Changes Regarding Emergency Management Filing Requirements

Similar documents
Currant Lake Telecommunication Tower

ICAO Universal Security Audit Programme (USAP) ICAO Regional Aviation Security Audit Seminar. USAP-CMA Activity Process Conduct

[Docket ID ED-2014-OPE-0035; CFDA Number: B.] Proposed Priority - Foreign Language and Area Studies

Generator Replacement at the Garden River Power Plant

Annual Report Pursuant to the Access to Information Act

CANADIAN WEATHER RADAR NETWORK MODERNIZATION PROJECT FAIRNESS MONITOR FINAL REPORT. Submission Date: March 10, 2016

Installation of Emergency Back-Up Generators at the Palisades Power Plant

[Docket ID BSEE ; 189E1700D2 ET1SF0000.PSB000 EEEE500000; Agency Information Collection Activities; Operations in the Outer Continental

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office. Policy for Development and Publication of Technical Guidance

Item 9 - Consideration of 2014 OCP

PART ENVIRONMENTAL IMPACT STATEMENT

Consultation on amendments to guidance on cyclical and ad hoc reviews (Variations submitted by approved regulators)

Guide to the. National Energy Board Participant Funding Program Under the National Energy Board Act. National Energy Board

ONE JOHNSON & JOHNSON PLAZA NEW BRUNSWICK, N.J November 28,2011

Notice to Members. Active Military Service. Executive Summary

The Transparify Think Tank Integrity Check

Appropriation Act No. 2,

Embodiment of Safety Management System (SMS) requirements into Commission Regulation (EC) No 2042/2003 Part-145

Guide to the Canadian Environmental Assessment Registry

DRAFT REGULATORY GUIDE

National Institute on Disability, Independent Living, and Rehabilitation Research

Final Rule Material: Overview

(Billing Code ) Defense Federal Acquisition Regulation Supplement: Defense. Contractors Performing Private Security Functions (DFARS Case

Revision of Executive Order Privacy and Civil Liberties Information Paper 1

DEPARTMENT OF HEALTH AND HUMAN SERVICES. Permanent Certification Program for Health Information Technology; Revisions to

Overview ICH GCP E6(R2) Integrated Addendum

ON JANUARY 27, 2015, THE TEXAS WORKFORCE COMMISSION ADOPTED THE BELOW RULES WITH PREAMBLE TO BE SUBMITTED TO THE TEXAS REGISTER.

PROCEDURE FOR ACCREDITING INDEPENDENT ENTITIES BY THE JOINT IMPLEMENTATION SUPERVISORY COMMITTEE. (Version 06) (Effective as of 15 April 2010)

Mid-Year Report What the FCCQ is doing for you

MEMORANDUM OF UNDERSTANDING (MOU) BETWEEN THE CANADIAN NUCLEAR SAFETY COMMISSION AND ENVIRONMENT CANADA

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. North American Electric Reliability ) Corporation ) Docket No.

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC

Call: Graduate school in energy systems

Tel.: +1 (514) ext Ref.: AN 12/51-07/74 7 December 2007

NOVA SOUTHEASTERN UNIVERSITY OFFICE OF SPONSORED PROGRAMS POLICIES AND PROCEDURES

Duquesne Light Our Energy... Your Power

REPORT 2016/106. Audit of management of implementing partners at the International Trade Centre FINAL OVERALL RATING: PARTIALLY SATISFACTORY

AWARDING FIXED OBLIGATION GRANTS TO NON-GOVERNMENTAL ORGANIZATIONS

Program Guidelines. Please use the appropriate form when completing an application. Mail one fully completed and signed original application to:

This matter comes before the Council on Affordable. Housing ("COAH" or "Council") on the application of Mendham

Amendments to IFRS 3 and IFRS 11: Previously Held Interest Analysis of feedback on the proposed amendments.

Life Extension of Nuclear Power Plants

POLICY ON INJURY/INCIDENT REPORTING AND INVESTIGATION

DEPARTMENT OF VETERANS AFFAIRS Grants for Transportation of Veterans in Highly Rural Areas

MINISTÈRE DE L EMPLOI ET DE LA SOLIDARITÉ SOCIALE THE REVIEW PROCESS

The official manual of the Sheriff's Department of the County of Los Angeles is hereby established and is titled "Manual of Policy and Procedures.

Direct Component Project Evaluation Form

Quality Risk Management ICH Q9

Civic Center Building Grant Audit Table of Contents

OVERVIEW OF UNSOLICITED PROPOSALS

CHAPTER 246. C.App.A:9-64 Short title. 1. This act shall be known and may be cited as the "New Jersey Domestic Security Preparedness Act.

