ASBESTOS MANAGEMENT PLAN

Similar documents
HS16 Asbestos Management

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

Asbestos Management Plan Commercial Services and Development, University of Tasmania

ASBESTOS POLICY PROCEDURES & GUIDANCE

ASBESTOS POLICY. Version: 3 Senior Managers Operational Group Date ratified: March 2016

ASBESTOS MANAGEMENT PLAN

Asbestos Management Policy

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects.

ASBESTOS MANAGEMENT POLICY

SAMPLE. Asbestos. Nominated Supervisor DANGER CONTAINS ASBESTOS FIBRES AVOID CREATING DUST CANCER AND LUNG DISEASE HAZARD.

ASBESTOS MANAGEMENT PLAN

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

ASBESTOS MANAGEMENT PLAN

NZQA registered unit standard version 1 Page 1 of 6. Conduct asbestos assessment associated with removal

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Asbestos Management Procedure

THE MANAGEMENT OF ASBESTOS POLICY, RESPONSIBILITIES AND PROCEDURES

Policy on Managing Asbestos

POLICY ON THE CONTROL OF ASBESTOS AT WORK

Asbestos Management Policy (Version 4)

Facilities Services Division

FORT RUCKER Environmental Document

Dunbritton Housing Association Limited

MODEL PLAN. (Name of School) INDOOR ENVIRONMENTAL QUALITY MANAGEMENT PLAN

Developing your council s asbestos policy. A guide to using the 2015 Model Asbestos Policy for NSW Councils to develop an asbestos policy

Developing your council s asbestos policy. A guide to the Model Asbestos Policy for NSW councils

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program.

Asbestos - Duty to Manage & Learning From its Mismanagement

HEALTH AND SAFETY ARRANGEMENTS

NASUWT. heal h safe. ASBESTOS: Advice for NASUWT Representatives. The Teachers Union. at work. the largest UK-wide teachers union

Instructions to Bidders Asbestos Abatement

UNIVERSITY OF ROEHAMPTON ASBESTOS POLICY

ASBESTOS MANAGEMENT POLICY

Asbestos Awareness Annual Presentation

SECTION HAZARDOUS MATERIALS HEALTH AND SAFETY PLAN

Los Rios Community College District NEW EMPLOYEE TRAINING CHECK LIST

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

P400 Foundation Course. Asbestos Surveying and Analysis Course specification

Health and Safety Executive Board. Update on HSE Activities on Asbestos

An electronic copy of this document is available on the SC intranet and the Learning Gateway.

Asbestos Management Plan. 12 th Edition. September 2014

Occupational and Environmental Health Guidelines for the Evaluation and Control of Asbestos Exposure

ASBESTOS MANAGEMENT PLAN:

DIRECTIVE 2009/148/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL

Asbestos (Health and Safety) Policy

Asbestos identification, risk assessment approaches, asbestos register and asbestos management plan

Asbestos Management Plan for an Essex County Council premises

DEPARTMENT OF LABOUR. Government Notice. R: February 2002 OCCUPATIONAL HEALTH AND SAFETY ACT, 1993 (ACT NO. 85 OF 1993)

Training Course Catalog

Formaldehyde Exposure Control Policy

Asbestos Register. Sheffield City Council

Prison Service Order Health and Safety Policy Statement

Faculty of Health Staff Meeting: Health and Safety Refresher. March 23, 2012

Health and and Safety Executive. Health and Safety. Executive Update. Phil Chester HM Inspector of Health and Safety

Faculty of Science Risk Assessment Procedure

REVISION 5 (Ref: ZHUX0015/JF/R1/Rev5)

University of North Dakota Facilities Department Respiratory Protection Program. Table of Contents. 1.0 Introduction Purpose...

Asbestos Management Plan

Formaldehyde Exposure Control Plan

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

Indoor Environmental Quality Management Plan

TSI TSI. TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO.

Overview of the Province of Ontario s Underground Mine Blitzes

NZQA registered unit standard version 1 Page 1 of 5

APPLICATION FOR A LICENCE TO OPERATE AS AN ASBESTOS REMOVALIST

General Health and Safety Information for Victoria University. An outline of any further Health and Safety Training you may require.

