Expression of Interest for undertaking feasibility studies for City Gas Distribution Projects

Similar documents
NCC Infrastructure Holdings Limited

APPLICATION FORM FOR ENLISTMENT OF VENDORS

Solar Energy Corporation of India Limited New Delhi

TENDER FOR EMPANELMENT OF MANUFACTURERS/SUPPLIERS FOR SUPPLY & INSTALLATION OF MODULAR FURNITURE AT BANK S VARIOUS OFFICES/BRANCHES PAN INDIA

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

Application Form For Enlistment Of Contractors & Architects

REQEUEST FOR EXPRESSION OF INTEREST (REOI) FOR OIL, CENTRE OF EXCELLENCE FOR ENERGY STUDIES (COEES) BUILDING AT GUWAHATI IN ASSAM

Empanelment of Consultancy Firms

APPLICATION FORM FOR REGISTRATION OF CONTRACTORS (Please attach the documents as per Annexure Numbers mentioned in the form)

PREQUALIFICATION DOCUMENT

a) For Electrical Safety Audit

WEBEL TECHNOLOGY LIMITED

THE INSTITUTE OF CHARTERED ACCOUNTANTS OF INDIA (ICAI) APPLICATION FOR

NOTICE FOR THE EXPRESSION OF INTEREST (EOI) : (REVISED)

Empanelment of Graphic Design House and Printing Agency

Expression of Interest (EOI) For Empanelment of Advertising Agencies. EOI Ref: BNPR.10.AdvertisingAgency Date:

SPICES BOARD (Ministry of Commerce & Industry, Govt of India) Palarivattom P.O, Cochin Kerala

Expression of Interest (EoI) Notice

Request for Expression of Interest

Expression of Interest (EOI) For LEARNING MANAGEMENT SYSTEM

Indian Highways Management Company Limited Expression of Interest

PAKISTAN CIVIL AVIATION AUTHORITY REQUEST FOR PROPOSAL ENERGY PERFORMANCE CONTRACT AT JINNAH INTERNATIONAL AIRPORT

Request for Proposal Tree Trimming Services June 4, 2018 Procurement Contact Linda Lapeyrouse

REQUEST FOR REGISTRATION AS SUPPLIER FOR THE PERIOD STARTING 1 ST JULY 2016 AND ENDING 30 TH JUNE 2018

EXPRESSION OF INTEREST IN APPOINTING A PANEL OF ATTORNEYS

SITC of RFID Car Parking System including Manpower support and CAMC भ रत य वम नपत तन प र धकरण AIRPORTS AUTHORITY OF INDIA CHENNAI AIRPORT, CHENNAI

STATE BANK OF INDIA PREMISES & ESTATE DEPARTMENT 3 RD FLOOR, LOCAL HEAD OFFICE BHADRA, AHMEDABAD PH : (079)

RFP for Export Reports generation and maintenance for India Brand Equity Foundation (IBEF)

Expression of Interest (EOI) EOI No: EOI/GM (CSR)/

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT

I. CATEGORISATION REVISED NOTIFICATION FOR REGISTRATION OF NEW CONTRACTORS (FIRMS) FOR CIVIL WORKS

Food Safety and Standards Authority of India

Empanelment of Event Management and Public Relations (PR) Organisations

RFP for Designing Branding Creatives for India s participation at MSV Brno as Partner Country for India Brand Equity Foundation

Request for Empanelment (RFE) of. Facilitators

TENDER NOTICE FOR ENGAGEMENT OF REPUTED AGENCY FOR PROVIDING NURSING & PARAMEDICAL STAFF ON CONTRACT BASIS

Contractors who are desirous of tendering for above work and fulfills the Following requirements shall be eligible to apply:

