TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT

Similar documents
National Consultant Proposal Development Specialist, Integrated Solutions for Sustainable Development of Koh Tao Island

1) PROJECT DESCRIPTION

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Terms of Reference Ref: PN/FJI

INTERNATIONAL AGRICULTURE AND FORESTRY EXPERT TERMS OF REFERENCE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

PROCUREMENT NOTICE. Project name: Small Decentralized Renewable Energy Power Generation (DREG)

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX Evaluator (Crime Expert) Senior Specialist

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE National Consultant - Architect (Building Permit Studio)

Country: Nepal. Description of the assignment:

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: MEXX

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

REQUEST FOR CONSULTANCY SERVICES INDIVIDUAL CONTRACT (IC) CODE: XCAU WORKSHOP CONSULTANT IN TRINIDAD AND TOBAGO

United Nations Children s Fund (UNICEF)

REQUIRED DOCUMENT FROM HIRING UNIT

TERMS OF REFERENCE CONSULTANCY TO CONDUCT A TRAINING NEEDS ASSESSMENT ON HEALTHCARE WASTE MANAGMENT IN SELECTED HEALTH FACILITIES.

Terms of reference GENERAL INFORMATION

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Reference No.: UNDP/PN/35/2016 Date: 10 August 2015

Chesapeake Conservation Corps Host Organization Application Instructions

Terms of reference. APPROVED e-requisition. Completed technical proposal

TERMS OF REFERENCE BRANCHLESS AND MOBILE BANKING REGULATORY EXPERT. Monrovia (Liberia), Vientiane (Lao PDR) and Off-Site

United Nations Development Programme. Terms of Reference

II. Background Information

SUPPORT TO ELECTORAL PROCESS IN TUNISIA PROJECT (SEPT) Terms of References

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultant and consultant assigned by consulting firm/institution

United Nations Development Programme

SCIENCE ADVISORY COMMITTEE TERMS OF REFERENCE

REQUIRED DOCUMENT FROM HIRING UNIT

Climate change is an important issue in Indonesia. The country consists of thousands of islands with lowlying coastal areas liable to floods as well

Vacancy Announcement. National Project Officer, Grassroots Capacity Building for REDD+ RECOFTC, Myanmar Country Program

GENERAL INFORMATION Services/Work Description: Project/Program Title: Home-based with travel to Addis Ababa I. BACKGROUND

We invite leading data scientists from any country or discipline to become a Visiting Researcher at The Alan Turing Institute.

Terms of Reference. International Consultant GEF Project Development Specialist

TERMS OF REFERENCE Individual Contractor. National Consultant Post Disaster Needs Assessment in Cambodia

Terms of Reference (ToR) Developing Advocacy Strategy for NCA Partners

Terms of Reference For Cholera Prevention and Control: Lessons Learnt and Roadmap 1. Summary

North Lombok District, Indonesia

REQUIRED DOCUMENT FROM HIRING UNIT

EU Risk Assessment Agenda: Funding opportunities across the EU and its Member States

REQUEST FOR PROPOSALS BIG DARBY ACCORD. Proposals Due by October 25, 2004

Asia and the Pacific Regional Coordinator

Regional Strategy for Latin America and the Caribbean on Sustainable Consumption and Production Roadmap,

KERALA FOREST DEPARTMENT PERIYAR TIGER CONSERVATION FOUNDATION, THEKKADY

REQUIRED DOCUMENT FROM HIRING UNIT

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. for individual consultants and individual consultants assigned by consulting firms/institutions

Embedded Physician-Scholar Program

REQUIRED DOCUMENT FROM HIRING UNIT

1. Invitation. 2. Background

United Nations Development Programme Terms of Reference

TERMS OF REFERENCE RWANDA LESSONS LEARNED ON DISASTER RECOVERY

SFI Research Centres Reporting Requirements

International Tree Foundation. Centenary Campaign Manager. Application Pack

SMALL GRANTS PROGRAM GUIDELINE FOR STUDENT RESEARCH GRANT

Invitation For Tender

GUIDELINES for Thailand International Postgraduate Programme (TIPP)

BOI Policies and Plans for attracting Investment in 2018

IMPACT REPORTING AND ASSESSMENT OFFICER IN SOUTH SUDAN

The undertaking involves 4 NGOs/CSOs under separate contract as follows:

Cambodia, Lao PDR, Viet Nam: GMS Biodiversity Conservation Corridor Project

Guidelines. Ministry of Natural Resources and Forestry Land Stewardship and Habitat Restoration Program (LSHRP) Ontario.

