HUNTON& WilliAMS. August 1, U.S. Army Corps of Engineers Attention: CECW-CO-R 441 G Street NW \Vashington, DC Dear Sir or Madam:

Similar documents
Corps Regulatory Program Update

United States Army Corps of Engineers Pittsburgh District Regulatory Program. Westmoreland County 2014 Engineers Workshop. March 20 th & 21 st, 2014

2017 Nationwide Permit Reissuance

Public Notice No. PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATION FOR NATIONWIDE PERMITS

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4

U.S. ARMY CORPS OF ENGINEERS

RE: HLT P: Medicaid Reimbursement of Nursing Facility Reserved Bed Days for Hospitalizations

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 STANDARD OPERATING PROCEDURES. June 5, 2014

Discharges Associated with Pesticide Applications Under the NPDES Permit Program. Frequently Asked Questions (FAQ)

NATIONWIDE PERMIT 12 AND DOMESTIC OIL PIPELINES: AN INCOMPATIBLE RELATIONSHIP?

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O

ARGUED DECEMBER 12, 2016 DECIDED APRIL 11, 2017 IN THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT

AGENCY: Veterans Employment and Training Service (VETS), Labor. SUMMARY: The Veterans Employment and Training Service (VETS) is publishing this

Shifting Regulation for Mountaintop Mining Valley Fills and the Confusion it Creates: The Spruce No. 1 Mine Inception to Current Litigation

The House and Senate overwhelmingly approved the legislation. The vote in the Senate was 91-7 and in the House of Representatives.

October 18, Headquarters U.S. Army Corps of Engineers Attn: CECW-CO-N (Ms. Mary Coulombe) 441 G Street NW Washington, DC

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Los Angeles District, Phoenix Office 3636 N. Central Ave., Suite 900 Phoenix, AZ 85012

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

The DEP has four main regulations that relate to pipeline construction.

PASPGP-5 REPORTING CRITERIA CHECKLIST

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

March 14,2014. Please contact me at (716) , if you have any questions concerning this matter.

DRYING OUT: WETLANDS OPENED FOR DEVELOPMENT BY U.S. SUPREME COURT AND U.S. ARMY CORPS

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

Public Notice NOTICE ANNOUNCING MINOR MODIFICATIONS TO THE LETTER OF PERMISSION AUTHORIZING TRANSPORATION PROJECTS

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia

PUBLIC NOTICE Application for Permit

DDTC Issues Overly Expansive Interpretation of the ITAR for Defense Services (and Presumably Technical Data)

PUBLIC NOTICE Application for Permit

DEP has three main regulatory chapters that relate to pipeline construction.

GAO MILITARY BASE CLOSURES. DOD's Updated Net Savings Estimate Remains Substantial. Report to the Honorable Vic Snyder House of Representatives

RE: NLADA Comments to Draft 2015 Compliance Supplement (80 Fed. Reg ) (December 4, 2015)

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Re: Protecting Statutory Conscience Rights in Health Care; Delegations of Authority (RIN ZA03), 83 Fed. Reg (January 26, 2018)

IN THE UNITED STATES COURT OF APPEALS FOR THE FIFTH CIRCUIT

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Anchorage Grounds; Galveston Harbor, Bolivar Roads Channel, Galveston, Texas

Security Zones; Naval Base Point Loma; Naval Mine Anti Submarine. SUMMARY: The Coast Guard is increasing a portion of an existing

February 20, RE: In Support of Fee Wavier for Freedom of Information Act Request Number: (FP )

Skipp kropp Steptoe & Johnson PLLC

P C R C. Physician Clinical Registry Coalition. January 1, [Submitted online at: ]

AGENCY: Office of Postsecondary Education, Department of. SUMMARY: The Secretary adopts as final, without change, the

SAFETEA-LU. Overview. Background

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1104 NORTH WESTOVER BOULEVARD, UNIT 9 ALBANY, GEORGIA SEPT 1ER

RECENT COURT DECISIONS INVOLVING FQHC PAYMENTS AND METHODOLOGY

Safety and Security Zones; New York Marine Inspection and Captain of the Port

DEPARTMENT OF VETERANS AFFAIRS Grants for Adaptive Sports Programs for Disabled Veterans and Disabled Members of

December 21, 2012 BY ELECTRONIC DELIVERY

Regulatory Division General Information: January 2016

Joint Application Form for Activities Affecting Water Resources in Minnesota

Regulatory Guidance Letter 92-01

WATER SUPPLY CHALLENGES: THE ACF CASE

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB-f

2100 Second St., SW Washington, DC Staff Symbol: G-MEP Phone: (202) United States U.S. Coast Guard NOV /11

SECTION 401 CERTIFICATION BEST PRACTICES

Board of Supervisors' Agenda Items

PUBLIC NOTICE Application for Permit

ACTION: Notice of Proposed Amendments to SBIR and STTR Policy Directives.

