AWACS Mission Training Center (MTC)

Similar documents
Joint Terminal Control Training & Rehearsal System (JTC TRS)

Ogden Air Logistics Center

Ogden Air Logistics Center

Ogden Air Logistics Center

Planned Acquisitions

SIMULATOR SYSTEMS GROUP

Software Intensive Acquisition Programs: Productivity and Policy

Shadow 200 TUAV Schoolhouse Training

SIMULATORS SUSTAINMENT MANAGEMENT. ADVANCE PLANNING BRIEFING to INDUSTRY 12 May 2009

Exhibit R-2, RDT&E Budget Item Justification

Distributed Mission Operations Air National Guard Update

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

For the Period June 1, 2014 to June 30, 2014 Submitted: 15 July 2014

Defense Acquisition: Use of Lead System Integrators (LSIs) Background, Oversight Issues, and Options for Congress

Defense Acquisition Review Journal

The Coalition Warfare Program (CWP) OUSD(AT&L)/International Cooperation

712CD. Phone: Fax: Comparison of combat casualty statistics among US Armed Forces during OEF/OIF

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

US Coast Guard Corrosion Program Office

White Space and Other Emerging Issues. Conservation Conference 23 August 2004 Savannah, Georgia

Ogden Air Logistics Center

terns Planning and E ik DeBolt ~nts Softwar~ RS) DMSMS Plan Buildt! August 2011 SYSPARS

DDESB Seminar Explosives Safety Training

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

Engineered Resilient Systems - DoD Science and Technology Priority

Lessons Learned From Product Manager (PM) Infantry Combat Vehicle (ICV) Using Soldier Evaluation in the Design Phase

Evolutionary Acquisition an Spiral Development in Programs : Policy Issues for Congress

Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft

Opportunities to Streamline DOD s Milestone Review Process

Cerberus Partnership with Industry. Distribution authorized to Public Release

Mobility Branch. Mr. Michael Dudley AFLCMC/WNSM May 17

Mission Assurance Analysis Protocol (MAAP)

United States Air Force 423 SCMS Hydraulic Actuator Chrome Replacement

Determining and Developing TCM-Live Future Training Requirements. COL Jeffrey Hill TCM-Live Fort Eustis, VA June 2010

ALLEGED MISCONDUCT: GENERAL T. MICHAEL MOSELEY FORMER CHIEF OF STAFF, U.S. AIR FORCE

Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century

Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL

Rapid Reaction Technology Office. Rapid Reaction Technology Office. Overview and Objectives. Mr. Benjamin Riley. Director, (RRTO)

Army Aviation and Missile Command (AMCOM) Corrosion Program Update. Steven F. Carr Corrosion Program Manager

Presented to: Presented by: February 5, Aviation and Missile Research, Development and Engineering Center

Electronic Attack/GPS EA Process

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

USAF TECHNICAL TRAINING NAS Pensacola Florida Develop America's Airmen Today --- for Tomorrow

Occupational Survey Report AFSC 4A1X1 Medical Materiel

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

COTS Impact to RM&S from an ISEA Perspective

DoD Cloud Computing Strategy Needs Implementation Plan and Detailed Waiver Process

Improving the Quality of Patient Care Utilizing Tracer Methodology

Development of a Hover Test Bed at the National Hover Test Facility

Wildland Fire Assistance

DOING BUSINESS WITH THE OFFICE OF NAVAL RESEARCH. Ms. Vera M. Carroll Acquisition Branch Head ONR BD 251


DoD Corrosion Prevention and Control

The Fully-Burdened Cost of Waste in Contingency Operations

ASAP-X, Automated Safety Assessment Protocol - Explosives. Mark Peterson Department of Defense Explosives Safety Board

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

2011 USN-USMC SPECTRUM MANAGEMENT CONFERENCE COMPACFLT

The Army Executes New Network Modernization Strategy

Product Manager Force Sustainment Systems

Integrated Comprehensive Planning for Range Sustainability

Life Support for Trauma and Transport (LSTAT) Patient Care Platform: Expanding Global Applications and Impact

Report No. D May 14, Selected Controls for Information Assurance at the Defense Threat Reduction Agency