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR SERVICES AND WORK. 21 December 2016

Reference Number: Form ALCRG APPLICATION FOR A MUHD ARIFF AHMAD RESEARCH GRANT FORM (ALCRG1) First Request for Proposals: 15 Dec 2014

H2020 possibilities for SMEs. Dr. Laura Kauhanen Green Growth Programme coordination team

1. Background. 2. Objectives of the Assignment:

TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR RECP ASSESSMENTS AND SERVICES, IN MYANMAR. 19 October 2017

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA

4/1/2014-6/30/ /1/ /31/2013 1/1/2013-3/31/2013 4/1/2013-6/30/2013 7/1/2013-9/30/2013 1/1/2014-3/31/2014

SFI Research Centres Reporting Requirements

UNDP Ethiopia TOR. National Consultant On Climate Change and Renewable Energy ( house hold energy and/or improved cook stove expert )

Terms of Reference (TOR) for Independent End of Project Evaluation

INSTRUCTION TO BIDDERS

Format for the preparation of Final reports

This Call for Proposals (CFP) is specific for UNDP Lebanon - Peace Building Project.

A GUIDE TO THE MOBILITY AND HARDSHIP SCHEME AND RELATED ARRANGEMENTS

CALL FOR THEMATIC EXPERTS

DRAFT New Delhi City Resilience Action Plan

International Tree Foundation. Finance and Admin Assistant. Application Pack

Consultancy opportunity: Sustainable Infrastructure Financing Training Programme

THE IAEA FUKUSHIMA REPORT AND THE IMPLICATIONS FOR NUCLEAR SAFETY AND EMERGENCY PREPAREDNESS

UNDP Pakistan NGO Engagement Policy STRATEGIC MANAGEMENT UNIT UNITED NATIONS DEVELOPMENT PROGRAMME, PAKISTAN

TERMS OF REFERENCE. One year with possible extension. Based in Hanoi with frequent travel to Mekong Delta or based in Can Tho

Uganda: Conservation of Biodiversity in the Albertine Rift Valley Forests (UNDP)

BEAHR Programs Guide. Environmental Training for Indigenous Communities

INDUSTRIAL ENERGY OPTIMIZATION PROGRAM

Adviser. Thank you for your interest in this position with PGF, as managed by Abt Associates. This document includes information on the following:

FY17 Special Conditions for Court Appointed Special Advocate (CASA) Grants

REQUEST FOR PROPOSAL. Issue date: 28 March RFP closing date: 20 April 2018 RFP closing time: 18:00 Central European Time

Topical Peer Review 2017 Ageing Management of Nuclear Power Plants

Forest Carbon Partnership Facility 4f. Update on Monitoring and Evaluation (M & E) Framework

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

Photo: Shira Bizarel. Design Brief

Misr El Kheir Foundation: Science, Technology and Innovation (STI) Program Guide for Applicants

Bhutan s experience in data collection and dissemination of ICT statistics. Pem Zangmo National Statistical Bureau Thimphu: Bhutan

Call for proposals. JSTP Joint Research Projects: Agriculture & Food: How to Feed the World?

STANDARD REQUEST FOR QUOTATIONS (SRQ) (CONSULTANCY AND DESIGN)

Transcription:

