Navigation Approach to 408 Guidance

US Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG

DEPARTMENT OF THE ARMY EC US Army Corps of Engineers CECW-ZB Washington, DC Circular No September 2018

New Draft Section 408 Policy Document EC

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

Planning Modernization & WRRDA Implementation

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

Civil Works Process Overview

Digitally signed by BIGELOW.BENJAMIN.JAMES ou=pki, ou=usa, cn=bigelow.benjamin.james Date:

PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF ENGINEERS PROJECT PURSUANT TO 33 U.S.C. SECTION 408

DEPARTMENT OF THE ARMY EC U.S. Army Corps of Engineers CECW Washington, D.C Circular No December 2012

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS 441 G STREET, NW WASHINGTON, DC

Update on USACE Civil Works Program Authorities, Policies, and Guidance

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Washington, DC

REVIEW OF DECISION DOCUMENTS

REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408

Regulation 20 November 2007 ER APPENDIX H POLICY COMPLIANCE REVIEW AND APPROVAL OF DECISION DOCUMENTS TABLE OF CONTENTS

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE

What is a Cooperative Agreement?

REVIEW PLAN. San Clemente Storm Damage and Shoreline Protection Feasibility Study

GAO ARMY CORPS OF ENGINEERS. Peer Review Process for Civil Works Project Studies Can Be Improved

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

Water Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress

Levees in the USA and the Vital Role of Local Sponsors

Dave (Sanford) always good to see you again. Ladies & Gentlemen, I m glad to be here

Distribution Restriction Statement Approved for public release; distribution is unlimited.

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program

CITY OF LAREDO Environmental Services Department

CURRENT AND FUTURE STUDIES

Department of the Army U.S. Army Corps of Engineers Washington, DC

REVIEW PLAN MALIBU CREEK ECOSYSTEM RESTORATION FEASIBILITY STUDY MALIBU, CALIFORNIA LOS ANGELES DISTRICT

REVIEW PLAN. Dade County Florida Beach Erosion Control and Hurricane Protection (BEC&HP) Project Limited Reevaluation Report. Jacksonville District

Distribution Restriction Statement Approved for public release; distribution is unlimited.

U.S. Army Corps of Engineers Navigation Program Update

Quality Assurance/Quality Control Procedures for Environmental Documents

USACE 2012: The Objective Organization Draft Report

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

REVIEW PLAN. Savannah Harbor DMCA 12A Dike Raising

U.S. Army Corps of Engineers Navigation Program Update

WATER SUPPLY CHALLENGES: THE ACF CASE

Department of Army Permit Evaluation Process

REVIEW PLAN SAIPAN LAGOON AQUATIC ECOSYSTEM RESTORATION STUDY SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS (CNMI)

Brig. Gen. Thomas W. Kula Commanding General Aug. 14, US Army Corps of Engineers BUILDING STRONG

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DIVISION, GREAT LAKES AND OHIO RIVER CORPS OF ENGINEERS 550 MAIN STREET CINCINNATI, OH

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

Cooperative Agreements

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

Security Zones; Naval Base Point Loma; Naval Mine Anti Submarine. SUMMARY: The Coast Guard is increasing a portion of an existing

REVIEW PLAN ORESTIMBA CREEK, CALIFORNIA FLOOD RISK MANAGEMENT FEASIBILITY STUDY SACRAMENTO DISTRICT

DEPARTMENT OF THE ARMY. MEMORANDUM FOR Commander, US Army Corps of Engineers, Los Angeles District, (ATTN: CESPL-ED-DB, Mr.

U.S. Army Corps of Engineers Chicago District PM Symposium 2015

National Levee Safety Program (NLSP)

US Army Corps of Engineers. Little Rock District

SAFETEA-LU. Overview. Background

jobs program earmark ban

South Atlantic Division. US Army Corps of Engineers

Corps Regulatory Program Update

PUBLIC NOTICE.

-2- 4) The Corps will ensure the biological assessment is prepared in accordance with the Corps' "Biological Assessment Template."