Embedded Training Solution for the Bradley Fighting Vehicle (BFV) A3

The Effects of Multimodal Collaboration Technology on Subjective Workload Profiles of Tactical Air Battle Management Teams

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

Exhibit R-2, RDT&E Budget Item Justification

Test and Evaluation of Highly Complex Systems

The Effects of Outsourcing on C2

World-Wide Satellite Systems Program

Occupational Survey Report AFSC 4H0X1 Cardiopulmonary Laboratory

A Scalable, Collaborative, Interactive Light-field Display System

Fiscal Year 2011 Department of Homeland Security Assistance to States and Localities

Office of the Assistant Secretary of Defense (Homeland Defense and Americas Security Affairs)

Report Documentation Page

Inside the Beltway ITEA Journal 2008; 29: Copyright 2008 by the International Test and Evaluation Association

Program Manager Training Systems PM 203

ASNE Combat Systems Symposium. Balancing Capability and Capacity

Air Education and Training Command

Information Technology

DoD Architecture Registry System (DARS) EA Conference 2012

DODIG March 9, Defense Contract Management Agency's Investigation and Control of Nonconforming Materials

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Army Modeling and Simulation Past, Present and Future Executive Forum for Modeling and Simulation

Air Education and Training Command

Value and Innovation in Acquisition and Contracting

United States Army Aviation Technology Center of Excellence (ATCoE) NASA/Army Systems and Software Engineering Forum

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

Intelligence, Surveillance, Target Acquisition and Reconnaissance

Dynamic Training Environments of the Future

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Report No. D February 9, Internal Controls Over the United States Marine Corps Military Equipment Baseline Valuation Effort

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

LCS Mission Modules Program

Joint Committee on Tactical Shelters Bi-Annual Meeting with Industry & Exhibition. November 3, 2009

Operational Energy: ENERGY FOR THE WARFIGHTER

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

DON Mentor-Protégé Program

Transcription:

AWACS Mission Training Center (MTC) Kelly Morris 677 AESG/SYCB (937) 255 8655 Kelly.Morris@wpafb.af.mil 25 May 10 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 1

Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE 25 MAY 2010 2. REPORT TYPE 3. DATES COVERED 00-00-2010 to 00-00-2010 4. TITLE AND SUBTITLE AWACS Mission Training Center (MTC) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 677 AESG/SYCB,Wright Patterson AFB,OH,45433 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR S ACRONYM(S) 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13. SUPPLEMENTARY NOTES 2010 USAF APBI, May 25, 2010, Wright Patterson AFB, OH 14. ABSTRACT 11. SPONSOR/MONITOR S REPORT NUMBER(S) 15. SUBJECT TERMS 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT a. REPORT unclassified b. ABSTRACT unclassified c. THIS PAGE unclassified Same as Report (SAR) 18. NUMBER OF PAGES 57 19a. NAME OF RESPONSIBLE PERSON Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18

AWACS MTC Description The MTC shall be a high fidelity simulation of E 3 mission system hardware, performance, and capability that represents Block 30/35 AWACS Includes simulations of sensor systems, data links, communication and navigation systems, constructive entities, common malfunctions, and databases Enables crewmembers to train in a stand alone mode or networked mode with other DMO participants for a full range of composite force employment options Block 30/35 to be replaced by Block 40/45 approximately FY20 2

AWACS MTC Acquisition Strategy Current contract ends Feb 14 Seeking Sole Source (SecDef Waiver) No Break in Training Program Office POC Name: Kelly Morris Organization: 677 AESG/SYBC Phone: (937) 255 8655 Email: Kelly.Morris@wpafb.af.mil 3

AWACS MTC Funding Current Program: $51.2M Procurement Authority POC Name: Steve Godby Organization: 677 AESG/SYK Phone: (937) 255 3748 Email: Steve.Godby@wpafb.af.mil 4

AWACS MTC Summary of Program Requirements 99% Availability with any deficiencies causing trainer down time to be corrected within 8 hours Must be available for Surge Operations Concurrency Must be concurrent with home station aircraft Support all modes of training DMO Interoperability Open Architecture to support Technology Insertions 5

AWACS MTC Milestones Contract Award Dec 13 Current Contract Company: PLEXSYS Interface Products, Inc. Contract Number: F33657-98-D-0021 Period of Performance: Feb 99 to Feb 14 6