TERMS OF REFERENCE FOR INDIVIDUAL CONTRACT POST TITLE: AGENCY/PROJECT NAME: COUNTRY OF ASSIGNMENT: Senior Coordinator on Inclusive Wildlife-based Management for the Buffer Zone and Protected areas of the World Heritage Sites IGSD Unit, UNDP/ Strengthening Capacity and Incentives for Wildlife Conservation in the Western Forest Complex Thailand 1) PROJECT DESCRIPTION The most significant threats to tigers survival in and around the Huay Kha Kaeng Tung Yai Naresuan World Heritage Site (HKK-TYN WHS) includes: i) habitat degradation and fragmentation; ii) poaching of the prey that tigers depend on; and iii) poaching of the tigers themselves. These threats are further exacerbated by limited capacity and insufficient resources to effectively plan and administer the wildlife sanctuaries, and limited working relationship with enclave and buffer communities. The Strengthening Capacity and Incentives for Wildlife Conservation in the Western Forest Complex Project is financially supported by the Global Environment Facility (GEF), with the Department of National Parks Wildlife and Plant Conservation as the Implementing Partner. The project aims to improve the management effectiveness of and sustainable financing for the HKK-TYN WHS, as well as to incentivize local community stewardship. The project has been organized into three components, and will be implemented over a period of five years (2015-2019). The first Component of the project is directed towards strengthening and scaling up existing best-practice management activities, and developing and testing innovative approaches to enforcement and compliance, in the HKK-TYN WHS. It will strive to reduce the direct threats to tigers and prey, improve effectiveness of wildlife sanctuary management, and enhance the use of data and information to support key management decision-making. The second Component of the project is focused on linking sustainable livelihood development in the enclave and buffer zone villages with specific conservation outcomes, and improving economic links between the

buffer zone and enclave villages and the Wildlife Sanctuary. It will seek to achieve these linkages by promoting incentives (including technical support and grant funding for sustainable livelihoods initiatives, ecotourism development and piloting a REDD+ Wildlife Premium carbon project) for community-based sustainable forest management, environmentally-friendly agricultural practices, nature-based tourism and education and improved wildlife and habitat protection. The Third Component of the project is directed towards raising the awareness in communities living in and around the WHS of the need to conserve, and the importance of protecting, the forest landscapes and associated wildlife. With the iterative recognition in these communities of the intrinsic value of the forest habitats and wildlife, work under this component will assist in strengthening the representation of the buffer and enclave communities in each of the Wildlife Sanctuary s Protected Area Committees (PACs). With improved community-based representation on the PAC, the project will assist in building the capacity (information, knowledge, skill) of each of the community representatives to assure a constructive and meaningful contribution to the co-management of the wildlife sanctuaries. The total GEF-supported funding for this project is US$7,339,450, with the co-financing of US$24,234,427 from the Thai counterparts. The project implementation is led by the Department of National Parks Wildlife and Plants (DNP) and other key agencies including NGOs, in collaboration with UNDP. 2) OBJECTIVE OF THE WORK UNDP Thailand is recruiting an Individual Contractor to assist the Project Manager on the Inclusive Wildlifebased management of HKK-TYN aiming at non-dnp stakeholders to be constructively engaged in innovative participatory management of the buffer zone areas and special areas for nature education. The work includes coordination and facilitation for key project stakeholders, ensuring efficiency, timeliness and quality results in demonstrating innovative wildlife-based management and development of sustainable financing mechanism for the buffer zone areas of the World Heritage Sites. 3) SCOPE OF WORK The Individual Contractor will be responsible for supervising and coordinating the direct implementation of Wildlife-based Ecotourism for HKK Buffer zone management as the innovative nature-based wildlife education and protected areas management. This includes the feasible demonstration of such innovation in the special areas for wildlife education in the World Heritage Sites, in close collaboration with WCO wildlife research office and Khao Nag Ram Wildlife Research Station. The Individual Contractor will report to the Project manager for all of the project s substantive and administrative issues. He/she will perform a liaison role with the DNP field officials, RFD local officials, and NGOs (notably Seub Nakasatien Foundation and WCS). The individual contractor will have to provide substantive wildlife management knowledge to the provincial and local government, and interested private sector as to mainstream wildlife-based management into the local administration and private business sustainability s management plan. He/she will have to maintain close