MEMORANDUM OF UNDERSTANDING COOPERATIVE ECOSYSTEM STUDIES UNITS NETWORK

Technical Revisions to Update Reference to the Required Assessment Tool for. State Nursing Homes Receiving Per Diem Payments From VA

STATEMENT OF The American Association of State Highway and Transportation Officials

South Sacramento HCP Regional General Permit

Rules and Regulations

Office of Surface Mining Reclamation and Enforcement

Case 1:10-cv ESH -HHK Document 14 Filed 07/15/10 Page 1 of 7 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

Department of Army Permit Evaluation Process

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Conservation Security Program: Implementation and Current Issues

Case 1:16-cv JEB Document 304 Filed 12/04/17 Page 1 of 8

April 3, The Honorable Steve Chabot Chairman Committee on Small Business U.S. House of Representatives Washington, DC 20515

NEBRASKA ENVIRONMENTAL TRUST BOARD RULES AND REGULATIONS GOVERNING ACTIVITIES OF THE NEBRASKA ENVIRONMENTAL TRUST

(Billing Code ) Defense Federal Acquisition Regulation Supplement: Costs. Related to Counterfeit Electronic Parts (DFARS Case 2016-D010)

Standing Rock Sioux Tribe v. U.S. Army Corps of Engineers

Comprehensive Planning Grant. Comprehensive Plan Checklist

SUMMARY: By this direct final rule, the Coast Guard is removing. the regulation for the safety zone at Snake Island, also known as

Internal Grievances and External Review for Service Denials in Medi-Cal Managed Care Plans

Mountaintop Coal Mining and the Clean Water Act: The Fight Over Nationwide Permit 21

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: The Department of Veterans Affairs (VA) is amending its regulations that

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

Funding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan %

Mine Permitting & Regulatory Update

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

Exemptions from Environmental Law for the Department of Defense: Background and Issues for Congress

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 (PASPGP-4) July 1, 2011

RE: CMS-1631-PM Medicare Program; Revisions to Payment Policies under the Physician Fee Schedule and Other Revisions to Part B for CY 2016

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program

A Chesapeake Bay Program Partnership Proposal for Ensuring Full Accountability of Best Practices and Technologies Implemented

DEPARTMENT OF VETERANS AFFAIRS SUMMARY: The Department of Veterans Affairs (VA) proposes to amend its rule

Case 1:12-cv ABJ Document 11 Filed 07/23/12 Page 1 of 11 UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

REGIONAL PERMIT. Effective date: August 15, 2013 Expiration Date: August 15, 2018

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

EQUAL EMPLOYMENT ADVISORY COUNCIL

PIPES Act of 2006 Redline of 49 USC CHAPTER SAFETY 49 USC CHAPTER SAFETY 01/19/04 CHAPTER SAFETY

Shellfish Aquaculture Permitting Program Update

Drawbridge Operation Regulation; Sturgeon Bay, Sturgeon Bay, WI. ACTION: Interim rule with request for comments.

SUPREME COURT OF THE UNITED STATES

Sandpiper Pipeline Route

Transcription:

HUNTON& WilliAMS IIUNTON & WILLIAMS LLP 2200 I'ENNSYLV:\NIA AVENUE, NW WASJ-IINCiTON. D.C 20037-1701 TEL 202 955 1500 It\ X 202 778 220 I August 1, 2016 DEIDRE DUNCAN DIRECT DIAL: 202 955 191 9 EMAIL: dduncan@hunton com FIL E NO 69 134.000004 Filed electronically at www.regulations.gov U.S. Army Corps of Engineers Attention: CECW-CO-R 441 G Street NW \Vashington, DC 20314-1000 Re: Comments of the Waters Advocacy Coalition on the U.S. Army Corps of Engineers' Proposal to Reissue and Modify Nationwide Permits, 81 Fed. Reg. 35,186 (June 1, 2016), COE-2015-0017; RIN 0710-AA73. Dear Sir or Madam: Please find attached the comments of the Waters Advocacy Coalition (WAC) for filing in the above-referenced docket. Thank vou for vour attention to this matter. J.' u Sincerely, uncan Counsel for Waters Ad vocacy Coalition Enclosure ATLANTA AUSTIN BANGKOK BEI.IING BRUSSELS CHARLOI'J"E DALLAS HOUSTON LONDON LOS ANGELES McLEAN MIAMI NEW YORK NORFOLK RA LEIGI I RI CH MOND SAN FRANCISCO TOKYO W:\SHINGTON W\V\V. hllllton.com

