Form 4: New Work Item Proposal. Reference number: ISO/NP Circulation date: (to be given by Central Secretariat)

Similar documents
ISO/TC 59/SC 13 N 526

INTERNATIONAL STANDARD

New work item proposal Outsourcing

CEN Technical Committees Mode of operations

PATHWAYS FOR STANDARDS DEVELOPMENT. Developing internationally aligned Australian Standards in the national interest

NEW PROJECT PROPOSAL FORM

NZS/ISO 15189:2007. Medical Laboratories Particular Requirements for Quality and Competence NZS/ISO 15189:2007

Simultaneous circulation to CEN and CENELEC TECHNICAL BOARDS

This document is a preview generated by EVS

ISO INTERNATIONAL STANDARD. Medical laboratories Requirements for safety. Laboratoires de médecine Exigences pour la sécurité

Jim Moore IEEE Computer Society Liaison Representative to ISO/IEC JTC 1/SC 7 Annual Report for Standards Activities Board Oct 2013

ISO/TR TECHNICAL REPORT. Business requirements for health summary records Part 2: Environmental scan

TC 100 Guidelines and Procedures

IEC-IEEE development of dual logo standards on condition monitoring Update November Kjell Spång KS miltek

Standardization Activities of SMIIC Technical Committees (TCs)

SCIENTIFIC RESEARCH METHODOLOGIES AND TECHNIQUES. Unit 14.c: PROJECT PROPOSAL PREPARATION - EXAMPLES = IMS & ISSS examples =

Project Plan for the CEN Workshop on Methodology for Improving the Resource Efficiency of Energy Intensive Industrial Processes WS TOP-REF

Safety EMC Environment Quality assurance

ISO/IEC JTC1/SC7 /N3020

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

Date of Publication: 13 December Deadline for tenders: 17 January 2018

Northeast Power Coordinating Council, Inc. Regional Standard Processes Manual (RSPM)

Packaging for terminally sterilized medical devices - Guidance on the application of ISO and ISO (ISO 16775:2014)

ECHA and the implementation of REACH,CLP and other tasks

Open call for Experts to

IAF MLA Document. Policies and Procedures for a MLA on the Level of Single Accreditation Bodies and on the Level of Regional Accreditation Groups

Hong Kong Tourism Board Hong Kong Transit Programme Guide to Application. Table of Contents

IECEx OPERATIONAL DOCUMENT

Call for Experts representing the SME perspective

Content Sheet 11-1: Overview of Norms and Accreditation

CMDCAS Handbook Policies and Procedures for Sector Qualification under the Canadian Medical Devices Conformity Assessment System (CMDCAS)

OPEN CALL FOR PROJECT TEAM EXPERTS European Standard for Patient Summary

This document is a preview generated by EVS

ISO Registration Bodies Governance ISO RMG Rules Sub-group Approved on 14 April 2017

CITY OF ASHLAND COMMUNITY DEVELOPMENT DEPARTMENT And HOUSING COMMISSION REQUEST FOR PROPOSALS (RFP) DEVELOP AFFORDABLE HOUSING NEEDS ASSESSMENT

RÉPUBLIQUE FRANÇAISE. Having regard to Decision No DC-0189 by the French Nuclear Safety Authority of 7 July

Ontario College of Trades

International Perspectives. Marjorie S. Greenberg, MA National Center for Health Statistics Centers for Disease Control and Prevention

The CMMI Product Suite and International Standards

Joint Operational Programme Romania Republic of Moldova

Topical Peer Review 2017 Ageing Management of Nuclear Power Plants

ICTpsp I C T P O L I C Y S U P P O R T P R O G R A M M E. CIP ICT PSP Pilots A, Pilots B, Thematic Networks, Best Practice Networks, PPI Pilots

Jim Matthews III Vice-President Chairman, SMB. ANSI Smart Sustainable Cities 21 November 2013 INTERNATIONAL ELECTROTECHNICAL COMMISSION