RFP for designing of the Annual Report for the Department of Commerce

EXPRESSION OF INTEREST FOR FNGO PROCUREMENT OF OPELIP

West Bengal State University

Request for Proposal. Selection of Soft Skill Training Firms for

Request for Proposal Hydraulic Rescue Tools. Date Issued: September 28 th, 2016

to up to 16:00 hrs up to 16:00 hrs. Downloading of the documents Last date of submission of the bid

PEOPLES UNIVERSITY OF MEDICAL & HEALTH SCIENCES FOR WOMEN NAWABSHAH AT DISTT: SHAHEED BENAZIRABAD

Institute of Leadership Development

FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES

Request for Proposal. For. Selection of Architectural Consultants. For IT CAPACITY BUILDING & TRAINING CENTRES. Madhya Pradesh

REQUEST FOR PROPOSAL FOR Web Hosting. Anniston City Schools. FRP Number FY2012 Web Hosting

PRE-QUALIFICATION NOTICE FOR EMPANELMENT OF ARCHITECTS/CONSULTANTS

49469-IND: Mumbai Metro Rail Investment Project. 12 June 2018, 15:00 hours Indian Standard Time (IST)

Rs with GP Rs.2800/-

NABET Accreditation Criteria for QMS Consultant Organizations (ISO 9001: 2008)

For Information, Issuance and Submission of EOI, please contact as follows:

STATE BANK OF INDIA EMPANELMENT OF AUDITORS FIRE SAFETY AUDITOR ELECTRICAL SAFETY AUDITOR TABLE OF CONTENTS: IMPORTANT DATES:

Telecommunications Consultants India Ltd. (A Government of India Enterprise)

Roadmap for Implementation of Renewable Energy Certificate Mechanism for India. Guidelines and Operating Rules for Monitoring Institution(s)

TENDER DOCUMENT. For Selection of Surveyor Agency for Survey works at Panagarh Industrial Park of WBIDC

Corporation Bank (A Premier Public Sector Bank)

Directorate, Medical Education and Research, Mumbai -1. EOI Notice

SURAT SMART CITY DEVELOPMENT LTD.

Online tender for preparation of Coffee Table Book on turnkey basis.

M P STATE ELECTRONICS DEVELOPMENT CORPORATION LTD (A Govt. of M.P Undertaking) Tender No: MPSEDC/TRIBAL/VC/DCGM/2018/374 Dated

VIJAYA BANK. (A Government of India Undertaking) Head Office at No.41/2, M.G. Road Phone: BANGALORE

Request for Proposals (RFP) The provision of Media Monitoring and Analyses services to the CSIR. RFP No. 770/09/06/2017

EXPRESSION OF INTEREST

ITEM RATE TENDER TENDER No. 14 / / ELDB

International Management Institute (IMI), New Delhi B-10 Qutab Institutional Area, Tara Crescent, New Delhi NIT IMID/1 Of

LIFE INSURANCE CORPORATION OF INDIA Divisional Office, 2 nd floor Jeevan Prakash Building, G.T.Road, Masoodabad, Aligarh

REQUEST FOR PROPOSAL (RFP)

RFP for Design, print and production of the Annual Report for India Brand Equity Foundation

SOFTWARE TECHNOLOGY PARKS OF INDIA

ENLISTMENT OF CONTRACTORS FOR CIVIL, ELECTRICAL AND INTERIOR WORKS

RFP for Empanelment of Interior Furnishing Contractors

Interested parties may submit their EoI along with technical proposal on or before 22 nd February, 2016, hrs, IST to GM (CSR) IIFCL.

