Minutes of the 66th General Meeting of the Wireless Innovation Forum 21 to 23 June 2010

Similar documents
UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Net Centricity FY 2012 OCO

Safety EMC Environment Quality assurance

Group Minutes X12N TG2 WG5/WG9 Healthcare Claim Status/Patient Information February 2 5, 2004

1. (Safe) Concept development 2. Proposal: Designing measures to maximise impact 3. Case Study IP at the proposal development stage 4.

2015 M-Enabling Summit Global Summit on Accessible Technology for Senior Citizens and Users of All Abilities

Digital Business Ecosystems Workshop

May Emergency Operations Standard Operating Guideline

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: SATCOM Ground Environment (SPACE) FY 2012 OCO

CEN Technical Committees Mode of operations

TSG-X Plenary Meeting Report September 26-30, 2005 Vancouver, BC CANADA

CEN/TC278/WG1 & ISO/TC204/WG5 Status report to CEN/TC204 April 2012

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate

3 rd Annual Electromagnetic Spectrum Operations Summit

ICT standardization and research - towards FP7 -

Topical Peer Review 2017 Ageing Management of Nuclear Power Plants

The Challenge: How and where do we find experienced, motivated researchers for R&D projects? ISIN breakfast briefing 24 th January 2017

The Helsinki Manifesto We have to move fast, before it is too late.

Systems Beyond 3G Cluster Meeting

SHARE PSI 2.0 and Samos Summit on ICT-enabled Governance

NIA BY-LAWS NURSING INFORMATICS AUSTRALIA (NIA)

Emerging Electromagnetic Spectrum Capabilities

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

PATHWAYS FOR STANDARDS DEVELOPMENT. Developing internationally aligned Australian Standards in the national interest

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82

Exhibit R-2, RDT&E Budget Item Justification

OPEN CALL FOR PROJECT TEAM EXPERTS European Standard for Patient Summary

ETCS Baselines, status, roadmap

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

The Shifting Sands of Government IP. John McCarthy Karen Hermann Jon Baker

A Standard LRV RFP One Year Later. Richard J. Wieczorek S.F. Bay Area Rapid Transit District Department Manager Procurement Oakland, California

Joint Command and Control (JC2) Capability & C2 Data Model

Alliance for Nursing Informatics Operating Guidelines

FIRESCOPE COMMUNICATIONS SPECIALIST GROUP

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

LICENSINGAPPLICATION GUIDELINES, 2016

New Jersey Department of Community Affairs Grant Application Instructions

EUROPEAN COMMISSION INFORMATION SOCIETY AND MEDIA DG INTERNATIONAL COOPERATION PUBLIC CONSULTATION FIRST OVERVIEW

NEW TOOLS FOR COORDINATING HEALTH CARE AND LONG-TERM SERVICES AND SUPPORTS. National HCBS Conference September 1, 2016

Server, Desktop, Mobile Platforms Working Group (SDMPWG) Dated

International Perspectives. Marjorie S. Greenberg, MA National Center for Health Statistics Centers for Disease Control and Prevention

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

APT Ministerial Conference on Broadband and ICT Development 1-2 July 2004, Bangkok, Thailand

HL7 A Quick Introduction

State of WICC Mike Klinkman Chair Wonca International Classification Committee Johannesburg. South Africa September 20, 2013

DMTF Standards Incubation Process

IT-014 Health Informatics Committee

Joint Program Executive Office Joint Tactical Radio System

CMS National Background Check Program (NBCP) State of Rhode Island (RI) Technical Assistance (TA) Meeting

CWDS Quarterly Employment Report (PA 1540) Instructions

Department of Defense INSTRUCTION

MBFTE BOARD MEETING MINUTES February 14, 2017 Elk River Fire Department Orono Parkway Elk River, MN :30 a. m.

Linking research and standardization. Integrating standards in your research project: a pocket guide for project proposers

RCN forum steering committees terms of reference

VIVO Project Charter v 1.1

Introduction The following is a comprehensive report on the initiatives and activities of the Ohio Program Office for the year 2016.