Medical Devices and Device-Led Combination Products; Voluntary Malfunction Summary

URBAN DESIGN PEER REVIEW PANEL TERMS OF REFERENCE

Ministry of Health and Long-Term Care. Guide to Requirements and Obligations Relating to French Language Health Services

Center for Devices and Radiological Health; Medical Devices and Combination Products;

Developing a framework for the secondary use of My Health record data WA Primary Health Alliance Submission

DEPARTMENT OF VETERANS AFFAIRS Special Home Adaptation Grants for Members of the Armed Forces and Veterans with

Duquesne Light Our Energy...Your Power

Agency Information Collection Activities; 30 CFR 550, Subpart B, Plans and. ACTION: Notice of Information Collection; request for comment.

Standard Peer Review Process for Minimum Flows and Levels and Water Reservations within the Central Florida Water Initiative Area

Title 35-A: PUBLIC UTILITIES

February 20, RE: In Support of Fee Wavier for Freedom of Information Act Request Number: (FP )

REGULATORY DOCUMENTS. The main classes of regulatory documents developed by the CNSC are:

REQUEST FOR INFORMATION. RFI No. CS-AM

Anchorage Grounds; Galveston Harbor, Bolivar Roads Channel, Galveston, Texas

HANDBOOK FOR THE INDIGENOUS ECONOMIC DEVELOPMENT FUND. January 2018

Brussels, 12 June 2014 COUNCIL OF THE EUROPEAN UNION 10855/14. Interinstitutional File: 2012/0266 (COD) 2012/0267 (COD)

Public Workshop Examining Contact Lens Marketplace and Analyzing Proposed Changes

RESOLUTION MSC.255(84) (adopted on 16 May 2008) ADOPTION OF THE CODE OF THE INTERNATIONAL STANDARDS AND RECOMMENDED PRACTICES FOR A SAFETY

Center for Medicaid and CHIP Services August, 2017

Northeast Power Coordinating Council, Inc. Regional Standards Process Manual (RSPM)

Application of Proposals in Emergency Situations

A review of the Gamma Knife Neurosurgery Program administered by Alberta Health

U.S. NUCLEAR REGULATORY COMMISSION STANDARD REVIEW PLAN

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY

Commonwealth of Pennsylvania

IRRC. Comments of the Independent Regulatory Review Commission. Department of Human Services Regulation # (IRRC #3176)

(Billing Code ) Defense Federal Acquisition Regulation Supplement: Defense. Contractors Performing Private Security Functions (DFARS Case

Re: Comments on the Draft Guidelines for the Low-Carbon Transit Operations Program

Human Performance Management Personnel Certification: Exposure Device Operators REGDOC-2.2.3

AGENCY: Office of Postsecondary Education, Department of. SUMMARY: The Secretary adopts as final, without change, the

Active Offer OF FRENCH-LANGUAGE HEALTH SERVICES

M E M O R A N D U M. The Project and the items that the Commission will be considering at the June 15 th, 2010 meeting are summarized below.

Real Property 1 (RP1) Property Management and Project Delivery Services

CUSC Modification Proposal Form CMP233

(Billing Code ) Defense Federal Acquisition Regulation Supplement: Costs. Related to Counterfeit Electronic Parts (DFARS Case 2016-D010)

Report of the Auditor General of Canada to the House of Commons

The services shall be performed at appropriate sites as described in this contract.

TECHNIQUES, AND PROCEDURES, AND OF MILITARY RULES OF ENGAGEMENT, FROM RELEASE UNDER FREEDOM OF

REPORT 2015/029 INTERNAL AUDIT DIVISION. Audit of personnel entitlements and allowances in the United Nations Disengagement Observer Force

Local Health Integration Network Authorities under the Local Health System Integration Act, 2006

COUNCIL-IN-COMMITTEE OPEN MEETING COMITÉ PLÉNIER SÉANCE OUVERTE AU PUBLIC

ALBERTA MEDICAL ASSOCIATION COMMENTARY DRAFT ALBERTA HEALTH ACT HEALTH CHARTER AND ADVOCATE REGULATION

PART I: GENERAL APPROACH TO THE REVIEW. A. [Applicability

Adopted Amendments: N.J.A.C. 14:7-1.4, 1.8, 1.9, 1.11, 1.12, 1.14, 1.20, 1.24, 1.25, and 2.3

This document provides useful instructions and tips to help you prepare your scholarship application.

i n d i g e n o u s e d u c a t i o n a w a r d s p r o g r a m Program Overview

SUPERIOR COURT OF THE STATE OF CALIFORNIA COUNTY OF SACRAMENTO

Organized in cooperation with the Nuclear Energy Agency of the Organisation for Economic Co-operation and Development (OECD/NEA)