Creation of Corporate Film for India Brand Equity Foundation (IBEF)

State of Florida Department of Transportation. DISTRICT SIX Attachment A Scope of Services 1/19/2018

CENTRAL ELECTRONICS LIMITED (A Public Sector Enterprise)

RFP for Production of video films on India for India Brand Equity Foundation (IBEF)

PRE- QUALIFICATION OF SUPPLIERS FOR HOME AFRIKA LIMITED

Gujarat Chamber of Commerce & Industry. GCCI MSME Excellence Award

REQUEST FOR PROPOSAL (RFP) PROJECT DESIGN AND CONTRACT DOCUMENT PREPARATION CEDAR BAND TRAVEL PLAZA ENTERPRISE

Request for Proposals (RFP) Moving office furniture from building 3A to building 22 and other CSIR store areas (in building 35 and 36)

Request For Proposal for Deployment of Hardware, Software and Manpower for OPD Management at District Head Quarter Hospital, Puri.

Inviting Expression of Interest

NOTICE INVITING TENDERS FOR

Automatic License Plate Recognition System for the Police Department

The International Centre Goa Dr. E Borges Road, Dona Paula Goa Tel: Website:

BharatPetroResources Limited

Downloaded from

Request for Proposal (RFP) For. Selection of Vendor for Maintenance of Computer Systems under Annual Maintenance Contracts for Delhi and NCR Area

REQUEST FOR PROPOSAL (RFP)

Request for Proposals (RFP) The provision of transport law specialist services for subsidised public transport contracts for the CSIR

Open Category Applicants

DALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP

RECRUITMENT TO THE POST OF GENERAL MANAGER (TECHNICAL) / SIGNAL DESIGN

REQUEST FOR PROPOSAL (RFP) EMPANELMENT OF EXTERNAL TRAINING INSTITUTES FOR IMPARTING ONLINE PRE- RECRUITMENT TRAINING TO AGENTS.

Computer Centre, DAVV, Indore Khandwa Road Indore

SCHEME FOR SETTING UP OF PLASTIC PARKS

Request for Proposals (RFP)

Transcription:

BHARAT PETROLEUM CORPORATION LIMITED (A Government of India Enterprise) Expression of Interest for undertaking feasibility studies for City Gas Distribution Projects Applications are invited from reputed and competent consultants with sound technical and financial capabilities, having specialized experience of carrying out the jobs of demand estimation, field engineering survey, City Gas Distribution network (CGDN) design and detailed feasibility report including financial analysis. The detailed scope of work is enclosed as Annexure I. Applicants are requested to send all the relevant documents in a sealed envelope, super scribing Empanelment of consultants for undertaking CGD feasibility studies of this notice to:- General Manager (Gas), Bharat Petroleum Corporation Ltd. ECE House, 28-A, K. G. Marg, Connaught Place, New Delhi 110 001 Applicants should go through the entire EOI document for more details. The consultants qualifying the criteria as mentioned in Annexure II need only apply. Nonsubmission of any of the relevant documents pertaining to this EOI/incomplete document can lead to rejection for the Empanelment process. This notice is only for the purpose of empanelment of consultants and BPCL may invite financial bids for assigning the jobs from time to time from the empanelled consultants on such terms and conditions as deemed fit. BPCL reserves the right to accept or reject any or all applications without assigning any reasons whatsoever thereof. for Bharat Petroleum Corporation Limited GM (Gas) 1

BHARAT PETROLEUM CORPORATION LIMITED General Manager (Gas), New Delhi ECE House, 28- A KG Marg, New Delhi - 110001 TEL NO: 0120-2474146; 2474369. FAX NO. 0120-2474380 Expression of Interest for undertaking feasibility studies for City Gas Distribution Projects TENDER NO. BPCL/CGD/2016-Empanelment Published on: 23/04/2016 Expression of Interests is invited from the interested applicants for the empanelment for undertaking city gas distribution projects as per the terms and conditions mentioned in Annexure I (scope of work) & Annexure II (Qualifying Crtieria). 1) Eligible Applicants as per Annexure II are invited to submit the relevant documents for the Empanelment for undertaking the City Gas Distribution Projects. The Documents are to be submitted in hard copy only. 2) Relevant documents as mentioned in the below table are to be submitted in physical form (off-line) in a sealed envelope super scribing Empanelment of consultants for undertaking CGD feasibility studies have to be submitted at:- General Manager (Gas), Bharat Petroleum Corporation Ltd. ECE House, 28A, K. G. Marg, Connaught Place, New Delhi 110 001 List of documents is as follows:- 2