Ladysmith School District. Indoor Environmental Quality Management Plan

INFORMAL SAFETY PROGRAM FOR SMALL BUSINESS

Health surveillance for silica and asbestos and the management of diagnosed occupational respiratory conditions

2018 TRAINING SCHEDULE

Health & Safety Policy

ADMINISTRATIVE PROCEDURES

Writtle College Health and Safety Policy

These tool box talks have been prepared by Constructing Better Health to raise awareness of the work related health issues you face on site

ST THOMAS MORE PRIMARY SCHOOL

Guidelines on Occupational Safety and Health Management Systems Ministry of Labour Notification No. 53, April 30, 1999

specialising in maths and computing Health, Safety and Environmental Policy Date March 2012 Review Date March 2014 Governor Committee Health & Safety

Overview Of Cal/OSHA s Injury & Illness Prevention Program Standard

Health and Safety Policy and Procedures

Control of Substances Hazardous to Health (COSHH) Procedure

Asbestos banned, how to reduce future risks. Lars Vedsmand, EFBWW/Danish Constr. Workers

RMM # 500 Title: Designated Substances Control Program Approved: Karen Belaire Vice President, Administration

ADMINISTRATIVE PROCEDURE

A Health and Safety Tip Sheet for School Custodians. Did you know? Step 1. Identify job hazards. Step 2. Work towards solutions

2.01 All employees of the University of Windsor shall be vigilant and shall exercise appropriate due diligence to minimize risks.

ST. AUGUSTINE S CATHOLIC PRIMARY SCHOOL

Duties of a Principal

HEALTH & SAFETY POLICY. 1. Policy Schedule. Date of last review: October Date of next review: September 2018.

Occupational Health and Safety Act, 1993 Asbestos Regulations, 2001

INJURY AND ILLNESS PREVENTION PLAN (IIPP) October 2015

Hazardous Materials and Waste Management Plan

\ University of California, Berkeley Injury and Illness Prevention Program

MASTER INDEX: Policies & Procedures Categories Page 1 of 1

Workplace Safety and Health Management System Administration

HEALTH AND SAFETY POLICY

DIRECTORATE OF ESTATES & FACILITIES THE UNIVERSITY OF MANCHESTER PROCEDURE AND INFORMATION MANUAL. EPM HS25 Asbestos Management Plan

CONTRACTORS SAFETY PROCEDURES Health and Safety Procedures Overview. Safety is a high priority of the Chinook s Edge School Division No. 73.

Injury and Illness Prevention Program. For. Banning Unified School District

HEALTH AND SAFETY POLICY

Transcription:

ADMINISTRATIVE PROCEDURE Approval Date 2014 Review Date 2019 Contact Person/Department Human Resources Administrator Replacing All Previous Procedures Page 1 of 6 Identification HR - 4206 ASBESTOS MANAGEMENT PLAN 1.0 PURPOSE Trillium Lakelands District School Board recognizes and is committed to its responsibilities to provide for the health and safety of all staff while at work. The matter of health and safety is of fundamental importance and every reasonable measure will be taken to protect all employees from injury due to accidents and health hazards. In order to achieve this objective, all employees are required to be active in health and safety and accident prevention by performing their tasks in accordance with the Occupational Health and Safety Act, the Regulations under the Act, established safety procedures, and safe work practices on the job. It is the responsibility of employees having supervisory responsibilities, to ensure that employees reporting to them comply with established safe work practices and procedures. Trillium Lakelands District School Board shall provide a safe and healthy environment. The purpose of this plan is to provide information on procedures and accepted work practices in compliance with the current (Ontario Regulation 278/05 Designated Substance Asbestos on Construction Projects and in Building and Repair Operations, July 1, 2010). To properly establish this program, staff must be aware of the program and the procedures to follow when conducting maintenance and other work that might disturb asbestos-containing material. 2.0 REFERENCES AND RELATED DOCUMENTS 2.1 Health and Safety Policy BU-3050 2.2 Occupational Health and Safety Act 2.3 Workplace Hazardous Materials Information System Regulations 2.4 Industrial Establishments Regulations 2.5 Education Act and Regulations 2.6 Ontario Regulation 278/05

