MTRIOT MISSILE. Software Problem Led Dhahran, Saudi Arabia. II Hi. jri&^andiovers^ht;gbmmittee afeejs$ää%and Technology,House ofbepre^eiitativess^

Similar documents
The Patriot Missile Failure

mm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150%

STATEMENT J. MICHAEL GILMORE DIRECTOR, OPERATIONAL TEST AND EVALUATION OFFICE OF THE SECRETARY OF DEFENSE BEFORE THE SENATE ARMED SERVICES COMMITTEE

DISTRIBUTION STATEMENT A

Theater Ballistic Missile Defense Analyses

Analysis of Interface and Screen for Ground Control System

MEADS MEDIUM EXTENDED AIR DEFENSE SYSTEM

THAAD Program Summary

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #161

MEADS Program Overview

Math 120 Winter Recitation Handout 4: Introduction to Related Rates

Kinetic Energy Kill for Ballistic Missile Defense: A Status Overview

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Air Defense System Solutions.

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

Defense Support Program Celebrating 40 Years of Service

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

2018 Annual Missile Defense Small Business Programs Conference

OPERATION DESERT SHIELD/ DESERT STORM Observations on the Performance of the Army's HeUfire Missile

Military Radar Applications

ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1

Russian defense industrial complex s possibilities for development of advanced BMD weapon systems

Phased Adaptive Approach Overview For The Atlantic Council

Standard Missile: Snapshots in Time Captured by Previous Johns Hopkins APL Technical Digest Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II

Lockheed Martin Corporation Integrating Air & Missile Defense

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

SMDC/ARSTRAT Role In Support Of Army Integrated Air and Missile Defense

Fire Support Systems.

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

2017 Annual Missile Defense Small Business Programs Conference

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45

The Verification for Mission Planning System

MEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

A METHOD OF RISK ANALYSIS AND THREAT MANAGEMENT USING ANALYTIC HIERARCHY PROCESS: AN APPLICATION TO AIR DEFENSE

Arms Control Today. U.S. Missile Defense Programs at a Glance

Science, Technology, and Attack Tactics Relevant to National Missile Defense Systems

GAO. DEFENSE BUDGET Trends in Reserve Components Military Personnel Compensation Accounts for

First Announcement/Call For Papers

Advanced Technology Overview for the Huntsville Aerospace Marketing Association

An Informed Guess About Why Patriot Fired Upon Friendly Aircraft and Saw Numerous False Missile Targets During Operation Iraqi Freedom

GUI_missileFlyout v2.01: User s Guide

AUSA BACKGROUND BRIEF

UNCLASSIFIED UNCLASSIFIED

MEMORANDUM. BASE OPS/ International Spy Museum. Operation Minute by Minute. 01 October, 1962 (time travel skills required)

Missile Defense Program Overview For The European Union, Committee On Foreign Affairs, Subcommittee On Security And Defence

2008 Assessment of the Ballistic Missile Defense System (BMDS)

C4I System Solutions.

AGI Technology for EW and AD Dominance

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY AVIATION Apache Longbow Weight and Communication Issues

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

Department of Defense

European Parliament Nov 30, 2010

Edited extract from: Department of the Army Historical Summary, FY 1979 (Washington, D.C.: U.S. Army Center of Military History, 1982, pp

GAO FORCE STRUCTURE. Improved Strategic Planning Can Enhance DOD's Unmanned Aerial Vehicles Efforts

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER

or.t Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved for Public Release Distribution Unlimited

Doc 01. MDA Discrimination JSR August 3, JASON The MITRE Corporation 7515 Colshire Drive McLean, VA (703)

Ballistic Missile Defense Update

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Section 7 A HYPOTHETICAL SYSTEM ARCHITECTURE