Comments of the Waters Advocacy Coalition on the U.S. Army Corps of Engineers Proposal to Reissue and Modify Nationwide Permits COE 2015 0017; RIN 0710 AA73 Deidre G. Duncan Kerry L. McGrath Brian R. Levey Hunton & Williams LLP 2200 Pennsylvania Avenue, NW Washington, DC 20037 (202) 955-1500 Counsel for Coalition August 1, 2016

Comments of the Waters Advocacy Coalition on the U.S. Army Corps of Engineers Proposal to Reissue and Modify Nationwide Permits COE 2015 0017; RIN 0710 AA73 I. Introduction The Waters Advocacy Coalition ( WAC or the Coalition ) submits the following comments in response to the U.S. Army Corps of Engineers ( the Corps ) Proposal to Reissue and Modify Nationwide Permits. See Notice of Proposed Rulemaking, 81 Fed. Reg. 35,186 (June 1, 2016) ( the Proposal ). The Coalition represents a large cross-section of the nation s construction, housing, transportation, recreational, mining, agriculture, manufacturing, and energy sectors, all of which are vital to a thriving national economy, including providing muchneeded jobs, products, and services. 1 Projects, activities, and operations in these sectors are often subject to regulation under Section 404 of the Clean Water Act ( CWA ) and members of the Coalition often rely on nationwide permits ( NWPs ) to ensure compliance with the CWA. In June 2015, the U.S. Environmental Protection Agency ( EPA ) and the Department of the Army ( the Agencies ) issued a rule redefining waters of the United States, expanding federal jurisdiction under the CWA. 80 Fed. Reg. 37,054 (June 29, 2015) ( WOTUS Rule or Rule ). On October 9, 2015, the U.S. Court of Appeals for the Sixth Circuit issued a nationwide stay of the WOTUS Rule pending further order of the court. 2 The scope of federal jurisdiction and its effect on the efficient administration of the NWP program is of critical importance to WAC and its members. Indeed, Congress enacted Section 404(e) of the CWA in direct response to the Agencies efforts to increase the scope of jurisdictional areas following the 1 The complete list of signatories to these comments is included in Attachment A. 2 In re E.P.A., 803 F.3d 804 (6th Cir. 2015). 1

Callaway decision. 3 Anticipating that an increase in the scope of waters of the United States would lead to an increased need for Section 404 permits, 4 Congress enacted Section 404(e) to allow for general permits, including general permits on a nationwide basis. 5 In particular, Congress intended that the NWP program streamline permitting for activities resulting in discharges to waters of the United States that cause only minimal adverse environmental effects. 33 U.S.C. 1344(e)(1); see also 33 C.F.R. 325.5(c). Accordingly, there is no question that the scope of the definition of waters of the United States and, therefore, the status of the WOTUS Rule has critical implications for the NWP program. While WAC supports the reissuance of the NWPs, it makes the following recommendations: Due to the nationwide stay of the WOTUS Rule, the Corps should clarify that the WOTUS Rule definitions will not apply to the final NWPs and should remove any citations to stayed regulations. If the WOTUS Rule is implemented, WAC believes that the Rule will have significant implications on the NWP program, and the Corps will need to address those implications through revised NWPs at that time. Even with the WOTUS Rule stayed, several WAC members believe the acreage caps should be increased. At a minimum, however, the Corps should maintain the current acreage limits, pre-construction notification ( PCN ) thresholds, and stream waiver provisions, but should apply more flexible standards. These recommendations are discussed in more detail in the following sections. II. The Corps Should Clarify that the WOTUS Rule Does Not Apply. The Corps has not made it clear which regulations defining the scope of waters of the United States would apply to the reissued NWPs. As the Corps acknowledges, the WOTUS 3 Natural Res. Def. Council, Inc. v. Callaway, 392 F. Supp. 685, 686 (D.D.C. 1975). The Callaway reasoning and holding has subsequently been limited. See Solid Waste Agency of N. Cook Cnty. v. U.S. Army Corps of Eng rs, 531 U.S. 159 (2001) ( SWANCC ); Rapanos v. United States, 547 U.S. 715 (2006) (plurality op.). 4 H.R. Rep. No. 95-139 (1977), reprinted in 4 Comm. on Env t & Pub. Works, A LEGISLATIVE HISTORY OF THE CLEAN WATER ACT OF 1977, at 1216-17 (1978). 5 123 Cong. Rec. 38,968 (1977). 2