EPEAT Requirements of PREs

Industry Cluster Grants Program Implementation Grant Application Materials

APPLICATION PROCEDURE TO OPERATE A COMMERCIAL CANNABIS BUSINESS IN CULVER CITY

Q&A Call Force Protection and Soldier Systems PADR-FPSS-2017 and the General Annexes

AUDIT UNDP BOSNIA AND HERZEGOVINA GRANTS FROM THE GLOBAL FUND TO FIGHT AIDS, TUBERCULOSIS AND MALARIA. Report No Issue Date: 15 January 2014

ISO TC 130/WG11 Environmental Impact of Printed Products 3 rd meeting 23 April :00 18:00 Yogyakarta, Indonesia

Project Request and Approval Process

[Discussion Draft] [DISCUSSION DRAFT] SEPTEMBER 9, H. R. ll

EA Cross Border Accreditation. Policy and Procedure for. Cross Border Cooperation. Between EA Members

Emergency Support Function 14. Community Recovery and Mitigation

Call for Submission of Proposals

EU Local and Regional Competitiveness Project TERMS OF REFERENCE TECHNICAL COMMITTEE ARCHITECT EXPERT

CAPACITIES PROVISIONAL 1 WORK PROGRAMME 2007 PART 2. (European Commission C(2006) 6849) RESEARCH FOR THE BENEFIT OF SMES

CEN/TC278/WG1 & ISO/TC204/WG5 Status report to CEN/TC204 April 2012

External Publication of Job Posting

JOINT PROJECT DESCRIPTION TEMPLATE

PROFESSIONAL AND INSTITUTIONAL DEVELOPMENT PROGRAM: PROGRAM GUIDELINES

Medical Device and Health Software

CEN/TC 354. Doc. Number: N New CEN Enquiry Procedure - Presentation from CEN (Webinar ) Main changes: For information

Guidelines for Industrial Postdoc In force as of 9 March 2015

EUROPEAN EXTERNAL ACTION SERVICE

IECEE OPERATIONAL DOCUMENT

IAF Guidance on the Application of ISO/IEC Guide 61:1996

THE REPUBLIC OF BULGARIA THE COUNCIL OF MINISTERS. DECREE No. 121 dated May 31 st, 2007

DMTF Standards Incubation Process

Ramsar Regional Initiatives (RRIs) News from the Regional Initiative Workshop 22 November

HL7 RCRIM Regulated Product Submissions

Standards and Research : a key issue for

EUROPEAN COMMISSION. Proposal template. Pilot Project Call PP

PICK-ME Kick-off meeting Political, scientific, contractual and financial aspects

Economic and Social Council

Draft Procedure for Community gtld Change Requests January 2018

CMDv/BPG/002. BEST PRACTICE GUIDE for Veterinary Decentralised Procedure (DCP)

Incentive Guidelines Innovation Clusters

IAF Liaison Report to CIML November 2014

Aboriginal Community Capital Grants Program Guide

TERMS OF REFERENCE TECHNICAL COMMITTEE BUSINESS DEVLEOPMENT EXPERT

Owner s Project Manager Selection

BEST PRACTICE GUIDE FOR DECENTRALISED AND MUTUAL RECOGNITION PROCEDURES

Working document QAS/ RESTRICTED September 2006

PRIVACY MANAGEMENT FRAMEWORK

ENHANCED INTEGRATED FRAMEWORK EXECUTIVE SECRETARIAT FOR THE EIF (ES) AND EIF TRUST FUND MANAGER (TFM) PROCEDURES FOR FEASIBILITY STUDIES.

The study has two components related to business development:

Request for Proposals Feasibility Study: Tidal Sector Service Barge/Drydock

NHS Wales Escalation and Intervention Arrangements

UNITAID PROPOSAL PROCESS

HOMELAND SECURITY GRANT PROGRAM (HSGP) State Project/Program: DIVISION OF EMERGENCY MANAGEMENT

moassessment The Self-Assessment is provided in Annex 2. Following the self-assessment, there is no need for a CEN BT decision.