FAS Military Analysis GAO Index Search Join FAS

Evaluation of U.S. Army Assessment of Patriot Antitactical Missile Effectiveness

Acquisition Review Quarterly Winter 2003

FM AIR DEFENSE ARTILLERY BRIGADE OPERATIONS

1THE ARMY DANGEROUSLY UNDERRESOURCED' AUSA Torchbearer Campaign Issue

Ground-Based Air Defence System IRIS-T SLM IRIS-T SLS

Chapter 13 Air and Missile Defense THE AIR THREAT AND JOINT SYNERGY

Summary Report for Individual Task Perform a Tactical Aerial Reconnaissance and Surveillance Mission Status: Approved

The Cruise Missile Threat: Prospects for Homeland Defense

Department of Defense

UNCLASSIFIED R-1 ITEM NOMENCLATURE

SHOWDOWN IN THE MIDDLE EAST

Missile Defense Agency Small Business Innovative Research (SBIR) /

Addendum 9 March 2017

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

FIGHTER DATA LINK (FDL)

Trusted Partner in guided weapons

BMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

A/55/116. General Assembly. United Nations. General and complete disarmament: Missiles. Contents. Report of the Secretary-General

A991072A W GAO. DEFENSE SATELLITE COMMUNICATIONS Alternative to DOD's Satellite Replacement Plan Would Be Less Costly

Introduction to missiles

Kill Vehicle Work Breakdown Structure

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Subj: ELECTRONIC WARFARE DATA AND REPROGRAMMABLE LIBRARY SUPPORT PROGRAM

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

Report to Congress. Theater Missile Defense. Architecture Options. for the Asia-Pacific Region

Exhibit R-2, RDT&E Budget Item Justification

Activity: Persian Gulf War. Warm Up: What do you already know about the Persian Gulf War? Who was involved? When did it occur?

Challenges in Vertical Collaboration Among Warfighters for Missile Defense C2

CRS Report for Congress

BATTLEFIELD AUTOMATION Software Problems Hinder Development of the Army's Maneuver Control System

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Transcription:

?*$m mw 1, H«"» it in laii Office jri&^andiovers^ht;gbmmittee afeejs$ää%and Technology,House ofbepre^eiitativess^ MTRIOT MISSILE Software Problem Led Dhahran, Saudi Arabia ^^y^ 19980513 249 II Hi SMSTRraDTlON STATEMENT * j&pprcmxi for puife raiocn»* wmm.;: ' : "^Pi^isf^;^ '^*ü ^P^i mmm&m &Mm A^'i *,;y.i^>»**«,fa, & $*"; <j^<t -»V t^. &)$,* < ' ** *"»^S»'S{P : [WLWJ 8o %.<&& '?SSi?i^%#J^ii^Ä», i1'^wl 1;'$'^^W$ S I?

Accession Number: 3461 Publication Date: Feb 01, 1992 Title: Patriot Missile Defense: Software Problem Led to System Failure at Dhahran, Saudi Arabia Corporate Author Or Publisher: U.S. General Accounting Office, GAO, Washington, DC 20548 Report Number: GAO/IMTEC-92-26 Descriptors, Keywords: Patriot Missile Defense System Operation Desert Storm Dhahran Saudi Arabia Scud Army Barracks Software Surface To Air Mobile Short Range Ballistic Missile Pages: 00016 Cataloged Date: Apr 23, 1992 Document Type: HC Number of Copies In Library: 000001 Record ID: 23702

