Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program

Similar documents
F-35 Weapon System Overview

F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

F-22 RAPTOR (ATF) BACKGROUND INFORMATION

F-35 Sustainment Lockheed Martin Corporation

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71

DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE

D/PUS/11/7/1(626) 20 October 2017 COMMITTEE OF PUBLIC ACCOUNTS (PAC) CARRIER STRIKE: WRITTEN RESPONSES

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

F/A-18 E/F SUPER HORNET

Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

F-35 Lightning II Program Status and Fast Facts January 30, 2017

F-35 Lightning II Program Status June 2017

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 27 R-1 Line #75

F-35 Joint Strike Fighter (JSF)

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

Exhibit R-2, RDT&E Budget Item Justification

STATEMENT OF BRUCE W. CLINGAN, USN DIRECTOR, AIR WARFARE BEFORE THE SUBCOMMITTEE ON AIR AND LAND FORCES OF THE HOUSE ARMED SERVICES COMMITTEE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

NAVAIR Control & Guidance Activities ACGSC Meeting 99, Boulder Colorado, March Shawn T Donley Naval Air Systems Command

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

F-35 Lightning II Program Status and Fast Facts June 8, 2017

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, F-35 Sustainment

UNCLASSIFIED FY 2018 OCO. FY 2018 Base

Advanced Manufacturing and the F-35 Lightning II

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2019 OCO. FY 2019 Base

Navy-Marine Corps Strike-Fighter Shortfall: Background and Options for Congress

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

B-1B CONVENTIONAL MISSION UPGRADE PROGRAM (CMUP)

33 FIGHTER WING JSF INTEGRATED TRAINING CENTER. Fire From The Clouds

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

F-35 Mission Systems Software

Intelligence and Insight You Can Trust. Copyright 2008 IHS Inc. All Rights Reserved. 1

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: F/A-18 Squadrons. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit TM

Legacy Tanker Division

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Small Diameter Bomb Increment I (SDB I) Precision Strike Association Annual Program Review

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

Navy & Marine Corps Vertical Lift: Past and Future

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Flight PatternQ&A with the first military test pilot to fly the X-35 and F-35

Common Range Integrated Instrumentation System (CRIIS)

Industry Day RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division. 23 May 2012

Terma and F-35 Global supplier to the Joint Strike Fighter program

Spectrum of Testing. OPERATIONAL testing for the warfighter in the representative BATTLESPACE ENVIRONMENT

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Common Range Integrated Instrumentation System (CRIIS)

FIGHTER DATA LINK (FDL)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

Armed Unmanned Systems

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

Long Range Land Attack Projectile (LRLAP)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

SOF Future Vertical Lift (FVL) COL Ramsey Bentley

F-35 Lightning II Joint Strike Fighter (JSF) Program: Background, Status, and Issues

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

From: Commanding Officer, Strike Fighter Squadron FIFTEEN To: Director, Naval Aviation History and Publication Division, Naval Historical Center

The overall goals of MILITARY F-35A LIGHTNING II AT RED FLAG

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Combined Aerial Target Service (CATS)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

M-346 ITS ETTS and LVC filling the gap towards New Generation Combat Aircraft Training

F-35 Joint Strike Fighter (JSF) Program: Background and Issues for Congress

Ogden Air Logistics Center

F-35 Lightning II A New Generation of Fighter

Naval Air Systems Command (NAVAIR) Naval Air Warfare Center Aircraft Division (NAWC AD) Lakehurst, NJ

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

F-35 Joint Strike Fighter (JSF) Program: Background and Issues for Congress

Lessons Learned from the MSG- 128 Study on Incremental Implementation of NATO Mission Training through Distributed Simulation Operations

Prepared for Milestone A Decision

Exhibit R-2, RDT&E Budget Item Justification

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARLEIGH BURKE (DDG 51) CLASS GUIDED MISSILE DESTROYER WITH THE AN/SPY-1D RADAR

Transcription:

Air Armament Symposium 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program FOR OFFICIAL USE DISTRIBUTION ONLY // REL TO USA, STATEMENT GBR MOD, A. ITA Approved MOD, NLD for MOD, public TUR release; MND, CAN distribution DND, AUS is DOD, unlimited. DNK MOD, and NOR MOD 1