ISO/IEC JTC1/SC7 /N3020

ICT, FET Open LIFT ICT-FP Using Local Inference in Massively Distributed Systems Collaborative Project D 7.1 Quality Assurance Plan

COMMON AVIATION COMMAND AND CONTROL SYSTEM

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Jim Moore IEEE Computer Society Liaison Representative to ISO/IEC JTC 1/SC 7 Annual Report for Standards Activities Board Oct 2013

5G Networks Expert Group Members Short Bios

P4: PACIFIC REGIONAL ICT REGULATORY DEVELOPMENT PROJECT APPROVED ON JULY 30, 2014 UNIVERSITY OF THE SOUTH PACIFIC

Department of Defense INSTRUCTION. Policy and Procedures for Management and Use of the Electromagnetic Spectrum

Overview of IEEE and IEEE-SA. for the Telecommunication Technology Committee (TTC)

A l l e g a n C o u n t y 911 Policy & Procedural Board

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Alliance for Nursing Informatics Operating Guidelines

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Command, Control, Communications Technology

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #152 Page 1 of 15

WAKE COUNTY FIRE COMMISSION Thursday, July 20, 2017

ENEA experience in message based interoperability

Doing Business with DARPA

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 12 R-1 Line #203

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

CHAIRMAN OF THE JOINT CHIEFS OF STAFF INSTRUCTION

Scope of Services The City is seeking consulting services for the following tasks:

Interoperable eid as a key enabler for pan-european (egovernment) services

HYDROELECTRIC COMMUNICATION TECHNICIAN I HYDROELECTRIC COMMUNICATION TECHNICIAN II Range B55/B75 BOD 7/12/2017

Integrating Software Architecture Evaluation in a DoD System Acquisition

Jim Matthews III Vice-President Chairman, SMB. ANSI Smart Sustainable Cities 21 November 2013 INTERNATIONAL ELECTROTECHNICAL COMMISSION

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO

Doing Business with DARPA

TC 100 Guidelines and Procedures

Brussels, 7 December 2009 COUNCIL THE EUROPEAN UNION 17107/09 TELECOM 262 COMPET 512 RECH 447 AUDIO 58 SOC 760 CONSOM 234 SAN 357. NOTE from : COREPER

Open Call for Experimentation

Medicare and Medicaid Programs: Electronic Health Record Incentive Program -- Stage 3 and Modifications to Meaningful Use in 2015 through 2017

Department of Defense INSTRUCTION. 1. PURPOSE. This Instruction, issued under the authority of DoD Directive (DoDD) 5144.

UNCLASSIFIED. FY 2016 Base

IW and Plugfest Event Meeting September 29th, 2008

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Long Haul Communications. FY 2011 Total Estimate. FY 2011 OCO Estimate

europeana business plan 2012

KCDEE Update Human Services Committee November 7, 2012

Department of Defense CHARTER

CENTRAL MINNESOTA EMERGENCY SERVICES BOARD (ESB) Wednesday, June 14, :00 p.m. St. Cloud City Hall Conference Room #1, St.

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

St. James s Hospital Research Governance and Support Framework

Transcription:

Minutes of the 66th General Meeting of the Wireless Innovation Forum 21 to 23 June 2010 The 66th General Meeting of The (SDR Forum version 2.0) was held 21 to 23 June, 2010 in Mainz, Germany. The meeting was hosted by the German Federal Networks Agency. This document provides the minutes of the Forum s meeting. The drop box for this meeting can be found at: http://groups.winnforum.org/p/do/si/topic=366 The drop box is accessible to Forum members only. The feedback form for this meeting can be found at (feedback is still welcome): http://www.wirelessinnovation.org/page/66meetingsurvey Opening Plenary: Monday 21 June 2010 The meeting was called to order at 12:00 PM by the Chair of the Forum, Mr. Bruce Oberlies. Meeting announcements were made and an introduction was given to the Security Work Group Document Securing Software Reconfigurable Communications Devices (document WINNF-08-S-0013) to be balloted at the Plenary level on Wednesday. Following this introduction, Mr. Oberlies initiated a review of the agenda for the 66th General Meeting and adjustments were made based on feedback received. Following this review, Mr. Oberlies recessed the Plenary until Wednesday at 08:30. The meeting was adjourned at 13:00. Key Accomplishments in Mainz The following defines the key decisions and milestones achieved in Mainz, organized by committee. Information on specific projects in development can be found at: http://www.wirelessinnovation.org/page/current_projects User Requirements Committee Meeting Minutes SDR 10 Workshops Planned The User Requirements Committee met in Plenary session on Tuesday, 22 June 2010. During this session, they continued to organize workshops to be held in conjunction with SDR 10 on Tactical Radio and Public Safety communications. They will also organize an Analyst workshop as they have done the following two years covering both existing and emerging markets. In addition, during the plenary session the User Requirements Committee discussed plans for the market sizing report on mature industries