GAO United States General Accounting Office Washington, D.C. 20548 Information Management and Technology Division B-247094 February 4,1992 The Honorable Howard Wolpe Chairman, Subcommittee on Investigations and Oversight Committee on Science, Space, and Technology House of Representatives Dear Mr. Chairman: On February 25, 1991, a Patriot missile defense system operating at Dhahran, Saudi Arabia, during Operation Desert Storm failed to track and intercept an incoming Scud. This Scud subsequently hit an Army barracks, killing 28 Americans. This report responds to your request that we review the facts associated with this incident and determine if a computer software problem was involved. If so, you asked that we provide information on what the specific software problem was, and what has been done to correct it. Appendix I details our objectives, scope, and methodology. Results in Brief The Patriot battery at Dhahran failed to track and intercept the Scud missile because of a software problem in the system's weapons control computer. This problem led to an inaccurate tracking calculation that became worse the longer the system operated. At the time of the incident, the battery had been operating continuously for over 100 hours. By then, the inaccuracy was serious enough to cause the system to look in the wrong place for the incoming Scud. The Patriot had never before been used to defend against Scud missiles nor was it expected to operate continuously for long periods of time. Two weeks before the incident, Army officials received Israeli data indicating some loss in accuracy after the system had been running for 8 consecutive hours. Consequently, Army officials modified the software to improve the system's accuracy. However, the modified software did not reach Dhahran until February 26, 1991 the day after the Scud incident. Background The Patriot is an Army surface-to-air, mobile, air defense missile system. Since the mid-1960s, the system has evolved to defend against aircraft and cruise missiles, and more recently against short-range ballistic missiles. MO^II&M IX Xl\itii''iiJ*J fsedi PLEASE RETURN TO: BMD TECHNICAL INFORMATION CENTER BALLISTIC MISSILE DEFENSE ORGANIZATION 7100 DEFENSE PENTAGON WASHINGTON D.C. 20301-7100 s Software Problem