AWACS MTC End User POC Name: Maj Mary Ellington, 552 OSS/OST Phone: (405) 734 2435 Email: mary.ellington@tinker.af.mil Original Developer/OEM Company: PLEXSYS Interface Products, Inc. Date Delivered: Feb 99 7

AWACS Maintenance Trainer System (MTS) Kelly Morris 677 AESG/SYCB (937) 255 Kelly.Morris@wpafb.af.mil 25 May 10 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 8

AWACS Maintenance Trainer System (MTS) Description The E 3 MTS primary mission is to provide training and hands on experience as defined in the E 3 AWACS TOs. Mockup exercises familiarize students with physical characteristics, removal and replacement of LRUs, SRUs, BITE and external test connectors. Capability to conduct advanced 5/7 level training with students using test equipment to troubleshoot instructor created faults. Program provides support for organic USAF and NATO at Tinker AFB. 9

AWACS Maintenance Trainer System (MTS) Acquisition Strategy Current contract ends 30 Sep 11 Service Disabled Veteran Owned Small Business set aside Maintain concurrency with E 3 aircraft modifications Program Office POC Name: Kelly Morris Organization: 677 AESG/SYBC Phone: (937) 255 Email: Kelly.Morris@wpafb.af.mil 10

AWACS Maintenance Trainer System (MTS) Funding Current Program: $25M Procurement Authority POC Name: Organization: Phone: Email: Steve Godby 677 AESG/SYK (937) 255 3748 Steve.Godby@wpafb.af.mil 11

AWACS Maintenance Trainer System (MTS) Summary of Program Requirements 95% Availability with any deficiencies causing trainer down time to be corrected within 8 hours MTS training capability: Per the Training System Configuration Working Group (TSCWG) agreed upon direction Program Management: 100% of deliverables on time with correction to 100% within 5 working days of notification No break in training 12

AWACS Maintenance Trainer System (MTS) Milestones Industry Day 5 Mar 10 and 10 May 10 at Tinker AFB, Release RFP 1 Jul 10 Contract Award 1 Jul 11 OK Current Contract (if recompete) Company: Contract Number: Period of Performance: ProActive Technologies, LLC F42630 01 C 0247 Aug 01 30 Sep 11 13

AWACS Maintenance Trainer System (MTS) End User POC Name: Phone: Email: SMSgt Nick Grba, DSN 884 3901 Nick.Grba@tinker.af.mil Original Developer/OEM (if recompete) Company: Date Delivered: ProActive Technologies, LLC Dec 01 14

AWACS Flight Crew Trainer (FCT) Kelly Morris 677 AESG/SYCB (937) 255 8655 Kelly.Morris@wpafb.af.mil 25 May 10 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 15

AWACS Flight Crew Trainer (FCT) Description The FCT will provide trained, mission qualified crew members for E 3 crewmembers Pilot, Copilot, Navigator and Flight Engineer including initial, difference, upgrade, continuation, senior staff and recertification. Both Instructor Based Training (IBT) and Computer Based Training (CBT) will be provided by the contractor through curriculum development. All courseware developed belongs to the government. FCT will be concurrent with the E 3 aircraft and operate high fidelity simulation of the aircraft. as a 16

AWACS Flight Crew Trainer (FCT) Acquisition Strategy Current contract ends Sep 14 SECDEF Waiver (Seeking Sole Source) No Break in Training Program Office POC Name: Kelly Morris Organization: 677 AESG/SYBC Phone: (937) 255 8655 Email: Kelly.Morris@wpafb.af.mil 17

AWACS Flight Crew Trainer (FCT) Funding Current Contract $158M Procurement Authority POC Name: Steve Godby Organization: 677 AESG/SYK Phone: (937) 255 3748 Email: Steve.Godby@wpafb.af.mil 18

AWACS Flight Crew Trainer (FCT) Summary of Program Requirements Qualified Crew Member Contractor Devices: 2 Level D Operational Flight Trainers (OFT) 1 Level 7 Flight Training Device (FTD) GFE device: 1 Navigation Part Task Trainer (NPTT) 19

AWACS Flight Crew Trainer (FCT) Milestones Contract Award Aug 14 Current Contract Company: L 3 Communications Contract Number: F42630 00 C 0024 Period of Performance: Jan 00 Sep 14 20