including commercial wireless infrastructure, MILCOM, public safety and SATCOM. A analysts has been found to perform the study and the next step is to develop a statement of work and put together a project proposal. History of the Public Safety Special Interest Group Presented Mr. Rick Taylor, representing Harris Corporation, provided an overview of the charter, scope, and history (including approved documents) of the PSSIG to the attendees of the meeting, most of which were not familiar with the group. Technology Survey Project Matured The Public Safety Special Interest Group worked on editing the functional requirements identified in the Request for Information to be distributed to industry. Hybrid SATCOM Reference Architecture for Public Safety Applications Project Proposal Approved The SATCOM Survey results were presented by Mr. Bob Schutz, representing Datron World Communications to the SATCOM Special Interest Group (SATCOM-SIG). Based on the results, the SIG finalized a proposal for the development of a Hybrid SATCOM Reference Architecture for Public Safety Applications. The proposal was reviewed and approved, with modification to narrow the scope, by the Project Approval Committee. Issues in the International Tactical Radio Market Domain matured The International Tactical Radio Special Interest Group (ITR-SIG) reviewed this document and agreed to split the document into three sections: o US and European market analysis, to be led by Randy Navarro representing SAIC o Certification, to be led by Rafael Aguado representing Indra o Interoperable communications, to be led by Dave Murotake representing SCA Technica Work plans to complete these documents by the September meeting were established, and plans began on a follow on projects. Regulatory Committee Meeting Minutes Plans for Q1 FY2011 Set The Regulatory Committee reviewed the FY2011 Operations plan and discussed actions for the next quarter to include: o Submitting outlines for SDR 10 Workshop o Supporting the Committee on Advanced Wireless networking and Infrastructure in finalizing and hosting TVWS Workshop o Issuing an RFP for regulatory counsel o Issuing Regulatory Survey to membership o Issuing Regulatory alerts as appropriate o Supporting the Roadmap Committee o Conducting Regular Conference Calls

Committee on Next Generation Radio Technology Meeting Minutes Business Models for Open Source Air Interfaces matured The Commercial Baseband Processing Technologies Workgroup (CBPT-WG) made significant progress on this report, providing updates that include: o Network Architecture overview o Market overview o IP issues (patents) related to proliferation o Types of open source licenses o Several business models Security Work Group o Securing Software Reconfigurable Communications Devices-Part 2 project proposal presented Revised PAC proposal concerning developing security requirements profiles for Public Safety Radios was presented to the Security Work Group by Mr. John Fitton, representing Harris Corporation. o International Security Services API (ISS-API) Project Plan Updated Proposed updates to the project plans were presented to the ISS-API task group by Mr. Mark Turner, representing Harris Corporation. These updates include: Incremental, parallel development (top-down and bottom-up) Security service oriented work package structure focused on waveforms APIs (5 individual work packages) Top-down: Use and requirements development (with ITR-SIG) Bottom-Up: API development (with SCA API WG) The draft project schedule was also reviewed, a multi-surface model that facilitates both open standardization (category 1) and protected interests (categories 2/3) was presented, candidate API guiding principles/best practices were reviewed, and the CICM specification summary was reviewed. Plans were set to continue development in a weekly teleconference to occur on Wednesdays. Transceiver Facility Work Group o Reference Implementations of the Specification explored Representatives from Hanyang University presented a reference implementation on the transceiver facility specification to the Transceiver Facility Specification Work Group that was developed in their labs. Representatives from Thales offered that they were also working on a reference implementation and is considering releasing it. Its impact on maturing the Transceiver Facility Specification version 2.0 was evaluated. o Detailed Implementation Feedback from EULER An exhaustive presentation was made by representatives from THALES concerning the implementation feedback gathered from implementation realized for WiMax in the EULER project. Includes: Spotting of ambiguities within the specification, 9 detailed WiMAX use cases relative to Time management,

Implementation approach. o Discussion on Functional Configuration Profiles A discussion was also held by the work group on specification of Functional Configuration profiles describing how the Transceiver should behave in the case of standard waveforms being implemented following the Facility Paradigm. o Plans regarding v2.0 Need to release in September a V1.3 document ready to enter ballot process was identified. This to maintain synchronisation with the developing interest reported (e.g. Korea). o Need to establish liaison agreement with TTA Need to establish a liaison agreement with Korean national standardisation institute TTA was identified, based on the report that group PG705-1 dedicated to Smart Antenna for SDR was being created. Committee on Advanced Wireless Networking and Infrastructure Meeting Minutes Voting process for Information Process Architecture Volume 1 set In a joint meeting between the Cognitive Radio Work Group and the Public Safety Special Interest Group, the joint voting process for this document at the group level was set. The groups agreed to include independent voting and joint approval of comment resolutions. The groups will work to clean up the document in the next few weeks and then begin the ballot process. Test Guidelines for Secondary Spectrum Access matured The document was reviewed by the Test and Measurement Work Group (TMWG) for new members, and work continued on finalizing the completed sections, on identifying tests required based on FCC rules and on documenting test implementation issues. During the meeting, the decision was made to define the test requirements, but delay writing the tests until after the first publication. Accordingly, the group will: o Finish sections 1-6 and circulate within TMWG o When section 7 is complete, socialize with other groups and begin the ballot process Modeling Language for Mobility (MLM) ontology matured The Ontology document was reviewed by the MLM work group, and group read through and edited the document to prepare it for vote by the Forum Coordinating Committee on International SCA Standards Meeting Minutes Election Process for Executive Board Set In Plenary session of the Coordinating Committee on International SCA Standards agreed to proceed with