B-247094 Figure 1: Patriot Fired for Missile Interception '1* Source: Department of Defense The Patriot system was originally designed to operate in Europe against Soviet medium- to high-altitude aircraft and cruise missiles traveling at speeds up to about MACH 2 (1500 mph). To avoid detection it was designed to be mobile and operate for only a few hours at one location. JWHIH33TIÖ2 Page 2 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 Patriot System Description The Patriot operates as part of a battalion usually composed of six batteries. Each battery is made up of one ground-based radar unit for surveillance and target detection, tracking, and engagement; an Engagement Control Station for manual or automated command and control of the missile interceptors; eight missile launchers; and a Communications Relay Group for communications support. An Information Coordination Center controls the batteries and coordinates their operation with other battalions and higher level U.S. Command authorities. Figure 2: Patriot Missile Launcher in Saudi Arabia Source: Department of Defense Page 3 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 The heart of the Patriot system is its weapons control computer. It performs the system's major functions for tracking and intercepting a target, as well as other battle management, command and control functions. The Patriot's weapons control computer used in Operation Desert Storm is based on a 1970s design with relatively limited capability to perform high precision calculations. To carry out its mission, the Patriot's weapons control computer obtains target information from the system's radar. The Patriot's radar sends out electronic pulses that scan the air space above it. When the pulses hit a target they are reflected back to the radar system and shown as an object (or plot) on the Patriot's display screens. 1 Patriot operators use the software to instruct the system to intercept certain types of objects such as planes, cruise missiles, or tactical ballistic missiles (such as Scuds). During Desert Storm the Patriot was instructed to intercept tactical ballistic missiles. For the Patriot's computer to identify, track, and intercept these missiles, important information 2 describing them was kept by the system's range-gate algorithm. 3 After the Patriot's radar detects an airborne object that has the characteristics of a Scud, the range gate an electronic detection device within the radar system calculates an area in the air space where the system should next look for it. The range gate filters out information about airborne objects outside its calculated area and only processes the information needed for tracking, targeting, and intercepting Scuds. Finding an object within the calculated range gate area confirms that it is a Scud missile. Figure 3 depicts a correctly calculated range gate area. A radar plot indicates the object's position in terms of latitude, longitude, and azimuth (elevation angle in degrees from the radar). A radar track is a series of plots that, when processed, indicate an object's altitude, speed, direction, and position. 2 Such information includes velocity (speed and direction), latitude, longitude, azimuth, and altitude. 3 An algorithm is a precise description of a method for solving a particular problem. Page 4 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 Figure 3: Correctly Calculated Range Gate 3. Track Action - Only Range Gated Portion ot Beam Processed 2. Validation Action Normal Action Range Gate 1. Search Action- No Range Gate Entire Beam Processed Patriot Radar System The range gate's prediction of where the Scud will next appear is a function of the Scud's known velocity and the time of the last radar detection. Velocity is a real number that can be expressed as a whole number and a decimal (e.g., 3750.2563...miles per hour). Time is kept continuously by the system's internal clock in tenths of seconds but is expressed as an integer or whole number (e.g., 32, 33, 34...). The longer the system has been running, the larger the number representing time. To predict where the Scud will next appear, both time and velocity must be expressed as real numbers. Because of the way the Patriot computer performs its calculations and the fact that its registers 4 are only 24 bits long, the conversion of time from an integer to a real number cannot be any more precise than 24 Registers are temporary storage areas for instructions or data. They are special storage locations whose advantage is speed. They can very rapidly accept and transfer instructions or data and are therefore used in performing arithmetic or comparison operations. Page 5 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 bits. 5 This conversion results in a loss of precision causing a less accurate time calculation. The effect of this inaccuracy on the range gate's calculation is directly proportional to the target's velocity and the length of time the system has been running. Consequently, performing the conversion after the Patriot has been running continuously for extended periods causes the range gate to shift away from the center of the target, making it less likely that the target, in this case a Scud, will be successfully intercepted. Key Events Leading to Patriot's Failure to Intercept Scud Missile Shortly after Operation Desert Shield began, Patriot battalions were deployed to Saudi Arabia and then to Israel. These battalions were generally placed in permanent positions to defend key assets, military personnel, and citizens against Iraqi Scud missiles. Because this was the first time the Patriot had been used to defend against Scud missiles, which fly at approximately MACH 5 (3750 mph), the Army had much to learn about tracking and intercepting them. To obtain Scud data, the Army relied on operational experience conveyed by Patriot users as well as other intelligence sources. With the launch of each Scud, the Army became more and more knowledgeable about the Scud's flight characteristics. Recorded data is another more useful tool that could have provided detailed data on the Patriot's actual performance. However, obtaining recorded performance data from Patriot units was hindered for two reasons. First, the Patriot was not equipped with an embedded (internal) data recorder to retain system performance information. Second, although portable, external data recorders were available, U.S. commanders decided not to use them because they believed the recorders could cause an unanticipated system shutdown. However, Israeli commanders used data recorders on the Patriot systems they controlled and provided this data to the U.S. Army. As information from all sources became available, software changes were made from August 1990 to February 1991 by the Patriot Project Office in Huntsville, Alabama, to adapt the system to the Desert Storm environment. During the conflict the Patriot's software was modified six times. Patriots had to be shut down for at least 1 to 2 hours to install each software modification. The precision of a computer's calculations depends on the number of bits in its registers. Since the Patriot's registers are only 24 bits long, precision beyond 24 bits is not possible unless the software is specifically written to adjust for such hardware limitations. Computers built today have registers that contain as many as 64 bits, permitting calculations with far greater precision. Page 6 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 Anomaly Observed in Patriot Range Gate On February 11,1991, the Patriot Project Office received Israeli data identifying a 20 percent shift in the Patriot system's radar range gate after the system had been running for 8 consecutive hours. (Figure 4 depicts the location of a Scud within the range gate after the Patriot has been in operation for over 8 hours.) This shift is significant because it meant that the target (in this case, the Scud) was no longer in the center of the range gate. The target needs to be in the center of the range gate to ensure the highest probability of tracking the target. As previously mentioned, the range gate is calculated by an algorithm that determines if the detected target is a Scud, and if the Scud is in the Patriot's firing range. If these conditions are met, the Patriot fires its missiles. Figure 4: Calculated Range Gate After Approximately 8 Hours 1. Search Action- No Range Gate Entire Beam Processed 2. Validation Action 3. Track Action - Only Range Gated Portion of Beam Processed /3/\ Range \ Gate \ y Area V^lg^X 20 Percent Shift >jsiii"p V In Range Gate Patriot Radar System Page 7 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 Figure 5: Incorrectly Calculated Range Gate Patriot Project Office officials said that the Patriot system will not track a Scud when there is a range gate shift of 50 percent or more. Because the shift is directly proportional to time, extrapolating the Israeli data (which indicated a 20 percent shift after 8 hours) determined that the range gate would shift 50 percent after about 20 hours of continuous use. Specifically, after about 20 hours, the inaccurate time calculation becomes sufficiently large to cause the radar to look in the wrong place for the target. Consequently, the system fails to track and intercept the Scud. See Figure 5 for a representation of an incorrect range gate calculation. Appendix II shows the number of meters the range gate shifts from the center of the target after continuous operation. 2. Validation Action / 3. Track Action - Only Range Gated Portion of Beam Processed /3/> 1. Search Action- No Range Gate- Entire Beam /^V^ Processed / fs^v. ^* >;^^ "y?\ ^ ^Jii* ^". \ Missile Outside ( 2 \ V Range Gate \ \\ Range \^Y Gate \ "" \ V Area Missile ä ikäv&'&wsrvwwssäwivj'jw^ Patriot Radar System ^SwfrT ES^ Page 8 GAO/IMTEC-92-26 Patriot Missile Software Problem

