruments (Component #1) and market-enabling activities (Component #2 and Component #4) that will combine with a financial support mechanism (Component #3) in order to help transform the market for off-grid renewable energy technologies in rural communities. The renewable energy technologies that have been selected by this project have been chosen firstly because they are small scale and secondly because they are the most suitable (and affordable) for rural communities in Ethiopia. The initial list of technologies includes improved cook stoves, solar cookers, solar hot water systems, and solar lanterns. This list of technologies has been chosen in consultation with the Ethiopian Ministry of Environment and Forestry (MEF) and technologies needed to be affordable to be selected. The list of technologies will be further reviewed as part of the full project preparation. Objectives of the assignment: Scope of the assignment: Under the guidance and direct supervision of the, MEF, UNDP, Ethiopia country office and the Regional Technical Advisor on Climate Change, UNDP Bratislava, the national Consultant on Climate Change and Renewable Energy will be responsible for supporting the work of the Senior Expert International Consultant on Climate Change and Renewable Energy. The national Expert will travel to regions and is responsible for working at least 120 working days on the key tasks over the course of the assignment. The national Consultant On Climate Change and Renewable Energy (house hold energy and/or improved cookstove expert) will be responsible for five key outputs during the course of his/her assignment in Ethiopia. (i) Collaboration Report Outlining the Activities of All Other Donors in this field for feeding into Baseline Report (Pre-

Output 1) (ii) Detailed comments on draft UNDP Project Document, GEF Request for CEO Endorsement, and GEF Tracking Tool and Draft Public Awareness Strategy (Output 2) (iii) Technology Selection Report (Output 3) (iv) Financial Support Mechanism Report (Output 4) (v) Business Incubator Report (Output 5) The roles of the various experts to be contracted under this assignment over a period of 5 months will be as follows: Postion Lead Role Supporting Role Senior Expert International Consultant on Climate Change and Renewable Energy (80 days) National Consultants on Climate Change and Renewable Energy (solar energy expert ) (120 days) Collaboration Report Outlining the Activities of All Other Donors in this field for feeding into Baseline Report (Pre-Report 1) Detailed Baseline Report (Pre-Report 2) Technology Selection Report (Report 2) Financial Support Mechanism Report (Report 4) Business Incubator Report (Report 5) UNDP Project Document (Report 6) GEF Request for CEO Endorsement (Report 7) GEF Tracking Tool (Report 8) Environmental and Social Screening Assessment (additional task) Public Awareness Report (Report 3) Detailed Inputs contributing to the baseline report for Solar (Pre-Report 2) Organization of all workshops, meetings and consultations Co-Financing Letters from Key Stakeholders All other reports Report 2, Report 4, Report 5, Report 6, Report 7, Report 8 National Consultants on Climate Change and Renewable Energy ( house hold energy and/or improved cookstove expert ) (120 days) Public Awareness Report (Report 3) Organization of all workshops, meetings and consultations Co-Financing Letters from Key Stakeholders Detailed Inputs contributing to the baseline report for Improved Cookstove (Pre-Report 2) Report 2, Report 4, Report 5, Report 6, Report 7, Report 8 The national consultant (house hold energy and/or improved cookstove expert ) shall familiarize himself/herself with the approved PIF and PPG documents, along with the GEF secretariat comments to the PIF/PPG as well as any STAP comments to make sure that they are taken into account during the preparation of all documents and reports.

PART I. PREPARATION OF THE FIRST MISSION The national consultant (house hold energy and/or improved cookstove expert expert) should make sure that they are in Addis Ababa, Ethiopia at least one month prior to the first mission of the international consultant (senior expert) in order to assist with the mission preparation and to start preparation of the four reports that the national consultant (house hold energy and/or improved cookstove expert) will work on. In particular, it would be important that prior to mission 1 the national consultant is involved in the mission preparation and planning. PART II. FIRST MISSION AND PREPARATION OF DRAFT FIRST TWO REPORTS As part of the work the national consultant (house hold energy and/or improved cookstove expert) should make sure that the following reports are ready in draft form by the time the mission takes place: A) Draft Collaboration Report Outlining the Activities of All Other Donors in this field for feeding into Baseline Report (Pre-Report 1) B) Draft Technology Selection Report (Report 2) During the first ten day mission of the international consultant (senior expert), the main aim will be to better define the project strategy and design and to further define the role of the key stakeholders including the institutional and implementation arrangements. The national consultant will pay particular attention during the first mission to questions about the technologies selection, the financial support mechanism, and the business incubator creation and operating modalities. A key outcome of the first mission will be a refined and improved project strategy and a much better understanding of how this new project will fill the gaps left by other international technical assistance programmes in Ethiopia that aim to support rural energy development. Following the first mission, the aim will be to finalize these two reports so that within 2 months of the first mission the national consultant will have completed A) Final Collaboration Report Outlining the Activities of All Other Donors in this field for feeding into Baseline Report (Pre-Report 1) B) Final Technology Selection Report (Report 2) The draft documentation package for submission to GEF is the key responsibility for the International Consultant (Senior Expert). This documentation package will only be developed after mission one and after the detailed baseline report is completed (because baseline information needs to be included in the full documentation package) and only submitted to Government of Ethiopia. The draft documentation package will include the following documents (i) UNDP Project Document (ii) GEF CEO Endorsement Request (iii) GEF Tracking Tool and (iv) Environmental and Social Screening Assessment. It is important that the national consultant closely involved in the preparation of these documents, providing data and information where required, and that he/she provides detailed comments and feedback on each of these draft documents. PART III. PREPARATION OF SECOND MISSION The purpose of the second mission will be to validate the findings of the team of consultants on how the project should be designed taking into account the comments and concerns of all key stakeholders while at the same time designing a project that can be approved by the GEF Secretariat. A detailed mission agenda will need to be prepared and agreed in advance of the second mission and meetings and a stakeholders workshop planned in advance. The second mission should happen within six months of the start of the assignment. The second mission needs to include a detailed stakeholders workshop which brings together all key stakeholders PART IV. SECOND MISSION AND FINALIZATION OF COMPLETE DOCUMENTATION PACKAGE The second ten day mission to Ethiopia which should take place within 4 months of the start of the assignment will be used to assist in reconfirming/specifying the project strategy, finalizing project sections on: (a) project logframe matrix (b) an assessment of the social, economic and financial sustainability of proposed project activities; (c) assessment of alternatives to the project strategy and establishing the cost effectiveness of the preferred strategy and suite of activities; (d) a replication strategy for project activities; (e) assessment of the risks to the proposed project activities and identifying measure to mitigate these risks; (f) baseline section & incremental cost analysis. The key role of the International Consultant (junior expert) for this mission will be to prepare draft documents/reports in advance of the second mission including:

A) Draft Financial Support Mechanism Report (Report 4) B) Draft Business Incubator Report (Report 5) During the second mission, a stakeholder s consultation workshop will be held where the team of consultants which will present the draft reports and the draft project design and strategy with the purpose of obtaining comments and feedback. A particular focus will be on presenting the draft Project Results Framework which will clearly define the outcomes and indicators of the project. These comments and feedback will be incorporated into the full project design and the full project documentation package which should be submitted to UNDP for internal clearance within one month of the completion of the second mission. The junior expert will provide further comments to assist with prepararing the finalized GEF Request for CEO Approval and UNDP Project Document addressing all the comments received from stakeholders. However, following mission two the main task of the national consultant will be to prepare: A) Final Financial Support Mechanism Report (Report 4) B) Final Business Incubator Report (Report 5) Key elements from the reports on technology selection, financial support mechanism design, and business incubator design will be incorporated into the UNDP Project Document and the GEF Request for CEO endorsement. It is the job of the national consultant to make sure that they are incorporated in an appropriate manner. In addition, the information collected as part of the detailed baseline report and the Collaboration Report Outlining the Activities of All Other Donors in this field for feeding into Baseline Report will provide useful data and information that can be included also. PART V: FULL PROJECT APPROVAL OF NEW UNDP GEF PROJECT Within two months of the second mission, the complete documentation package should be technically cleared by UNDP Ethiopia and by the UNDP GEF Regional Technical Advisor and submitted to UNDP New York for clearance and submission to the GEF Secretariat. The documents that need to be submitted to the GEF Secretariat include: (i) UNDP Project Document (ii) GEF Request for CEO Endorsement (iii) GEF Tracking Tool (iv) All co-financing letters from project partners (responsibility of UNDP Ethiopia and the national experts) Key elements from the technology assessment report, the financial support mechanism report, and the business incubator report will be included in the UNDP Project Document and the GEF Request for CEO endorsement, meaning that the national consultant will play a critical role in helping to ensure the full project approval as part of the overall project team. Obtaining the full project approval will require taking on board and into account all comments received by the GEF Secretariat in order to revise, improve, and finalize the complete documentation package as in most cases projects are not approved on the first submission. A UNDP response to GEF Secretariat Comments should be prepared which should take into consideration all GEF Secretariat comments and show how they have been addressed in the revised UNDP Project Document and GEF Request for CEO Endorsement. Changes to the UNDP Project Document and the revised GEF Request for CEO endorsement shall be highlighted in yellow. Part V should result in the full approval of the new UNDP GEF project at which point in time the assignment of the International Consultant shall finish. Financial Proposal The national consultant should submit with their offer a financial proposal as one lump sum cost using the following table for breakdown of the total assignment cost.

Nr. of units* Units Rate / USD Total / USD Work in home office in Addis Ababa** Work on all project documentation 100 man/days 0 Travel Days man/days Work on 2 missions of IC (senior expert)** Mission(s) 20 man/days 0 Sub-total fee 0 Travel costs International travel to and from country/ies mission 0 Lump Sum for 5 months *** per month 0 Local travel destination 0 Sub-total travel costs 0 Miscellaneous (communication, printing, 0 visa) TOTAL 0 * Estimates are indicated in the TOR, the applicant is requested to review and revise, if applicable. ** Add rows as needed Please note that the financial proposal is all-inclusive and shall take into account various expenses incurred by the consultant/contractor during the contract period (e.g. fee, health insurance, vaccination, office costs and any other relevant expenses related to the performance of services...). All envisaged travel costs must be included in the financial proposal within Ethiopia. This includes all travel costs to and from Ethiopia. Please note however that for any travel that may be required within Ethiopia, UNDP Ethiopia shall provide a car and a driver, as required, so no local travel costs are envisaged. This assignment is only for international consultants who are willing to spend the entire duration of the assignment in Addis Ababa, Ethiopia. National consultants who are not based in Addis Ababa should not apply unless they are willing to travel to Addis Ababa at their own cost for the assignment Qualified women and members of minorities are encouraged to apply. Incomplete applications will not be accepted. Individual Consultants are responsible for ensuring they have vaccinations/inoculations when travelling to certain countries, as designated by the UN Medical Director. Consultants are also required to comply with the UN security directives set forth under dss.un.org