Rule was stayed by the Sixth Circuit after being challenged by multiple states, businesses, municipalities, and trade associations. See 81 Fed. Reg. at 35,190. Yet, critical definitions in the proposed NWPs refer to provisions in the stayed rule. For example, definitions including waterbody, non-tidal wetland, ordinary high water mark, and tidal wetland cite to the new WOTUS regulations. See, e.g., id. at 35,239-40 (citing 33 C.F.R. 328.3(c)). The WOTUS Rule litigation is ongoing, the nationwide stay ordered by the Sixth Circuit is in effect, and, given the briefing schedule set by the Sixth Circuit, it is very unlikely that a final decision on the WOTUS Rule challenges will be issued before the Corps promulgates the final NWPs (sometime before March 19, 2017). 6 Because the WOTUS Rule will still be stayed nationwide when the Corps reissues the NWPs, the Corps cannot incorporate the WOTUS Rule s new jurisdictional definitions into the reissued NWPs or cite to the stayed regulations. The Corps should adhere to the Agencies November 2015 joint memorandum responding to the nationwide stay, which directs both EPA and Corps staff to comply with the Sixth Circuit s stay, and to resume use of the Agencies prior regulatory definition of waters of the United States. 7 According to the memorandum, the Agencies should apply the regulations defining waters of the United States codified in 1986 8 and follow the 2008 Rapanos Guidance 9 in making jurisdictional determinations. Similarly, to avoid any confusion with the NWP program, the Corps should comply with the Agencies directive, remove citations to stayed 6 See Case Management Order No. 2, In re E.P.A., Nos. 15-3751, et al. (6th Cir. June 14, 2016). Final briefs on the merits will be filed in February 2017 with oral argument to follow. Meanwhile, the Corps intends to promulgate the new NWPs before the current permits expire on March 18, 2017. 81 Fed. Reg. at 35,189. According to the Proposal, [t]he Corps will try to publish the final NWPs... approximately 90 days before the planned effective date, i.e. December 2016. Id. 7 See EPA and Dep t of the Army Memorandum, Administration of Clean Water Programs in Light of the Stay of the Clean Water Rule; Improving Transparency and Strengthening Coordination, at 2 (Nov. 16, 2015). 8 33 C.F.R. 328.3 (1986) (Corps); 40 C.F.R. 122.2 (1986) (EPA). 9 EPA and U.S. Army Corps of Eng rs, Clean Water Act Jurisdiction Following the U.S. Supreme Court's Decision in Rapanos v. United States & Carabell v. United States (Dec. 2, 2008). 3

regulations, and clarify that the 1986 regulations will apply to the reissued NWPs. Upon conclusion of the litigation, the Corps may seek to amend the NWPs accordingly. III. The Scope and Meaning of Waters of the United States Has Significant Implications for the NWP Program. Under the NWP program, the Corps can authorize certain categorical activities that involve discharges to waters of the United States resulting in no more than minimal individual and cumulative adverse environmental effects. 33 U.S.C. 1344(e). For many categories of such activities, the Corps has established acreage and/or linear foot limits on impacts to waters of the United States to ensure that the authorized activities will have minimal environmental effects. For example, NWP 12 (Utility Line Activities) authorizes discharges of dredged or fill material associated with construction, maintenance, repair, and removal of utility lines provided the discharge does not cause the loss of greater than ½-acre of non-tidal waters of the United States. 81 Fed. Reg. at 35,219 (emphasis added). Similarly, NWP 14 (Linear Transportation Projects) allows activities for construction, expansion, modification and improvement of linear transportation projects where the activities will cause a loss of no more than ½-acre of non-tidal waters and ⅓-acre of tidal waters. Id. at 35,220. Thus, to determine whether an activity qualifies for authorization through a NWP, it is critical to understand the scope of the activity s impacts to waters of the United States. Any change in the scope of the waters of the United States definition would necessarily affect the scope and applicability of the NWP program. A. The WOTUS Rule Broadens the Definition of Waters of the United States. The WOTUS Rule fundamentally expands the waters of the United States definition, thereby requiring a completely different analysis to determine whether an activity qualifies for authorization through a NWP. Through expansive definitions of key terms such as adjacent, neighboring, and tributary, the WOTUS Rule extends jurisdiction to myriad features that 4