AWACS Flight Crew Trainer (FCT) End User POC Name: Lt Col William Rogan, 552 ACW/XPR Phone: 405 739 2755 Email:William.Rogan@tinker.af.mil Original Developer/OEM Company: L 3 Communications Date Delivered: Jan 00 21

F 15C Mission Training Center Kristi Forino Organization: 677 AESG/SYCB Phone: (937) 904 4102 Email: kristi.forino@wpafb.af.mil Date: 25 May 10 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 22

F 15C Mission Training Center Description The F 15C MTC program consists of simulation system capability provided through the use of an MTC that contains high fidelity cockpits, instructor/operator stations, brief/debrief capabilities, threat stations, command and control stations, a realistic combat environment and DMO Network capability. The ACC aircrews may perform any or all functions identified in the Master Training Task List associated with flying solo or multiship missions from mission planning through mission debrief. The capability to simulate all functions associated with all aspects of full spectrum F 15C training and wartime missions are present. User: ACC, PACAF, USAFE 23

F 15C Mission Training Center Acquisition Strategy Single award Acquisition Strategy In Work Program Office POC Name: Organization: Phone: Email: Kristi Forino 677 AESG/SYCB (937) 904 4102 Kristi.forino@wpafb.af.mil 24

F 15C Mission Training Center Funding Current contract value: $230M Operations and Maintenance Procurement Authority POC Name: Organization: Phone: Email: Ryan Evans 677 AESG/SYK (937) 255 3801 ryan.evans@wpafb.af.mil 25

F 15C Mission Training Center Summary of Program Requirements Simulation Services: Meet ACC Mission Essential Competency Training List and Roadmap Immersive Training Environment Full Spectrum Training Capability System Capabilities: High fidelity, simulated combat environment Integrated with simulations of all avionics and weapons systems Programmed or interactive threat aircraft, gunnery, air to air and surface to air missiles, electronic countermeasures, communications networks, command and control structures, atmospherics DMO Network capability 26

F 15C Mission Training Center Summary of Program Requirements Types of devices: 4 Ship Integrated Mission Training Center 4 ship integrated cockpits Instructor/operator station Brief/debrief Anticipated Training Locations RAF Lakenheath Kadena AB Optional 2 CONUS sites (unfunded) Technical Data: N/A (simulation services) 27

F 15C Mission Training Center Milestones Released Services RFI(s): Oct 08 and Mar 09 First Industry Day: Dec 08 Acquisition Strategy: In work RFP Release: TBD Contract Award: 2011/2012 Current Contract Company: Contract Number: Period of Performance: Boeing F33657 97 D 0025 Nov 97 Nov 12 28

F 15C Mission Training Center End User POC Name: Phone: Email: Rich Grohs (757) 764 8164 grohsrf@langley.af.mil Original Developer/OEM Company: Date Delivered: Boeing May 00 Start of Service 29

DMO Operations & Integration Photo of System Mr. Andrew Hostetter 677 AESG/SYCB 656 6808 Andrew.hostetter@wpafb.af.mil 25 May 2010 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 30

DMO Operations & Integration Description DMO O&I provides the integration and operational services necessary to integrate geographically separated DMO and legacy simulator systems. The contractor provides the necessary infrastructure and updates critical technologies needed to evolve the overall capability of DMO to support a real time common synthetic battle space. The contractor establishes and maintains the standards that enable interoperability among dissimilar simulator systems and is the master architect of the DMO Network. The contractor also is required to provide scheduling, network connectivity, and other operational services necessary to support DMO training events. 31

DMO Operations & Integration Acquisition Strategy Services IDIQ Full and open Single award Program Office POC Name: Andrew Hostetter Organization: 677 AESG/SYCB Phone: (937) 656 6808 Email: andrew.hostetter@wpafb.af.mil 32

DMO Operations & Integration Funding Estimate $ Budget submitted 3400 Operations & Maintenance Appropriation Procurement Authority POC Name: Organization: Phone: Email: Steve Godby 677 AESG/SYK (937) 255 3748 Steve.godby@wpafb.af.mil 33