I B-247094 Significant shifts of the range gate away from the desired center of the target could be eliminated by rebooting the system turning the system off and on every few hours. Rebooting, which takes about 60 to 90 seconds, reinitializes the computer's clock, setting the time back to zero. Patriot Project Office Response to Anomaly Army officials said that they believed the Israeli experience was atypical they assumed other Patriot users were not running their systems for 8 or more hours at a time. However, after analyzing the Israeli data and confirming some loss in targeting accuracy, the officials made a software change which compensated for the inaccurate time calculation. This change allowed for extended run times and was included in the modified software version that was released on February 16,1991. However, Army officials did not use the Israeli data to determine how long the Patriot could operate before the inaccurate time calculation would render the system ineffective. On February 21,1991, the Patriot Project Office sent a message to Patriot users stating that very long run times could cause a shift in the range gate, resulting in the target being offset. The message also said a software change was being sent that would improve the system's targeting. However, the message did not specify what constitutes very long run times. According to Army officials, they presumed that the users would not continuously run the batteries for such extended periods of time that the Patriot would fail to track targets. Therefore, they did not think that more detailed guidance was required. Iraqi Scud Attack and Aftermath The air fields and seaports of Dhahran were protected by six Patriot batteries. Alpha Battery, the battery in question, was to protect the Dhahran Air Base. On February 25, Alpha Battery had been in operation for over 100 consecutive hours. Because the system had been on so long, the resulting inaccuracy in the time calculation caused the range gate to shift so much that the system could not track the incoming Scud. Consequently, Alpha Battery did not engage the Scud, which then struck an Army barracks and killed 28 American soldiers. On February 26, the next day, the modified software, which compensated for the inaccurate time calculation, arrived in Dhahran. According to Army officials, the delay in distributing the software from the United States to all Page 9 GAO/IMTEC-92-26 Patriot Missile Software Problem

B-247094 Patriot locations was due to the time it took to arrange for air and ground transportation in a wartime environment. In September 1991, officials from the Patriot Project Office stated that Patriot algorithms will continue to be re-examined as a result of experience gained during Desert Storm and will continue to be tested against aircraft, cruise, and tactical ballistic missiles. Further, an endurance test has been conducted to ensure that extended run times do not cause other system difficulties. We conducted our review from June 1991 to January 1992, in accordance with generally accepted government auditing standards. As requested, we did not provide a draft of this report to the Department of Defense for its review and comment. Instead, we discussed the report's facts with officials involved and incorporated their views as appropriate. These officials generally agreed with the facts as presented. We plan no further distribution of this report until 30 days from the date of this letter. We will then send copies to the Secretary of Defense, the Secretary of the Army, and other interested parties. Copies will also be made available to others upon request. Should you have any questions concerning this report, please contact Samuel Bowlin, Director, Defense and Security Information Systems at (202) 336-6240. Major contributors to this report are listed in appendix III. Sincerely yours, 0 Ralph V. Carlone Assistant Comptroller General Page 10 GAO/IMTEC-92-26 Patriot Missile Software Problem