Savannah District Presentation

PEER REVIEW PLAN SANTA CRUZ RIVER FEASIBILITY STUDY (TRES RIOS DEL NORTE) LOS ANGELES DISTRICT

DEPARTMENT OF THE ARMY *EC U.S. Army Corps of Engineers CECW-CE Washington, DC Circular No January 2018

Distribution Restriction Statement Approved for public release; distribution is unlimited.

Human Subject Regulations Decision Charts

Regional Economic Impact Analysis of the American Recovery and Reinvestment Act US Army Corps of Engineers

Cooperative Agreements. US Army Corps of Engineers BUILDING STRONG

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA September 17, 2018 PUBLIC NOTICE

WELCOME! Public Involvement 2 of 2: Public Involvement and NEPA

Cultivating Interagency Consistency NRCS/Corps Regulatory Workgroup

United States Army Corps of Engineers Overview

WEBER HYDROELECTRIC PROJECT Scoping Meeting

U.S. Army Corps of Engineers Navigation Program Update

TRICARE Management Activity s Human Research Protection Program, Data Sharing Agreement Program, and the TMA Privacy Board

TEXOMA Same Conference

Sabine Pass to Galveston Bay, Texas

November 20, 2017 PUBLIC NOTICE

Infrastructure Month Tool Kit Talking Points

OMBIL. Wednesday, April 19 th, 2:10 3:10 Dena Williams Miriam Fleming Jeff Krause

CDBG Crosscutting Issues: Environmental Review

Proposed Connector between Airline Highway (US 61) and Interstate 10 in St. John the Baptist Parish

PUBLIC NOTICE Application for Permit

DEPARTMENT OF THE ARMY GENERAL PERMIT

US ARMY CORPS OF ENGINEERS PERMITTING ARTIFICIAL REEFS

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

MAP-21 and Project Delivery: A Legal Perspective

SPECIFIC AND MASTER PLANS

Project Management Plan (PMP) Park Ranger Community of Practice

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

ENVIRONMENTAL ASSESSMENTS. Classification & Documentation

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

The House and Senate overwhelmingly approved the legislation. The vote in the Senate was 91-7 and in the House of Representatives.

TEXAS DEPARTMENT OF TRANSPORTATION. Transportation and the Federal Government

Georgia Environmental Conference

Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

USACE NATURAL RESOURCE MANAGEMENT UNIFORM PROGRAM

AAPA/USACE Quality Partnership Initiative

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Society of American Military Engineers (SAME) Arkansas/Tulsa Post 2012 Future Work and Partnering Symposium

Transcription:

Engineer Circular 1165-2-216 Requests to Alter USACE Projects Tammy Conforti Levee Safety Program Manager and Section 408 Policy Lead HQUSACE US Army Corps of Engineers

Topics Background Process Overview Key Policy Highlights 2

Background 33 USC 408 Provides the Secretary of the Army authority to grant permission to alter a USACE civil works project if 1. Does not impair usefulness of the project 2. Not injurious to the public interest 3

Purpose Improve consistency in the way USACE considers, processes, and documents decisions for requests for alterations to Civil Works projects. Create a process that is applicable to all types of Civil Works projects. Be transparent on what information is required. Create a process that can be tailored by districts to the appropriate scope, scale, and complexity of a proposed alteration. 4

What does this EC apply to? All USACE Civil Works projects Alterations within real estate interests of the USACE project Actions that build upon, alter, improve, move, occupy, or otherwise could affect the USACE project 5

What does this EC not apply to? Routine operations and maintenance activities Shoreline Management and Master Planning Programs Certain Real Estate Outgrants 6

Basic Layout of the EC The main EC applies to all Section 408 requests The appendices provide supplemental guidance - Dams and Reservoirs (including Navigation Dams) Non-Federal Hydropower Development Levee, Floodwall or Flood Risk Management Channel Projects Navigation Channels, Harbors, Locks, Jetties, Bridges, and Features Accepting funds through Section 214 System Performance Analysis 7

Terminology No more minor versus major Permission (instead of permit) Alteration (instead of modification or encroachment) Requester (instead of applicant) H&H System Performance Analysis (instead of H&H Risk Analysis) Categorical Permission (similar to General Permit) 8