collaboration with any complementary local initiatives and programs. The Individual Contractor will assist the Project Manager in reporting, on a periodical basis, to the Project Board (PB). Key duties and responsibilities will include: Implementation and monitoring support Liaise with all relevant field-based government agencies, and all project partners, including donor organizations and NGOs for effective coordination on Wildlife-based Ecotourism for HKK Buffer zone management as the innovative nature-based wildlife education and protected areas management.; Enhance feasible demonstration of the innovative nature-based wildlife education and protected areas management in the special areas for wildlife education in the World Heritage Sites Facilitate technical backstopping to field-based sub-contractors and training activities supported by the project; Assist relevant government agencies and project partners including donor organizations and NGOs to gain better understanding on innovative wildlife-based management Mainstream wildlife-based management and education into the provincial administrative plan and budgeting, through training, workshop, and on-the-job training; Coordinate and assist scientific institutions with the initiation and implementation of any field studies and monitoring components of the project; Report progress of the project to Project Manager; Effective management support Facilitate the regular coordination meetings and dialogues with relevant stakeholders; Assist in private sector partnership formulation on wildlife-based livelihoods initiatives and economic incentives in conservation activities; Assist in developing profiles of potential partners in innovative conservation schemes Provide feedback from stakeholders involved in field-based activities on challenges and recommendations for smooth implementation; Knowledge building and management support Document relevant field-based experiences and lessons learned; Assist in provision of regular knowledge sharing and dissemination forum Assist in liaising and filling the communication gaps of diversified stakeholders in acquiring new knowledge and understanding of innovative conservation setting.

4) EXPECTED OUTPUTS AND DELIVERABLES No Name of deliverables Due Time Effective Coordination 1 Report on stakeholders analysis : Focus group classification for pilot site - Mar 2018 Zone 2 2 Report on coordination mechanism for the focus group Apr 2018 3 Report on Integrated plan of Zone 2 adopted by the Provincial Governor May 2018 4 Report on Landscape design and actions to be taken for zone 2 by partner June 2018 agencies 5 Report on concluding work plan adopted by each party and timeframe July 2018 Feasible Demonstration Zone 2 and preparation for zone 1,3,4 6 Report on Wildlife Management in Zone 2 Soft Release and Wildlife Watch Aug 2018 7 Report on Community Participation and designed Show room of WHS Sept 2018 products 8 Report on Zone 2 projection as a prototype of Wildlife-based Ecotourism Oct 2018 Mainstreaming into Provincial Administrative plan and budgeting Nov 2018 9 Report on Committed budget of Provincial Administration Dec 2018 10 Roadmap of Uthai Thani Wildlife-based Ecotourism Highlights Jan 2019 Demonstration of consecutive zones (2,1,3,4) 12 Report on Launching of zone 2 demonstration and preparation for the Feb 2019 integrated plan of zone 1,3, and 4 by partner agencies 13 Report on Infrastructure development as designed and projection of the Mar 2019 whole landscape of Tap Salao Reservior expectation when finished 14 Report on stakeholders consultation on financial management, responsible Apr 2019 parties and benefits sharing 15 Report on valuation of wildlife premium added on the ecotourism, price May 2019 differentiation and tailor-made programme with conclusion of financial management structure 16 Report on kick off Wildlife-based ecotourism with the first target group on Jun 2019 board 17 Report on problems, counter measures, risks log, and lessons learned July 2019 Demonstration of consecutive zones (1,3,4) 18 Report on progress of readiness on consecutive zones and Road map of each Aug 2019 19 Report on provincial budgeting and adoption of Wildlife-based ecotourism as Sept 2019 provincial destination and highlight of the provincial development plan 20 Report on Kick off zone 1, 3, 4 and perspectives of Wildlife-based Oct 2019 Ecotourism around Tap Salao Reservoir Private sector partnership and resources mobilization 21 Report on Round Table of private Sector Partnership (local and international) Nov 2019 consultation and commitment 22 Report on financial stream and capacity Strengthening to meet the world standard Dec 2019

Business plan for Sustainable Financing 23 Report of sustainable financing structure and management mechanism as the prototype for WHS Wildlife-based Ecotourism 24 Report on National Seminar hosted by Provincial Governor, co-hosted by DNP, private sector partnership, and management unit of Tap Salao Wildlifebased Ecotourism Jan 2020 Feb 2020 25 Conclusion of the job done Mar 2020 The schedule of deliverables is based on key deliverables as follows: 1. Effective coordination on Wildlife-based Ecotourism for HKK Buffer zone management - Series of stakeholders consultation - Report on focused groups meeting - Coordination mechanism 2. Feasible demonstration of the innovative nature-based (wildlife) education and protected areas management (both in Buffer zone and Protected Areas) - Work plan on feasible demonstration (based on the feasibility study on Wildlife-based Ecotourism) - Committed agencies in piloting the feasible demonstration and management structure 3. Mainstream wildlife-based management and education into the provincial administrative plan and budgeting - Report on the integrated agenda on Wildlife-based Ecotourism into the Provincial development committee meetings 4. Private sector partnership formulation on Wildlife-based Ecotourism/ wildlife-based education scheme - Advocate knowledge and better understanding - Report of interested business partners/ sponsorship 5. Document relevant field-based experiences and lessons learned on wildlife-based Ecotourism and Education scheme - Concluding inputs for the contracted team to develop Business Plan and sustainable Financing of the World Heritage Site 5) INSTITUTIONAL ARRANGEMENTS Each month, the Individual Contractor shall submit a report on tasks undertaken, challenges encountered, and work plans for the following month to the Project Manager, as representative of the Inclusive Green Growth and Sustainable Development Unit, UNDP Thailand, for review and approval. Payment shall be made within two weeks after the receipt of above mentionedreport.