ASBESTOS MANAGEMENT 2 HR - 4206 3.0 TERMS AND DEFINITIONS 3.1 ASBESTOS - a natural fibre commonly used in the manufacture of building materials. The use of asbestos is generally classified into two groups: friable and non-friable. Friable material may be found in pipe elbows, straight pipe insulation, as well as boiler and valve wrapping. If friable material is disturbed or damaged, fibres will become airborne. Although friable materials are banned as a construction material, it is still present in many buildings. Materials of non-friability include vinyl asbestos tile (VAT), ceiling tile, and transite cement. Several diseases are associated with exposure to asbestos through the inhalation of fibres. These include asbestosis, mesothelioma, cancer of the lung and other asbestos related cancers. There is typically a latency period of more than ten years after the first exposure to asbestos and the onset of an asbestos related disease (Designated Substances in the Workplace: A Guide to the Regulation Respecting Asbestos on Construction Projects and in Buildings and Repair Operations, Ontario Ministry of Labour, 2005). 3.2 FRIABLE ASBESTOS a material that is friable is one which can be crumbled, pulverized or powdered by hand pressure. 3.3 NON-FRIABLE ASBESTOS a material that is non-friable is one in which the asbestos fibres are bound or locked into the product matrix, so that the fibres are not readily released. 3.4 DETAILED SURVEY FOR ACCESSIBLE ASBESTOS CONTAINING MATERIALS (ACM) - record of all buildings owned and occupied within the school district which contain asbestos materials. 3.5 ASBESTOS MANAGEMENT PLAN a plan which sets out the steps required to handle asbestos containing materials. 3.6 TYPE I, TYPE II, TYPE III OPERATIONS - Operations that may expose a worker to asbestos are classified as Type 1, Type 2 and Type 3 operations (see Ont. Reg. 278/05) 4.0 ADMINISTRATIVE PROCEDURE 4.1 RESPONSIBILITIES 4.1.1 FACILITY SERVICES a) Detailed Survey for Accessible Asbestos Containing Materials (ACM) As part of the Asbestos Management Plan, it is mandatory to prepare and maintain a record of all buildings owned and occupied within the school district which contain asbestos materials. A building record will be established by means of a written report or electronic file with attached floor plans. The report and/or drawings will show the extent and condition of the accessible asbestos containing materials in the building, location of any samples taken, as well as the results of the analysis of the samples taken.

ASBESTOS MANAGEMENT 3 HR - 4206 A copy of the detailed survey, as well as the Asbestos Management Plan will be kept in the main office of each facility where it will be available for review. It will be used to direct employees or contractors in locating asbestos containing material while they are performing work. b) Annual Reassessment An annual inspection will be conducted by the Facility Services Department to update the condition of any accessible asbestos containing materials in the building. A copy of this inspection will be kept by the school with the Asbestos Management Plan. c) Training Program i) Asbestos Abatement Workers Training is to be provided to those workers who are working directly with asbestos containing material in repair/removal operations. The training will be arranged by the Facility Services Department and will cover areas as outlined in the Regulation. ii) Custodial/Maintenance Staff The Facility Services Department will co-ordinate training for all new Custodians and Maintenance staff. Those individuals requiring training will be identified by the Operations Supervisors. The training will cover areas as outlined in the Regulation. d) Notification of Damaged ACM Any concerns regarding damaged/deteriorated asbestos materials are to be directed to the Facility Services Department. The Facility Services Department will evaluate the condition of the material and arrange for clean-up and repair/removal as appropriate. e) Maintenance of the Asbestos Management Plan A copy of the Detailed Survey, Intrusive Inspection, the Annual Reassessment, as well as any repair/removal reports must be maintained at the school in the main office (within the asbestos binder), as well as at the Facility Services Department. Any consultant/contractor or maintenance reports involving repair or removal must be kept on file at the Facility Services Department and noted in the Asbestos Survey.