F-35 Program At Nexus of Planned Concurrency 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 ASTOVL MRF ATA JAST JSF CDP Eglin AFB ITC Operations NATF AX JSF SDD Derivatives and Enhancements System Development and Demonstration FMS F-35 PRECURSOR PROGRAMS: Advanced Short Takeoff Vertical Landing Multi-Role Fighter Advanced Tactical Aircraft Naval Advanced Tactical Fighter Advanced Attack Joint Advanced Strike Technology / Concept Demonstration Phase LRIP Low Rate Initial Production Full Rate Production Performance Based Global Sustainment 2

Top Level Schedule FY 05 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 CY 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 19 Qtr 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 System Development and Demonstration Air System Program Events AS CDR 1 & 2 PSFD AS CDR 3 MOU CTOL 1st Flt STOVL 1st Flt CV 1st Flt Service IOCs TBD Follow- On Development Test and Evaluation AF BF CV Flight Sciences Mission Capability Block 2B Block 3C OA 2 OA 3 IOT&E TBD DAB Reviews 05 06 07 08 09 10 11 12 13 14 15 16 17 Production & Sustainment LRIP 1 Long Lead Full Funding Del LRIP 2 Long Lead Full Funding Del LRIP 3 Long Lead Full Funding Del LRIP 4 Long Lead Full Funding Del LRIP 5 Long Lead Full Funding Delivery LRIP 6 Long Lead Full Funding Delivery LRIP 7 Long Lead Full Funding Delivery LRIP 8 Long Lead Full Funding Delivery LRIP 9 Long Lead Full Funding Performance Based Logistics (PBL) (Increasing scale & fidelity thru MYP) Delivery Production Approach 2015 & Out TBD 3

Expanding the Lightning II Fleet 12 Developmental Test Aircraft at Pax / Edwards 6 Production Jets Fielded at Eglin / Edwards 1170 Flights / 1812.6 Hours As of 30 Sept 11 4

Aircraft at Eglin: Preparing for Flight Training Operations AF-9 & AF-8 Arrived 14 & 20 July 2011 AF-10 & AF-11 Arrived 31 Aug 2011 AF-12 & 13 Deliver in Next Few Weeks Operational Utility Eval. Planned this Year 5

SDD Test Progress F-35A: 533 flights / 982.9 flight hours (as of 30 Sept 11) Focus: Envelope expansion, Aerial Refueling, Weapons Bay open testing, supersonic AF-6 / AF-7 completed Maturity flights F-35B: 500 flights / 623.9 flight hours (as of 30 Sep 11) Focus: Envelope expansion, Sea Trial prep LHD WASP trials began 3 Oct 11 F-35C: 137 flights / 205.8 flight hours (as of 30 Sep 11) Focus: Envelope expansion, Ship suitability at NAES Lakehurst Completed Jet Blast Deflector and 29 of 68 catapult test points Arresting hook testing underway Mission Systems Maturity flights for Block 1 initial training release Block 1B (multi-level security) in flight test Block 2A release to CATB this month; F-35 DT this year AF-1/AF-2 BF-2 CF-2 6

Video of First LHD Landing Shown 7

SDD Software Roadmap (Simulation Only) Fleet Software Releases Aligned to LRIP Deliveries 8

Weapons Carriage Requirements 9

Weapons Carriage Requirements BF-1, 1000lb JDAM, AMRAAM 10

F-35 Comprehensive LFT Program Congressionally Mandated Full-up System Level Testing Validate Vulnerability Design Super High Velocity Airflow System (S-HiVAS) up to 380 KTAS Running Engine with dynamic loads on control surfaces Capture Unintended System Effects AA-1 Production Representative 91 Flights 125.9 Flight Hours FUSL Testing 26 Choreographed Shots (Oct 10 Sept 11) S-HiVAS 9 TF-33 Engines Realistic Threats AAA SAMs MANPADs 11

Video of LFT Shown 12

Radar Cross-Section Testing Early Signature Results Very Promising 13

Summary Program Reset Making Good Progress Flight Test and Production Results Helping to Build Confidence in the New Baseline Plan Production operations stabilizing and maturing DT demonstrating a generally robust weapon system design Software and Mission Avionics reflecting stable performance Program Building Momentum... But a Long Way to Go to Deliver the Full Expected Capability 14

Questions 15