have not previously been regulated as waters of the United States, such as isolated wetlands and ponds, streams and washes that flow infrequently, many ditches and other man-made conveyances, and industrial and stormwater features. Under the WOTUS Rule s definition of tributary, the Agencies would now be able to assert jurisdiction based on any indication of a bed, banks, and ordinary high water mark, including ditches, drains, and streams remote from navigable-in-fact waters and carrying minor water volume. See 80 Fed. Reg. at 37,105. Moreover, whereas the current regulations have a more limited definition of adjacent and allow for jurisdiction based on adjacency only for wetlands, under the WOTUS Rule s broad adjacent definition, any water feature (including wetlands, ponds, and other industrial features) would be jurisdictional if it is within the 100-year floodplain and 1,500 feet of any feature that qualifies as a tributary. See id. at 37,078. Even if a feature falls outside these broad definitions of tributary and adjacent water, the WOTUS Rule provides a catch-all provision, allowing for jurisdiction over all water features in the 100-year floodplain or within 4,000 feet of a water of the United States as long as the Agencies find a significant nexus. Id. When taken together, the WOTUS Rule would significantly expand federal jurisdiction to cover vast swathes of the landscape, which would result in a major shift in the NWP program. B. The Proposal Fails to Clarify Numerous Key Terms and Definitions That Are Related to the WOTUS Rule. Numerous key terms and definitions used in the proposed NWPs tie directly to key terms defined in the WOTUS Rule. But the Corps fails to clarify the use of such terms in the context of the NWP program. i. The Corps Should Not Adopt the WOTUS Rule s Definition of Adjacent. The term adjacent is critical to the implementation and application of the NWPs because it is incorporated into the descriptions of many NWPs, General Conditions, and related 5

definitions, but the Proposal does not provide a definition of adjacent or indicate whether the Corps intends to rely on the WOTUS Rule s definition of adjacent. Instead of clarifying the term adjacent, the Corps has removed the clause of the 2012 waterbody definition that provided that adjacent means bordering, contiguous, or neighboring. Compare 77 Fed. Reg. 10,184, 10,290 (Feb. 21, 2012) with 81 Fed. Reg. at 35,240. Yet, there is no explanation in the preamble for the purpose or intent of this modification which leaves no formal definition of adjacent in the proposed rule. The meaning of this term is especially important for NWPs 29 (Residential Developments) and 40 (Agricultural Activities), because those NWPs do not authorize discharges into non-tidal wetlands adjacent to tidal waters. 81 Fed. Reg. at 35,224, 35,227 (emphasis added). And as explained above, the WOTUS Rule has a significantly broader definition of adjacent that would substantially expand the meaning of the term. In the context of NWPs 29 and 40, the use of the WOTUS Rule s concept of adjacency could mean that fewer discharges would qualify for authorization under those NWPs. Moreover, without clarification, regulators and applicants managing discharges associated with residential developments or agricultural activities sited near tidal areas will have difficulty determining whether impacts are jurisdictional and whether a NWP is required. ii. The Corps Should Clarify or Eliminate the Waterbody Definition. The Proposal s use of the key term waterbody which relies in part on the adjacent concept causes further confusion. The term waterbody, which is used in a number of NWPs and General Conditions, is significant for determining whether activities qualify for NWP authorization. For example, under NWPs 12 (Utility Line Activities) and 14 (Linear Transportation Projects), for activities crossing a single waterbody more than one time at separate and distant locations, or multiple waterbodies at separate and distant locations, each 6