ASBESTOS MANAGEMENT 4 HR - 4206 f) School Notification It is the responsibility of the Senior Manager of Facility Services or Designate to notify the school Principal in writing prior to any asbestos repair/removal projects under said Manager s control. Note: If the school Principal is not available for notification (i.e. summer hours), then the Custodial Supervisor will be notified. g) Type III Operations The Senior Manager of Facility Services or Designate will retain the services of a qualified contractor for all Type III Asbestos removal projects. Work will be completed as per the applicable regulation and under the direction of an engineering or environmental consultant trained in the field. h) Intrusive Inspection for Construction Purposes In the event of renovation or demolition of a building, it is the responsibility of the Senior Manager of Facility Services or Designate to arrange for an intrusive inspection to non-accessible areas when necessary. i) Type III Operations School Notification It is the responsibility of the Senior Manager of Facility Services or Designate to notify the school Principal in writing prior to any asbestos repair/removal projects under said Manager s control. Note: If the Principal is not available for notification (i.e. summer hours), then notification will take place through the Custodial Supervisor. 4.1.2 MAINTENANCE SUPERVISOR a) Asbestos Abatement Workers Type I and Type II operations (as outlined in the Regulation) may be performed by the Facility Services Department under the direction of the Maintenance Supervisor. The Facility Services Department will provide supplies and equipment as required. All repair/removal operations will be documented and kept on file at the Facility Services Department and recorded in the Asbestos Survey. Maintenance workers will undergo asbestos training prior to engaging in asbestos work. All asbestos removal shall be performed in accordance with the Regulation.

ASBESTOS MANAGEMENT 5 HR - 4206 b) Medical Surveillance i) Pre-Placement Examination It is mandatory that all Board employees engaging in asbestos work receive a pre-placement medical by a qualified physician. The medical will include a series of tests including a pulmonary function test and a chest x-ray. Human Resources will maintain all pertinent documentation with supporting confidentiality. ii) Asbestos Work Report All persons involved in Type II and Type III operations are required by the Ministry of Labour to produce an Asbestos Work Report Form 1". Form 1 must be submitted to the Ministry of Labour once every 12 months, and immediately upon termination. The Asbestos Work Report will include the number of hours the worker has spent on a Type II or Type III operation. The Provincial Physician keeps track of the worker s accumulated exposure and will determine when a medical examination is required. c) Maintenance Staff and Contractors Maintenance staff and contractors will be supplied with all documentation involving the location of all friable and nonfriable asbestos, in chance of contact with or disturbance of the material. Notification to contractors will be supplied by a written statement on Purchase Order or Tender agreement. Note: Maintenance staff/contractors must immediately cease work if they come across asbestos that must be disturbed or removed. Work may only resume after approval from the Senior Manager of Facility Services or Designate. d) School Notification It is the responsibility of the Maintenance Supervisor to verbally notify the school Principal prior to any asbestos repair/removal projects under said Supervisor s control. Note: If the Principal is not available for notification (i.e. summer hours), then notification will take place through the Custodial Supervisor.

ASBESTOS MANAGEMENT 6 HR - 4206 e) TRANSPORTATION AND DISPOSAL The Maintenance Supervisor will arrange for proper disposal of asbestos waste as per the asbestos waste regulation made under the Environmental Protection Act. 4.1.3 PURCHASING SUPERVISOR a) Purchasing Services The Purchasing Supervisor, in conjunction with the Facility Services Department, will provide procurement services for asbestos operation requirements, including written documentation of the location of friable and non-friable asbestos. 4.1.4 SCHOOL PRINCIPALS/BUILDING MANAGERS 4.2 BULK SAMPLES a) Contractor Notification Ensure maintenance staff as well as contractors review the Detailed Survey with the Head Custodian prior to undertaking any work. b) Staff Notification It is the responsibility of the Principal to notify staff of the Asbestos Management Plan and Detailed Survey. These documents are available for review in the main office. Principals/Building Managers will notify staff of the time and location of any asbestos work operation. Copies of the floor plan showing the location of asbestos containing materials will be given to staff at the beginning of each school year. If asbestos repair/removal projects take place during the summer months, the Custodial Supervisor is responsible to inform custodians and maintenance of the repair/removal. Representative bulk samples will be taken by the Facility Services Department to determine if a suspect material contains asbestos. Analysis will determine if the material does or does not contain asbestos, the type, and the concentration. The number of samples taken shall be in accordance with TABLE 1 BULK MATERIAL SAMPLES of the Regulation.