the election of the Executive Board for the Steering Group as defined in the letter that was sent. The Committee further agreed to allow the elected members of the Executive Board to self organize once elected. Work on SCA Next to Resume The SCA Next Work decided to resume meeting on a bi-weekly basis to prepare for the SCA Next Roll Out meeting August 24 and 25 and to explore the Asynchronous Messaging proposal submitted by Mr. Eric Christensen representing General Dynamics. SCA Certification Guide #2 SCA Test, Evaluation and Certification Model Realization Project Proposal Finalized This recommendation is being developed by the SCA Test and Certification Work Group to define the realization aspects (including business models) of the role based, generic certification process of SCA based SDRs, as defined in "Test and Certification Guide for SDRs based on SCA, Part 1: SCA" (SDRF-08-P-0007-V1.0.0). The project proposal was approved by the work group and will be submitted to the CC SCA Steering Group for approval. Roadmap Committee Minutes Wiki To Be Developed to define Top 10 Most Wanted Wireless Innovations The Roadmap Committee agreed to crowdsource the development of the top 10 list through the use of a Wiki. This Wiki will have a standard template describing the domain the challenges or problems, and the solutions needed to address them. Technical WG and SIG chairs will provide contributions based on their groups work, and an RFI will be issued to allow contributions from the public. Other Highlights of the 66 th General Meeting EU Project Review A review of EU Cognitive Radio projects was given to the Cognitive Radio Work Group including the following 4 presentations: Cognitive Radio / Software Defined Radio Research Activities Overview at RTWH Aachen, presented by Venkatesh Ramakrishnan, RTWH Aachen Cognitive Radio Activities in SUPELEC SCEE team, presented by Patricia Kaiser, Supelec OneFIT project (Opportunistic networks and cognitive management systems for efficient application provision in the Future Internet), presented by Kamran Arshad, University of Surrey CTVR: The Telecommunications Research Centre, presented by James Neel, Cognitive Radio Technologies for Paul Sutton, Trinity College Dublin) Policy Information Processing Exchange Systems (PIPES) Architecture A presentation was made on the PIPES architecture by Mr. Bob Schutz representing Datron World Communications

European Project WOLF A presentation was made on the European project Wolf, addressing military communications in an urban environment, by Mr. Eric Nicollet representing Thales Communications COST IC0905 TERRA MoU Mr. Keith Nolan, representing CTVR, presented an overview of the COST-TERRA Program. This program is funded under an the European Cooperation in Science and Technology program, which is an instrument of the European Science Foundation, and is focused on developing a Techno-Economic Regulatory Framework for Radio Spectrum Access for Cognitive Radio/Software Defined Radio. Following the presentation by Mr. Nolan, a Memorandum of Understanding was signed between the COST-TERRA program and the Wireless Innovation program allowing collaboration in areas of benefit to both parties. ETSI Technical Committee of Reconfigurable Radio Systems a presentation was made by Paul Bender of the Federal Networks Agency on behalf of the ETSI-TC RRS presenting an overview of the Committee and potential collaboration with the Forum. Regional reports were also presented from representatives from ITU regions 1, 2, and 3 as well as a liaison report on relevant activities from representatives of EDA during an open Plenary Session on Wednesday, 23 June 2010. Closing Plenary Wednesday, 23 June 2010 The meeting was recalled to order at 8:30 hours by Mr. Bruce Oberlies. It was determined at this time that a quorum was not present, so Mr. Oberlies announced that the Security Work Group Document would be managed via email ballot, and that other business would be deferred until the September meeting in Schaumburg, Illinois. Out Briefs Out briefs were given on the outcomes of the Mainz meeting by the chairs of the Technical Committees, the Roadmap Committee, the User Requirements Committee, and the Regulatory Committee. IPR Policy Training Training on the Forum s IPR Policy was given by Mr. Lee Pucker. It was agreed that this training would be repeated during plenary session in Schaumberg. FY2011 Operations Plan The FY2011 Operations Plan and Budget was presented by Mr. Lee Pucker. The plan will be sent to the members immediately following the 66 th meeting for ballot approval of the proposed budget. Close of the 66th General Meeting Following presentation operations plan, Mr. Oberlies adjourned the meeting. The meet closed at 10:30 hours.