Sr No Particulars Remarks 1 Powers of Attorney for the Authorized Signatory To be provided by applicant 2 Stamped and signed copy of this EOI document, EOI: BPCL/CGD/Empanelment 3 Documents with regards to the Qualification Criteria for empanelment as described in Annexure II & Annexure III Applicant has to get it stamped and signed from the authorized signatory and give it to BPCL Applicants are advised to go through Annexure II for understanding the documents required. 4 No Deviation Confirmation Attachment no: 1 5 Details of relationship with BPCL director as per Attachment no: 2 format 6 Declaration A,B & C by Applicant Attachment no: 3 Note that the main envelope super scribing Empanelment of consultants for undertaking CGD feasibility studies will have two envelopes one containing the original copy and one containing the photocopy of all the documents. 3) Only those consultant(s) would be empanelled who have submitted all the documents and who satisfy the qualifying criteria which will be established by the detailed evaluation of the documents by BPCL. 4) For revising the panel in future, BPCL may ask for any of the documents mentioned in this EOI or any other documents so as to make any addition (s) /deletion (s) in the panel made. 5) BPCL reserves the right to withdraw or cancel this Empanelment process at its sole discretion and without assigning any reason whatsoever and in which case, the applicant shall have no right whatsoever to either claim for the appointment in the panel or seek reimbursement of any costs. 3

Annexure I Scope of Work for Applicants applying for the Empanelment process for undertaking CGD network feasibility studies for a defined Geographical Area (GA) Scope of work shall include the following:- 1. DEMAND ESTIMATION A. Objective i. Assessment of demand of natural gas for a City Gas Distribution Network (CGDN) during economic life of the project (25 years) in the geographical area (GA) defined as per the Petroleum & Natural Gas Regulatory Board (PNGRB) bid or by BPCL, as the case may be, over different categories of customers taking into account: a. Switch over from alternative fuels based on economics, including due to mandation by local government or any other statutory body. b. Economic growth parameters (GDP, Industrial Growth, etc.) available in public domain. c. Any other relevant factor(s) including gas allocation policy of the Government of India (GoI), available sources of supply and proposed connectivity of the CGDN to an existing or proposed natural gas transmission pipeline. ii. Realisable demand of natural gas to be estimated under optimistic, pessimistic and realistic scenarios. iii. Capturing Consultant's discussions with key stake holders, such as, anchor load industries, Industrial associations, large commercial complex on acceptability of natural gas in the region. iv. Recommendations on most likely natural gas realizable demand scenario. Demand estimation to conform to PNGRB s regulations on Authorizing Entities to Lay, Build, Operate, or Expand City or Natural Gas Distribution Networks & GoI policies B. Scope of work: Market Survey & Demand Estimation i. Collection of the relevant geographical, demographic and economic data for a defined geographical area (GA) and the Charge Areas (CAs). 4