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY

EBRD Shareholder Special Fund interim evaluation

DEVELOPMENT OF THE RA II STRATEGIC OPERATING PLAN FOR SUMMARY

Preparatory Action on Defence Research. Proposal Template for Action Grants

Current and future standardization issues in the e Health domain: Achieving interoperability. Executive Summary

Public Service of Wallonia

COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL)

Grant Preparation Forms (GPF) - overview

CSA Mobile Application Security Testing (MAST) Initiative

Transcription:

Form 4: New Work Item Proposal Circulation date: 2017-11-15 Closing date for voting: 2018-02-08 Proposer (e.g. ISO member body or A liaison organization) SN Reference number: ISO/NP 23234 (to be given by Central Secretariat) ISO/TC 59 N 1327 Secretariat SN A proposal for a new work item within the scope of an existing committee shall be submitted to the secretariat of that committee with a copy to the Central Secretariat and, in the case of a subcommittee, a copy to the secretariat of the parent technical committee. Proposals not within the scope of an existing committee shall be submitted to the secretariat of the ISO Technical Management Board. The proposer of a new work item may be a member body of ISO, the secretariat itself, another technical committee or subcommittee, an organization in liaison, the Technical Management Board or one of the advisory groups, or the Secretary-General. The proposal will be circulated to the P-members of the technical committee or subcommittee for voting, and to the O-members for information. The proposer has considered the guidance given in the Annex C during the preparation of the NWIP. Proposal (to be completed by the proposer)

Title of the proposed deliverable. English title: Buildings and civil engineering works -- Security -- Planning of security measures in the built environment French title: Bâtiments et ouvrages de génie civil -- Sûreté -- Planification des mesures de sûreté dans l'environnement bâti (In the case of an amendment, revision or a new part of an existing document, show the reference number and current title) Scope of the proposed deliverable. This document provides requirements and recommendations for effective planning and design of security measures in the built environment. The purpose of the standard is to achieve optimal protection of assets against all kinds of malicious acts, while ensuring aesthetic, financial and practical aspects. This document describes which methods and routines that should be employed in the various stages of the build project, as well as the competencies needed to achieve a good result. This document is applicable to both new construction and refurbishments. Purpose and justification of the proposal* Over the past 20 years, protection against malicious acts has gained increased attention due to acts of terrorism, sabotage and vandalism. The objective of an attack can be to destroy, damage or appropriate an asset, or compromise information held by the asset. The assets in need of protection can both be the built environment in itself, or entities contained in the built environment. In order to obtain a secure built asset it is essential to involve the right type of security thinking and planning at the correct stage of the build project. This is also essential in order to achieve reasonable costs, reasonable delivery time, as well as optimal aesthetics and usability for the end result. Failure to involve different disciplines within security at various points in the build project, or failure to coordinate the security planning with other parts of the build project, has often resulted in security that is at odds with other aims in the overall build project. The new standard is intended to give the planner a well-structured template for developing the concepts of security measures and identifying the right competencies needed for various types of security planning. The linkage provided in this standard between the security planning and other parts of the build project provides a greater awareness of the actual needs and consequences for the technical and operational solutions, and the future users of the structure. Consider the following: Is there a verified market need for the proposal? What problem does this standard solve? What value will the document bring to end-users? See Annex C of the ISO/IEC Directives part 1 for more information. See the following guidance on justification statements on ISO Connect: https://connect.iso.org/pages/viewpage.action?pageid=27590861 Preparatory work (at a minimum an outline should be included with the proposal) A draft is attached An outline is attached An existing document to serve as initial basis The proposer or the proposer's organization is prepared to undertake the preparatory work required:

If a draft is attached to this proposal: Please select from one of the following options (note that if no option is selected, the default will be the first option): Draft document will be registered as new project in the committee's work programme (stage 20.00) Draft document can be registered as a Working Draft (WD stage 20.20) Draft document can be registered as a Committee Draft (CD stage 30.00) Draft document can be registered as a Draft International Standard (DIS stage 40.00) If the attached document is copyrighted or includes copyrighted content: The proposer confirms that appropriate permissions have been granted in writing for ISO or IEC to use that copyrighted content. Is this a Management Systems Standard (MSS)? NOTE: if, the NWIP along with the Justification study (see Annex SL of the Consolidated ISO Supplement) must be sent to the MSS Task Force secretariat (tmb@iso.org) for approval before the NWIP ballot can be launched. Indication(s) of the preferred type to be produced under the proposal. International Standard Publicly Available Specification Technical Specification Technical Report Proposed development track 18 months* 24 months 36 months 48 months te: Good project management is essential to meeting deadlines. A committee may be granted only one extension of up to 9 months for the total project duration (to be approved by the ISO/TMB). *DIS ballot must be successfully completed within 13 months of the project's registration in order to be elligible for the direct publication process Draft project plan (as discussed with committee leadership) Proposed date for first meeting: Dates for key milestones: DIS submission Publication 2020-02-08 2021-02-08 Known patented items (see ISO/IEC Directives, Part 1 for important guidance) If "", provide full information as annex Co-ordination of work: To the best of your knowledge, has this or a similar proposal been submitted to another standards development organization? If, please specify which one(s): A statement from the proposer as to how the proposed work may relate to or impact on existing work, especially existing ISO and IEC deliverables. The proposer should explain how the work differs from apparently similar work, or explain how duplication and conflict will be minimized. To our knowledge, no similar work exists. However, the TC 59 secretariat will reach out to relevant

A statement from the proposer as to how the proposed work may relate to or impact on existing work, especially existing ISO and IEC deliverables. The proposer should explain how the work differs from apparently similar work, or explain how duplication and conflict will be minimized. committees in CEN and ISO with a view to ascertain the potential for collaboration. A listing of relevant existing documents at the international, regional and national levels. The proposal is built on the rwegian standard NS 5834 Societal security Protection against intentional undesirable actions Planning of security measures in the built environment Please fill out the relevant parts of the table below to identify relevant affected stakeholder categories and how they will each benefit from or be impacted by the proposed deliverable(s). Industry and commerce large industry Industry and commerce SMEs Government Benefits/impacts Examples of organizations / companies to be contacted Construction companies. Architects. Building owners. Consulting engineering companies. Construction companies. Architects. Insurance companies. Building owners. Consulting engineering companies. Building regulation authorities. Security advisory services. Consumers Consumer rights organizations. Labour Improved protection of employees Labour unions. Academic and research bodies Educating security experts Research institutions working with security problems. Standards application businesses n-governmental organizations Other (please specify)

Liaisons: A listing of relevant external international organizations or internal parties (other ISO and/or IEC committees) to be engaged as liaisons in the development of the deliverable(s). ISO/TC 292 Security and resilience ISO/TC 267 Facility management Joint/parallel work: Possible joint/parallel work with: IEC (please specify committee ID) CEN (please specify committee ID) CEN/TC 325 Crime prevention through building, facility and area design Other (please specify) A listing of relevant countries which are not already P-members of the committee. te: The committee secretary shall distribute this NWIP to the countries listed above to see if they wish to participate in this work Proposed Project Leader (name and e-mail address) Dr Knut Rakvåg knut.rakvag@multiconsult.no Name of the Proposer (include contact information) Kari S. Borgos ksb@standard.no This proposal will be developed by: An existing Working Group: A new Working Group: (title: ISO/TC 59/WG 5 Security in the built environment ) (te: establishment of a new WG must be approved by committee resolution) The TC/SC directly To be determined:

Supplementary information relating to the proposal Other: This proposal relates to a new ISO document This proposal relates to the adoption as an active project of an item currently registered as a Preliminary Work Item This proposal relates to the re-establishment of a cancelled project as an active project Maintenance agencies and registration authorities This proposal requires the service of a maintenance agency. If yes, please identify the potential candidate: This proposal requires the service of a registration authority. If yes, please identify the potential candidate: NOTE: Selection and appointment of the MA or RA is subject to the procedure outlined in the ISO/IEC Directives, Annex G and Annex H, and the RA policy in the ISO Supplement, Annex SN. Annex(es) are included with this proposal (give details) Outline of the proposed standard Additional information/question(s)