DMO Operations & Integration Summary of Program Requirements Services required for the development of CAF DMO Standards Services required for the interoperability of DMO Federations Services required to support DMO training Services required to support training between federates of differing security domains 34

DMO Operations & Integration Milestones Industry Day Jan 12 Draft RFP Release Apr 12 Industry Day May 12 Release RFP Jun 12 Contract Award Jun 13 Current Contract (if recompete) Northrop Grumman Information Systems Contract Number: F33657 98 D 2061 Period of Performance: through Dec 2014 35

DMO Operations & Integration End User POC Air Combat Command Original Developer/OEM (if recompete) Northrop Grumman Information Systems 36

F 15 ATD/MTD John Skalski Organization: 677AESG/SYCB Phone: DSN 986 6911, 937 656 6911 Email: john.skalski@wpafb.af.mil Date: 25 May 2010 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 37

F 15 ATD/MTD Description Provides on site/on call Contractor Logistics Support (CLS) CAF wide for F 15E aircrew training devices (ATDs), F 15A E maintenance training devices (MTD) and sustainment of the Training System Support Center (TSSC) capabilities. The TSSC also sustains F 15E ATDs/MTDs with aircraft driven (currency) and trainer unique (obsolescence) changes, engineering and technical support of the software/hardware baseline, problem report clean up, engineering studies for systems improvements, configuration management, and technical data and spare parts management. 38

F 15 ATD/MTD Acquisition Strategy Current contract ends Dec 12 Full and open competition o One year basic with 4 option years Program Office POC Name: Organization: Phone: Email: John Skalski 677AESG/SYCB DSN 986 6911, 937 656 6911 john.skalski@wpafb.af.mil 39

F 15 ATD/MTD Funding POE is TBD Procurement Authority POC Name: Organization: Phone: Email: Ryan Evans 677AESG/SYK DSN 785 3801, 937 255 3801 Ryan.Evans@wpafb.af.mil 40

F 15 ATD/MTD Summary of Program Requirements Provide Contract Logistic Support (CLS), training system modification and Training System Support Center operation Six F 15 E, Integrated Avionics Trainers (IATs), mostly simulated aircraft components that emulate a working aircraft avionics system Six categories of Maintenance Training Devices flight controls, avionics, armament, engine, gear and seat and canopy 39 various devices at 10 locations CONUS/OCONUS including landing 41

F 15 ATD/MTD Milestones Pre solicitation Stage: Market Research; issue first RFI Synopsis Mar 2011 Current Contract (if recompete) Company: Contract Number: Period of Performance: The Boeing Company F33657 01 D 2074 QP01, TSA II 1 Jan 2003 31 Dec 2012 42

F 15 ATD/MTD End User POC Name: Phone: Email: Arnold Lorea 757 764 3658 arnold.lorea@langley.af.mil Original Developer/OEM (if recompete) Company: Date Delivered: McDonnell Douglas Corp July 1972 43

F 16 Training System Re Compete Mr Ricky Fennell Organization: 677 AESG/SYCB Phone: 937 656 5620 Email: ricky.fennell@wpafb.af.mil Date: 25 May 10 All information contained in this presentation represents the Government s understanding of the nature of the anticipated procurement as of the presentation date. All information is subject to change. 44

F 16 Training System Re Compete Description Provides off aircraft simulator training capability (all blocks) for aircrew and maintenance personnel for the F 16 Falcon. Flight simulators include both Unit Training Devices (UTD), and enhanced visual, 360 Deg. Simusphere, Weapon System Training (WST) devices with visual database generation capability 84 WST/UTDs, 100 MTDs, at 36 USAF and FMS locations FMS support (CLS) to Greece, Jordan, Bahrain.et, al. 45

F 16 Training System Re Compete Acquisition Strategy Competitive Procurement Full and Open Single Award ID/IQ (Competitive Procurement vs. SB Set Aside TBD) Program Office POC Name: Mr Ricky L Fennell Organization: 677 AESG Phone: 937 656 5620 Email: ricky.fennell@wpafb.af.mil 46

F 16 Training System Re Compete Funding Program in sustainment with 10 year total funding projected at $350M+ (all types of funds primarily Production, O&M/CAM, NGB funding) Level of effort and funding highly dependant on future force structure changes Procurement Authority POC Name: Mr Ryan Evans Organization: 677 AESG/PK Phone: 937 255 3801 Email: ryan.evans@wpafb.af.mil 47