Process Overview 9

Basic Steps Step 1: Pre-Coordination Step 2: Written Request Step 3: Required Documentation Step 4: District Agency Technical Review Step 5: Summary of Findings Step 6: Division Review, if required Step 7: HQ Review, if required Step 8: Notification Step 9: Post-Permission Oversight 10

Key Points Process is intended to be scalable, based on the scope and scale of the proposed alteration Process is district led Created some ways to streamline the process Coordination throughout the process is encouraged 11

Non-federal sponsor Team Members Applicant, if not the non-federal sponsor District Section 408 Coordinator To ensure coordination across business lines To provide requestors with one point of contact Appropriate Regional Integration Team 12

Key Policy Highlights 13

Real Estate Outgrants Lead is the Real Estate Contracting Officer Can follow processes for recreational and nonrecreational outgrants Real Estate must ensure technical requirements in appendices of the EC are met Real Estate must check if HQ review and decision is need based on decision questions in EC. If HQ review is required, then considered a Section 408 and Director of CW approval will be required Outgrants not covered by Real Estate guidance is a Section 408 14

Role of the Non-federal Sponsor Because non-federal sponsors are cost-share partners and/or have O&M responsibilities Section 408 requests must come from or have written concurrence of the non-federal sponsor If there are multiple sponsors, each sponsor must provide concurrence Written acknowledgment and acceptance of any new O&M requirements Reminder that 33 CFR 208.10 focuses on sponsors responsibilities. Decision to issue a Section 408 permission is a USACE responsibility. Processes for both can work together, but one does not replace the other. 15

Environmental Compliance A Section 408 decision is a federal action and NEPA and other environmental compliance is required. Scope of analysis limited to the federal project areas that would be directly or indirectly affected by proposed alteration. NEPA documentation the requester s proposal will be identified as the requester s preferred alternative. Alternatives analysis is limited to 1) no action and 2) requester s preferred alternative. 16

Environmental Compliance Categorical exclusions may apply Leverage existing NEPA documentation EAs will not be circulated without Division approval EISs do not have to come up to HQ before released for public review 17

Coordination with Regulatory When a Section 408 request also requires a Section 10/404/103 decision, close coordination is required Section 10/404/103 decisions are separate decisions and require separate decision documentation Leverage information between the two processes Note, injurious to the public interest for Section 408 is not the same as contrary to the public interest for Section 10/404/103 Section 408 decision must be made before the Section 10/404/103 decision is issued 18

Review Requirements Section 408 review requirements are not covered in detail in Engineer Circular 1165-2-214 (review policy) Type I Independent External Peer Reviews (IEPRs) are not required Review requirements are determined by the district based on the scope and scale of the alteration The requester is responsible to develop a review plan for Type II IEPRs and quality control as determined by the district The district is responsible to develop a review plan to cover the district s review of the Section 408 request 19

District Review Plans Cover district-led Agency Technical Review (ATR) of the Section 408 requests ATR will make three determinations 1. Impair the usefulness of the USACE project 2. Injurious to the public interest 3. Legal and policy compliance 20

Decision Level Delegation of authority: From ASACW to Chief of Engineers to DCW The Division can create a regional process DCW has delegated certain Section 408 requests to the District Commanders The required documentation is based on the alteration and should be the same regardless of decision level 21

Division/HQ Review Questions in which the answer "yes" would require a Division/HQUSACE review and decision 1. Type II IEPR? 2. EIS? 3. Change how authorized purpose is met? 4. Impact study alternatives? 5. Crediting being sought? 6. Installation of hydropower facilities? 7. Is ASACW approval needed under Section 204(f)? Only complete Summary of Findings should be submitted to Division then to HQ The Division Commander has the ability to deny the request prior to reaching HQ 22

Categorical Permission New Concept Similar to a General Permit for the Regulatory Program Cover alterations similar in nature with similar impacts Provide public notice of the potential activities Create a validation process 23

WRRDA 2014 Section 1006: Policy for accepting funds under Section 214 of WRDA 2000 will be updated Section 1007: Post process for public comment within one year Establish specific timelines Create a public database for tracking Section 1008: Provision for expedited hydropower projects 24

Submit internal and external feedback on USACE Civil Works webpage at http://www.usace.army.mil/missions/civilwor ks 25

Discussion 26