Framework for managing performer concerns NHS (Performers Lists) (England) Regulations 2013

Transcription:

File Ad-GA-RG-GFR-FMAP 01 13 July 2017 To: National Energy Board Regulated Pipeline Companies National Energy Board Filing Manual Revision 2017-01 The National Energy Board (NEB or Board) committed to updating its Filing Manual to clarify Emergency Management (EM) filing requirements for its regulated companies during the application process. Updating the Filing Manual is another important step in the Board s initiative to improve transparency of EM information and to promote continual improvement in EM. Other important steps to date include Board Order MO-006-2016 compelling publication of emergency procedures manuals on company websites and Board Order MO-002-2017 compelling publication of EM Program information on company websites. Changes Regarding Emergency Management Filing Requirements The Filing Manual is designed to assist applicants who seek approval from the Board and interested parties in understanding the Board s expectations about the information an applicant is to include in an application under the National Energy Board Act. On 11 January 2017, the Board initiated a consultation process on proposed changes to the Filing Manual regarding EM filing requirements. The proposed changes were based on learnings from the Board s EM consultation and transparency project, recent regulatory processes, and general changes to the Board s and stakeholders expectations regarding the types and scope of EM information made publicly available. The Board sought comments on the draft text for inclusion in the Filing Manual from NEB-regulated companies, first responders, municipalities, Indigenous groups, members of the public, and other interested parties. The comment period closed on 13 March 2017. Consideration of Comments Received The Board received comments from seven parties regarding the draft EM filing requirements. All comments received are available on the Board s website at http://www.nebone.gc.ca/bts/ctrg/gnnb/flngmnl/nbl/2017-07-13nbl-eng.html. Of the seven parties that commented, three proposed changes to the draft text (County of Strathcona, City of Montreal, and the Canadian Energy Pipeline Association) with the remaining four commenters expressing /2

- 2 - no concerns regarding the draft text (City of Montreal Police Department, Laval Fire Department, City of Windsor Fire Department, and Tim Loncarich). The Board has considered the comments received and it has decided to make changes to the draft text regarding EM filing requirements and to amend the Filing Manual accordingly. Comments received and the Board s response, particularly for comments that have resulted in changes to the draft text, are summarized in Attachment I. The final text of the EM filing requirements expands on information in the current Filing Manual and the changes explicitly address the amount and scope of EM information to be filed in an application. In the Board s view, this will result in more detailed EM information being filed earlier on in the hearing process to inform hearing participants understanding of the proposed project and participation in the hearing process as well as the Board s assessment of the project. The desired outcome of the revised filing requirements is a more complete application that leads to a more consistent, efficient hearing process that includes a comprehensive record of EM information. Next Steps The new EM Filing Requirements, along with additional administrative amendments, have been added to the Filing Manual Release 2017-01. The amendments are summarized in the attached Filing Manual table of concordance. Additional amendments to the Filing Manual are expected to be made this year. The revised Filing Manual is available on the Board s website (www.neb-one.gc.ca) and hard copies may be requested by calling the NEB at 1-800-899-1265. The Board welcomes any comments that readers might have on the content and usability of the Filing Manual, or other matters that could assist with its future updates and revisions. All comments may be directed to the Board by: E-mail: filingmanual@neb-one.gc.ca Facsimile: Secretary of the Board at 403-292-5503 or toll free at 1-877-288-8803 Mail: Sheri Young Secretary of the Board National Energy Board Suite 210, 517 Tenth Avenue SW Calgary, AB T2P 0X8 Should you have any questions of a more general nature related to emergency management and NEB-regulated pipelines, please contact Jeff Bird, Acting Director Emergency Management and Security Team at 1-800-899-1265 or via e-mail at jeff.bird@neb-one.gc.ca.

- 3 - Thank you for your interest in the Filing Manual Update. Yours truly, Original signed by Sheri Young Secretary of the Board Attachments c.c. Bureau des relations gouvernementales et municipales Ville de Montréal (City of Montreal) - Andres.bayona@ville.montreal.qc.ca CEPA - AMiller@cepa.com Bureau du directeur et relations avec les élus Service de Police de la Ville de Montréal (City of Montréal Police Service) - Samia.Kettou@spvm.qc.ca Service de sécurité incendie de Laval (Laval Fire Department) - m.arsenault@laval.ca, r.daigneault@laval.ca Tim Loncarich - tim@bidocean.biz County of Strathcona - Lori.mills@strathcona.ca