F 16 Training System Re Compete Summary of Program Requirements Services Contract Contractor Logistics Support (CLS) On Call support driven by repair time requirement On Site support driven by availability rate Change Management Concurrency and trainer unique changes Training Systems Support Center (TSSC) for all devices Aircrew instruction acquired separately Does not procure new training devices 48

F 16 Training System Re Compete Milestones Initial Sources Sought Synopsis 7Dec09 / 12Mar10 Industry Day 27 28 Apr10 Acquisition Strategy Panel (ASP) Jun10 RFP Release Aug10 Proposals Received Oct10 Planned Contract Award Mar11 Current Contract (if recompete) Company: : L3 Communications Contract Number: F33657 01 D 2077 (QP01) Period of Performance: 31 Jul 01 30 Sep 11 49

F 16 Training System Re Compete End User POC Name: Dick Wade and Jeff Brown (ACC/TRSS) Phone: 573 764 3642 Email: richard.wade@langley.af.mil Jeffrey.brown@langley.af.mil Incumbent Company: L3 Communications Sustainment contract expires in Sep 11 50

B 1 Training System Lindsay Liming 677 th AESG/SYCB (937) 255 2685 Lindsay.liming.1@wpafb.af.mil 25 May 10 Government disclaimer statement indicating that all information is provided for information purposes only, represents a best understanding of the procurement as of the presentation date, and is subject to change.

B 1 Training System Description The objective of the B 1 TS program is to provide the Warfighter fully integrated, cost effective, high fidelity training in the operation, weapons employment and maintenance of the B 1 weapon system. The B 1 contract is a 5 year effort that combines concurrency upgrades, Contractor Logistics Support (CLS) and Training Systems Support Center (TSSC) operations. This is not a full scale development for the training system; rather the modifications to the B 1 TS are to maintain concurrency with the B 1 weapon system and provide CLS for the TS. No new devices will be acquired. The major modification for this contract will be the B 1 Integrated Battle Space (IBS) upgrade, Training System (TS) modification. 52

B 1 Training System Acquisition Strategy Anticipate 90 day transition and 12 month base with 6 one year option periods Service contract Firm Fixed Price, IBS and Sustainment Blocks (SB) CLINs are FPIF Contract Award Date NLT 1 Oct 2011 o Allows for a 90 day transition with the incumbent Program Office POC Name: Lindsay Liming Organization: 677th AESG/SYCB Phone: (937) 255 2685 Email: lindsay.liming.1@wpafb.af.mil 53

B 1 Training System Funding 3600, 3010, and 3400 funding available for both ATS and MTS. Procurement Authority POC Name: Steve Godby Organization: 677 th AESG/SYK Phone: (937) 255 3748 Email: steve.godby@wpafb.af.mil 54

B 1 Training System Summary of Program Requirements Modifications to bring Training Systems into configuration concurrency with the B 1 aircraft. o Major modification will be the IBS upgrade to the TS Full time on site CLS for the ATS and on call CLS for the MTS Training Software Support Center: Maintain configuration management over training software baselines; maintain the technical order and drawing library for its assigned trainers; perform routine sustainment software changes to maintain the training fidelity of the devices; provide management and database support for Distributed Missions Operations ( DMO); correct training system deficiencies. Operational sites include Dyess AFB, Ellsworth AFB & Sheppard AFB 55

B 1 Training System Milestones Draft RFP Release 8 Jun 10 677 AESG ASP 18 Jun 10 RFP Release 30 Aug 10 Proposals Received 1 Oct 10 Contract Award 1 Oct 11 Current Contract Company: Rockwell Collins Contract Number: F33657 01 D 0012 Period of Performance: 2/23/2006 12/31/2011 56

B 1 Training System End User POC Name: (ACC) Arnold Lorea, ACC TRSS/TSF Phone: (757)764 3658 Email: arnold.lorea@langley.af.mil Name: (AETC) Steve Jones, 372 TRS/Sheppard AFB, TX Phone: (940) 696 4794 Email: steven.jones@sheppard.af.mil Original Developer/OEM Boeing 1988 57