6) DURATION OF ASSIGNMENT, DUTY STATION AND EXPECTED PLACES OF TRAVEL Duration of Assignment: The Individual Contractor will work during the period of 1 March 2018 31 March 2020 (not exceeding 500 days in 25 months). The Individual Contractor shall be paid on a Lump Sum basis. This position does not qualify for overtime pay. Duty Station: Uthai Thani-Based, Thailand with frequent travel to Nakornsawan province, and occasionally commute to Tung Yai Naresuan which is part of the World Heritage Sites, when relevant to the assignment. The Individual Contractor may need to arrange transport on his/her own and the transport cost shall be reimbursed at actual cost but not exceeding the price quoted by UNDP s travel agent. The Individual Contractor shall receive Living Allowance and Terminal Expenses in locations as assigned and must be mutually agreed by both parties prior to travel. 7) DEGREE OF EXPERTISE AND QUALIFICATIONS The Individual Contractor should have the following expertise and qualifications. Education: Thai national with Bachelor s Degree in management, administration, economics, environment or a closely related field, or equivalent relevant work experience. Experience: At least 15 years of experience, with proven records of experiences in project implementation, especially those related to wildlife conservation, protected area management; Hands-on experience in field-based international cooperation project, dealing with local government, communities, and stakeholders to form the co-management in the protected area; Proven experience working in public administration, Department of national Parks, Wildlife and Plant Conservation (DNP), in particular Proven record of working with private sector in CSR or sustainable development partnership Experience on individual and institutional capacity building process, both technical and managerial skills; Be a strong team player, able to work independently and processing excellent interpersonal skill and ability to engage a wide range of stakeholders; Display cultural, gender, religion, race, nationality and age sensitivity and adaptability. Language Requirements : Good command of writing and speaking Thai and English

8) REQUIRED DOCUMENTS Interested individual consultants must submit the following documents/information to demonstrate their qualifications. Please group them into one (1) single PDF document as the application only allows to upload maximum one document: a) Letter of Confirmation of Interest and Availability and financial proposal using the template provided in Annex III. Note: National consultants must quote prices in Thai Baht. b) Personal CV or P11, indicating all experience from similar projects, as well as the contact details (email and telephone number) of the Candidate and at least three (3) professional references. Incomplete proposals may not be considered. The short-listed candidates may be contacted and the successful candidate will be notified 9) CRITERIA FOR SELECTION OF THE BEST OFFER Individual consultants will be evaluated based on the following methodology: Cumulative analysis The award of the contract shall be made to the individual consultant whose offer has been evaluated and determined as a) responsive/compliant/acceptable; and b) having received the highest score out of set of weighted technical criteria (70%). and financial criteria (30%). Financial score shall be computed as a ratio of the proposal being evaluated and the lowest priced proposal received by UNDP for the assignment. Technical Criteria for Evaluation (Maximum 100 points) Criteria 1 Relevance of Education Max 15 points Criteria 2 Relevant experience in public administration, DNP in particular -Max 20 Points Criteria 3 Relevant experience as a Team Leader Max 10 points Criteria 4 Relevant experience on Wildlife Conservation and Management Max 30 points Criteria 5 Relevant experience on International Cooperation Project Max 25 Points Only candidates obtaining a minimum of 70% of the total technical points would be considered for the Financial Evaluation.