Attachment I to Board Letter Page 1 of 4 Summary of Comments Received and the Board s Response Commenter Comment Board Response County of Strathcona The County of Strathcona (County) suggested that the Board note that consultation agreements with municipalities should be considered by applicants in Section 3.4.2 Designing Project-Specific Consultation Activities. The County suggested that the word "planning" be included in the revised text in the last paragraph of Section 3.4 Consultation so that it reads, "The Board also expects companies to conduct effective public consultation activities during the "planning", construction, and operation phases of a project. The Board has revised the draft text in Section 3.4.2 to address this comment. The Board notes that Section 3.4 Consultation is primarily focused on an applicant s consultation obligations during the planning and application phases of a proposed project and the Board has included draft text throughout this section to further clarify its expectations. The Board also expects companies to conduct consultation activities during the construction and operation phases of a project and this is the context of the paragraph referred to by the County. The Board has included revised text to clarify the context of this paragraph as applying to construction and operations. The County had questions related to how the Board considers issues related to fire protection and suppression and fire codes. Therefore, the Board has not added the word planning to the paragraph as suggested by the County. The Board is of the view that consultation expectations during the planning phase of a project are sufficiently addressed elsewhere in Section 3.4. The Board views these questions as being outside of the scope of the proposed Filing Manual revisions and has not made any changes to the draft text. Board Staff have contacted the County to discuss its questions further.

City of Montreal The City of Montreal (City) suggested that the Board make certain filing requirements more prescriptive and mandatory in nature at the time of filing an application. Attachment I to Board Letter Page 2 of 4 The Board has revised the text of the Filing Manual to promote the filing of more complete applications to lead to a more consistent, efficient hearing process that includes a comprehensive record of EM information. The Board also has regulatory and policy requirements and an established EM oversight program that applies to operating facilities. The Board agrees that the issues noted by the City within its suggested filing requirements are important issues related to planning for and responding to emergencies. However, the Board is of the view that the issues noted by the City: Would be informed by consultation activities associated with the project application and the Board has revised its expectations for consultation regarding emergency management in the draft text; Are adequately addressed in the draft Filing Manual text already, which emphasizes a risk informed approach in addressing issues related to malfunctions and accidents and emergency management; Are covered by existing regulatory requirements under the National Energy Board Onshore Pipeline Regulations; and/or Are more appropriately addressed following project approval if approval is granted. The Board will continue to engage the City regarding emergency management and NEB-regulated pipelines, particularly through its Montreal Regional Office, to

Attachment I to Board Letter Page 3 of 4 Canadian Energy Pipeline Association (CEPA) CEPA requested clarification of certain sections of the draft text regarding the type and extent of information that the Board expects to be filed with an application. CEPA suggested that the Board clarify its expectations regarding the filing of emergency procedures manuals in Section 1.5 Confidential Filing and Guide AA - Post Certificate or Order Requirements. CEPA suggested that the Board clarify its expectations regarding the use of external website links as part of an application or during a regulatory proceeding in Section A.2.6.2 Mitigation Measures, Mitigation for Potential Effects of Accidents and Malfunctions. CEPA requested clarification on the draft text in Section 3.4 Consultation pertaining to an applicant s consultation program regarding emergency management. CEPA requested that the Board clarify whether its proposed changes to the section entitled, Consultation further explain its regulatory requirements and regulatory approach. The Board has revised the draft text in certain sections to provide clarity as to its expectations but the Board does not agree with CEPA that additional clarification is required in all of the areas noted by CEPA. The Board notes that none of the draft text affects the process for filing of applications. The Filing Manual requires the types and scope of information to be provided by applicants to be commensurate with the scope of the project, potential risks, and level of stakeholder interest. The Board agrees with the need for clarification in these sections and has revised the draft text accordingly. The Board agrees with the need for clarification in this section and has revised the draft text accordingly. The Board is of the view that the draft text is sufficiently clear and has not made changes in response to these comments. The Board notes that the draft text was added to bring clarity to existing wording in the Filing Manual. Except for the section entitled Consultation Regarding Emergency Management, substantive new text was not added and the Board s expectations of an applicant s consultation program remain unchanged. It is the responsibility of the applicant to justify its methodology for consultation and how it considered any comments received. The Board has not made changes to the draft text in response to this comment. The Board notes that the draft

Attachment I to Board Letter Page 4 of 4 Regarding Emergency Management in Section 3.4 Consultation would have any impact on the requirements for Public Awareness Programs. text for the Filing Manual does not impact Public Awareness Programs which are a requirement under the National Energy Board Pipeline Damage Prevention Regulations Obligations of Pipeline Companies and address operating pipelines, not proposed projects.