ii. iii. Determination of the relevant census data including determination of household population over the GA (including the charge areas and each Mandal/ Taluka / Municipal Ward) and estimates of growth over the economic life of the project. To collect primary and secondary data based on energy types, classification and their usage in the GA and establish the present natural gas demand potential and forecast the realizable demand for natural gas over the economic life of the project considering annual growth, economics of switch over from alternative fuels and newer applications, over the following consumption segments- a. Domestic b. Commercial c. Industrial d. Transport iv. To adopt appropriate statistical tools in arriving at a representative sample size for each category of customers, collect raw data in suitably designed survey format (to be approved by BPCL) and present analysis of the results of the survey. v. To consider the development plans of the local Government or development authority s plan document for identifying major industrial areas, industrial parks, Special Economic Zones (SEZs), development or industrial corridors, commercial zones, office/ administrative blocks, bazaars, aerodromes, railway/ bus stations, malls/ plazas, housing estates and any major energy consuming areas in the GA. vi. vii. viii. ix. For commercial and industrial demand survey, segregation of fuel consumption over type of customers. For anchor load customers, customer contact details and result of interviews as per pre-approved questionnaire on all relevant aspects, like, willingness to use natural gas to be analysed. All assumptions, including use of bulletins of Industrial association/ body and other publications considered in demand projections are to be stated upfront. Demand from consumer segments need to be further categorized by size and end-use as per the basis approved by BPCL. Demand for CNG to be analyzed over different types of vehicles operating in the GA considering average daily trip distance, mileage, willingness to convert based economics & interactions with transport unions, study of traffic pattern within and outside the GA, local transport authority s plans, location of retail outlets of oil marketing companies and other relevant factors. x. To collect relevant data, analyse and form an independent view on the likely impact of the following on the demand for CNG in the GA- 5

a. any notification of the Judiciary, Central/ State Govt or Local body for any mandatory conversion of vehicles to CNG as fuel b. Plans for setting-up of MRTS in the GA c. Development of national/ state highways/ waterways d. Impact of existing or proposed CGDNs in areas contiguous to the GA e. Any other relevant factor. xi. xii. The Consultant would be required to submit a draft report of the findings, analysis including backups along with the soft copy of the data sheets with formulae linkages. Any modification and revision in the draft report shall be required to be completed as required by BPCL and final report is to be submitted after due consultations. The Consultant may take the assistance of a local surveyor or survey agency, duly approved by BPCL, to carry out survey based on the approved sample size for each consumer segment. The Consultant, however, has to ensure that the market surveyor carries out the task accurately and shall be responsible for the accuracy of the data collation and analysis. 6

2. FIELD ENGINEERING SURVEY, CGD NETWORK DESIGN & COST ESTIMATION A. Scope of Work : Field engineering survey/ design of CGD network including cost estimation for the GA over economic life of the project considering: i. Demand assessed: Assessment of demand of natural gas (including CNG) during economic life of project (25 years) in the geographical area (GA) defined. ii. Gas sourcing & pipeline connectivity a. Feasible gas sourcing option : Identify potential sources of supply of natural gas both domestic gas and R-LNG considering: i. Government policy ii. Affordable price iii. Connectivity of the GA with natural Gas pipeline(s) or LNG tank truck or any other mode b. To identify potential sources (over time horizon, quantity, price, location and supplier) of natural gas to feed the requirement of the CGDN. c. To study the transmission pipeline connectivity to the GA considering existing transmission pipeline(s) and in case of proposed, indicating the likely date of commissioning of the said transmission pipeline (s). d. To evaluate setting of the proposed City Gate Station (s) in the GA considering the most optimal route and natural gas pipeline tariffs. iii. Mapping and phasing of requisite infrastructure, equipments and facilities considering gas demand from various categories of customers over the economic life of the project and with due consideration for a. Peak loads b. Redundancies c. Contractual obligations for booking of pipeline capacity for sourcing of gas and its transmission till city gate station d. Approved technology and practices as per the notified technical and safety standards, including specifications of the PNGRB. 7