1 Page 11 GAO/IMTEC-92-26 Patriot Missile Software Problem

Contents Letter l Appendix I u Objectives, Scope, and Methodology Appendix II 15 Effect of Extended Run Time on Patriot Operation Appendix III 16 Major Contributors to This Report Figures Figure 1: Patriot Fired for Missile Interception 2 Figure 2: Patriot Missile Launcher in Saudi Arabia 3 Figure 3: Correctly Calculated Range Gate 5 Figure 4: Calculated Range Gate After Approximately 8 Hours 7 Figure 5: Incorrectly Calculated Range Gate 8 Abbreviations GAO IMTEC General Accounting Office Information Management and Technology Division Page 12 GAO/IMTEC-92-26 Patriot Missile Software Problem

1 Page 13 GAO/IMTEC-92-26 Patriot Missile Software Problem

Appendix I Objectives, Scope, and Methodology \ The Chairman, Subcommittee on Investigations and Oversight, House Committee on Science, Space, and Technology, requested that we review the facts of the February 25,1991, incident in which the Patriot defense system failed to engage an Iraqi Scud missile and determine if a computer software problem was involved. If so, our objectives were to provide information on what specific software problem prevented the Patriot from intercepting the Scud missile and what has been done to correct it. To meet these objectives, we interviewed Patriot Project Office officials responsible for maintaining Patriot software and reviewed official Department of the Army analyses describing the cause of this incident. Subsequently, we independently verified the Army's findings by analyzing key documentation including (1) a description of the Patriot system computer architecture; (2) the assembly language programs responsible for surveillance, tracking, and target engagement; and (3) selected machine instructions that caused the tracking inaccuracy. To determine what was done to locate and correct the software problem, we interviewed software maintenance officials at the Patriot Project Office and obtained documentation on the specific changes made to the software. Additionally, we checked the Army's correction to the software by performing the key calculations needed to account for longer run times. To become more knowledgeable about how the Patriot system performed in an operational environment, we participated in a simulation at the Patriot Software Test Facility in Huntsville, Alabama, where we intercepted Scuds with Patriot missiles. Through the simulation, we gained a better understanding of the Patriot's hardware, software, and human interfaces. Further, we interviewed and obtained documentation from officials involved in Patriot software and operations at the Department of the Army Headquarters in Washington, D.C. Our work was conducted from June 1991 through January 1992 at the Department of the Army, Washington D.C., and the Patriot Program Office, Huntsville, Alabama. Page 14 GAO/IMTEC-92-26 Patriot Missile Software Problem

r Appendix II Effect of Extended Run Time on Patriot Operation Hours Seconds Calculated Time (Seconds) Inaccuracy (Seconds) Approximate Shift in Range Gate (Meters) 0 0 0 0 0 1 3600 3599.9966.0034 7 8 28800 28799.9725.0275 55 20 a 72000 71999.9313.0687 137 48 172800 172799.8352.1648 330 72 259200 259199.7528.2472 494 100 b 360000 359999.6667.3433 687 Continuous operation exceeding about 20 hours target outside range gate b Alpha Battery ran continuously for about 100 hours Page 15 GAO/IMTEC-92-26 Patriot Missile Software Problem

Appendix III Major Contributors to This Report ] Information Michael Blair, Assistant Director Sally Obenski, Evaluator-in-Charge Management and Paula Bridickas, Computer Scientist Technology Division, Washington, D.C. (510680) Page 16 GAO/IMTEC-92-26 Patriot Missile Software Problem