9) CONSULTANT PRESENCE REQUIRED ON DUTY STATION/UNDP PREMISES 10) PAYMENT TERMS Please indicate any special payment terms for the contract. X Lumpsum Consultant must send a financial proposal based on Lump Sum Amount. The total amount quoted shall be allinclusive and include all costs components required to perform the deliverables identified in the TOR, including professional fee, travel costs, living allowance (if any work is to be done outside the IC s duty station) and any other applicable cost to be incurred by the IC in completing the assignment. The contract price will be fixed output-based price regardless of extension of the herein specified duration. Payments will be done upon completion of the deliverables/outputs and as per below percentages: No Name of deliverables Due Time Effective Coordination 1 Report on stakeholders analysis : Focus group classification for pilot site - Zone 2 % of Payment Mar 2018 4% 2 Report on coordination mechanism for the focus group Apr 2018 4% 3 Report on Integrated plan of Zone 2 adopted by the Provincial Governor May 2018 4% 4 Report on Landscape design and actions to be taken for zone 2 by partner June 2018 4% agencies 5 Report on concluding work plan adopted by each party and timeframe July 2018 4% Feasible Demonstration Zone 2 and preparation for zone 1,3,4 6 Report on Wildlife Management in Zone 2 Soft Release and Wildlife Watch Aug 2018 4% 7 Report on Community Participation and designed Show room of WHS Sept 2018 4% products 8 Report on Zone 2 projection as a prototype of Wildlife-based Ecotourism Oct 2018 4% Mainstreaming into Provincial Administrative plan and budgeting Nov 2018 4% 9 Report on Committed budget of Provincial Administration Dec 2018 4% 10 Roadmap of Uthai Thani Wildlife-based Ecotourism Highlights Jan 2019 4% Demonstration of consecutive zones (2,1,3,4) 12 Report on Launching of zone 2 demonstration and preparation for the integrated plan of zone 1,3, and 4 by partner agencies Feb 2019 4% 13 Report on Infrastructure development as designed and projection of the Mar 2019 4% whole landscape of Tap Salao Reservior expectation when finished 14 Report on stakeholders consultation on financial management, responsible Apr 2019 4%

parties and benefits sharing 15 Report on valuation of wildlife premium added on the ecotourism, price May 2019 4% differentiation and tailor-made programme with conclusion of financial management structure 16 Report on kick off Wildlife-based ecotourism with the first target group on Jun 2019 4% board 17 Report on problems, counter measures, risks log, and lessons learned July 2019 4% Demonstration of consecutive zones (1,3,4) 18 Report on progress of readiness on consecutive zones and Road map of each Aug 2019 4% 19 Report on provincial budgeting and adoption of Wildlife-based ecotourism as Sept 2019 4% provincial destination and highlight of the provincial development plan 20 Report on Kick off zone 1, 3, 4 and perspectives of Wildlife-based Oct 2019 4% Ecotourism around Tap Salao Reservoir Private sector partnership and resources mobilization 21 Report on Round Table of private Sector Partnership (local and international) Nov 2019 4% consultation and commitment 22 Report on financial stream and capacity Strengthening to meet the world Dec 2019 4% standard Business plan for Sustainable Financing 23 Report of sustainable financing structure and management mechanism as Jan 2020 4% the prototype for WHS Wildlife-based Ecotourism 24 Report on National Seminar hosted by Provincial Governor, co-hosted by DNP, private sector partnership, and management unit of Tap Salao Wildlifebased Ecotourism Feb 2020 4% 25 Conclusion of the job done Mar 2020 4% In general, UNDP shall not accept travel costs exceeding those of an economy class ticket. Should the IC wish to travel on a higher class he/she should do so using their own resources In the event of unforeseeable travel not anticipated in this TOR, payment of travel costs including tickets, lodging and terminal expenses should be agreed upon, between the respective business unit and the Individual Consultant, prior to travel and will be reimbursed. Travel costs shall be reimbursed at actual but not exceeding the quotation from UNDP approved travel agent. The provided living allowance will not be exceeding UNDP DSA rates. Repatriation travel cost from home to duty station in Bangkok and return shall not be covered by UNDP. 11) ANNEXES TO THE TOR 1. Project Document 2. Feasibility Study of Wildlife-based Eco tourism in Buffer Zone of Huai Kha Kaeng Wildlife Sanctuary.