The basic purpose of design is to estimate the Capex and Opex besides fulfilling the requirement of the regulations of PNGRB. Since the objective is not for procurement of materials or services and construction of the facilities at this stage, the specification of material and services is to be limited to achieve this end. iv. Development of Bill of materials (with +/- 10% accuracy) based on the above mapping and phasing exercise in the formats approved by BPCL using MS Excel Software tool for- a. Designing the layout of the steel pipeline network reaching each charge area of the GA as per PNGRBs regulations and meeting the technical standards defined b. Estimation of yearly Capex for each of the phases separately reflecting cost of each of the facility/ equipment-type with complete rate break-up over material and labour/ laying/ erection cost components, including applicable taxes and levies and CENVAT Credit available. c. To identify and evaluate design alternatives with respective Cost-benefit analysis, while designing the CGD Network adopting relevant & latest technology. d. Optimization of CGD network infrastructure design using standard software under various demand scenarios by adopting least cost approach for estimating Capex & Opex. e. Estimates of activity-based yearly Opex required for operation and maintenance, including replacement of the CGD Network infrastructure optimized over the economic life of the project considering latest rates (with break-up over basic cost, freight, duties and taxes). The primary objective is to configure the CGDN in the most optimal manner and arrive at realistic Capex and Opex numbers and resource deployment plan during the project life. Redundancy of equipment and supply e.g. ring-mains, reliability of equipment and services, health, safety, security and environment (HSSE) issues to be clearly spelled out with cost effective solutions. Special attention is to be given to large areas covered in the GA and to appropriately address all issues in technical, commercial and HSSE terms including crossing over water bodies and climatic conditions akin to the region. 8

3. DETAILED FEASIBILITY REPORT INCLUDING FINANCIAL ANALYSIS The inputs shall be provided by BPCL based on the studies submitted by its consultants for- i. Demand estimation and sourcing of natural gas. ii. Field engineering survey, CGD network design/ infrastructure design & cost estimation. Financial feasibility model is to be developed using Microsoft Excel software tools and should be updatable for changes in inputs, assumptions and any other parameters, including simulation of any scenario. All assumptions need to be specified along with their justifications. A. Scope of Work Determination of the financial feasibility of the CGD project considering demand estimates, CGD Network design, Capex and Opex by calculation of: a. Internal Rate of Return in the project, including Project and Equity IRRs b. NPV of the project c. Estimated yearly profit / (loss) over economic life of the project and year-end Balance Sheets d. Financial ratios and margin analysis e. Adoption of optimum financing pattern and dividend policy f. Estimated P&L Accounts g. Estimated Balance sheets h. Cash flows i. Working capital requirements Financial Feasibility as above is to be determined separately for each of the following: a. Overall project b. Regulated and non-regulated activities as per the relevant PNGRB regulations c. Product-wise (PNG domestic, industrial, commercial and CNG) by following sound basis for allocation of Capex and Opex over various cost heads. B. Scenario building: Build relevant business scenarios and carry-out risk analysis by examining the impact of variations in costs, prices, tax & duties, economic parameters, supply and other risks (including competition) on project s financial feasibility. C. Sensitivity & Impact Analysis: 9

To clearly enumerate the assumptions made in the estimates, financial analysis, work out and report the effect of variation of critical parameters, individually and in combination on the overall financial viability and indices thereof, e.g. IRR (Project and Equity), ROI, payback period, etc. D. Modularity: All data is to be tabulated in a modular manner precisely narrating the assumptions (with justification) including conversion factors. Financial analysis to be done in such a way that PV calculation as per PNGRB s bid evaluation method based on all the four criteria are fully linked with data and computations. E. Usage of tools for analyzing financial viability: Developing financial model in MS Excel with formulae linkages incorporating estimated natural gas demand, Capex, Opex, prices and all other relevant parameters. All formulae to be incorporated and suitably linked across such excel sheets/ files/ models. The financial model so developed shall be validated for accuracy and Scenario building and is required to be submitted to BPCL before the submission of final report. Note:- The scope of work has been made considering broadly the requirements for BPCL during the bidding for City Gas Distribution projects. This scope should not be considered sacrosanct and changes can be made in the scope when the actual tender is floated for giving assignments for which the e-bidding procedure would be undertaken as and when required. 10