crossing is considered a single and complete project for purposes of NWP authorization. Id. at 35,220, 35,221. Therefore, to determine whether linear projects, such as pipelines, railroads, and highways, qualify for NWP authorization, the prospective permittee has to evaluate whether crossings are single and complete project[s] based on waterbody crossings. Yet the waterbody definition is muddled by an unclear relationship to and/or overlaps with the definition of waters of the United States and related key concepts from the WOTUS Rule. The proposed rule defines waterbody as a jurisdictional water of the United States. Id. at 35,240. The definition states that a wetland adjacent to a waterbody determined to be a water of the United States under 33 CFR 328.3(a)(1) through (5) is considered a single aquatic unit with that waterbody. Id. As discussed above, the Proposal would remove the clause of the waterbody definition providing that adjacent means bordering, contiguous, or neighboring, and it is unclear which interpretation of adjacent the Corps would rely on in applying its waterbody definition. See id. Again, use of the adjacent concept from the WOTUS Rule would be substantially more expansive, and WAC is concerned that its use in the context of the waterbody definition could be misinterpreted to result in broader areas being considered a single aquatic unit, thereby resulting in, for example, fewer crossings qualifying as separate and distant locations under NWPs 12 and 14. Based on the first clause of the waterbody definition, it appears that the Corps intends to use waterbody interchangeably with water of the United States in the NWP program. If that is the case, to alleviate this confusion, the Corps should eliminate the waterbody definition altogether and use the term water of the United States instead. Or, at a minimum, the Corps should clarify the waterbody definition to avoid using concepts from the WOTUS Rule in that definition. 7

iii. The Corps Should Remove Provisions in the Proposal Adopting or Incorporating Other Concepts from the Stayed WOTUS Rule. Finally, the Corps improperly relies on other various concepts from the stayed WOTUS Rule throughout the Proposal. For example, NWP 43 (Stormwater Management Facilities) cites to the exclusion of certain stormwater features under the WOTUS Rule. Id. at 35,227. Definitions such as non-tidal wetland, ordinary high water mark, and tidal wetland cite to the new regulations in the WOTUS Rule. Id. at 35,239-40. And most importantly, the term water of the United States is used throughout the Proposal in nearly every NWP. The Corps should remove provisions in the proposal adopting or incorporating terms, definitions, or concepts from the stayed WOTUS Rule. And if the WOTUS Rule is implemented at some point, the Corps will also need to address the new definition s significant implications on the NWP program, which will likely necessitate revisions to the NWPs to relax linear and acreage limitations, restore consistency with the Congressional intent for a streamlined permitting process where there are minimal environmental impacts, and fulfill the Corps stated objective of reducing reliance on individual permits. See id. at 35,188. IV. An Increase in Jurisdiction Would Threaten the Effective Administration of the NWP Program. Broader jurisdiction under the WOTUS Rule would increase the burden on the Corps and permit applicants to develop mitigation plans and would significantly increase the number of annual applicants for NWPs, straining already-limited Corps resources. Project proponents would also face greater uncertainty as to whether aquatic features are jurisdictional and, thus, whether a NWP is available. The confluence of these factors would impede the efficient processing of NWP applications and limit the program s effectiveness, in direct contradiction to Congress s intent in establishing the program. A. Greater Burden on Corps and Applicants to Develop Mitigation Plans 8

Compensatory mitigation can include requirements to offset authorized losses of jurisdictional waters and wetlands so that the net adverse environmental effects are no more than minimal. Id. at 35,188. If the WOTUS Rule is implemented, more areas would be treated as jurisdictional and that would, in turn, mandate more robust mitigation plans. Projects originally designed to avoid jurisdictional features may now find newly designated waters of the United States directly within the path or boundaries of the project. Consistent with the proposed General Condition 23, the district engineer may require compensatory mitigation for losses of jurisdictional waters of the United States to ensure that activities authorized by NWPs result in no more than minimal adverse environmental effects. See id. at 35,210. The potential addition of jurisdictional areas under the WOTUS Rule and the added complexity of the mitigation requirements would encumber the application process. B. Influx of Applications for NWPs and Individual Permits If the WOTUS Rule is implemented, the scope and prevalence of jurisdictional features would increase. Consequently, discharges of dredged or fill material into these newly jurisdictional features would trigger CWA Section 404 requirements, significantly increasing the number of activities seeking authorization through NWPs. Also, some activities that previously qualified for NWPs may no longer be able to meet the acreage thresholds, increasing the need for individual permitting. As the Corps has stated, use of the NWP program is critical to ensuring that the Corps is able to focus its limited resources on more rigorous evaluation of activities that have the potential for causing more severe adverse environmental impacts. Id. at 35,188. Again, this was Congress s motivation for enacting Section 404(e). However, if more areas are jurisdictional and fewer activities qualify for NWP authorization, the Corps resources will be 9