Annexure II 1. Qualifying Criteria for Empanelment:- Applicants have to fulfill criteria given below (criterion 1.1, 1.2 & 1.3 individually under this Annexure II) and are required to submit the documents against each qualifying criteria:- 1.1 Number of completed assignments during last 3 financial years (FY 2013-2014, 2014-2015, 2015-2016) should be at least 3. Completed assignment should be in the following areas:- i) City Gas Distribution Network, and/ or ii) Natural gas or petroleum product pipeline The assignments should include the following three activities on a combined basis:- I. Demand estimation II. Field engineering survey, design & cost estimation III. Detailed Feasibility Report including Financial Analysis Notes:- a. Completion of an assignment means that the consultant has assumed overall responsibility of completion of the all the above three activities of the assignment. b. Activities i) & ii) mentioned above could have been outsourced by the applicant but the activity iii) should have necessarily been undertaken by the applicant in-house. In case activity iii) has been outsourced by the applicant, the assignment will not be considered for evaluation. c. In case of outsourcing of activity i) and/ or ii), only those assignments for which consultant had taken the overall responsibility of completion of the assignment would be considered for evaluation. d. If an applicant has taken an assignment prior to FY 2013-2014, that is prior to 1 st April, 2013 but has completed the assignment between 1 st April 2013 and 31 st March, 2016 (both dates inclusive) which is to be established by the relevant proof, then this assignment(s) would be considered for evaluation. 11

1.2 Value of completed assignments (which has the same meaning as explained in Criterion 1) during last 3 years on a cumulative basis (FY 2013-2014, 2014-2015, 2015-2016) should be at least Rs. 42.25 lakhs for applying for the empanelment. With regards to criterion 1.1 & 1.2 above, the bidder shall submit a copy of Work Order and Completion Certificate and also a Chartered Accountant certificate in the format given in Annexure III. 1.3 Applicant should be a company registered under Company s Act 2013. Registration certificate of the company has to be provided in this regard. 1.4 Applicant should not be an entity, including its associate, which is a) Laying, Building or Operating any city gas distribution network; or b) Had participated in any of the bid rounds for CGD Network conducted by the PNGRB; or c) Had applied to the PNGRB for grant of an authorization for laying, building, operating of a CGD Network directly or through its Associates. This needs to be certified by the authorized signatory of the Company in an Affidavit on the Company s letter head. This declaration shall be verifiable from the records & database of the PNGRB and any false statement would lead to rejection of the applicant for award of the tender as well as from the empanelment. Associate means a company as defined under the Companies Act 2013 2. Other Terms & Conditions i. Consultant shall allow BPCL to check with its clients to assess the veracity of claim of experience and also to inspect the tools proposed to be used by the consultant. The consultants should furnish further details on fulfilling qualifying criteria should BPCL ask for the same any time during pendency of this empanelment. ii. If any time during the validity of this empanelment, it is found that the consultant has misrepresented or hidden facts on qualifying criteria, or if there is any change in the status of the consultant, thereby, not fulfilling the qualifying criteria anymore, consultant s empanelment would be terminated. 12

iii. Empanelment of the consultants does not guarantee any award of assignment / contract. 13

Annexure III (The applicant shall provide certificate from their Chartered Accountant on letter head of the CA firm for the number and value of assignments, duly signed and sealed as per the format provided herein.) CHARTERED ACCOUNTANTS CERTIFICATE FOR NUMBER AND VALUE OF ASSIGNMENT This is to certify that M/s. has done number of assignments in the financial years 2013-14, 2014-15, 2015-16 (till 31 st March 2016) cumulatively and the value of these assignments cumulatively is Rs Lakh. It is further certified that these assignments are from the areas of City Gas Distribution Network and/ or natural gas or petroleum product pipeline and they include activities of :- i) Demand estimation ii) Field engineering survey, design & cost estimation iii) Detailed Feasibility Report including Financial Analysis In these assignments M/s has assumed overall responsibility of completion of the all the activities of the assignment. In respect of each of these assignments, activity iii), i.e.,detailed Feasibility Report including Financial Analysis, was NOT outsourced to any other sub-contractor/ entity and in case the activities i) and ii) were outsourced, the entire responsibility of completion of all the three activities of the assignment was taken up by M/s. Encloures: 1. copy of work order 2. completion certificate in support of above criteria. Date: For (Name of Accounting Firm) Place: Name of Partner Seal of the Firm: Membership Number Chartered Accountant 14