strained with the influx of individual permit applications and it will not be able to authorize activities with minimal environmental impacts in a streamlined, timely manner. The Corps is already struggling to process permits in a timely manner and simply will not be able to handle the notifications, consultations, reviews, assessments and approvals that will result from the greatly expanded scope of CWA jurisdiction under the WOTUS Rule. A lack of Corps resources, additional mitigation requirements, and confusion over whether water is jurisdictional would substantially increase the time and cost it takes to obtain a NWP. Typically, it takes over two years to obtain an individual permit but only ten months to obtain a NWP. 10 Many developers design projects to qualify for a NWP by avoiding impacts to jurisdictional areas. As the Corps notes, NWPs provide incentives to permit applicants to reduce impacts to jurisdictional waters and wetlands to meet the restrictive requirements of the NWPs and receive authorization more quickly than they would through the individual permit process. Id. at 35,188. A prolonged or complex NWP process may dissuade project proponents from this practice. Moreover, an increase in time and cost will make it more difficult for smaller projects to afford to comply with the program. This outcome is counter to the goals of the NWP Program and the CWA. V. WAC Supports Increases in Acreage Limits, PCN Thresholds, and Stream Waiver Provisions but, at a Minimum, the Corps Should Maintain Existing Standards. The Corps seeks comments on changes in acreage and linear foot limits..., PCN thresholds, and the use of other tools for complying with the no more than minimal adverse environmental effects requirement for NWPs. Id. at 35,191. While several WAC members 10 See Rapanos, 547 U.S. at 721 (plurality op.) (citing David Sunding & David Zilberman, The Economics of Environmental Regulation by Licensing: An Assessment of Recent Changes to the Wetland Permitting Process, 42 NAT. RESOURCES J. 59, 74-76 (2002) ( The average applicant for an individual permit spends 788 days and $271,596 in completing the process, and the average applicant for a nationwide permit spends 313 days and $28,915 not counting costs of mitigation or design changes. )). 10

urge the Corps to increase the current standards, at a minimum, the Corps should maintain the existing acreage caps, PCN thresholds, and stream waiver provisions. If the WOTUS Rule is implemented, however, the Corps must assess the need to increase the thresholds due to the potential implications of the WOTUS Rule, discussed above. A. Acreage Limits and PCN Thresholds To qualify for NWPs 12, 14, 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52, the total loss of waters of the United States... cannot exceed ½-acre, id. at 35,191, and for certain NWPs, a PCN may be required where the loss is greater than 1 10-acre. See, e.g., id. at 35,220. The current acreage limits and PCN thresholds were developed and refined over decades of successive public notice and comment to meet the statutory objectives of the NWP program which include providing a streamlined authorization process. The limits and thresholds are appropriate and may even be overly conservative in some areas and are well supported by the record, protective of the environment, and fully meet the minimal effects standard. WAC, therefore, urges the Corps, at a minimum, to retain the acreage caps and thresholds for the NWPs. If the WOTUS Rule goes into effect, however, the Corps must consider increasing these thresholds to avoid an overwhelming influx of individual permit applications and an additional burden for applicants. With more features and areas considered waters of the United States, many more activities will exceed the NWP threshold, and applicants will be forced to rely on individual permits. Individual permits are more costly than NWPs and the application process is considerably longer. 11 Also, a large increase in individual permit applications is likely to overwhelm EPA and Corps staff, further increasing delays. Overall, the increased costs and delays associated with individual permitting could thwart development and maintenance of 11 Supra note 9. 11