Attachment 1 NO DEVIATION CONFIRMATION To, General Manager, Gas Bharat Petroleum Corp. Ltd. 1 st Floor, ECE House, 28-A, KG Marg New Delhi- 110001 Dear Sir, We understand that any deviation/ exception in any form may result in rejection of bid submitted by us to BPCL against tender enquiry No. Tender No...dtd In view of the above, we certify that we have not taken any deviation/ exception anywhere in the bid submitted by us and we agree that if any deviation/ exception is considered or noticed afterward our bid may be rejected summarily without given any reason. Name and signature of bidder s authorized signatory Date Place Office Seal 15

DETAILS OF RELATIONSHIP WITH BPCL DIRECTORS Attachment: 2 1. Name of the Company responding to the tender: 2. Address of: (a) Registered Office: (b) Principal office: 3. State whether the Company is a Pvt. Ltd. Co. or Public Co. or Co-operative Society. 4. Names of Directors of the Company/Co-operative Society 5. State whether any of the Director of the Tenderer/Company is a Director of BPCL: Yes/No 6. If answer is Yes to Sr. No.5, state the name(s) of the BPCL s Director. 7. State whether any of the Director of the Tenderer Company is related to any of the Directors of BPCL: Yes/No 8. If Yes to (7) state the name(s) of BPCL s Director & the concerned Director s (of the tenderer Co.) relationship with him/her. *Strike out whichever is not applicable. DATE / PLACE TENDERER: SIGNATURE OF 16

Declaration by Tenderer Attachment: 3 DECLARATION A We declare that we have complied with and have not violated any clause of the standard Agreement Place: Signature & Seal Date: DECLARATION B We declare that we do not have any employee who is related to any officer of the Corporation / Central / State Government OR We have the following employees working with us who are near relatives of the officers of the Corporation / Central / State Government. Name of the employee; Name & designation of the officer of the Corporation /Central / State Government: 1. 2. 3. 4. Place: Signature & Seal Date: Strike off whichever is not applicable. DECLARATION C The Tenderer is required to state whether he is a relative of any Director of our Corporation or the tenderer is a firm in which Director of our Corporation or his relative is a partner or is any other partner of such a firm or alternatively the Tenderer is a private company in which Director of our Corporation is member or Director, (the list of relative(s) for this purpose is given overleaf) Place: Signature & Seal Date: N.B: Strike off whichever is not applicable. If the Contractor employs any person subsequent to signing the above declaration and the employee so appointed happen to be near relatives of the Officer of the Corporation/Central/State Government, the Contractor should submit another declaration furnishing the names of such employees who is/are related to the Officer/s of the Corporation/Central/State Government. (Pl refer to the enclosed list of relatives) 17

LIST OF RELATIVES A person shall be deemed to be a relative of another, if any and only if, i) He / She / They are members of Hindu Undivided family or ii) He / She / They are Husband & Wife or iii) The one is related to the other in the manner indicated below. 1. Father 2. Mother (including Step Mother) 3. Son (including Step Son) 4. Son s Wife 5. Daughter (including Step Daughter) 6. Father s Father 7. Father s Mother 8. Mother s Mother 9. Mother s Father 10. Son s Son 11. Son Son s Wife 12. Son s Daughter 13. Son s Daughter s Husband 14. Daughter s Husband 15. Daughter s Son 16. Daughter s Son s Wife 17. Daughter s Daughter 18. Daughter s Daughter s Husband 19. Brother (including Step Brother) 20. Brother s Wife. 21. Sister (including Step Sister) 22. Sister s Husband 18