critical infrastructure, such as highways, railroads, and utility lines that previously would have relied heavily on NWPs. The Corps should, instead, focus its limited resources on proposed activities that have the potential for substantial adverse environmental impacts, and, thus, an increase in acreage thresholds may be appropriate. B. Stream Waiver Provisions Since 2002, the 300 linear foot limit for losses of stream bed in NWPs 21, 29, 39, 40, 42, 43, 44, 50, 51, and 52, and the 500 linear foot limit for NWP 13, could be waived if the district engineer determined based on the PCN that the proposed activity would not result in more than minimal individual and cumulative environmental adverse effects. In the final 2012 NWPs, a requirement was added whereby waivers of certain NWP limits could be granted only through a written determination by the district engineer. In the latest proposal, the Corps is soliciting comment on whether to make any changes to the numeric limits of the waiver and whether district engineers should retain the authority to issue activity specific waivers of certain NWP limits. See id. at 35,191-92. WAC supports the current case-by-case authority provided to district engineers to issue activity-specific waivers. It is important that district engineers maintain the authority to issue waivers, and WAC opposes any changes that restrict or narrow this authority. Sustaining the current waiver descriptions will give district engineers the flexibility to grant waivers where they are appropriate and reasonable. Removing this authority would require activities that exceed certain numeric levels to obtain individual permits even though they have minimal adverse environmental effects. Furthermore, WAC opposes any linear foot cap because it would limit district engineers ability to analyze the specific environmental conditions, reducing flexibility within the program. Also, there is no evidence that a linear foot limit would provide any further 12

assurances that these NWPs only authorize activities with no more than minimal adverse environmental effects. The current provisions, providing the district engineer with case-by-case discretion, reflect Corps experience and better accomplish the statutory standards and objectives of the program. Finally, a linear foot cap, coupled with expanded CWA jurisdiction under the WOTUS Rule if implemented, could severely limit the availability of NWPs. If the WOTUS Rule is implemented, the broader definition of waters of the United States would mean that larger numbers of disperse features would be potentially impacted, even though actual environmental impacts would be no greater than without implementation of the Rule. For example, newly jurisdictional features such as ditches, isolated wetlands, dry washes and drainages may be impossible to avoid, and an arbitrarily low linear foot cap could unduly restrict the availability of NWPs. Given the marginal nature of most of these features, it is appropriate to give the district engineer flexibility to grant waivers where they are appropriate and reasonable. Moreover, if the WOTUS Rule is implemented, the criteria should be expanded to allow district engineers the flexibility to grant waivers under additional circumstances where there are minimal adverse environmental effects. VI. Conclusion In sum, the Coalition believes that the Corps failed to adequately analyze a critical component of the NWP program the scope of waters of the United States subject to the Corps jurisdiction. Due to the pending litigation and nationwide stay of the WOTUS Rule, the Corps should clarify that the WOTUS Rule s terms, definitions, and key concepts will not apply to the reissued NWPs, and should remove citations to stayed regulations. If the WOTUS Rule is implemented, WAC believes it will have significant implications for the NWP program, and the 13

Corps will need to revise the NWPs to maintain the streamlined process envisioned by Congress. Even with the Rule stayed, several WAC members believe that the Corps should increase the current acreage limits, but, at a minimum, the Corps should maintain current acreage limits, PCN thresholds, and stream waiver provisions. This will ensure that the NWP program provides expedited permitting to activities with minimal adverse environmental effects, as Congress intended. 14

ATTACHMENT A Agricultural Retailers Association American Exploration & Mining Association American Farm Bureau Federation American Gas Association American Petroleum Institute American Public Power Association American Road & Transportation Builders Association American Society of Golf Course Architects Associated Builders and Contractors, Inc. Associated General Contractors of America Association of American Railroads Association of Equipment Manufacturers Association of Oil Pipe Lines Club Managers Association of America Corn Refiners Association CropLife America Edison Electric Institute Fertilizer Institute Florida Sugar Cane League Foundation for Environmental and Economic Progress Golf Course Builders Association of America Golf Course Superintendents Association of America Independent Petroleum Association of America Industrial Minerals Association North America International Council of Shopping Centers International Liquid Terminals Association Irrigation Association National Association of Home Builders National Association of Manufacturers National Association of REALTORS National Association of State Departments of Agriculture National Cattlemen s Beef Association National Corn Growers Association National Cotton Council National Council of Farmer Cooperatives National Industrial Sand Association National Mining Association National Multifamily Housing Council National Oilseed Processors Association National Pork Producers Council National Rural Electric Cooperative Association National Stone, Sand, and Gravel Association Public Lands Council Southeastern Lumber Manufacturers Association Southern Crop Production Association Texas Wildlife Association Treated Wood Council, Inc. United Egg Producers U.S. Chamber of Commerce 15